dakar 17,18 novembre 2003 egnos: institutional aspects

6
Dakar 17,18 Novembre 2003 EGNOS: Institutional aspects

Upload: irea-lindsey

Post on 27-Mar-2015

218 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Dakar 17,18 Novembre 2003 EGNOS: Institutional aspects

Dakar 17,18 Novembre 2003

EGNOS: Institutional aspects

Page 2: Dakar 17,18 Novembre 2003 EGNOS: Institutional aspects

EGNOS contributors & investors

(ESA, EC, ATSP…)

System Development

ESA

EGNOSSignal and Data Provider

European ATS Providers

European airspace users

Certification

Industry

Sub system (MCC, RIMS,..) Operations & maintenance

EGNOS framework for Europe

Select

Control

Sub contract

Service &ATC interface

CNS/ATM Service

Pay

Safety Case

Pay

Page 3: Dakar 17,18 Novembre 2003 EGNOS: Institutional aspects

System Development

ESA

EGNOS and ISASignal and Data Provider

( European & Africanshare holders)

European & African ATS Providers

European & African airspace users

Certification

Industry

Sub system (MCC, RIMS,..) including new sites in Africa Operations & maintenance.

Potential EGNOS & ISA framework (Europe & Africa): option 1

EGNOS & ISAcontributors & investors

European African

Control

Select

Service &ATC interface Pay

PayCNS/ATM Service

Page 4: Dakar 17,18 Novembre 2003 EGNOS: Institutional aspects

System Development

ESA

EuropeanATS Providers

European airspace users

Industry

Potential EGNOS & ISA framework (Europe & Africa): option2

ISA provider :operations & maintenance

for African sites

African ATS Providers

African airspace users

Agreement

EGNOS & ISAcontributors & investors

European African

Certification Certification

Control

Select

Pay

PayCNS/ATM Service

Service &ATC interface

EGNOS Signal and Data Provider

Pay

Pay

Service &ATC interface

CNS/ATM Service

Page 5: Dakar 17,18 Novembre 2003 EGNOS: Institutional aspects

Certification: a 2 steps approach

System Safety Case

ATS Service ProvidersCoordination for ECAC: Eurocontrol

National Certification Authorities

Approval

Approval

Prepare

Design, development, technical verification, operations & maintenance.

ATS Safety CasesGuidance material

Prepared by Eurocontrol

Page 6: Dakar 17,18 Novembre 2003 EGNOS: Institutional aspects

Service Provision scheme and charging mechanisms.

OBJECTIVE: Implementation of the Service Level Agreements and the charging mechanism between ESDP, ECAC ATS Providers and final users

ESDPEuropean

ATS ProvidersAirspace Users

SLA

€€ (e.g.via Eurocontrol CRCO)

CNS/ATM service ( including EGNOS)