dadex company profil

10
An Introduction to our plastic An Introduction to our plastic piping systems piping systems

Upload: munawar-khan

Post on 14-Apr-2017

188 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Dadex Company Profil

An Introduction to our plastic piping systemsAn Introduction to our plastic piping systems

Page 2: Dadex Company Profil

ABOUT US

•Established in 1959

•Listed on the Karachi Stock Exchange

•3 Factories: Karachi, Hyderabad, Lahore.

•Over 700 employees

•11 offices throughout Pakistan

•Turnover of US$ 35m

•Largest producer of thermoplastic pipes in Pakistan

•A team of over 30 engineers

Page 3: Dadex Company Profil

OU

R V

ISIO

N

Page 4: Dadex Company Profil
Page 5: Dadex Company Profil

Boundless Thinking Timeless Innovation• 1959 Roofing• 1966 Piping• 1991 Plastics – PVC Pipe System• 1993 Polyethylene Pipe System

» PE for Gas» PE for Water

• 1997 PVC Pipe System for Soil, Waste and Vent• 1999 PPR-Hot and Cold Water Pipe System • 2001 Injection Molding• 2002 PE Cable Duct System• 2002 PVC Electrical Conduits• 2004 High Efficiency Irrigation Systems• 2005 Aluminum Composite Panels for Cladding• 2005 PVC Tubewell Casing and Screen Pipe System • 2006 Flowline – Complete uPVC underground

sewerage system• 2008 Specialty Piping Systems

Page 6: Dadex Company Profil

International Affiliations / Certifications

• Licensee of Wavin Overseas b.v., The Netherlands

• ISO 9001:2000 certified

• Pakistan Standards Institute certified

Page 7: Dadex Company Profil

for pipe systems since 1991 for irrigation systems since 2004

represents world leading organizations in Pakistan.

Page 8: Dadex Company Profil

licensedThermoplastic Pipe Systems

– Polyethylene (PE) Systems

– Polypropylene Random (PPR) System

– Unplasticised Polyvinyl Chloride (u-PVC) Systems

Page 9: Dadex Company Profil

Quality Management system emphasizes greatly on following attributes:

DocumentationDocuments required by organisation to ensure effective planning, operationand control processes records required by the standard.

Traceability • Where appropriate identify product by suitable means throughout realisation.• Identify status with respect to measurement & monitoring requirements.• Where traceability is required, control & record unique identification of • product.

Consistency Maintaining consistency, any time, every time, in whatever we do through policies, standard operating procedures, work instructions etc.

QUALITY MANAGEMENT SYSTEM

Page 10: Dadex Company Profil

SERVICESOur customer services team offers a variety of services focusing on different aspects of technical support

● Design Review, BOQs & Estimates

● Turnkey Projects (Sample / Model)

● Jointing services

● Demonstrations & Trainings

● Periodic site visits

● Product testing Guidance on site

● Engineering advice and consultancy