daftar pustaka - digilib.itb.ac.id = 7835,52 kn no. elemen ... 1 0.184 10927.91 2 0.247 14188.92 ......
TRANSCRIPT
xiv
DAFTAR PUSTAKA
ATC, 1996, Seismic Evaluation and Retrofit of Concrete Buildings, ATC-40 Report, Applied Technology Council, Redwood City.
Budiono, Bambang, 2007, Catatan Kuliah Dinamika Struktur dan Pengantar Rekayasa
Gempa.
CSI, 2005, CSI Analysis Reference Manual, Computer and Structures, Inc., Berkeley CSI, 2005, ETABS Integrated Building Design Software User’s Guide, Computer and
Structures, Inc., Berkeley . Departemen Pekerjaan Umum, 1987, Pedoman Perencanaan Pembebanan untuk Rumah dan
Gedung, SKBI-1.3.53.1987, Yayasan Badan Penerbit PU, Jakarta. International Conference of Building Officials, 1997, Uniform Building Code, International
Conference of Building Officials, Whittier. Park, R., and T. Paulay, 1974, Reinforced Concrete Structures, John Wiley and Sons, New
York. Paz, Mario, 1987, Dinamika Struktur, Penerbit Erlangga, Jakarta. Setio, Herlien D., 2007, Catatan Kuliah Dinamika Struktur dan Pengantar Rekayasa Gempa,
Penerbit ITB, Bandung.
L-1
LAMPIRAN A
MODEL STRUKTUR
Denah lantai model struktur shearwall
Denah lantai model struktur tube
L-2
Tampak samping rangka eksterior dan interior model struktur shearwall 10 lantai
Tampak samping rangka eksterior dan interior model struktur tube 10 lantai
Tampak samping rangka eksterior dan interior model struktur shearwall 15 lantai
L-3
Tampak samping rangka eksterior dan interior model struktur tube 15 lantai
Tampak samping rangka eksterior dan interior model struktur shearwall 20 lantai
L-5
LAMPIRAN B
PERHITUNGAN Vb
Perhitungan Vb sistem struktur shearwall 10 lantai
Cv : 0,7T bangunan : 1,1724 detik
volume/ berat berat total tebal b h t atau p lantai (kN) (x jmlh lantai)
1 balok utama - 0,3 0,6 6 64,8 1555,2 155522 balok anak - 0,2 0,35 6 25,2 604,8 60483 pelat 0,15 30 30 - 135 3240 324004 kolom 5 - 0,55 0,55 3,6 30,492 731,808 3659,045 kolom 10 - 0,45 0,45 3,6 20,412 489,888 2449,446 shearwall 0,2 6 3,6 - 17,28 414,72 4147,27 boundary element - 0,85 0,2 3,6 4,896 117,504 1175,04
berat total 65430,72
R = 5,5Vb = 7102,99 kN
No. ElemenUkuran (m)
Perhitungan Vb sistem struktur tube 10 lantai
Cv : 0,7T bangunan : 1,1724 detik
volume/ berat berat total tebal b h t atau p lantai (kN) (x jmlh lantai)
1 balok utama - 0,3 0,6 6 64,8 1555,2 155522 balok anak - 0,2 0,35 6 25,2 604,8 60483 pelat 0,15 30 30 - 135 3240 324004 kolom dalam 5 - 0,55 0,55 3,6 17,424 418,176 2090,885 kolom dalam 10 - 0,45 0,45 3,6 11,664 279,936 1399,686 kolom luar 5 - 0,7 0,7 3,6 70,56 1693,44 8467,27 kolom luar 10 - 0,6 0,6 3,6 51,84 1244,16 6220,8
berat total 72178,56
R = 5,5Vb = 7835,52 kN
No. ElemenUkuran (m)
Perhitungan Vb sistem struktur shearwall 15 lantai
Cv : 0,7T bangunan : 1,6887 detik
volume/ berat berat total tebal b h t atau p lantai (kN) (x jmlh lantai)
1 balok utama - 0,35 0,65 6 81,9 1965,6 294842 balok anak - 0,2 0,4 6 28,8 691,2 103683 pelat 0,15 30 30 - 135 3240 486004 kolom 5 - 0,7 0,7 3,6 49,392 1185,408 5927,045 kolom 10 - 0,55 0,55 3,6 30,492 731,808 3659,046 kolom 15 - 0,45 0,45 3,6 20,412 489,888 2449,447 shearwall 0,2 6 3,6 - 17,28 414,72 6220,88 boundary element - 0,85 0,2 3,6 4,896 117,504 1762,56
berat total 108470,88
R = 5,5Vb = 8175,16 kN
No. ElemenUkuran (m)
L-6
Perhitungan Vb sistem struktur tube 15 lantai
Cv : 0,7T bangunan : 1,6887 detik
volume/ berat berat total tebal b h t atau p lantai (kN) (x jmlh lantai)
1 balok utama - 0,35 0,65 6 81,9 1965,6 294842 balok anak - 0,2 0,4 6 28,8 691,2 103683 pelat 0,15 30 30 - 135 3240 486004 kolom dalam 5 - 0,65 0,65 3,6 24,336 584,064 2920,325 kolom dalam 10 - 0,55 0,55 3,6 17,424 418,176 2090,886 kolom dalam 15 - 0,4 0,4 3,6 9,216 221,184 1105,927 kolom luar 5 - 0,75 0,75 3,6 81 1944 97208 kolom luar 10 - 0,6 0,6 3,6 51,84 1244,16 6220,89 kolom luar 15 - 0,45 0,45 3,6 29,16 699,84 3499,2
berat total 114009,12
R = 5,5Vb = 8592,56 kN
No. ElemenUkuran (m)
Perhitungan Vb sistem struktur shearwall 20 lantai
Cv : 0,7T bangunan : 2,1877 detik
volume/ berat berat total tebal b h t atau p lantai (kN) (x jmlh lantai)
1 balok utama - 0,4 0,75 6 108 2592 518402 balok anak - 0,25 0,45 6 40,5 972 194403 pelat 0,15 30 30 - 135 3240 648004 kolom 5 - 0,8 0,8 3,6 64,512 1548,288 7741,445 kolom 10 - 0,7 0,7 3,6 49,392 1185,408 5927,046 kolom 15 - 0,55 0,55 3,6 30,492 731,808 3659,047 kolom 20 - 0,45 0,45 3,6 20,412 489,888 2449,448 shearwall 0,2 6 3,6 - 17,28 414,72 8294,49 boundary element - 0,85 0,2 3,6 4,896 117,504 2350,08
berat total 166501,44
R = 5,5Vb = 9686,47 kN
No. ElemenUkuran (m)
Perhitungan Vb sistem struktur tube 20 lantai
Cv : 0,7T bangunan : 2,1877 detik
volume/ berat berat total tebal b h t atau p lantai (kN) (x jmlh lantai)
1 balok utama - 0,4 0,75 6 108 2592 518402 balok anak - 0,25 0,45 6 40,5 972 194403 pelat 0,15 30 30 - 135 3240 648004 kolom 5 - 0,7 0,7 3,6 28,224 677,376 3386,885 kolom 10 - 0,55 0,55 3,6 17,424 418,176 2090,886 kolom 15 - 0,5 0,5 3,6 14,4 345,6 17287 kolom 20 - 0,4 0,4 3,6 9,216 221,184 1105,927 kolom luar 5 - 0,8 0,8 3,6 92,16 2211,84 11059,28 kolom luar 10 - 0,6 0,6 3,6 51,84 1244,16 6220,89 kolom luar 15 - 0,5 0,5 3,6 36 864 432010 kolom luar 20 - 0,45 0,45 3,6 29,16 699,84 3499,2
berat total 169490,88
R = 5,5Vb = 9860,39 kN
No. ElemenUkuran (m)
L-7
LAMPIRAN C
BASE SHEAR VS DISPLACEMENT
Base shear sistem shearwall 10 lantai
Step Displacement Base Force
(m) (kN) 0 0.000 0.00 1 0.101 8151.19 2 0.168 11838.63 3 0.370 16404.68 4 0.478 18302.22 5 0.478 17986.25 6 0.479 18044.06 7 0.479 17910.40 8 0.479 17777.08 9 0.481 17844.57
10 0.431 13864.17
Base shear sistem tube 10 lantai
Step Displacement Base Force (m) (kN)
0 0.000 0.00 1 0.166 10235.11 2 0.216 12922.52 3 0.225 13160.75 4 0.367 14979.12 5 0.556 16221.45 6 0.660 16571.83 7 0.660 16319.77 8 0.663 16380.17 9 0.663 16184.30
10 0.665 16251.24 11 0.623 13636.53
L-8
Base shear sistem shearwall 15 lantai
Step Displacement Base Force
(m) (kN) 0 0.000 0.00
1 0.153 10089.93
2 0.192 12248.47
3 0.248 13687.17
4 0.453 15908.35
5 0.658 17438.17
6 0.734 17965.34
7 0.656 12460.03
Base shear sistem tube 15 lantai
Step Displacement Base Force
(m) (kN)
0 0.000 0.00
1 0.199 11198.10
2 0.256 14107.05
3 0.267 14395.30
4 0.387 15704.55
5 0.587 16780.79
6 0.788 17562.52
7 0.832 17712.67
8 0.684 9085.42
Base shear sistem shearwall 20 lantai
Step Displacement Base Force
(m) (kN)
0 0.000 0.00
1 0.184 10927.91
2 0.247 14188.92
3 0.287 15179.58
4 0.420 16642.65
5 0.621 17838.86
6 0.829 18767.03
7 0.977 19382.62
8 0.770 7118.65
L-9
Base shear sistem tube 20 lantai
Step Displacement Base Force
(m) (kN)
0 0.000 0.00
1 0.200 9294.37
2 0.230 10666.45
3 0.340 15478.68
4 0.416 16689.16
5 0.559 17669.38
6 0.766 18437.58
7 0.970 19058.77
8 1.048 19285.15
9 0.880 11267.49
L-10
LAMPIRAN D
KURVA KAPASITAS OUTPUT ETABS
Kurva kapasitas dan ADRS model struktur Shearwall 10 lantai
Kurva kapasitas dan ADRS model struktur tube 10 lantai
L-11
Kurva kapasitas dan ADRS model struktur Shearwall 15 lantai
Kurva kapasitas dan ADRS model struktur tube 15 lantai
L-12
Kurva kapasitas dan ADRS model struktur Shearwall 20 lantai
Kurva kapasitas dan ADRS model struktur tube 20 lantai
L-13
LAMPIRAN E
INTER-STORY DRIFT
Inter-story drift struktur shearwall 10 lantai pada saat displacement maksimum (step 4)
Story Displacement (m) Interstory Drift10 0,478 0,01599 0,421 0,01628 0,362 0,01647 0,303 0,01636 0,245 0,01595 0,187 0,01504 0,133 0,01373 0,084 0,01152 0,043 0,00831 0,013 0,00360 0,000 0,0000
Inter-story drift struktur shearwall 10 lantai pada saat performance point (antara step 3 dan 4)
Story Displacement (m) Interstory Drift10 0,287 0,0099 0,254 0,0098 0,220 0,0107 0,185 0,0106 0,150 0,0105 0,116 0,0094 0,083 0,0083 0,053 0,0072 0,027 0,0051 0,009 0,0020 0,000 0,000
Inter-story drift struktur tube 10 lantai pada saat displacement maksimum (step 6)
Story Displacement (m) Interstory Drift10 0,646 0,01279 0,600 0,01608 0,543 0,01937 0,473 0,02186 0,395 0,02325 0,311 0,02264 0,230 0,02183 0,151 0,01972 0,081 0,01541 0,025 0,00700 0,000 0,0000
L-14
Inter-story drift struktur tube 10 lantai pada saat performance point (antara step 3 dan 4)
Story Displacement (m) Interstory Drift
10 0,364 0,011
9 0,346 0,011
8 0,320 0,0127 0,284 0,0126 0,242 0,0125 0,194 0,0114 0,147 0,0103 0,100 0,0092 0,055 0,0071 0,018 0,0030 0,000 0,000
Inter-story drift struktur shearwall 15 lantai pada saat displacement maksimum (step 6)
Story Displacement (m) Interstory Drift15 0,734 0,015414 0,678 0,015813 0,622 0,016112 0,564 0,016411 0,505 0,016610 0,445 0,01659 0,386 0,01648 0,327 0,01607 0,269 0,01556 0,213 0,01465 0,161 0,01334 0,113 0,01183 0,070 0,00972 0,035 0,00691 0,011 0,00300 0,000 0,0000
Inter-story drift struktur shearwall 15 lantai pada saat performance point (antara step 3 dan 4)
Story Displacement (m) Interstory Drift15 0,397 0,00714 0,370 0,00813 0,342 0,00812 0,313 0,00811 0,282 0,00910 0,251 0,0099 0,219 0,0098 0,187 0,0097 0,156 0,0096 0,124 0,0085 0,095 0,0084 0,067 0,0073 0,043 0,0062 0,022 0,0041 0,007 0,0020 0,000 0,000
L-15
Inter-story drift struktur tube 15 lantai pada saat displacement maksimum (step 7)
Story Displacement (m) Interstory Drift15 0,832 0,004414 0,816 0,007913 0,787 0,012212 0,743 0,016711 0,683 0,020410 0,610 0,02059 0,536 0,02138 0,460 0,02167 0,382 0,02136 0,305 0,02025 0,232 0,01804 0,167 0,01653 0,108 0,01432 0,057 0,01081 0,018 0,00490 0,000 0,0000
Inter-story drift struktur tube 15 lantai pada saat performance point (antara step 4 dan 5)
Story Displacement (m) Interstory Drift
15 0,434 0,003
14 0,423 0,005
13 0,407 0,006
12 0,384 0,008
11 0,354 0,01010 0,317 0,0099 0,284 0,0108 0,248 0,0117 0,210 0,0116 0,171 0,0105 0,133 0,0094 0,098 0,0093 0,065 0,0082 0,035 0,0071 0,011 0,0030 0,000 0,000
L-16
Inter-story drift struktur shearwall 20 lantai pada saat displacement maksimum (step 7)
Story Displacement (m) Interstory Drift20 0,9769 0,014519 0,9245 0,014918 0,8708 0,015317 0,8158 0,015316 0,7594 0,015715 0,7017 0,016014 0,644 0,016113 0,585 0,016512 0,525 0,016511 0,466 0,016310 0,407 0,01589 0,351 0,01548 0,295 0,01547 0,242 0,01426 0,191 0,01325 0,143 0,01194 0,100 0,01053 0,062 0,00862 0,031 0,00611 0,009 0,00260 0,000 0,0000
Inter-story drift struktur shearwall 20 lantai pada saat performance point (antara step 4 dan 5)
Story Displacement (m) Interstory Drift20 0,499 0,00619 0,476 0,00718 0,452 0,00717 0,428 0,00716 0,402 0,00815 0,374 0,00814 0,346 0,00813 0,317 0,00812 0,288 0,00811 0,257 0,00810 0,227 0,0089 0,197 0,0088 0,168 0,0087 0,139 0,0086 0,111 0,0075 0,085 0,0074 0,060 0,0063 0,038 0,0052 0,020 0,0041 0,006 0,0020 0,000 0,000
L-17
Inter-story drift struktur tube 20 lantai pada saat displacement maksimum (step 8)
Story Displacement (m) Interstory Drift20 1,049 0,004219 1,033 0,005818 1,012 0,008117 0,983 0,011416 0,942 0,015015 0,888 0,015514 0,832 0,017413 0,770 0,019212 0,701 0,020711 0,626 0,021710 0,548 0,02109 0,472 0,02108 0,397 0,02077 0,322 0,01976 0,251 0,01785 0,187 0,01494 0,134 0,01353 0,085 0,01152 0,044 0,00851 0,013 0,00360 0,000 0,0000
Inter-story drift struktur tube 20 lantai pada saat performance point (antara step 4 dan 5)
Story Displacement (m) Interstory Drift
20 0,552 0,004
19 0,539 0,005
18 0,522 0,006
17 0,502 0,007
16 0,477 0,008
15 0,447 0,007
14 0,422 0,008
13 0,393 0,009
12 0,362 0,010
11 0,327 0,01010 0,290 0,0109 0,255 0,0108 0,219 0,0107 0,182 0,0106 0,146 0,0105 0,111 0,0084 0,081 0,0083 0,053 0,0072 0,029 0,0051 0,009 0,0020 0,000 0,000
L-18
LAMPIRAN F
SENDI PLASTIS
Formasi sendi plastis rangka eksterior struktur shearwall 10 lantai (step 2)