    PMEXAM Daily Crossword

    Created and distributed by http://www.pmexam.com

    2. The time in calendar units between the actual start date of the schedule activityand either the data date of the project schedule if the schedule activity is inprogress or the actual finish date if the schedule activity is complete.

    4. Multiple attributes associated with each schedule activity that can be includedwithin the activity list.

    8. The time in calendar units between the start and finish of a schedule activity.9. A change request that has been processed through the integrated change

    control process and approved.11. The point in time that work actually ended on a schedule activity.12. The graphic presentation of a schedule activity in the arrow diagramming

    method.16. The process of identifying and documenting dependencies among schedule

    activities.17. Total costs actually incurred and recorded in accomplishing work performedduring a given time period for a schedule activity or work breakdown structurecomponent.

    18. A documented tabulation of schedule activities that shows the activitydescription, activity identifier, and a sufficiently detailed scope of workdescription so project team members understand what work is to be performed.

    19. The act of formally receiving or acknowledging something and regarding it asbeing true, sound, suitable, or complete.

    20. The process of estimating the types and quantities of resources required toperform each schedule activity.

    21. An estimating technique that uses the values of parameters and measures ofscale such from a previous, similar activity as the basis for estimating the sameparameter or measure for a future activity.

    1. The process of identifying the specific schedule activities that need to beperformed to produce the various project deliverables.

    2. A component of work performed during the course of a project.3. Effort applied to project work that is not readily divisible into discrete efforts for

    that work, but which is related in direct proportion to measurable discrete workefforts.

    5. A schedule network diagramming technique in which schedule activities arerepresented by arrows.

    6. Those criteria, including performance requirements and essential conditions,which must be met before project deliverables are accepted.

    7. A technique that explores the accuracy of assumptions and identifies risks tothe project from inaccuracy, inconsistency, or incompleteness of assumptions.

    9. The process of estimating the number of work periods that will be needed tocomplete individual schedule activities.10. A category of projects that have common components significant in such

    projects, but are not needed or present in all projects.11. A short unique numeric or text identification assigned to each schedule activity

    to differentiate that project activity from other activities.12. Factors for planning purposes, are considered to be true, real, or certain withou

    proof or demonstration.13. A short phrase or label for each schedule activity used in conjunction with an

    activity identifier to differentiate that project schedule activity from otherschedule activities.

    14. The process of obtaining the human resources needed to complete the project.15. The point in time that work actually started on a schedule activity.17. The right to apply project resources, expend funds, make decisions, or give

    approvals.18. One or more numerical or text values that identify characteristics of the work or

    in some way categorize the schedule activity that allows filtering and ordering ofactivities within reports.

    21. The act of formally confirming, sanctioning, ratifying, or agreeing to something.

    Acr oss Down

    A

    C

    T

    I

    V

    I

    T

    Y

    D

    U

    R

    A

    T

    I

    O

    N

    E

    S

    T

    I

    M

    A

    T

    I

    N

    G

    1 2 3

    4

    5 6 7

    8 9 10

    11

    12 13

    14 15

    16

    17

    18

    19

    20

    21

  • 8/13/2019 Daily Puzzles July 1

    2/4

  • 8/13/2019 Daily Puzzles July 1

    3/4

  • 8/13/2019 Daily Puzzles July 1

    4/4