    Dale LindbergVice President & Director

    Power Generation Services- Asia

    Dale has spent his entire 40 year career with B&V.

    Currently he resides in B&Vs Beijing office

    overseeing our Services business in Asia. Dale has

    been working in Asia for 30 years. Over the past 4

    years he has had extensive experience with the

    China Export Model. Office Location

    Beijing, Peoples Republic

    of China

    Education

    B.Sc. Civil Engineering

  • 8/11/2019 Dale Lindberg_China Export Model

    2/23

    VICEPRESIDENTANDDIRECTORPOWERGENERATIONSERVICES ASIADALELINDBERG

    CHINAEXPORTMODELCHALLENGES/SOLUTIONS

    25Nove

    mber2013

  • 8/11/2019 Dale Lindberg_China Export Model

    3/23

    ChineseEPC contractorshaveinconsistentrecordsfor

    thedelivery

    of

    projects

    outside

    of

    China

    TypicalprojectdeliveryinsideChinaisnotEPC model Ownersprojectteamimplementstheproject

    management Ownersheadquarterandprojectteamjointly

    procure

    individual

    equipment

    with

    the

    assistance

    fromthedesigninstitutewhodesignsthepowerplant

    Afewlocalcivilanderectioncompaniesarehired Aprofessionalcommissioninginstitutedoesthe

    startup,commissioningandperformancetesting

    Historically,China

    export

    projects

    have

    been

    governmenttogovernmenttypeprojects.NowincludingIPPs

    ThecultureandpracticeofprojectexecutioninsideChinaisdifferentthanoutsideofChina

    BACKGROUNDOF

    CHINA

    EXPORTPROJECTS

    25November2013BVI|

    2

  • 8/11/2019 Dale Lindberg_China Export Model

    4/23

    Aggressivepricing

    FinancingsupportfromChinaEXIMBANK,SINOSURE andChinesegovernment(exportfinancing)

    Promiseaggressiveprojectschedules

    Todatenotdelivered

    WillingtobringChineseconstructionlabortosite

    Less

    sensitive

    to

    commercial

    terms Aggressivesales/marketing

    WillingnesstotakeOwnershiprole

    COMPETITIVENESSOF

    CHINESE

    EPCCONTRACTORSOUTSIDEOFCHINA

    25November2013BVI|

    3

  • 8/11/2019 Dale Lindberg_China Export Model

    5/23

    Inconsistentinternationallevelofquality

    Conformitywith

    owners

    contract

    versus

    China

    standardpractices

    Projectmanagementexperienceandhumanresourcesforoverseasprojects

    Projectcontrols cost,scheduleandrisk

    managementprocedures

    (lacking

    CPM

    planning)

    Actualimplementationofinternationalandlocalcodesandstandards

    Managinginterfaceswithlocalconstruction

    contractorsand

    local

    authorities

    EnglishCommunicationskills amajorhurdle

    Safety,Health,Environmentperformance

    EntryandworkpermitsforChineselabors

    CHALLENGESFOR

    CHINESE

    EPC

    CONTRACTORSOUTSIDEOFCHINA

    25November2013BVI|

    4

  • 8/11/2019 Dale Lindberg_China Export Model

    6/23

    BLACK&VEATCH

    SOLUTIONFOR

    CHINAEXPORT

    5

  • 8/11/2019 Dale Lindberg_China Export Model

    7/23

    AsOwnersEngineer,supporttheowner

    withmanagement

    of

    the

    Chinese

    EPC

    OwnersEngineershouldhavesignificantexperienceandresourcesinChinaandshouldbegiventheauthority

    to

    manage AsEP/EPC ContractortoprocureChinese

    equipmentandmanageChinesepartnersandvendors

    Black&Veatchbringsleadershipforoverall

    project

    management,

    quality

    control,technicalcoordinationandinterfaceswiththeclientandlocalconstructioncontractors

    WEHAVE

    USED

    TWO

    APPROACHES

    TO

    ASSIST

    OWNERSADDRESSTHECHALLENGESOFUSINGCHINESECONTRACTORSANDEQUIPMENT

    25November2013BVI|

    6

  • 8/11/2019 Dale Lindberg_China Export Model

    8/23

    BLACK&

    VEATCH

    CHINA

    EXPORT

    PROJECTS

    Project Client Location Capacity(MW) Scope ServicePeriod

    Banten Genting Indonesia 660 MW, Coal FullOE 2012 ongoing

    Salalah IWPP Sembcorp OmanCombined Cycle430MW/15MIGD

    PartialOE 20082012

    Rabigh IPPProject

    ACWC Saudi

    Arabia 2x660,

    Oil Full

    OE 02/2009

    03/31/2013

    Tiroda ThermalPower

    Adani PowerMaharashtra

    PrivateLtdIndia

    3x660,PC,Supercritical

    Limitedscope 04/2009

    ongoing

    Tanjung Jati B Sumitomo Indonesia 2X660MW

    EP 20092012

    PTBABanjasari PT

    Bukit

    Asam Indonesia Banjasari 2x100MW

    OE 07/2007

    on

    going

    BarcarenaPowerPlant

    Vale(CVRD) Brazil 2x300,PC,60HZ Fullscope 1/2008

    ongoing

    PLN10KProgram PLN Java,Indonesia

    Suralaya 1x600PC,Paiton 1x660PC,

    Rembang 2x300PC,Ad ipala

    Limitedscope 11/2007 2014

    OyuTolgoiPowerPlant

    Ivanhoe Mongolia 3x150,CFB Fullscope 04/2007 pending

    MonteEsperanzaPowerPlant

    Globeleq Panama 2x135,CFB,60HZ OE 3/2007

    onhold

    Cilacap S2P Java,Indonesia 2x300,PC Limitedscope 06/2004 12/2006

    25November2013BVI|

    7

  • 8/11/2019 Dale Lindberg_China Export Model

    9/23

  • 8/11/2019 Dale Lindberg_China Export Model

    10/23

    ManyoverseasprojectsrequireU.S./InternationalCodesandStandards

    ChineseDIs

    /Contractors

    have

    limited

    or

    no

    capability

    to

    designtointernationalstandards

    Limitedcapabilityin:

    Heatbalancesandperformancecalculations

    Dynamicfoundationdesign

    NFPA

    Noiseplanning/modeling

    Difficultcoordinating

    with

    vendors

    and

    other

    contractors

    EffectivedrawingcontrolandmanagementsystemsarenotusedbyDIs

    ENGINEERINGOBSERVATIONS

    25November2013BVI|

    9

  • 8/11/2019 Dale Lindberg_China Export Model

    11/23

    MustensurethatContractorunderstands

    localmandatory

    requirements

    Fire/explosionprotection,environmental,health,safety

    Expectthattheprojectwillbedesigned

    primarilyto

    GB

    (China

    National

    Standards)

    Significantcostbenefitsandshorterdeliveryperiodsforequipment

    RequireInternationalStandardsonlywherecritical

    AmericanASME,ANSIandInternationalISO,IEE,IEEC

    MaterialApplicationGuide

    CODES&STANDARDS

    25November2013BVI|

    10

  • 8/11/2019 Dale Lindberg_China Export Model

    12/23

    Kickoffmeeting(reviewofreqm andalignment)

    Agreeonbasicdesignfirst

    Reviewcriticaldrawings

    Design

    liaison

    meetingsLimitdrawingreviewcycles

    UseBeijingofficedesignreviewteam

    Weeklycoordination

    Actionitemlists

    ENGINEERINGSOLUTIONS

    25November2013BVI|

    11

  • 8/11/2019 Dale Lindberg_China Export Model

    13/23

    DonotuseCPM planning

    Donotuseprogressmodel

    Littleinterface/coordinationamongEPC

    Do

    not

    plan

    for

    floatDonotuseLNTP

    Missschedules

    PROJECTCONTROLS

    OBSERVATIONS

    25November2013BVI|

    12

  • 8/11/2019 Dale Lindberg_China Export Model

    14/23

    Black&VeatchguideEPC indevelopmentofCPM plan

    Black&VeatchguideEPC indevelopmentofprogressmodel

    DonepriortoNTP

    Black&VeatchinstructEPC onCPM analysis

    Black&VeatchmonitorEPC monthlyprogressreportandschedulestatus

    Quicklyelevate

    critical

    deviations

    Review/discussscheduleinmonthlyprojectmeetings

    PROJECTCONTROL

    SOLUTIONS

    25November2013BVI|

    13

  • 8/11/2019 Dale Lindberg_China Export Model

    15/23

    Ensurequalified,toptierChinesevendorsareincludedinthe

    EPC Contract

    Qualitycontroliscritical significanttimeneedstobespentinvendorshopstoverifyproperproceduresare

    followedEPC ContractRequirementsareoftennotfloweddownto

    vendors

    Obtainingtimelydesigninformationcanbedifficultinfluences

    overall

    design

    schedule

    Technicaladvisorcapabilityislimited

    PROCUREMENTOBSERVATIONS

    25November2013BVI|

    14

  • 8/11/2019 Dale Lindberg_China Export Model

    16/23

    EnsureprequalifiedvendorsinEPC contract

    Black&Veatchhasdoneduediligenceon400Chinesevendorsandprequalfied 180

    Procurement/QCkickoffmeeting

    LTP planBlack&Veatchinspection

    Surveillancereports

    Resolveissuestimelyinshop

    Deviationmanagement

    Expediting

    PROCUREMENTSOLUTIONS

    25November2013BVI|

    15

  • 8/11/2019 Dale Lindberg_China Export Model

    17/23

    Constructionactivitiesaregenerallynot

    plannedin

    detail

    Difficultiesincoordinatingwithlocalsubcontractors

    Coordinationbetweenconstructionand

    commissioningneeds

    improvement

    Chineseconstructioncontractorsareaccustomedtofielddesignchangesproblemscanoccurwithforeigncontractors

    notused

    to

    this

    approach

    Safetyisnotafocus

    Reportingislimited

    CONSTRUCTIONOBSERVATIONS

    25November2013BVI|

    16

  • 8/11/2019 Dale Lindberg_China Export Model

    18/23

    QualifiedSiteManager

    QualifiedSiteManager

    DisciplineSiteEngineers

    DisciplineSiteEngineers

    ProjectControlsProject

    Controls QCManagerQCManager

    SpecialtyEngineering

    Support

    SpecialtyEngineering

    Support

    WeeklyCoordination

    Meetings

    WeeklyCoordination

    Meetings

    ActionItemLists

    ActionItemLists

    ClaimsManagement

    ClaimsManagement

    CONSTRUCTIONOVERSIGHT

    25November2013BVI|

    17

  • 8/11/2019 Dale Lindberg_China Export Model

    19/23

    Donebysubcontractors

    Commissioningprocessisnotintegratedintotheoverallprojectplan

    Astructuredprocessisnotfollowed

    Notenough

    time

    is

    typically

    allotted

    for

    commissioning

    Constructiondoesmanyequipmentcommissioningtasksthatwouldnormallybedonebythecommissioningteam

    Hydrotesting

    of

    critical

    pipe

    not

    done

    Steamblowcompletedonacceleratedbasis(3days)

    STARTUP/COMMISSIONING

    OBSERVATIONS

    25November2013BVI|

    18

  • 8/11/2019 Dale Lindberg_China Export Model

    20/23

    QualifiedCommissioningManager

    Disciplinestartupengineers

    Startuppackages

    Startup

    scheduleFireprotectionandDCS protectioninplacepriorto

    hotcommissioning

    STARTUP/COMMISSIONING

    OVERSIGHT

    25November2013BVI|

    19

  • 8/11/2019 Dale Lindberg_China Export Model

    21/23

    Needperformancetestplan

    Agreementoncalculatedresults(correctionmethods)

    Black&Veatchwitnessand

    performancereport

    review

    PERFORMANCETESTING

    25November2013BVI|

    20

  • 8/11/2019 Dale Lindberg_China Export Model

    22/23

    Q&A