TEXAS DEPARTMENT OF TRANSPORTATION SUMMER • 2015
“Work with others to provide safe and reliable transportation solutions for Texas.”
DA L L A S D I S T R I C T
0346_112114
THE SOUTHERN GATEWAY PROJECT
NEED AND PURPOSE Interstate 35E/US 67 carry about 180,000 vehicles per day just south of downtown Dallas on pavement that was first constructed in the 1950s. The proposed Southern Gateway project would rebuild the aging highway from Colorado Boulevard to the I-35E/US 67 split and address the aging pavement, capacity needs and safety improvements of one of Dallas’ major urban arteries. The proposed project would add managed lane and some general purpose lane capacity and smooth out the sharp Zang Blvd. curve. The existing Zang curve is 5 degrees and the proposed curve is 3 degrees to upgrade the deficient geometry. The project would also substantially reduce the ongoing maintenance demands for TxDOT on one of the primary North American Free Trade Agreement (NAFTA) corridors.
The Southern Gateway Project (TSG) was approved during the 83rd Legislature as a possible Public Private Partnership (PPP) project. The potential impacts of the project, hereby referred to as “TSG Managed Lanes Project” would be addressed in an environmental assessment (EA) and would include a section of I-35E within the Dallas Horseshoe (HS) Project. In the future, two separate EAs would be prepared to complete the ultimate TSG configuration, one for the I-35E section south of US 67 and another for the US 67 section.
The TSG ultimate project was previously cleared environmentally as a facility that included HOV lanes. However, in place of the existing and proposed HOV lanes, 1-2 reversible tolled managed lanes would be implemented, which would allow for dynamic tolling of both HOV and single occupancy vehicles.
PROJECT SEGMENTSI-35E | COLORADO BLVD. TO REUNION BLVD. – Change 2 existing reversible HOV lanes to 2 reversible tolled managed lanes.
I-35E | COLORADO BLVD. TO I-35E/US 67 SPLIT – Full reconstr. to ultimate config. including change of 1 existing reversible HOV lane to 2 reversible tolled managed lanes and widening of mainlanes in select locations from 8 to 10 lanes and non continuous frontage road from the split to Beckley/12th.
I-35E | I-35E/US 67 SPLIT TO I-20 – Construction of 1 reversible tolled managed lane within the median.
US 67 | I-20 TO I-35E/US 67 SPLIT – Reconstruction to change existing 1 concurrent HOV lane to 2 reversible tolled managed lanes within the median.
US 67 | FM 1382 TO I-20
– Construction of 1 reversible tolled managed lane within the median.
– Total Length of TSG Managed Lanes Project: Approximately 20 miles
– Preliminary Total Proj. Cost (2014 Dollars): $470 M
– Anticipated FONSI Environmental Clearance: Summer 2016
NEXT STEPS1. Additional public meetings on June 23 & 25,
2015 and July 7 & 9, 2015
2. Evaluate and consider inputs from local cities and communities
3. Update project scopes and funding strategies
4. Update and refine current EA and schematic design
EXISTING HOVCONCURRENT FLOW HOV LANE (US 67)
• Paint Buffer Separation• 24 – hour operation• 2.5 centerline miles inside service area – Dallas
REVERSIBLE FLOW HOV LANE (I-35E)• Barrier Separation• 12 – hour operation
– NB 6 hours (AM) – SB 6 hours (PM)
• 6.3 centerline miles outside service area – Dallas
PROGRAMMING STATUS• MTP (2035 Metropolitan Transportation Plan, 2014 Amendment): YES
• UTP (2015 Unified Transportation Program): NO
• STIP (Statewide Transportation Implementation Program): NO (Last Approved), but YES (Current Pending Revision 2015-2018)
FUTURE TSG ULTIMATE RECONSTRUCTION PROJECTS (2035)
US 67 from FM 1382 to I-20
TSG US 67 ULTIMATE RECONSTRUCTION (2035):
I-35E from Danieldale Rd. to I-35E/US 67 split
TSG I-35E SOUTH ULTIMATE RECONSTRUCTION PROJECT (2035):
• Full reconstr. to ultimate config. /widening mainlanes from 4 to 6 lanes and frontage rds. from 4 to 4/6 lanes
US 67 from I-20 to I-35E/US 67 split
• Full reconstr. to ultimate config./widening mainlanes from 4 to 6 lanes and frontage rds. from 4 to 4/8 lanes
• Total Length of US 67 Ultimate Reconstruction Project: Approximately 10.5 miles
• Anticipated FONSI Environmental Clearance: Fall 2016
• Full reconstruction to ultimate configuration (config.) including widening of frontage roads from 4 to 4/6 lanes
• Total Length of I-35E South Ultimate Reconstruction Project: Approximately 5.5 miles
• Anticipated FONSI Environmental Clearance: Fall 2016
TxDOT graphicNOTES: Highlighted areas are not drawn to scale. Dates are subject to change.
CONTACT INFORMATION
Michelle RaglonPublic Information Officer(214) [email protected]
John Nguyen, P.E.TxDOT Project Manager(214) [email protected]
Tony HartzelPublic Information Supervisor(214) [email protected]
Dallas District Office4777 E. Highway 80Mesquite, TX 75150
Cockrell Hill
Duncanville
DeSoto
Cedar Hill
Cedar HillState Park
Dallas ExecutiveAirport
Trinity River Greenbelt
Joe PoolLake
Mountain CreekLake
Mountain Creek LakePark
DALLAS
S Belt Line Rd.
E Belt Line Rd.
1382
1382
1382
77
67
20
20
20
35E
35E
30
FairPark
12
12303
408
12
45
45
30
342
342
310
175
E Ledbetter Dr.
W Ledbetter Dr.
Danieldale Rd.
Pleasant Run Rd.
Wintergreen Rd.
77
35E
67
35E
67
N
2 miles
Colorado Blvd.
Completed Project (est. 2019-2020)
TSG I-35E South Ultimate (2035)
TSG US 67 Ultimate (2035)
Full Ultimate Reconstruction (2035)
500 feet
S Zang Blvd.
S Beckley Ave.
Rockwood St.
W 12th St.
35E
N
COCKRELL HILL
DUNCANVILLE
DESOTOCEDAR
HILL
Dallas ExecutiveAirport
Joe PoolLake
Mountain CreekLake
Mountain Creek LakePark
S Belt Line Rd.
1382
1382
1382
77
2020
20
35E
TxDOT graphicNOTE: Highlighted areas not drawn to scale.
FairPark
12
12303
40812
45
3030
30
342
342
175
E Ledbetter Dr.
W Ledbetter Dr.
35E
67
E Belt Line Rd.
Danieldale Rd.
Pleasant Run Rd.
Wintergreen Rd.
Colorado Blvd.
W 12th St.
77
35E
2 miles
DALLAS
N
67
67
Managed Lanes Improvements
Future Reconstruction
Full Reconstruction w/Managed Lanes
Old Centerline (design speed: 50 MPH)
New Project Area
New Centerline (design speed: 60/70 MPH)
ESTIMATED PROJECT COSTS: PHASE IManaged Lanes $470 million
PRELIMINARY FUNDING SOURCES
Phase I $470 M
Ultimate (TBD) $2.0 B
TxDOT graphicsSOURCE: Texas Department of Transportation. NOTE: Dates subject to change.
• Build 5-2R-5 from Marsalis Avenue to Colorado and 4-2R-4 from the split to Marsalis with the 5th lane to be added on the outside GP shoulder in the future
• Add 2 reversible lanes to existing 67 facility from Camp Wisdom Road to 35E/67 split
• Add 1 reversible lane to existing 67 facility from N of FM 1382 to Camp Wisdom Rd.
ESTIMATED PROJECT COSTS: ULTIMATE
Design, Construction, ROW, Utilities and Tolling/ITS
$2.0 B
Public meetingsJune 23 & 25, 2015; July 7 & 9, 2015
FHWA schematic approval Spring 2016
Public hearing Spring 2016
FHWA environmental clearance Summer 2016
TSG MANAGED LANES TIMELINE
TEXAS DEPARTMENT OF TRANSPORTATION SUMMER • 2015
“Work with others to provide safe and reliable transportation solutions for Texas.”
DA L L A S D I S T R I C T
0346_112114
THE SOUTHERN GATEWAY PROJECT
TxDOT graphicNOTE: Illustrations depict examples of lane design only. Not to scale.*Varies 4 lanes from the split to Marsalis.**Varies – Frontage roads are not continuous from the split to Beckley/12th Street.
DRAFT PROPOSED SECTIONS
PHASE I CONFIGURATIONPHASE I CONFIGURATIONPHASE I CONFIGURATIONPHASE I CONFIGURATION
EXISTINGEXISTINGEXISTINGEXISTING
US 67: I-20 TO I-35E US 67: FM 1382 TO I-20 I-35E: US 67 TO COLORADO BLVD.I-35E: I-20 TO US 67
General Purpose Lanes
HOV Lanes
General Purpose Lanes
HOVLanes
General Purpose Lanes
General Purpose Lanes
FrontageRoads
FrontageRoads
General Purpose Lanes
General Purpose Lanes
FrontageRoads
FrontageRoads
General Purpose Lanes
General Purpose Lanes
FrontageRoads
FrontageRoads
General Purpose Lanes*
General Purpose Lanes
ManagedLanes
FrontageRoads**
FrontageRoads
General Purpose Lanes
General Purpose Lanes
ManagedLanes
FrontageRoads
FrontageRoads
General Purpose Lanes
General Purpose Lanes
ManagedLanes
FrontageRoads
FrontageRoads
General Purpose Lanes
General Purpose Lanes
ManagedLanes
FrontageRoads
FrontageRoads
67
67
20
20
20
45
3030
342
342
161
161
1382
1382
408
303
1382
12
12 12
MountainCreekLake Dallas
ExecutiveAirport
Trinity RiverGreenbelt
Joe PoolLake
IrvingLake Fair
Park
DeSotoLancaster
Duncanville
Cedar Hill
Oak Cli� CedarCrest
DALLAS CO.
ELLIS CO.
Dallas
175
N
2 miles
67
6720
20
20
45
3030
342
342
161
161
1382
1382
408
303
1382
12
12 12
MountainCreekLake Dallas
ExecutiveAirport
Trinity RiverGreenbelt
Joe PoolLake
IrvingLake Fair
Park
DeSotoLancaster
Duncanville
Cedar Hill
Oak Cli� CedarCrest
DALLAS CO.
ELLIS CO.
Dallas
175
N
2 miles
67
67
67
20
20
20
45
3030
342
342
161
161
1382
1382
408
303
1382
12
12 12
MountainCreekLake Dallas
ExecutiveAirport
Trinity RiverGreenbelt
Joe PoolLake
IrvingLake Fair
Park
DeSotoLancaster
Duncanville
Cedar Hill
Oak Cli� CedarCrest
DALLAS CO.
ELLIS CO.
Dallas
175
N
2 miles
67
67
67
20
20
20
45
3030
342
342
161
161
1382
1382
408
303
1382
12
12 12
MountainCreekLake Dallas
ExecutiveAirport
Trinity RiverGreenbelt
Joe PoolLake
IrvingLake Fair
Park
DeSotoLancaster
Duncanville
Cedar Hill
Oak Cli�
Davis St. Davis St. Davis St.
CedarCrest
DALLAS CO.
ELLIS CO.
Dallas
175
N
2 miles
77
77
35E
35E 35E 35E 35E
35E
77
35E
77
35E
77
35E
77
35E
77
35E
77
35E
67
67
7575 75 75IrvingIrvingIrvingIrving 35E35E 35E 35E