Page 1: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

D7.6. 1st Dissemination Report FINAL VERSION

Page 2: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 2 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

DOCUMENT CODIFICATION:

Project number 695822 Acronym ENERINVEST

Full title Spanish Sustainable Energy financing Platform

Project URL https://www.enerinvest.es/

Document URL N/A (It will be uploaded to the e-platform)

EU Project officer Björn Zapfel

Deliverable Number D.7.6. Title First Dissemination Report

Work package Number W.7. Title Communication and Dissemination Activities

Date of delivery Contractual: M18 Final Delivery: M18

Author EnerAgen and Ecoserveis EnerAgen (María Muñoz, [email protected])

Ecoserveis (Virginia Mata, [email protected])

Status Delivered

Nature Report

Revisions

Dissemination level CO and Public

Abstract for dissemination Report including proofs of the communication and dissemination activities carried out, together with the results of an Impact Evaluation.

Keywords Communication; social networks; media; dissemination

Page 3: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 3 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

TABLE OF CONTENTS

INTRODUCTION ............................................................................................................................. 5

THE SCOPE AND OBJECTIVES OF THE 1ST DISSEMINATION REPORT ............................................. 5

COMMUNICATION AND DISSEMINATION PLAN ........................................................................... 6

IMPLEMENTATION OF THE COMMUNICATION AND DISSEMINATION STRATEGY ....................... 7

The Focus Groups of ENERINVEST in the C&D Strategy ........................................................... 8

Main milestones of the C&D Strategy .................................................................................... 10

ACTIVITIES, TOOLS AND CHANNELS OF THE STRATEGY .............................................................. 13

Branding of ENERINVEST: ....................................................................................................... 13

Website and e-Platform ......................................................................................................... 14

Workshops and Events ........................................................................................................... 17

Presentations ......................................................................................................................... 20

Presence in the Media and Stakeholders involvement ......................................................... 21

NEWSLETTERS................................................................................................................. 21

WEB PLATFORM ............................................................................................................. 24

ACTIVITY OF SOCIAL MEDIA ........................................................................................... 25

WEBINARS ...................................................................................................................... 27

ENERINTOOL ................................................................................................................... 32

PROMOTIONAL MATERIAL ............................................................................................. 33

RESULTS OF MONITORING AND EVALUATION ACTIVITIES ......................................................... 35

Engagement of Target Groups in the e-Platform ................................................................... 35

Web evaluation and results of the analysis ........................................................................... 37

Results of Social Media analysis ............................................................................................. 41

Page 4: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 4 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

Summary of impact monitoring indicators ............................................................................ 45

ANNEXES ..................................................................................................................................... 47

Page 5: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 5 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

INTRODUCTION

ENERINVEST aims to become the reference national funding-related platform in Spain for Sustainable Energy Projects (SEPs) while widely contributing to increase knowledge and deliver innovative approaches, strategies, models and tools regarding financial mechanisms for energy projects.

The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, is one of the objectives of the project. In this sense, to set up a favorable environment in which contacts can be made among all parties involved in energy projects, a fluid communication between stakeholders is essential.

The activities planned in the project, the tools designed and the e-Platform developed make possible to bring together all these different stakeholders. For this reason, a specific Communication and Dissemination strategy has been designed and may be applicable throughout the project period. It contains and plans the methodology and the channels used for transmitting the information and knowledge acquired.

After 18 months of work and monitoring, it is of great interest to carry out a full evaluation of the dissemination and communication practices and the activities developed. An analysis of the impacts achieved and a correct diagnosis will give us a list of conclusions and a proposal of corrections and improvements aimed at achieving the objectives of ENERINVEST.

THE SCOPE AND OBJECTIVES OF THE 1ST DISSEMINATION REPORT

This document contains a brief summary and description of the dissemination activities carried out during the first 18 months of the project and that form part of a complete strategy. The Communication and Dissemination Plan was expressly designed for this project and explains all these actions in detail.

This first Report includes the most important proofs of dissemination. It gathers and shows the results of a monitoring work made during this first period by the work package (WP) leader, together with and impact evaluation of the activities performed by all the partners.

The purpose of this document is also to make public these dissemination results, as well as to inform the European Commission Services, all project partners and their work teams.

Page 6: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 6 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

COMMUNICATION AND DISSEMINATION PLAN

The Communication and Dissemination Plan, C&D Plan, was prepared and delivered in the fourth month of the project, in May 2016, being implemented since the beginning of the project.

The C&D Plan aims to provide to all of the partners in the consortium with a reference guide to manage and evaluate the dissemination and communication activities in order to gain visibility and increase impact among the key target groups and different stakeholders. Besides, internal communication issues are also addressed within the Plan, since an appropriate communication between the partners is key to achieve the common objectives.

The Communication and Dissemination Plan explains the difference between internal communication and the activities of external communication and dissemination. The latter are essential in the project and will be the main focus of this report.

The plan clearly defines the communication objectives and identifies the key players in the development of sustainable energy projects, classifying them into four general categories, named as target groups. The identified groups are: SEP Promoters, Financial Institutions and Bodies, Public Authorities and Policy Makers, and Other Stakeholders.

The last group consists of agents especially interested in energy projects, such as energy agencies and sectorial associations, among others, whose cooperation and participation is essential for the project objectives. This group is an important potential audience for dissemination.

The Plan establishes specific objectives of each target group and the mechanisms and tools to be applied to keep them informed and get their involvement in the platform.

A periodical revision of the C&D Plan activities is performed, taking into account the project needs and the partners support and contributions. In this sense, a formal intermediate evaluation has been made in month 18, and an updated version of the C&D Plan will be delivered, considering the results of the monitoring and evaluation process gathered in this report.

The Updated Plan will implement the improvements, new target stakeholders and focus groups identified, and a proposal of corrective actions for the next period of the project.

Page 7: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 7 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

IMPLEMENTATION OF THE COMMUNICATION AND DISSEMINATION STRATEGY

Communication and dissemination activities need a clear planning and definition of responsibilities. For this reason a strategy has been designed for the entire duration of the project in which it is intended to predict the tasks that are involved in making a good distribution of information, reaching all the target groups and getting their interest and involvement.

The main activities, tools and channels considered essential for implementing an optimal communication and dissemination strategy, which can reach the target groups and stakeholders identified, are shown in the graphic below.

All of the partners are deeply involved in the dissemination activities and use the different tools and channels here described. All of them have been considered in order to clearly maximize the impact of the project activities and its results.

Figure 1: Chart of Activities planned, Tools and Channels used during the project.

These instruments must be properly combined in order to generate interest and awareness in the project. Other important instruments have been implemented and can contribute to maximize the impact. Thus, the definition of a clear brand identity and logo for ENERINVEST, and the design and maintenance of the Website as the first step to get involved in the e-Platform, were key actions during these first period of the project.

Internet and ICT:

E - Platform

Social Media

Webinars

Forums online

Presence on the media

Events:

Workshops

Collective Events

EnerInvest Award

VISUAL IDENTITY E-PLATFORM POSITIONING EVALUATION AND MONITORING

Promotional material

Reference material

ACTIVITIES, TOOLS AND CHANNELS

Page 8: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 8 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

The Focus Groups of ENERINVEST in the C&D Strategy

The project considers the organization of specific working teams for Strengthening & Encouraging SEPs in an effective way, in concrete six Focus Groups (FG) are working.

• Collective Events Focus Group. • Assistance Focus Group. • Discussion Forums and Webinars Focus Group. • Connecting Initiatives Focus Group. • Financial Work Focus Group • Promoters Work Focus Group

The development and activity of all groups are related to communication and dissemination activities, although in different ways. The most directly involved in these tasks are Collective Events FG and Discussion Forums and Webinars FG, both composed of the nine consortium partners.

The Collective Events FG decides the topics and the most interesting participants as well as the logistic for the preparation of the events. The topics are chosen regarding the necessities knowing through the Promoters and Financial Focus Groups. The Collective Events group was launched in February, with a total of two meetings for the organization of the first event of the project, celebrated on the 14th of June.

The Connecting Initiatives FG is led by the Project Coordinator with the support of all partners. This group identifies experts in different areas of SEPs and organizes face-to-face meetings to bring together stakeholders. The first event was celebrated the 26th of April 2017. This group also develops questioners which could be filled after events or through the ENERINTOOL. This activity gives us feedback and information regarding the issue we have to cover for each user or participant.

The internal communication tools among the partners, and also the connecting channels used with all the collaborators and agents in these working Focus Groups are essential. Channels such as e-mail, telephone or formal face-to-face meetings have been employed.

Every working session was planned and prepared using a professional software for online meetings and communication activities. This tool offers the option of managing online streaming videoconferences, at the same time they are celebrated in person.

Page 9: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 9 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

Figure 2: Images of the online meetings held with the Financial working Focus Group and the Promoters working Focus Group.

Page 10: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 10 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

Main milestones of the C&D Strategy

In the course of the project there are key moments in which communication efforts must be intensified, especially when there are approaching events and activities organized by ENERINVEST.

A well-designed C&D strategy must anticipate these moments and use a variety of resources to achieve the impact objectives expected, as well as to reach the groups of stakeholders that are interested in the development of SEPs.

The following Table gives a description of the use of varied tools and channels for communication and dissemination activities that were implemented when key project results are achieved or important milestones in global planning are overcome.

Milestone or Project Results

C&D Activities Who When

(C&D emphasis)

Visual identification of the project. Results of branding selection (D7.1)

Visual Identity Tookit. Distribution, voting and selection of the definitive logo by the partners.

WP7 leader M2

Kick off meeting

Presentation to key stakeholders Launching event of ENERINVEST (April 2016) First C&D Campaign (April 2016) Specialised and mass media, mailing, presentation at relevant events Interview to the Coordinator of ENERINVEST

All partners From M3

Communication and Dissemination Plan (D7.2)

Presentation of the Plan and Communication and Dissemination Strategy designed. Distribution and approval by partners.

WP7 leader and Ecoserveis

M4

Launching of the Website and starting activity in social networks (D7.4)

Presentation to key stakeholders Second C&D Campaign (September 2016) Specialised and mass media, mailing, presentation at relevant events

All partners From M6

Launching of the Platform (Starting of first tools and features)

Announcement to key stakeholders Social media, specialised and mass media, website, presentation at relevant events. Event organised for projects ENERINVEST and IN-BEE: “Assessing the intangibles: the socioeconomic Benefits of improving energy efficiency” (October 2016).

WP7 leader and all partner

From M8

Page 11: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 11 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

Milestone or Project Results

C&D Activities Who When

(C&D emphasis)

Launching of Map of Experiences (D3.1)

Social media, specialised media, website, presentation at relevant events Webinar session for Energy Agencies Third C&D Campaign (April 2017) Feedback from Financial and Promoters Working Groups

All partners From M10

Results of WP2 Analysis: • Spanish sustainable

energy projects (SEP) legal framework, (D2.1)

• Spanish SEPs Financial existing framework, (D2.2)

• Technical aspects of SEPs in Spain, D2.3)

• SEP Best Practices Handbook, (D2.6)

Third C&D Campaign (April 2017) Webinar session for Energy Agencies Social media, specialised media, website, presentation at relevant events Feedback from Financial and Promoters Working Groups

All partners From M10

Guide for Investors and Promoters (D3.2)

Press release in the Website Social media, specialised media, mailing, presentation at relevant events Feedback from Financial and Promoters Working Groups A specific C&D Campaign (Status: on-going)

All partners From M15

SEP financial assessment tool (D4.2) (Starting of first tools and features)

Announcement and presentation of ENERINTOOL to key stakeholders. Social media, specialised media, presentation at relevant events Feedback from Financial and Promoters Working Groups A specific C&D Campaign (Status: on-going) Presentation at First Collective Event of ENERINVEST (Barcelona, June 2017)

WP4 leader and all partners

From M16

Page 12: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 12 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

Table 1: Main milestones and Results for emphasizing C&D Activities during the first 18 months.

Engagement of Key Stakeholders and Target Groups

Social media, news at specialised media, mailings, presentations at relevant events Constitution and follow-up of Financial and Promoters Working Groups. Several Videoconferences and meetings of discussion and information exchanging The 4th C&D Campaign (May and June 2017) for First Collective Event. The peer-to-peer event of ENERINVEST (April 2017)

All partners From M3 to M36

Page 13: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 13 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

ACTIVITIES, TOOLS AND CHANNELS OF THE STRATEGY

Branding of ENERINVEST:

The project and its platform must have their own identity brand in order to have a clear presentation in society, making them easy to identity and be remembered.

Visual tools can help to ease a first contact with the target groups. The design and selection of a coherent collection of images and a memorable logo were the first steps of the Communication and Dissemination Strategy.

The Visual identity toolkit of ENERINVEST was subcontracted to a professional in marketing, design and image. First of all, up to six different designs of brand identity logo were proposed and presented to the members of the consortium before choosing the final one.

Figure 3: Proposals of logos for the project.

Once the final logo was chosen a set of different versions of the logo were generated, (different sizes, formats, colours, final uses, etc.) together with the guidelines for its use. The following picture shows the final logo for the project.

Figure 4: Set of Logos for ENERINVEST Project.

Page 14: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 14 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

The visual toolkit consists of the following materials:

• The ENERINVEST Set of Logos, with Spanish and English versions (ES/EN). • A Set of templates for Word and Power Point (ES/EN) and instructions of use. • Leaflets with general information about the project: the objective, the challenges, the

target groups addressed, its main activities and the partners involved. Leaflets are available in digital and printed copies and in Spanish and English versions.

• Roll-ups to be used in the events and presentation (EN/ES).

A Manual of use of the brand identity has been sent to all of the partners.

Several sets of images have been produced in the course of the project, either by the partners in charge of dissemination or by a professional. They covered different needs in the dissemination activities.

The following key moments or applications have needed an own image, adequate in format, quality and measures:

• The elaboration of the website. • The profile images on social networks. • Three of the four mass media campaigns and dissemination:

- The Second campaign: launch of the ENERINVEST website; - The Third campaign: Presentation of the Map of Experiences and documents of technical, legal and financial Analysis; - The Fourth campaign: Celebration of the first collective event.

The production of a specific brand image of the assessment tool "Enerintool" was made by an external professional. A sample of all these images is included in Annex 2.

In the design and dissemination of these images and materials all the mandatory requirements coming from the EU communication protocol have been included. The use of EU emblem, the information of EU funding, and the disclaimer of the EASME Agency responsibility for the content, were always taken into account.

Website and e-Platform

The project website was published on the 26th of July 2016, as planned in the schedule set by the European Commission. It is available in two domains:

www.enerinvest.es and www.enerinvest.eu .

The website is an invaluable tool for the project since it is the first source of information for many people. Therefore, it contains the right information in a clear and accessible design and structure and clearly gives an overview about ENERINVEST, its objectives, progress and results, the partnership and main contacts.

Page 15: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 15 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

Because of the particular characteristic of the initiative of ENERINVEST as a contact interactive platform, the public website can be considered part of the e-Platform developed. The first design of the site was a temporary version online, that allowed to start the communication and dissemination activities and was integrated into the e-Platform once it has become operative.

Both, the website and the e-platform have been designed by an external firm complying with a series of technical and legal requirements, privacy and image terms, all of them defined and approved by the partners. These definitions are based on the provisions of the Project Grant Agreement (Document N0.695822), and include a note that exempts the EASME from liability for the use that may be made of the information contained therein.

The e-platform also offers a secured password-protected intranet, which is used as an internal collaborative platform by the partners. The intranet allows the management of the different resources of the e-platform, those public ones as well as the restricted documents for exclusive use of the project partners. All partners can provide contents to the platform and all reference material generated within the project will be included. A general view of the Intranet is shown in the screenshot in Figure 4.

Figure 5: Screenshot of the Intranet platform linked to EnerInvest Project.

Two versions of the website are available. A first version includes the interface, all contents, resources and documents in Spanish. A second version shows the contents and main and static resources in English, ignoring most of the news and events periodically updated. The website has also been translated to the Catalan language, and Basque and Galician translations could be performed in the second midterm of the project.

In the design of the web and the e-Platform, internal and external measures to generate traffic in the site have been considered. They were implemented for attracting more visitors to the site. The development of structured contents for intuitive navigation, the definition of optimal and critical keywords and search terms, the use of metatags and the prioritization and proactive use of keyword density, can contribute to increase the global impact and improve web positioning.

The structure of the website has eight main sections, as shown in the screenshots in Figures 5 and 6. The project's basis, the calendar, news, activities and a resources collection, giving

Page 16: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 16 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

access to the Map of Experiences, the Enerintool, all project’s outputs or documents, and to some links to related websites. The search menu includes forums and webinars applications, contacts to the partners of the project and a FAQ section.

The website and the e-platform were launched and integrated covering three segments: Basic information, for non-registered users; General access, for registered users; and Intranet, only for partners. Besides, an internal document was produced in order to guide all the partners in the use of the intranet, and also an interactive guide was developed to guide the registered users in the use of the e-platform.

Figure 6: Screenshot of the structure of the website linked to EnerInvest Project.

Figure 7: Screenshot of RESOURCES Section on the website linked to EnerInvest Project.

The use of Web evaluation tools is also a key input for monitoring the impact and interest of the project and its actions.

Page 17: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 17 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

Two appropriate systems for getting useful information about the web page impact (Google analytics and Mustat tool) have been implemented and monitored. They were used in order to evaluate website traffic, measure site visits, or to obtain the origin of visitors, among other parameters.

Finally note that a massive communication campaign was carried out and launched on the 13th of September 2016. It was focused on the announcement of ENERINVEST website and the starting point of social networks activity. The scope was national and to get a greater diffusion there was a noticeable involvement of the partners of the consortium.

Workshops and Events

Part of the communication and dissemination activities were carried out by in-person events, such as workshops, peer-to-peer sessions or collective events. These activities are addressed to specific target groups depending on the topic and will be periodically organised throughout ENERINVEST duration.

In the first 18 months of the project two communication events have been held, a launching event on the 7th of April 2016, and an event targeting the ESCOs associations on the 6th of October 2016, the last one in collaboration with the EU project IN-BEE.

A specific workshop to foster the contact between promoters and investors was held on the 26th of April 2017. This peer-to-peer meeting was organized with the purpose of stimulating the communication between players as well as fostering the investment in SEPs. The stakeholders invited presented to the financial players their current SEPs, and also, the financers exposed to the promoters their financial solutions.

LINK TO NEWS AND ACTIVITIES PUBLISHED IN THE WEBSITE:

• Launching event: Presentation of ENERINVEST on the 7th of April 2016.

https://www.enerinvest.es/noticias/general/promover-la-financiacion-en-energia-sostenible-el-objetivo-de-enerinvest-y-la-union-europea-2

• Event organised for projects ENERINVEST and IN-BEE: “Assessing the intangibles: the socioeconomic Benefits of improving energy efficiency”. On the 6th of October 2016.

https://www.enerinvest.es/noticias/general/los-proyectos-enerinvest-e-in-bee-en-la-jornada-sobre-beneficios-intangibles-derivados-del-modelo-ese-y-mecanismos-de-financiacion-58

• Peer-to-Peer meeting. An event for connecting investors, financial institutions and promoters. On the 26th of April 2017.

https://www.enerinvest.es/noticias/general/enerinvest-promueve-una-jornada-de-encuentro-entre-promotores-e-inversores-de-proyectos-de-energia-sostenible-108

Page 18: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 18 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

One of the planned national dissemination events was also held. This is the First Collective Event of the 14th of June 2017 in Barcelona. The organization of the event, the experts and discussion topics chosen were valued very positively, above 7.6 out of 10, by attendees and participants. It gathered more than 75 people from all stakeholders and profiles, coming from all over Spain.

The purpose of this first act was to exchange information, successful experiences, documentation, technical and economic data, technologies and applicable law. The target audience was all stakeholders and actors related to the design, development and implementation of sustainable energy projects, both public and private.

The format of the event was structured in a first part with seven flash expositions, fast and dynamic presentations on successful stories representative of sustainable energy projects; followed by group activities: the participants were distributed among the five round tables formed by experts, to participate in solving problems and limitations identified in the different types of projects chosen:

1. Rehabilitation of buildings

2. HVAC (heating, ventilating and air conditioning) systems - boilers, direct expansion and industrial refrigeration, solar thermal, distribution system improvement, and industrial heat production

3. Lighting and electrical equipment and installations

4. Monitoring of facilities, consumption accounting and energy management

5. Sustainable electrical production facilities. Self-consumption projects.

Finally, the ENERINVEST partners summarized the conclusions reached from each type of project, and the five moderators shared in plenary these ideas with all the attendees.

In order to obtain an objective assessment of the event, the consortium developed a satisfaction survey. It was a useful source of information delivered to all attendees at the time of accreditation.

The survey with a total of 37 questions consists of questions of closed response, to assess the degree of interest of the projects and topics covered, the level of knowledge and experience of the experts in the discussion sessions and the degree of general satisfaction. Suggestions and points to improve for future events were also requested.

A little summary of most important figures and ratios of the event would be: a total of 75 attendees, 11 provinces represented, 9 financiers, 19 public promoters or public entities, 16 ESCOs and technical companies, 10 private promoters and 21 interested people.

The following graphs show the statistics of participation according to the type of agent or role represented in energy projects or according to the province of origin of the participant.

Page 19: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 19 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

Figure 8: Results of participation in EnerInvest First Collective Event.

A complete and specific feedback report of the event will be made as a deliverable document in the project. It includes the participation statistics, the topics discussed and exposed, the opinions expressed by the participants and the findings and results obtained in this first event and at every national event organized by the consortium.

In terms of dissemination for the first collective event, a mass communication campaign was designed in the previous months, involving all partners. The campaign was carried out during the months of May and June 2017, announcing the first event organized by ENERINVEST, as well as showing its results and the impact generated.

A document of conclusions and the collection of the speakers’ presentations are available at the RESOURCES section in the website. Also, two press releases and one article were written, the latter being published afterwards.

Some graphic material was designed as several images of event announcement, PowerPoint templates and collages of photos of the protagonists. All this material is available on the ENERINVEST website and was used in the social networks posts.

LINK TO DOCUMENT OF CONCLUSIONS AND SPEAKERS’ PRESENTATIONS: https://www.enerinvest.es/recursos/documentos.php?pag=1#punto1

LINK TO NEWS AND ACTIVITIES PUBLISHED IN THE WEBSITE:

• First Collective Event announcement:

https://www.enerinvest.es/actividades/general/primer-evento-colectivo-del-proyecto-enerinvest-jornada-de-encuentro-entre-agentes-clave-en-energia-sostenible-38

https://www.enerinvest.es/noticias/general/enerinvest-organiza-su-primer-evento-colectivo-con-la-presentacion-de-siete-proyectos-de-energia-sostenible-y-la-participacion-de-los-asistentes-en-actividades-grupales-para-superar-barreras-a-la-financiacion-a-la-sostenibilidad-110

Page 20: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 20 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

• First Collective Event conclusions:

https://www.enerinvest.es/noticias/general/interesantes-resultados-y-conclusiones-del-primer-evento-colectivo-organizado-por-enerinvest-en-barcelona-129

Presentations

Participation in external events related with sustainable energy or financial mechanisms is also important in order to contribute to the promotion of ENERINVEST. All partners actively work to identify and propose interesting events to attend, either to present the project initiative or to networking activities.

During this period, most of partners had participation in events and activities organised by relevant institutions, making presentations of the project, its objectives and the results achieved at every moment. Besides, the exhibitions of other European projects related to sustainable energy and financing were a moment for presenting ENERINVEST.

The partners have taken advantage of the organization of their own activities and events to make dissemination of the results of ENERINVEST. Thus EnerAgen presented the project at the XV General Assembly of the Association (22nd of April 2016, in Barcelona) and at the II Meeting of agencies and public bodies in the field of energy (31st of March 2017, in Cádiz).

ANESE made also a presentation, taking as a context the "Energy Efficiency Observatory" of the ESCOs Association, in April 2017.

In order to disseminate the main project results at EU level, Fernando García, acting as the ENERINVEST Coordinator, made a presentation at the "Energy Efficiency Finance Market Place", held on January the 18th 2017 in Brussels and organized by the European Commission's EASME Agency.

The session brought together about 80 participants, including: financial institutions interested in energy efficiency projects, sectorial associations and companies, potential promoters, local and regional public bodies, as well as organizations with experience in sustainable energy financing across the EU.

The thematic session brought together two platforms with different approaches. On the one hand, the SEFIPA project, which develops a platform for collective financing of sustainable energy in Austria; and secondly, the ENERINVEST Platform, which provides technical, legal and financial advice, establishing a connection between key players in the projects, and facilitating their development in Spain.

After a brief introduction by Björn Zapfel, Project Officer at the European Commission, Fernando exposed the main objectives and actions included in ENERINVEST, with an scheme of the progress made in the analysis of the current technical, legal and financial framework in Spain.

Page 21: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 21 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

LINK TO NEWS AND ACTIVITIES PUBLISHED IN THE WEBSITE:

• Presentation of ENERINVEST at the “Energy Efficiency Finance Market Place”.

https://www.enerinvest.es/noticias/financiacion-subvenciones/enerinvest-un-proyecto-que-aborda-esquemas-de-financiacion-innovadores-presentacion-de-la-plataforma-en-el-mercado-de-finanzas-de-eficiencia-energetica-organizado-por-easme-en-bruselas-87

• Announcement in Web calendar of the “Energy Efficiency Finance Market Place”.

https://www.enerinvest.es/actividades/general/un-mercado-de-finanzas-de-eficiencia-energetica-organizado-por-la-agencia-easme-de-la-comision-europea-acoge-en-bruselas-al-proyecto-enerinvest-24

The Annex 1 of this document shows a total register of 28 events where the project has been introduced to the audience or was the focus topic of the meeting.

Several news and/or announcements of these activities have generally been highlighted and published in the calendar of the ENERINVEST website or in the NEWS Section site.

Presence in the Media and Stakeholders involvement

NEWSLETTERS

Targeting different audiences at national level requires strong campaigns at local, regional and national level including regular presence in the media aimed at boosting potential stakeholders to join the e-platform.

Four massive communication campaigns have been carried out, the last three with greater diffusion, scope and involvement of all the partners of the consortium.

• The first campaign, held in April 2016, coincided with the launching event of the ENERINVEST project. The website and social networks were not active, so the dissemination channels consisted of a distribution of a press release to specialized and generic media, carried out by all the partners.

• The second campaign, launched the 13th of September 2016, focused on the announcement of ENERINVEST website and the start of social networks activity.

• The third campaign started in April 2017 and the press kit produced can be used to disseminate the results of the Map of Experiences and the Documents published in Work Package 2, which are the Financial, Legal and Technical frameworks.

• The last campaign was carried out during the months of May and June 2017, announcing the First Collective Event organized by ENERINVEST, as well as showing its results and the impact generated.

The partners Ecoserveis and EnerAgen worked together in order to complete the design of the campaigns carried out, from planning to launching, including the monitoring and evaluation of the impact figures achieved in the dissemination.

Page 22: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 22 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

Press releases and appropriate articles have been drafted for each milestone of the project, and also graphic material and short messages for dissemination in social networks were prepared and delivered to the members of the consortium. All these material included a brief description of the objectives of the campaign and the main target stakeholders and profiles to consider in the distribution.

As part of the C&D strategy, a regular activity on the website was maintained throughout the period. The website was used as an online channel for the publication of news, press releases, articles, activities and events related to the ENERINVEST project.

In the period up to month 18, a total number of 70 news items have been published, of which 26 news are internal and describe the progress, activities and results of ENERINVEST.

In order to reach target groups and stakeholders identified and also to meet the general objectives of ENERINVEST, a total of 44 external news and articles are available in the e-Platform, published choosing topical issues and specific topics of interest in Spain and the European Union. Information is focused on technical, financial and regulation aspects in the context of sustainable energy projects.

When displaying the online news, a template and several logos were chosen that allow a difference between the internal news, related to ENERINVEST and written by the consortium, and those that are external to the project or taken from other sources.

Additionally, there was a definition of 4 categories of news: General, Financing and Grants, Technologies and Regulation. These standards allow to organize the information in the webpage to reach different types of audiences and stakeholders, as well as guide in the reading of the published material and in the search on topics of interest. This practice also contributes to traffic generating on the platform and attracting new visitors to the website.

Furthermore, in order to achieve a good natural online positioning of the ENERINVEST website, keywords and search terms related to the contents have been included in each of the news, as well as a short description.

Figure 9: Screenshot of the definition and edition of News in the Intranet of Enerinvest.

Page 23: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 23 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

There are news of public dissemination and also of restricted access, some of which would be exclusive to the project partners and the officer, and others would be available to the registered users, depending on the chosen role (Financing bodies, Public promoters, Private promoters, ESCOs and Technicians, Other stakeholders).

Figure 10: Screenshot of the definition and edition of News in the Intranet of Enerinvest.

In addition to these publications made by the responsible for communication and dissemination work package (EnerAgen) with the contributions of all members of the consortium, an important number of news related to ENERINVEST have been published in at least 75 different media and online channels in the list of register that has been made so far.

As for the languages of diffusion, news of the platform were diffused and published in specialized websites, e-journals and magazines, and media in Spanish, Catalan and English.

The Annex 1 of this document shows a register of more than 125 news and articles about ENERINVEST, most of them published in external online media. An estimation of the total audience reached is also included, showing figures of the potential impact in the dissemination of the project.

Other channels and media have also been used during this period as the Radio and in-person interviews. One of the partners, Ecoserveis, improved and extended the audience with the presentation of the project's initiative in a radio program held on the 12th of June 2016. It was the radio program “Vida Verda” transmitted at RTVE (Radio 4) with an impact over 17,000 listeners.

It is important to note that Fernando García, the Coordinator of ENERINVEST, had an interview with one specialized media in the energy sector in May 2016. The document is available for download at NEWS Section in the website.

LINK TO THE ARTICLE PUBLISHED IN THE WEBSITE: https://www.enerinvest.es/noticias/general/el-proyecto-enerinvest-avanza-en-sus-objetivos-resumen-de-la-entrevista-realizada-al-socio-coordinador-del-proyecto-17

Page 24: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 24 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

WEB PLATFORM

The website includes the section CONTACT US as a channel of communication. It provides location data and information for making contact with the project partners. An email address is specified to contact the Coordinator of ENERINVEST: [email protected]

Also, a specific email address is available for those aspects concerning Communication and Dissemination to media: [email protected]

Filling out a simple form the web visitor can submit the subject of consultation and some contact details.

Figure 11: Screenshot of the CONTACT Section of the Website.

In order to engage new stakeholders in the platform, it is important to mention the REGISTRATION section, shown in Figure 11.

Figure 12: Screenshot of REGISTRATION section on the website linked to EnerInvest Project.

Page 25: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 25 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

In this section the web visitor can register on the e-Platform filling out a simple form and selecting a specific role according to their involvement in sustainable energy projects. Five types of agents or roles are considered, covering all the main stakeholders and target groups in the different stages and implementation of these projects.

In order to be registered, a user would choice among the roles of Investor, Public promoter, Private promoter, ESCOs and Technical Companies and Other interested users.

The categories firstly defined as users' roles had to be modified to consider the ESCOs and to include any user who showed a general interest in various topics.

Once the activity on the e-platform started and the users' registration section was activated, the number of people and institutions that have joined the ENERINVEST platform begins to be tracked and counted. This database will allow us to evaluate approximately the scope on the different target groups and the degree of interest awakened.

ACTIVITY OF SOCIAL MEDIA

The use of Social Networks will be key for tackling wider audiences.

ENERINVEST has daily presence on the Internet due to the social media strategy implemented, using Facebook, Google+, Twitter and LinkedIn profiles. All of them show the designed identity toolkit of the project and give a short descriptions of its objectives.

Twitter and Facebook profiles were set up in July 2016, and have been updated on a regular basis. Also LinkedIn and Google + were implemented, but having a weaker activity and impact.

Facebook: https://www.facebook.com/enerinvest/

Twitter: @EsEnerInvest

Page 26: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 26 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

Linkedin:: https://www.linkedin.com/groups/8559380

Google + & Google my Business: https://plus.google.com/110247972369226258486

Figure 13: Images of the ENERINVEST profiles in Social Networks.

Regular activity is posted showing new funding models, successful experiences, events, and any relevant issue regarding the activities of the project. Content has been posted in a clear and simple way, using illustrative images, messages to engage stakeholders, questions to answer or think about an idea (in order to get feedback from them). The description of simple examples were used to make financial keywords easier to understand for non-specialists.

Every published news or event announced in the ENERINVEST web calendar includes links to the four activated social networks, offering a direct publication on social media.

Although EnerAgen and Ecoserveis are responsible for keeping activity in social networks, all partners were involved in generating traffic and they interacted with ENERINVEST social media through their own company profiles.

An in-depth analysis of clear performance indicators is crucial to evaluate the social media strategy. During the first year of activity in social networks several key performance indicators were monitored and collected in order to get an objective overview of the impact achieved. An appropriate tool such as Twitter analytics was used to this end.

The key Indicators for monitoring social media traffic during the period have been chosen according to the following criteria:

• Concerning the reach and activity: the number of followers and lists, and demographic and location and traffic data.

• With regard to the interest and engagement of users: number of active followers, likes and shares, mentions, impressions and retweets, and most successful tweets.

Page 27: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 27 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

It should be noted that Google+ profile didn't generate traffic and had not enough activity to be monitored, so its analysis will be obviated in this report.

WEBINARS

The use of online tools together with traditional instruments allows reaching out to a wider audience and facilitates the organisation of even more specific presentations or discussions, reducing costs and time spent.

The design of the e-Platform includes an online Web conferencing software. This tool is now available and will be used in the second period of the project in order to organise Webinars of interest for ENERINVEST.

The nine consortium partners of the project participate in a specific working group identified as the Discussion Forums and Webinars Focus Group, which was created for these purposes. The core of the activity is done by ANESE as leader of the Focus Group but all the consortium members will contribute through the selection of the topics and the contact of external speakers.

In ENERINVEST energy agencies and public organisms for energy management are considered key stakeholders in the promotion of sustainable investments. For this reason, the partner EnerAgen has organized a series of online videoconferences that will tackle during 2017 different aspects on financing of sustainable energy projects. These Webinars are especially directed towards public administrations and energy agencies.

The title chosen for this online sessions was: "Let's Talk about Financing Sustainable Energy Projects". Two sessions were held in January and February with a wide attendance and interest from the agencies. The details of these activities are summarized in the following tables and a private document with conclusions was delivered to the attendees.

Webinar 1

Title: Financial tools in public administrations. Available tools and traditional barriers.

Date: Session made on the 12th of February 2017

Speakers: Sp1. Jordi Solé Muntada, Operations Manager of ECrowd!. Sp2. Íñigo Prior, Investment Advisor of Deutsche Bank.

Target Audience: Public entities, energy agencies

Number of attendees: A total attendance of 26 people. 22 participants of 15 energy agencies and public entities + 2 speakers + 2 from EnerAgen.

Page 28: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 28 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

Summary:

First of all, María Muñoz, Project Manager of EnerAgen presented the ENERINVEST project, its goals and tools. This presentation was focused in financial, technical and legal analysis about sustainable energy projects.

The second speaker, Jordi Solé made an explanation about basics issues to consider in crowdfunding, the main characteristics of this model of financing and its necessary stakeholders. He finished with a more specific presentation of the “ECrowd!” Platform.

Finally, Iñigo Prior introduced several instruments of Public-Private collaboration, which are being developed by European Commission within European Investment Bank and Deutsche Bank. In particular, he explained also the European Energy Efficiency Fund, EEEF, which is dedicated to measures for mitigating climate change through energy efficiency in countries of Europe Union. Investments in this Fund have three categories of projects: energy efficiency, renewable energy and clean urban mobility.

The main beneficiaries of these assistance mechanisms are public administrations that manage energy and transport services, social housing associations, and ESCOs, among others.

Dissemination of the Webinar:

Graphic material:

Page 29: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 29 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

Webinar 2

Title: The consideration as a public debt of Energy Efficiency investments.

Is this topic a barrier for public administrations? Searching for solutions.

Date: Session made on the 21st of February 2017

Speakers:

Sp1. Javier Sigüenza, General Secretary of AMI, Integral Maintenance Association. Sp2. Marta Gudiol, Head of Energy Efficiency Plan Unit of ICAEN, “Instituto Catalán de Energía” (Energy Agency of Cataluña).

Target Audience: Public entities, energy agencies

Number of attendees: A total attendance of 21 people. 17 participants of 8 energy agencies and public entities + 2 speakers + 2 from EnerAgen.

Page 30: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 30 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

Summary:

From EnerAgen (María Muñoz), started explaining progress and results achieved of ENERINVEST. She presented the map of experiences through success stories of innovative funding models of sustainable energy projects. Javier Sigüenza introduced European and Spanish actions in order to avoid the computation of public debt of energy performance projects. The last presentation was developed by Marta Gudiol, who explained the model of energy performance contract created by “Generalitat de Cataluña”.

Page 31: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 31 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

Dissemination of the Webinar:

Graphic material:

Page 32: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 32 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

ENERINTOOL

One of the strengths of this project is the development of a computer-based tool that provides a preliminary financial assessment and assistance on technical issues.

The Sustainable Energy Projects (SEPs) financial assessment tool (Enerintool) was developed choosing an attractive and intuitive design for users, and with a user-friendly interface. It is one of the instruments implemented in the e-platform, free and available for registered users.

Although the initial objective was to provide a preliminary assistance on technical and financial issues to registered users, a great chance to enable communication between stakeholders through the tool was detected.

During the design process of the Enerintool, the consortium considered the need of including an improvement in the first proposal. The tool can now be focused additionally to cover some communication issues between the key target groups. So, it can be considered as an extra channel for communication and making contacts among registered users that the e-platform offers.

Therefore, a Meeting Module was developed, where different users (financial institutions, public and private promoters, technical companies, and others) are able to meet other users with complementary interests in Sustainable Energy Projects.

The tool enables mutual contact data by means of fulfilling different forms and requests and, thus, covering the gap between the financial sector and the energy sector, and easing the dialogue among relevant stakeholders.

The following figure shows the interface of the Enerintool at the Meeting Module.

Figure 14: Screenshot of the Enerintool uploaded in the e-platform of ENERINVEST.

Page 33: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 33 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

PROMOTIONAL MATERIAL

Dissemination efforts are intensified especially when there are approaching events and activities organized by ENERINVEST and above all when key project results are achieved or important milestones in global planning are overcome. A review of distribution of efforts and times of greater emphasis on the C&D strategy are summarized in Table 1 of this document.

Leaflets with general information about ENERINVEST objectives, target groups and main actions have been edited in digital and printed copies of English and Spanish version. These brochures were sent to all the partners.

At the moment approximately the 40% of the initial edition of these leaflets have been distributed in the events in which the project has been presented. A special distribution of the English version was made in the European Forum1 celebrated in Brussels in January 2017.

The four events that have been organized by the ENERINVEST consortium have also been moments in which an important distribution of the printed brochures has been made. In this sense, the Collective Event in Barcelona, the peer-to-peer meeting of financers and promoters in April and the Presentations of the project organised in April and October 2016 in Madrid, served to deliver directly to the key agents the document and also the occasion of explaining it by its own authors.

Other printed or online marketing materials were produced for workshops, meetings, events, and letters presenting the initiative, invitations to the events, among others. We keep documents and reports informing about the results or conclusions of the events or webinars organized. Some of them were used in mailings and other documents can be consulted on the website in the format of news, or downloadable resources.

Any other relevant deliverable of the project (such as handbooks, guides, reports, manuals, documents of conclusions on the collective events, etc.) was loaded in the e-Platform at the RESOURCES section; link: https://www.enerinvest.es/recursos/ . This section also includes a short summary describing the contents and structure of the documents as the following figure shows.

ENERINVEST productions have been distributed through the website, social media and or targeted mailing to specific target groups.

1 The Energy Efficiency Finance Market Place. https://www.enerinvest.es/actividades/general/un-mercado-de-finanzas-de-eficiencia-energetica-organizado-por-la-agencia-easme-de-la-comision-europea-acoge-en-bruselas-al-proyecto-enerinvest-24

Page 34: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 34 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

Figure 15: Screenshot of Documents at the RESOURCES Section of the website EnerInvest.

Page 35: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 35 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

RESULTS OF MONITORING AND EVALUATION ACTIVITIES

During the first 18 months the WP7 Leader made a follow-up of the Communication and Dissemination activities and the effectiveness in the use of the tools proposed.

Taking into account that it is not possible to quantify the results of the whole range of the communication and dissemination activities carried out, a series of tasks and mechanisms have been selected in order to estimate the impact achieved. This variables can be quantified in terms of their impact, evaluated and reprogrammed if needed according to the results obtained.

Among others, the number and type of role of users registered in the platform, the analysis of the traffic generated on the website and the activity in social networks can give an estimation of the degree of impact achieved.

Engagement of Target Groups in the e-Platform

The monitoring of the number of users registered in the platform has been made since September 2016, once the REGISTRATION section was implemented on the Website.

In the first 10 months of activity a total of 415 registered users have joined, with an evolution in the number of active registrations shown in the following figure:

Figure 16: Evolution in the number of registered users of the e-Platform.

The impact results of the massive and coordinated communication and dissemination campaigns is observed in the growth in number of users from November 2016.

Also the tasks made for enriching the contents and options of the web page (especially news or activities published and resources uploaded) had a positive effect.

Page 36: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 36 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

The peer-to-peer meeting in April 2017 caused a remarkable increase in all profiles or roles defined. In addition to this, the announcement of the first collective event and the period after it was held have also raised the number of registrations.

However, 10 months of activity on the web is not enough time to obtain objective conclusions as to the degree of interest and involvement of the key players in the sustainable energy projects. The following table and pie chart show the distribution according to the registered user profiles.

User's Role Total Investor 40 Public promoter 64 Private promoter 33 ESCOs and technical companies 132

Other Stakeholders 146 Total 415

As a result of this analysis we can obtain some conclusions:

• In the first 10 months of monitoring around 67% of registered users are ESCOs and technical companies along with the category of other interested users (other Stakeholders).

The important number of this generic category reflects that the visitors of the web do show interest in the project, but they are not specially identified with any of the categories or roles defined in the register proposal.

• However, this generic public may be an interesting target audience to consider. Their doubts or difficulty to decide a direct role in sustainable energy projects may be due to their perception of a certain commitment at the time of registration.

• In spite of this, the sum of the key players formed by the categories of public promoters, private promoters and investors is above 65%. This enables the meeting between both parties, promoters and funders, making it viable to establish connections in the computer-based assessment tool, Enerintool.

As a future objective, some of the commercial and professional relationships initiated could result in proposals of new SEPs investments.

Page 37: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 37 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

Web evaluation and results of the analysis

In order to keep track of the traffic generated by the website associated with the ENERINVEST project, a rigorous monitoring process and analysis has been carried out by EnerAgen, using the Google Analytics tool. Monthly reports in the period between September 2016 and June 2017 have been collected. This tool provides a wealth of information about the effectiveness of our website and how users are interacting with it.

In order to show the monitoring of the monthly data, two significant periods of time have been chosen. The period between September and December 2016, and the period between January and June 2017. A comparison of the most relevant data will be shown in this section, together with a collection of images downloaded from the analysis tool.

The following features or key performance indicators have been chosen as those of more interest. They will allow to make a diagnosis of our website and to apply corrective actions or a greater development in future months.

Audience Overview:

The following table shows the results for the global period of 10 months tracked, that is from the 1st of September 2016 to the 30th of June 2017.

Key Performance Indicator Results of Evaluation (From Sept. 16 to June 2017)

Number of total sessions or total visitors to the Web 9,350

Number of unique users or visitors. 4,097

Average session duration 0:06:46

Total number of page views 54,090

Average pages views per session 5,79

Rate of new sessions compared to regular visitors 43,57%

Bounce Rate 46,90%

Average sessions per day 31,2

It is important to compare the evolution in this indicators between the two periods chosen. The following pictures offer an overview of how the website is doing, including visitors, unique visitors, page views, average time on site, bounce rate, and even a pie chart comparing new and returning visitors.

Page 38: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 38 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

Figure 17: Audience Overview of the website EnerInvest. Period: Sept.'16 to Dec.'16

Figure 18: Audience Overview of the website EnerInvest. Period: Jan.'17 to June'17

Users Flow Report:

The Users Flow Report is a graphical representation of the paths users took through our website. From the entrance source, they go through the pages and they exit the site.

Page 39: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 39 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

The most visited pages in a first interaction are the News section, the Registration form and the sub-section About Us in the ENERINVEST site.

In a second interaction users have priority access to the Activities and Resources sections. Inside the Resources menu, there is major traffic to the Map of Experiences, with a great increase from November and December 2016. Secondly traffic flows to the subsection Documents. The visits to the Registration form also increased, due to resources only available for registered users. As a result, the number of registered users in the e-Platform had a progressive rise.

In May and June 2017, the flow of users has focused on Activities and News, and in the first ENERINVEST Collective Event in Barcelona held on the14th of June.

It is remarkable the number of visits to the section of the ENERINTOOL since May 2017. This resource is currently available in a beta version, and has caused expectation in the public, so it is expected that the number of registered users will increase significantly.

Figure 19: Users Flow Report in June'17

Demographics and Language data:

Since the website is edited in three languages, Spanish, English and Catalan, it is also relevant to know from which languages the site is mostly receiving visits.

For each of the two periods analyzed the geographical areas where traffic is generated are shown on a map on a global scale, and also in greater detail in Spain.

The languages from which our website is most visited are Spanish and Catalan, followed by English. It would be interesting a growth in the English version, so that the possibility of translating a greater part of non-static contents should be considered.

As for the geographical areas from which the web were visited, Spain and Europe stand out, followed by Latin America and the United States. Within Spain there is an important web follow-up from Catalonia, Madrid and the central area, from the northwest and the Basque Country.

Page 40: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 40 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

Figure 20: Traffic map of the Enerinvest site on a global scale

Figure 21: Traffic map of the Enerinvest site. Detailed distribution in Spain and Languages.

Overview of Acquisitions and Traffic Reference:

The form of access or how Web users have reached it, also allows us to evaluate the effectiveness of social networks or the interest aroused from other web portals.

The access to the site from social media is important and has increased in the second period. More than 35% of users have looked for the project in general browsers, which shows that it has interested to public. Access should be increased from external links with the incorporation

Page 41: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 41 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

of the project into recognized web portals. This would improve the overall positioning of the site and attract new users.

Figure 22: Overview of Acquisitions and Traffic Reference.

Results of Social Media analysis

During the first year of activity, the follow-up and analysis of the main performance indicators chosen to evaluate the traffic and degree of data transfer in social networks gave us the following results:

It should be noted that Google+ profile didn't generate traffic and had not enough activity to be monitored, so its analysis will be obviated in this report.

• FACEBOOK PAGE https://www.facebook.com/enerinvest/

FIGURES OF REACH

Current followers: 55 Total number of publications: 99 Average participation rate for publication: 7.4% Global reach:

Page 42: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 42 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

Top 5 publications:

1. Date: 02/05/2017; 336 people reached. https://www.enerinvest.es/actividades/general/primer-evento-colectivo-del-proyecto-enerinvest-jornada-de-encuentro-entre-agentes-clave-en-energia-sostenible-38

2. Date: 17/04/2017; 313 people reached: Topic: Regístrate gratis en la web de ENERINVEST, para consultar los documentos de Análisis Técnico, Legal y Financiero, así como el Mapa de Experiencias con modelos innovadores de financiación para proyectos de #energíasostenible https://www.facebook.com/enerinvest/photos/a.1179079765514288.1073741828.1053813964707536/1528467697242158/?type=3

3. Date: 06/03/2017; 233 people reached. Topic: En el día de la #eficienciaenergética; Asignaturas pendientes para tener edificios eficientes en España. Medidas fiscales para acciones de mejora e implicación del sector bancario. Vía @elmundoes @CENER_Energia http://bit.ly/2moDfbR

4. Date: 01/02/2017 217; people reached. Topic: Se publica el Mapa de Experiencias en ENERINVEST. Descubre proyectos y modelos de financiación innovadores en España y la UE. Disponible desde hoy, 1 de febrero de 2017, para usuarios registrados. https://www.enerinvest.es/recursos/mapa-de-experiencias

5. Date: 09/03/2017; 194 people reached. Topic: La plataforma aspira a convertirse en el punto de encuentro y diálogo entre los principales actores del sector de las energías sostenibles, para aportar soluciones técnicas, legales y financieras a los proyectos promovidos tanto desde el sector público como desde el sector privado. La iniciativa, impulsada por ocho entidades que forman un consorcio coordinado por Deloitte Advisory, S.L, está dotada con 2 millones de euros del programa marco de investigación e innovación de la Unión Europea, Horizonte 2020, y pretende promover la inversión de otros 25 millones de euros en Proyectos de Energía Sostenible en toda España entre 2016 y 2019. https://www.enerinvest.es/noticias/general/enerinvest-inicia-actividad-en-los-medios-de-comunicacion-y-redes-sociales-44

Page 43: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 43 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

Demographic data:

• TWITTER PROFILE https://twitter.com/EsEnerInvest

FIGURES OF REACH

Current followers: 445 Total number of publications: 655 Total media content: 435 photos and videos Total number of impressions: 151,844 Added to 15 lists Month with more visits to the profile: June 2017 (583) 296 twits mentioning the project URL

Most successful twits:

• May 2017 | 2457 impressions | 36 total interactions

Información de Jornadas de análisis de aplicación del paquete #CleanEnergyEU #EMANW17 http://bit.ly/2pFyTA7 @EU_Regional @Energy4Europe pic.twitter.com/I9bF9NJmC5

• Sept 2016 | 2006 impressions | 39 total interactions

EnerInvest @EsEnerInvest Nace la Plataforma Española para la Financiación de la #Energía #Sostenible #enerinvest http://ow.ly/ycnV3049STq pic.twitter.com/3RlPWev354

• Feb 2017 | 1969 impressions | 47 total interactions

La mitad de los ciudadanos de la UE podría generar su propia energía en 2050 @ESEFICIENCIA @REScoopEU http://bit.ly/2kZXcEQ #EREF pic.twitter.com/EalkkKDBeQ

Page 44: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 44 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

• June 2017 | 1467 impressions | 61 total interactions

Mesa 4) Instalaciones, consumo y gestión energética: @AjRubi @circutor @SodexoIberia @unizar @energiacat, Agència Energía Osona #ENERINVEST

pic.twitter.com/fU6pYbfM6O

• Oct 2016 | 1196 impressions | 30 total interactions

El Parlamento Europeo aprueba la "Estrategia de Calefacción y Refrigeración" Rehabilitación energética de edificios http://bit.ly/2dKsuOs

pic.twitter.com/BACoeH4cXe

Graphs showing the evolution of the number of impressions and the engagement of Twitter profile users:

Figures 23: Overview of impressions and engagement evolution in Twitter.

Page 45: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 45 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

Summary of impact monitoring indicators

The following indicators have been used as an example of the impact monitoring evaluation.

Task Results of Evaluation

Media analysis. Presence in the Media

70 is the total Number of press releases and articles published in ENERINVEST Website

• 26 Internal News and articles drafted and published by the partners in the Website to inform about the project results and activities.

• 44 News and articles drafted and published by the partners in the Website to inform about legal, financial and technical issues of SEPs.

Number of press releases and articles about ENERINVEST published in external media: Around 125. 75 is the number of specialized or general media informing about the project with a total audience reached near 1.5 million of visitors. 39 is the total Number of events and activities highlighted and announced in the Website calendar

Website evaluation. Presence on the Internet

Website Traffic Monitoring KP Indicators and most popular pages • 9,350 total visitors to the website • More than 54,000 page views • Traffic to News / Activities / Resources and Registration

A number of 4 direct links and references to the platform in external websites.

Social Media analysis. Presence on the Internet

TWITTER: 445 Followers Around 2 tweet/day posted 151,844 Total number of impressions

FACEBOOK: 55 Followers

LINKEDIN: 38 members in one group.

Evaluation of National Conferences and Collective Events organized by ENERINVEST

Total number of speakers and attendees to the National Conferences and Events (workshops, webinars and forums) organized: 75 attendees.

11 provinces represented 9 funds and financers 19 public promoters 16 ESCOs and technical companies 10 private promoters 21 interested people

Result of Feedback Questionnaire of 1st Collective Event: above 7.6 out of 10.

Page 46: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 46 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

Task Results of Evaluation

Evaluation of Presentations at external events

Invitations received and participation in external events: 28 28 events attended for making project presentations and getting new stakeholders. Estimation of total number of attendees to the events: Above 2,000 attendees

Engagement of Stakeholders and Target Groups

415 Total Number of registered users in the e-platform

• 8% of Private promoters as registered users • 15% of Public promoters as registered users • 10% of Investors as registered users • 32% of ESCOs and Technical companies • 35% of other Stakeholders.

Constitution of Financial Working Groups (active collaboration and attendance to the meetings of several experts in financing). Around 11 experts. Constitution of Promoters Working Groups. Around 12 private promoters have shown interest and participated in the meetings. One peer-to-peer event, in April 2017: 42 attendees, with 15 private promoters registered. (See Annex 1).

Table 2: Summary of main impact monitoring indicators of the project.

Page 47: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 47 de 47

ENERINVEST WP7 - D.7.6. – First Dissemination Report - EN-Final version.

ANNEXES

Page 48: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 1 de 33

ENERINVEST [WP7] - [1st Dissemination Report] -[V0.1.]

D. 7.6. 1st Dissemination Report

Annexes FINAL VERSION

Page 49: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 2 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

TABLE OF CONTENTS

ANNEX 1 - COMMUNICATION & DISSEMINATION ACTIVITIES ...................................................... 3

Annex 1.1.- Events organised ................................................................................................... 4

Annex 1.2.- Events attended .................................................................................................... 6

Annex 1.3.- ENERINVEST News related published ................................................................. 12

Note 1: Analysis made using Mustat.com (number of visitors accounting tool). It shows the number of copies of the media website. ................................................................. 30

ANNEX 2: SETS OF IMAGES AND GRAPHIC MATERIAL PRODUCED FOR C&D ACTIVITIES OF THE PROJECT ....................................................................................................................................... 31

Page 50: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 3 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

ANNEX 1 - COMMUNICATION & DISSEMINATION ACTIVITIES

Annex 1.1.- Events organised

Annex 1.2.- Events attended

Annex 1.3.- ENERINVEST News related published

Page 51: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 4 de 33 ENERINVEST

WP7 - 1st Dissemination Report-Final version

Annex 1.1.- Events organised

Num. Identification of Event or Activity Date Participating Partner/s

Number of participants

Target Audience Link to Event or Media: Url

1

Jornada de Lanzamiento del Proyecto ENERINVEST.

Launching event: Presentation of ENERINVEST

07/04/2016

Deloitte as Project

Coordinator & all partners

70 attendees

Financial institutions, investment funds, public institutions, energy agencies, specialized press and private promoters

https://www.enerinvest.es/noticias/general/promover-la-financiacion-en-energia-sostenible-el-objetivo-de-enerinvest-y-la-union-europea-2

2

Jornada sobre beneficios intangibles derivados del modelo ESE y mecanismos de financiación

Event organized for projects ENERINVEST and IN-BEE: “Assessing the intangibles: the socioeconomic Benefits of improving energy efficiency”

06/10/2016

Deloitte as Project

Coordinator & all partners

40 attendees and 10

speakers

Financial entities, investment funds, energy agencies, private promoters and energy services entities, sectorial associations, ESCOs and Universities. Key players and contact people in the SEPs development in the European Union.

https://www.enerinvest.es/noticias/general/los-proyectos-enerinvest-e-in-bee-en-la-jornada-sobre-beneficios-intangibles-derivados-del-modelo-ese-y-mecanismos-de-financiacion-58

3

Jornada de encuentro entre promotores e inversores de Proyectos de Energía Sostenible

Peer-to-Peer meeting. An event for connecting investors, financial institutions and promoters.

26/04/2017 Deloitte ANESE 42 attendees

Financial institutions, Banks, Investment funds, and more than 15 private promoters and ESCOs.

https://www.enerinvest.es/actividades/financiacion-subvenciones/jornada-de-encuentro-entre-promotores-e-inversores-de-proyectos-de-energia-sostenible-36

https://www.enerinvest.es/noticias/general/enerinvest-promueve-una-jornada-de-encuentro-entre-promotores-e-inversores-de-proyectos-de-energia-sostenible-108

Page 52: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 5 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Identification of Event or Activity Date Participating Partner/s

Number of participants

Target Audience Link to Event or Media: Url

4

Primer Evento Colectivo del proyecto ENERINVEST. Jornada de encuentro entre agentes clave en energía sostenible

First National Collective Event organized by ENERINVEST

14/06/2017

Deloitte as Project

Coordinator & all partners

75 attendees

Financial institutions, investment funds, public institutions, ESCOs and Technical companies, private promoters, energy agencies and specialized press

https://www.enerinvest.es/actividades/general/primer-evento-colectivo-del-proyecto-enerinvest-jornada-de-encuentro-entre-agentes-clave-en-energia-sostenible-38

https://www.enerinvest.es/actividades/general/primer-evento-colectivo-del-proyecto-enerinvest-jornada-de-encuentro-entre-agentes-clave-en-energia-sostenible-39

Page 53: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 6 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Annex 1.2.- Events attended

Num. Identification of Event or Activity Date Participating Partner/s

Number of participants

Target Audience Link to Event or Media: Url

1 XV Asamblea General de EnerAgen y I Encuentro de agencias y organismos públicos en el ámbito de la energía

22/04/2016 EnerAgen 60 attendees Energy agencies and public bodies in the field of energy

https://www.enerinvest.es/noticias/general/recibido-con-exito-el-proyecto-enerinvest-en-la-xv-asamblea-general-de-eneragen-y-i-encuentro-de-agencias-y-organismos-publicos-en-el-ambito-de-la-energia-20

2 Programa de radio Vida Verda - RTVE (Radio 4) 12/06/2016 Ecoserveis

Around 17,000 listeners

http://www.rtve.es/alacarta/audios/vida-verda/vida-verda-invertir-renovables-qualitat-laire/3626768/

3

Jornada One2One: "Financing Options in Sustainable Energy" // Opciones de Financiación en Energía Sostenible. Organizada por el Programa Beenergi

17/06/2016 Diputació de Girona 60 attendees SMEs, municipalities, public administrations, financial institutions

http://www.diaridegirona.cat/comarques/2016/06/18/60-ajuntaments-pimes-participen-jornada/789243.html

http://beenergi.ddgi.cat/es/evento/opcions-de-financament-en-energia-sostenible/

https://www.enerinvest.es/noticias/general/unos-60-ayuntamientos-y-pymes-participan-en-una-jornada-sobre-energia-sostenible-1

4 I Peer to Peer Exchange Seminar. Seville (Spain). EMPOWERING Project Event

05/10/2016 Agenex NA

Financial institutions, investment funds, public institutions, energy agencies, specialized press and private promoters

http://www.empowering-project.eu/?page_id=288&lang=es

Page 54: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 7 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Identification of Event or Activity Date Participating Partner/s

Number of participants

Target Audience Link to Event or Media: Url

5

“Del Pacto a la Acción”. Jornada de Networking sobre Eficiencia Energética orientada a sectores públicos y privados de Cataluña.

14/10/2016 Ecoserveis

Diputació de Girona NA

SMEs, municipalities, public administrations, financial institutions

http://xarxaenxarxa.diba.cat/events/2016/10/14/del-pacte-accio-jornada-ii-networking-sobre-eficiencia-energetica-aplicada-als-sec

http://xarxaenxarxa.diba.cat/gallery/imatges-del-pacte-accio-jornada-ii-networking-sobre-eficiencia-energetica-aplicada-als-secto

6

X Jornadas Abulenses de Energía. Presentación de los avances el proyecto ENERINVEST como ejemplo de buenas prácticas.

08/11/2016 EnerAgen 141 people in registration

ESCOs, Energy agencies, Universities, Public bodies, R&D institutions and energy experts

http://www.apea.com.es/info/jornadas/x-jornadas.html

https://www.enerinvest.es/noticias/general/eneragen-presenta-los-avances-en-el-proyecto-enerinvest-en-las-x-jornadas-abulenses-de-energia-62

7 Ciclo técnico "La energia en la indústria" - Jornada 2: La eficiencia energética en la empresa

09/11/2016 Ecoserveis 50 attendees SMEs http://www.canmuntanyola.cat/2a-jornada-efici%C3%A8ncia-energ%C3%A8tica-a-l%E2%80%99empresa.html

8 First Transnational REHABILITE Forum in Navarra 15/12/2016

Agenex Nasuvinsa

80 attendees

Energy agencies, Public bodies, professionals and experts in energy rehabilitation

http://rehabilite.eu/rehabilite/actualidad/pamplona-acogio-el-primer-foro-transnacional-rehabilite

9 Argentina - 1° Jornada Nacional de Eficiencia Energética - Desarrollo de las Empresas de Servicios Energéticos

15/12/2016 ANESE 300 attendees

Energy agencies, Public bodies, professionals and experts in energy rehabilitation

https://www.minem.gob.ar/prensa/25874/el-presidente-macri-inauguro-la-1ra-jornada-nacional-de-eficiencia-energetica.html

Page 55: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 8 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Identification of Event or Activity Date Participating Partner/s

Number of participants

Target Audience Link to Event or Media: Url

10 Rehabilitación Energética: Soluciones de Europa a Extremadura 15/12/2016 Agenex NA

Financial institutions, investment funds, public institutions, energy agencies, specialized press and private promoters

http://www.intromac.com/rehabilitacion-energetica/

http://www.intromac.com/wp-content/uploads/2016/11/RehabilitacionEnergetica.pdf

11 Energy Efficiency Finance Market Place 18/01/2017

Deloitte y el Consorcio

ENERINVEST

52 attendees in an Event with

more than 250 registered people

Public organisms, professional and energy experts. National R&D Identities. Agricultural cooperatives.

https://ec.europa.eu/energy/en/events/energy-efficient-finance-market-place

https://www.enerinvest.es/noticias/financiacion-subvenciones/enerinvest-un-proyecto-que-aborda-esquemas-de-financiacion-innovadores-presentacion-de-la-plataforma-en-el-mercado-de-finanzas-de-eficiencia-energetica-organizado-por-easme-en-bruselas-88

12 Jornada Informativa H2020 Reto Social: Energía segura, limpia y eficiente

26/01/2017 Deloitte 30 attendees

Financial institutions, investment funds, public institutions, energy agencies, specialized press and private promoters

http://portal.uc3m.es/portal/page/portal/investigacion/servicio_investigacion/Jornada_H2020_RetoSocial

13 Webinar del Club Español de la Energía: La eficiencia energética como prioridad

28/02/2017 ANESE 15 attendees SMEs https://www.enerclub.es/eventsAction/Formacion_1/oferta_formativa/Webinar28022017

14

WSED – World Sustainable Energy Days 2017 - Casos de éxito: Servicios de Eficiencia Energética y modelos de negocio

03/03/2017 ANESE NA

Universities, ESCOs, Municipal public administrations, Technical companies

http://www.wsed.at/en/world-sustainable-energy-days.html

Page 56: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 9 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Identification of Event or Activity Date Participating Partner/s

Number of participants

Target Audience Link to Event or Media: Url

15 Curso de PYME a MESE (microempresas de servicios energéticos) en Vic

23/03/2017 Diputació de Girona 6 students

ESCOs, Technical companies, Financial entities, public institutions, specialized press and private promoters

http://beenergi.ddgi.cat/es/event/curs-de-pime-a-mese-a-vic/

16

Gandía, Ciudad Eficiente y Desarrollo de Smart City - Colaboración Público Privada – El modelo de las ESEs: Ventajas de las ESEs

23/03/2017 ANESE NA Energy agencies, Public Organisms, companies and experts in energy

http://www.anese.es/eventos/jornada-gandia-ciudad-eficiente-y-desarrollo-de-smart-city/

17 Foro de Inversión y Networking. Incentivos públicos, inversión privada 27/03/2017 ANESE NA

ESCOs, Technical companies, Financial entities, public institutions, specialized press and private promoters

http://www.anese.es/eventos/foro-de-inversion-y-networking-incentivos-publicos-inversion-privada/

18 II Encuentro de agencias y organismos públicos en el ámbito de la energía organizado por EnerAgen

31/03/2017 EnerAgen 50 attendees

Financial institutions, investment funds, public institutions, energy agencies, specialized press and private promoters

https://www.enerinvest.es/noticias/general/el-estudio-de-instrumentos-de-financiacion-de-enerinvest-uno-de-los-proyectos-singulares-expuestos-en-el-ii-encuentro-de-agencias-y-organismos-publicos-en-el-ambito-de-la-energia-organizado-por-eneragen-96

19

Presentación del “Observatorio de Eficiencia Energética 2016. El mercado de las Empresas de Servicios Energéticos”. ANESE introduce la filosofía de ENERINVEST.

04/04/2017 ANESE 90 attendees

ESCOs, Energy agencies, Universities, public bodies, professionals and experts in energy and lighting

http://www.anese.es/observatorio-anese-eses-espanolas-ahorro-energetico-ahorro-economico/

https://www.enerinvest.es/noticias/general/presentacion-del-observatorio-de-eficiencia-energetica-2016-el-mercado-de-las-empresas-de-servicios-energeticos-anese-introduce-la-filosofia-de-enerinvest-104

Page 57: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 10 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Identification of Event or Activity Date Participating Partner/s

Number of participants

Target Audience Link to Event or Media: Url

20 XIX Forum de la Energia Sostenible: Tecnologia, legislación y financiación para una iluminación de calidad

26/04/2017 Ecoserveis 46 attendees

Financial institutions, investment funds, public institutions, specialized press and private promoters

https://www.enerinvest.es/actividades/general/xix-forum-de-la-energia-sostenible-tecnologia-legislacion-y-financiacion-para-una-iluminacion-de-calidad-37

http://www.ecoserveis.net/es/fes-2017/

21 Publicación de ENERINVEST en Boletín Oficial de Fondos Europeos Cataluña

03/05/2017 Ecoserveis NA SMEs http://exteriors.gencat.cat/ca/detalls/noticia/20170502_Enerinvest

22

EMPOWERING-Forum - Covenant of Mayors for Climate and Energy: targets for 2030 Strategies, financing, best practices

24/05/2017 Agenex NA

ESCOs, Financial entities, Energy agencies, Universities, Public bodies, cooperatives and energy experts

https://www.uniurb.it/novita-ed-eventi/3933

23 Curso de PYME a MESE (microempresas de servicios energéticos) en Girona

02/06/2017 Diputació de Girona 6 students

http://beenergi.ddgi.cat/es/event/curs-de-pime-a-mese-a-girona-3a-edicio/

http://beenergi.ddgi.cat/es/meses/

24

Jornada de innovación “Nuevos modelos de financiación aplicables a proyectos de eficiencia energética y energías renovables”. ADE Castilla y León y CARTIF

12/06/2017 EnerAgen 25 attendees SMEs, ESCOs, Associations in the field of energy and the business sector

https://www.enerinvest.es/actividades/financiacion-subvenciones/el-proyecto-enerinvest-se-expondra-en-leon-en-la-jornada-nuevos-modelos-de-financiacion-aplicables-a-proyectos-de-eficiencia-energetica-y-energias-renovables-43

https://www.enerinvest.es/noticias/general/en-leon-la-jornada-de-innovacion-nuevos-modelos-de-financiacion-aplicables-a-proyectos-de-eficiencia-energetica-y-energias-renovables-ayuda-a-difundir-el-proyecto-enerinvest-119

Page 58: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 11 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Identification of Event or Activity Date Participating Partner/s

Number of participants

Target Audience Link to Event or Media: Url

25 Las empresas y sus costes energéticos - Ahorro y eficiencia, claves en la gestión empresarial

13/06/2017 ANESE NA http://www.gesternova.com/jornada-las-empresas-y-sus-costes-energeticos/

26 EUSEW Canarias 2017- UE: Clean Package y Observatorio del Mercado de los Servicios Energéticos

14/06/2017 ANESE 20 attendees

Financial institutions, investment funds, public institutions, energy agencies, specialized press and private promoters

http://2017.energyhub.es/eusew-canaries-2017.php

27 SEI Forums - Financing Energy Efficiency in Spain and Portugal 15/06/2017

Deloitte Diputación de

Huelva, EnerAgen, ANESE y AGENEX

161 attendees SMEs, ESCOs, Associations in the field of energy and the business sector

https://ec.europa.eu/energy/en/events/financing-energy-efficiency-spain-and-portugal

https://www.enerinvest.es/actividades/financiacion-subvenciones/el-circulo-de-bellas-artes-escenario-para-una-conferencia-organizada-por-la-comision-europea-sobre-la-financiacion-de-la-eficiencia-energetica-en-espana-y-portugal-42

28 Jornada “Investor Days Madrid”. Seminario sobre inversiones en energía sostenible y contratación EPC

10/07/2017 Deloitte ANESE

AGENEX 30 attendees

SMEs, ESCOs, Associations in the field of energy and the business sector

http://www.creara.es/noticias/investor-days-madrid-trust-epc-south

https://www.enerinvest.es/noticias/financiacion-subvenciones/enerinvest-se-presenta-en-investor-days-madrid-seminario-sobre-inversiones-en-energia-sostenible-y-contratacion-epc-126

Page 59: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 12 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Annex 1.3.- ENERINVEST News related published

Num. Name of Media Publication Date Publication Headline Relevant fact or milestone

Number of copies

(visitors/day) i Link for searching: Url

1 Europapress 13/09/2016 Una nueva plataforma on line permitirá captar inversiones en proyectos energía sostenible

Inicio de la campaña de comunicación a medios 13 de septiembre 2016

157.604

http://www.europapress.es/navarra/noticia-nueva-plataforma-on-line-permitira-captar-inversiones-proyectos-energia-sostenible-20160913184444.html

2 Eldiario.es 13/09/2016 Una nueva plataforma on line permitirá captar inversiones en proyectos energía sostenible

Inicio de la campaña de comunicación a medios 13 de septiembre 2016

238.021

http://www.eldiario.es/norte/navarra/ultima_hora/plataforma-permitira-inversiones-proyectos-sostenible_0_558545048.html

3 La información com

13/09/2016 Una nueva plataforma on line permitirá captar inversiones en proyectos energía sostenible

Inicio de la campaña de comunicación a medios 13 de septiembre 2016

269.439

http://www.lainformacion.com/medio-ambiente/energia-alternativa/plataforma-permitira-inversiones-proyectos-sostenible_0_953306132.html

4 20minutos 13/09/2016 El proyecto Enerinvest de energías sostenibles estrena su web con la participación de la Diputación

Inicio de la campaña de comunicación a medios 13 de septiembre 2016

353.719

http://www.20minutos.es/noticia/2836244/0/proyecto-enerinvest-energias-sostenibles-estrena-su-web-con-participacion-diputacion/

5 ESEficiencia 13/09/2016 ENERINVEST facilita la financiación de Proyectos de Energía Sostenible

Inicio de la campaña de comunicación a medios 13 de septiembre 2016

660 https://www.eseficiencia.es/noticias/enerinvest-facilita-la-finaciacion-de-proyectos-de-energia-sostenible

6 HuelvaYa.es 13/09/2016 El proyecto Enerinvest estrena su página web Inicio de la campaña de comunicación a medios 13 de septiembre 2016

3.825 http://huelvaya.es/2016/09/13/el-proyecto-enerinvest-estrena-su-pagina-web/

7 PamplonaActual 13/09/2016 “EnerInvest”, una nueva plataforma on line para Inicio de la campaña de 2.254 http://pamplonaactual.com/enerinve

Page 60: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 13 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Name of Media Publication Date Publication Headline Relevant fact or milestone

Number of copies

(visitors/day) i Link for searching: Url

captar inversiones en proyectos energía sostenible comunicación a medios 13 de septiembre 2016

st-una-nueva-plataforma-on-line-captar-inversiones-proyectos-energia-sostenible/

8 Energias-Renovables

13/09/2016 Enerinvest: 25 millones de euros en proyectos de energía sostenible en España

Inicio de la campaña de comunicación a medios 13 de septiembre 2016

3.193

http://www.energias-renovables.com/articulo/enerinvest-25-millones-de-euros-en-proyectos-20160913

9 Energias-Renovables

13/09/2016 Deloitte quiere movilizar 25 millones de euros en proyectos de energías renovables en el próximo trienio

Inicio de la campaña de comunicación a medios 13 de septiembre 2016

3.193

http://www.energias-renovables.com/articulo/deloitte-quiere-movilizar-25-millones-de-euros-20160913

10 RETEMA 14/09/2016 EnerInvest, una nueva plataforma para captar inversiones en proyectos de energía sostenible

Inicio de la campaña de comunicación a medios 13 de septiembre 2016

558

http://www.retema.es/noticia/enerinvest-una-nueva-plataforma-para-captar-inversiones-en-proyectos-de-energia-soste-covL6

11 AGENEX 14/09/2016 ENERINVEST inicia actividad en los medios de comunicación y redes sociales

Inicio de la campaña de comunicación a medios 13 de septiembre 2016

167

http://www.agenex.net/es/noticias-sp-6631/1351-enerinvest-inicia-actividad-en-los-medios-de-comunicacion-y-redes-sociales

12 AGENEX 14/09/2016 El proyecto europeo EnerInvest promoverá la inversión de 25 millones de euros en Proyectos de Energía Sostenible en España

Inicio de la campaña de comunicación a medios 13 de septiembre 2016

167

http://www.agenex.net/es/noticias-sp-6631/1350-el-proyecto-europeo-enerinvest-promovera-la-inversion-de-25-millones-de-euros-en-proyectos-de-energia-sostenible-en-espana

13 Navarra.es 13/09/2016 "EnerInvest", una nueva plataforma on line para captar inversiones en proyectos energía sostenible

Inicio de la campaña de comunicación a medios 13 de septiembre 2016

28.271 http://www.navarra.es/home_es/Actualidad/Sala+de+prensa/Noticias/2016/09/13/EnerInvest+energia+sosten

Page 61: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 14 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Name of Media Publication Date Publication Headline Relevant fact or milestone

Number of copies

(visitors/day) i Link for searching: Url

ible+Espana+web+Navarra.htm

14 ANESE 13/09/2016 El proyecto europeo ENERINVEST promoverá la inversión de 25 millones de euros en Proyectos de Energía Sostenible en España

Inicio de la campaña de comunicación a medios 13 de septiembre 2016

371 http://www.anese.es/?p=19489

15 ANESE 23/09/2016 Newsletter nº 24. Septiembre. Se estrena la plataforma ENERINVEST para promover proyectos de energía sostenible

Inicio de la campaña de comunicación a medios 13 de septiembre 2016

371

http://us8.campaign-archive2.com/?u=5eafacc121cf9eea9d284971f&id=da2429431b&e=[UNIQID]

16 HUELVA Buenas Noticias

13/09/2016 El proyecto Enerinvest estrena su página Web con la participación de la Diputación de Huelva

Inicio de la campaña de comunicación a medios 13 de septiembre 2016

14.435

http://huelvabuenasnoticias.com/2016/09/13/el-proyecto-enerinvest-estrena-su-pagina-web-con-la-participacion-de-la-diputacion-de-huelva/

17 Andalucía Información

13/09/2016 Enerinvest estrena web con la colaboración de la Diputación

Inicio de la campaña de comunicación a medios 13 de septiembre 2016

11.413

http://andaluciainformacion.es/motril/619896/enerinvest-estrena-web-con-la-colaboracion-de-la-diputacion/#

18 ENERAGEN 13/09/2016 El proyecto europeo EnerInvest promoverá la inversión de 25 millones de euros en Proyectos de Energía Sostenible en España

Inicio de la campaña de comunicación a medios 13 de septiembre 2016

89

http://www.eneragen.org/index.php/noticias/247-el-proyecto-europeo-enerinvest-promovera-la-inversion-de-25-millones-de-euros-en-proyectos-de-energia-sostenible-en-espana.html

19 Huelva Ya.es 13/09/2016 El proyecto Enerinvest estrena su página web Inicio de la campaña de comunicación a medios 13 de septiembre 2016

3.825 http://huelvaya.es/2016/09/13/el-proyecto-enerinvest-estrena-su-pagina-web/

20 SmartGrids Info.es 15/09/2016 ENERINVEST facilita la financiación de Proyectos de Energía Sostenible

Inicio de la campaña de comunicación a medios 13 de

482 https://www.smartgridsinfo.es/noticias/enerinvest-facilita-la-finaciacion-

Page 62: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 15 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Name of Media Publication Date Publication Headline Relevant fact or milestone

Number of copies

(visitors/day) i Link for searching: Url

septiembre 2016 de-proyectos-de-energia-sostenible

21 SmartLivingPlat.com

15/09/2016 ENERINVEST FACILITA LA FINANCIACIÓN DE PROYECTOS DE ENERGÍA SOSTENIBLE

Inicio de la campaña de comunicación a medios 13 de septiembre 2016

157 http://smartlivingplat.com/enerinvest-facilita-la-financiacion-de-proyectos-de-energia-sostenible/

22 COAMBA Colegio de Ambientólogos de Andalucía

20/09/2016 ENERINVEST: Plataforma Española de Financiación de Energía Sostenible

Inicio de la campaña de comunicación a medios 13 de septiembre 2016

275 http://coamba.es/noticias/6001-enerinvest-plataforma-espanola-de-financiacion-de-energia-sostenible

23 CIC Construcción 03/09/2016 EnerInvest quiere promover la inversión de 25 millones de euros en proyectos energéticos en España

Presentación del Proyecto ENERINVEST - 7 de abril 2016 538

http://www.cicconstruccion.com/es/notices/2016/03/enerinvest-quiere-promover-la-inversion-de-25-millones-de-euros-en-proyectos-energeticos-en-espana-68113.php?page_cii723=8&IDC=1#.V-pCFyiLSUk

24 INFORMEL DATA 16/09/2016 ENERINVEST promoverá la inversión de 25 millones de euros en Proyectos de Energía Sostenible en España

Inicio de la campaña de comunicación a medios 13 de septiembre 2016

83

http://www.informel.es/enerinvest-promovera-la-inversion-25-millones-euros-proyectos-energia-sostenible-espana/

25 SMARTLIGHTING 16/09/2016 ANESE participa en EnerInvest, proyecto que promueve la inversión de 25 millones de euros en Proyectos de Energía Sostenible

Inicio de la campaña de comunicación a medios 13 de septiembre 2016

1.098

http://smart-lighting.es/anese-participa-enerinvest-proyecto-promueve-la-inversion-25-millones-euros-proyectos-energia-sostenible/

26 Mejores Edificios.com

23/09/2016 La plataforma EnerInvest promoverá Proyectos de Energía Sostenible en España

Inicio de la campaña de comunicación a medios 13 de septiembre 2016

84

http://mejoresedificios.com/la-plataforma-enerinvest-promovera-proyectos-energia-sostenible-espana/

27 Solidarios News 13/09/2016 EnerInvest promoverá la inversión de 25 millones Inicio de la campaña de No results http://www.solidarios.news/2016/09

Page 63: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 16 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Name of Media Publication Date Publication Headline Relevant fact or milestone

Number of copies

(visitors/day) i Link for searching: Url

de euros en Proyectos de Energía Sostenible en España

comunicación a medios 13 de septiembre 2016

/13/enerinvest-promovera-la-inversion-de-25-millones-de-euros-en-proyectos-de-energia-sostenible-en-espana/

28 Enerinvest 29/06/2017 Cualquier Noticia publicada en nuestra Web, tendrá la valoración general de tráfico SEO del sitio Web de EnerInvest

Valoración general de tráfico SEO de la página Web de EnerInvest

83 http://www.mustat.com/enerinvest.es

29 Cdecomunicacion 13/04/2016 ENERINVEST, proyecto para facilitar financiación en proyectos de energía sostenible

Lanzamiento proyecto ENERINVEST 2.449

http://material-electrico.cdecomunicacion.es/noticias/sectoriales/17011/enerinvest-proyecto-para-facilitar-financiacion-en-proyectos-de-energia-sostenible

30 Caloryfrio 18/10/2016 EnerInvest: instrumentos financieros para las energías sostenibles GT Financiero 2.430

https://www.caloryfrio.com/noticias/actualidad/enerinvest-instrumentos-financieros-para-las-energias-sostenibles.html

31 Construible 24/04/2017 Nueva herramienta sobre modelos de Financiación Innovadores de Energía Sostenible de ENERINVEST

Campaña de difusión del Mapa de Experiencias 1.774

https://www.construible.es/2017/04/24/nueva-herramienta-modelos-financiacion-innovadores-energia-sostenible-enerinvest

32 Smart-lighting 08/06/2017 Primer evento colectivo ENERINVEST sobre energía sostenible en Barcelona

Anuncio del Primer Evento colectivo 1.098 http://smart-lighting.es/enerinvest-

energia-sostenible/

33 20minutos 13/09/2016 El proyecto Enerinvest de energías sostenibles estrena su web con la participación de la Diputación

Inicio de la campaña de comunicación a medios 13 de septiembre 2016

353.719

http://www.20minutos.es/noticia/2836244/0/proyecto-enerinvest-energias-sostenibles-estrena-su-web-con-participacion-diputacion/

34 Construction21 14/06/2017 Primer Evento Colectivo del Proyecto ENERINVEST Evento colectivo 2.435 https://www.construction21.org/espana/articles/es/primer-evento-

Page 64: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 17 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Name of Media Publication Date Publication Headline Relevant fact or milestone

Number of copies

(visitors/day) i Link for searching: Url

colectivo-del-proyecto-enerinvest.html

35 Enerlogy NA AQUATEC, PARTICIPA EN EL GRUPO DE TRABAJO DE PROMOTORES DEL PROYECTO ENERINVEST

Anuncio del Primer Evento colectivo No results

http://enerlogy.es/es/noticia/15/aquatec-participa-en-el-grupo-de-trabajo-de-promotores-del-proyecto-enerinvest

36 Navarracapital 27/04/2017 Nasuvinsa asesorará a entidades que apuesten por la eficiencia energética Asesoramiento 513 http://navarracapital.es/tag/enerinv

est/

37 Cogenspain 27/04/2017 Promover la financiación en energía sostenible, objetivo de ENERINVEST y la Unión Europea General 193

http://www.cogenspain.org/promover-la-financiacion-energia-sostenible-objetivo-enerinvest-la-union-europea

38 Buildup 14/06/2017 1er Evento Colectivo de la ENERINVEST proyecto Evento colectivo 743 http://www.buildup.eu/es/events/1er-evento-colectivo-de-la-enerinvest-proyecto

39 Retema 14/09/2016 EnerInvest, una nueva plataforma para captar inversiones en proyectos de energía sostenible

Lanzamiento de la Web de ENERINVEST 558

http://www.retema.es/noticia/enerinvest-una-nueva-plataforma-para-captar-inversiones-en-proyectos-de-energia-soste-covL6

40 Generalitat de Catalunya

05/02/2017 La plataforma Enerinvest, referent en el finançament de projectes d’energia sostenible gràcies a Horizon 2020

General 151579 http://exteriors.gencat.cat/ca/detalls/noticia/20170502_Enerinvest

41 Interempresas 02/06/2017 Enerinvest presentará siete proyectos de energía sostenible el próximo 14 de junio en Barcelona

Anuncio del Primer Evento colectivo 30.599

https://www.interempresas.net/Energia/Articulos/187404-Enerinvest-presentara-siete-proyectos-energia-sostenible-proximo-14-junio-Barcelona.html

42 Smartlivingplat 15/09/2016 ENERINVEST facilita la financiación de Proyectos de General 157 http://smartlivingplat.com/enerinves

Page 65: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 18 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Name of Media Publication Date Publication Headline Relevant fact or milestone

Number of copies

(visitors/day) i Link for searching: Url

Energía Sostenible t-facilita-la-financiacion-de-proyectos-de-energia-sostenible/

43 European Union Sustainable Energy Week – EUSEW 17

01/06/2017 1st Collective Event of the ENERINVEST project Anuncio del Primer Evento colectivo 1.528 http://eusew.eu/energy-days/1st-

collective-event-enerinvest-project

44 Huelvainformacion 14/09/2016 El proyecto europeo 'Enerinvest' estrena página web

Lanzamiento de la Web de ENERINVEST 3.400

http://www.huelvainformacion.es/huelva/proyecto-europeo-Enerinvest-estrena-pagina_0_1063094235.html

45 Ecoticias 14/09/2017 Algo nuevo se mueve en las energías renovables Lanzamiento de la Web de ENERINVEST 3.618

http://www.ecoticias.com/energias-renovables/126778/Algo-nuevo-mueve-energias-renovables

46 Cic 03/10/2016 Arranca Enerinvest como punto de encuentro on line del sector de las energías sostenibles General 538

http://www.cicconstruccion.com/es/notices/2016/10/arranca-enerinvest-como-punto-de-encuentro-on-line-del-sector-de-las-energias-sostenibles-68652.php#.WVDZg5CGO00

47 Universidad de Zaragoza

12/04/2016 Agentes del sector energético nacional se une en el proyecto europeo Enerinvest para promover la financiación en energía sostenible

General 39.041 http://www.unizar.es/actualidad/vernoticia_ng.php?id=29198

48 Solarnews NA Invitación al 1º evento colectivo del proyecto ENERINVEST

Anuncio del Primer Evento colectivo 374

http://www.solarnews.es/2017/06/12/invitacion-al-1o-evento-colectivo-del-proyecto-enerinvest/

49 Prefieres 24/05/2016 El Proyecto Enerinvest avanza en sus objetivos General 595 http://www.prefieres.es/el-proyecto-enerinvest-avanza-en-sus-objetivos

50 Proinstalaciones 06/06/2017 ANESE, ENERINVEST presentará siete proyectos de energía sostenible el próximo 14 de junio en

Anuncio del Primer Evento colectivo 285 http://www.proinstalaciones.com/ac

tualidad/asociaciones-informan/962-

Page 66: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 19 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Name of Media Publication Date Publication Headline Relevant fact or milestone

Number of copies

(visitors/day) i Link for searching: Url

Barcelona anese-enerinvest-presentara-siete-proyectos-de-energia-sostenible-el-proximo-14-de-junio-en-barcelona

51 Energías Renovables

11/04/2016 Enerinvest, la plataforma que facilita la inversión en proyectos de energía sostenible

Lanzamiento proyecto ENERINVEST 3.193

https://www.energias-renovables.com/panorama/enerinvest-la-plataforma-que-facilita-la-inversion-20160411

52 Portal.uc3m 26/01/2017 Jornada Informativa H2020 Reto Social: Energía segura, limpia y eficiente General 29.972

http://portal.uc3m.es/portal/page/portal/investigacion/servicio_investigacion/Jornada_H2020_RetoSocial/GARCIA_Fernando_Deloitte.pdf

53 Solidarios 13/09/2016 EnerInvest promoverá la inversión de 25 millones de euros en Proyectos de Energía Sostenible en España

General 87

http://www.solidarios.news/2016/09/13/enerinvest-promovera-la-inversion-de-25-millones-de-euros-en-proyectos-de-energia-sostenible-en-espana/

54 covenantofmayors NA 1st Collective Event of the ENERINVEST project Anuncio del Primer Evento colectivo 518 http://www.covenantofmayors.eu/a

genda_en.html?id_event=1745

55 Noticias de Navarra 26/12/2016 Nasuvinsa impulsa una plataforma para financiar rehabilitaciones con la UE General 65.000

http://www.noticiasdenavarra.com/2016/12/26/sociedad/navarra/nasuvinsa-impulsa-una-plataforma-para-financiar-rehabilitaciones-con-la-ue

56 Agualogy 12/04/2017 SUEZ ADVANCED SOLUTIONS SPAIN COLLABORATES ON THE LAUNCH OF A PLATFORM FOR FINANCING SUSTAINABLE ENERGY

Anuncio del Primer Evento colectivo 3.427

http://www.aqualogy.net/en/new/748/suez-advanced-solutions-spain-collaborates-on-the-launch-of-a-platform-for-financing-sustainable-energy

Page 67: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 20 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Name of Media Publication Date Publication Headline Relevant fact or milestone

Number of copies

(visitors/day) i Link for searching: Url

57 FNMC NA Nasuvinsa ofrece asesoramiento técnico, legal y financiero a empresas o entidades locales que activen proyectos de eficiencia energética

General 642

http://www.fnmc.es/nasuvinsa-ofrece-asesoramiento-tecnico-legal-y-financiero-a-empresas-o-entidades-locales-que-activen-proyectos-de-eficiencia-energetica/

58 Ecopost 22/04/2016 Plataforma para inversores y proyectos en energía sostenible General 55

https://www.ecopost.info/reuniran-a-inversores-y-proyectos-en-energia-sostenible/

59 ENERAGEN 05/04/2017

Enerinvest presenta su estudio de instrumentos de financiación en el II Encuentro de agencias y organismos públicos en el ámbito de la energía organizado por EnerAgen

Presentación de ENERINVEST ante las Agencias de Energía. Asamblea General en Cádiz 2017

89

http://www.eneragen.org/en/2017/04/05/enerinvest-presenta-estudio-instrumentos-financiacion-ii-encuentro-agencias-organismos-publicos-ambito-la-energia-organizado-eneragen-2/

60 ENERAGEN 17/02/2017 Soria albergará el XLIII Simposium Nacional de Alumbrado entre los días 24 y 26 de mayo

Mención a ENERINVEST en la presentación del XLIII Simposium Nacional de Alumbrado entre los días 24 y 26 de mayo

89

http://www.eneragen.org/en/2017/02/17/soria-albergara-xliii-simposium-nacional-alumbrado-los-dias-24-26-mayo-2/

61

Boletín Oficial de Fondos Europeos. Generalitat de Cataluña

02/05/2017 La plataforma Enerinvest, referent en el finançament de projectes d’energia sostenible gràcies a Horizon 2020

Publicación de ENERINVEST en Boletín Oficial de Fondos Europeos Cataluña

151579 http://exteriors.gencat.cat/ca/detalls/noticia/20170502_Enerinvest

62 Diputació de Girona

19/05/2017 «ENERINVEST», projecte europeu en el qual participa la Diputació, organitza el seu primer esdeveniment col·lectiu

Anuncio del Primer Evento colectivo 8.853

http://www.ddgi.cat/web/noticia.seam;jsessionid=04fbea316c6f9d49045485209c10?noticiaId=3848&cid=12512

Page 68: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 21 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Name of Media Publication Date Publication Headline Relevant fact or milestone

Number of copies

(visitors/day) i Link for searching: Url

63 Boletín de los gobiernos locales y Europa

21/04/2017 Girona: mapa d'experiències innovadores del prjecte Enerinvest

Campaña de difusión del Mapa de Experiencias 22.368

https://www.diba.cat/web/ri/butlletins/-/newsletter/30738801/56/115507143/girona-enerinvest-llanca-el-mapa-d-experiencies-innovadores-de-financament-per-a-projectes-d-energia-sostenible-a-espany-i-europa?utm_source=ButlletidelsgovernslocalsiEuropa_Diputacions&utm_medium=correu&utm_content=girona-enerinvest-llanca-el-mapa-d-experiencies-innovadores-de-financament-per-a-projectes-d-energia-sostenible-a-espany-i-europa&utm_campaign=56

64 Covenant of Mayors for Climate & Energy

01/06/2017 1st Collective Event of the ENERINVEST project Anuncio del Primer Evento colectivo 321

http://www.pactodelosalcaldes.eu/agenda_es.html?country=es&id_event=1745

65

Programa Beenergi. Anuncio como Actividad en Agenda

01/06/2017 Primer Evento Colectivo del proyecto ENERINVEST. Jornada de encuentro entre agentes clave en energía sostenible.

Anuncio del Primer Evento colectivo No results

http://beenergi.ddgi.cat/es/evento/1r-esdeveniment-collectiu-del-projecte-enerinvest/

66

Programa Beenergi. Publicación como Noticia

05/05/2017

Enerinvest organiza su primer evento colectivo con la presentación de siete proyectos de energía sostenible y la participación de los asistentes en actividades grupales para superar barreras a la financiación a la sostenibilidad

Anuncio del Primer Evento colectivo No results

http://beenergi.ddgi.cat/es/enerinvest-organitza-el-seu-primer-esdeveniment-collectiu-amb-la-presentacio-de-set-projectes-denergia-sostenible-i-la-participacio-dels-assistents-a-activitats-grupals-per-superar-barreres-al-financa/

Page 69: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 22 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Name of Media Publication Date Publication Headline Relevant fact or milestone

Number of copies

(visitors/day) i Link for searching: Url

67

Consell d'Iniciatives Locals per al Medi Ambient de les Comarques de Girona – CILMA

05/05/2017 Jornada de trobada entre agents claus en energia sostenible

Anuncio del Primer Evento colectivo No results http://www.cilma.cat/?p=185676

68

Consell d'Iniciatives Locals per al Medi Ambient de les Comarques de Girona – CILMA

05/05/2017 1r esdeveniment col·lectiu del projecte ENERINVEST

Anuncio del Primer Evento colectivo No results http://www.cilma.cat/?p=185874

69 Construible 28/04/2017 Nuevo Asesoramiento técnico, legal y financiero de Nasuvinsa para Proyectos de Eficiencia Energética

Campaña de difusión del Mapa de Experiencias 1.774

https://www.construible.es/2017/04/28/nuevo-asesoramiento-tecnico-legal-financiero-nasuvinsa-proyectos-eficiencia-energetica

70 ENERAGEN 05/04/2017

Enerinvest presenta su estudio de instrumentos de financiación en el II Encuentro de agencias y organismos públicos en el ámbito de la energía organizado por EnerAgen

ENERINVEST en II Encuentro de agencias y organismos públicos en el ámbito de la energía de EnerAgen.

89

http://www.eneragen.org/es/2017/04/05/enerinvest-presenta-estudio-instrumentos-financiacion-ii-encuentro-agencias-organismos-publicos-ambito-la-energia-organizado-eneragen/

71 Diputación de Huelva

05/05/2017 Una plataforma on line facilitará la información para invertir en proyectos sostenibles de energía General No results

http://www.diputaciondehuelva.com/b/noticias/9065_una-plataforma-on-line-facilitara-la-inf

72 Empresas - Junta de Castilla y León

01/06/2017 Nuevos modelos de financiación aplicables a proyectos de eficiencia energética y energías renovables

ENERINVEST en Jornada Cartif y ADE, sobre modelos de financiación aplicables a proyectos de eficiencia energética y energías

47.416

http://www.empresas.jcyl.es/web/jcyl/Empresas/es/Plantilla100Detalle/1255644717729/_/1284731535940/Comunicación

Page 70: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 23 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Name of Media Publication Date Publication Headline Relevant fact or milestone

Number of copies

(visitors/day) i Link for searching: Url

renovables

73 AGENEX 24/02/2016 AGENEX representará a la Plataforma Española de Financiación de Proyectos Energéticos, dentro del proyecto europeo enerinvest

Presentación proyecto ENERINVEST 167

http://www.agenex.net/es/noticias-sp-6631/1308-agenex-representara-a-la-plataforma-espanola-de-financiacion-de-proyectos-energeticos-dentro-del-proyecto-europeo-enerinvest

74 AGENEX 11/04/2016

AGENEX participa en la reunión de lanzamiento del proyecto europeo PLATAFORMA ESPAÑOLA DE FINANCIACIÓN DE ENERGÍA SOSTENIBLE (ENERINVEST)

Lanzamiento proyecto ENERINVEST 167

http://www.agenex.net/es/noticias-sp-6631/1328-agenex-participa-en-la-reunion-de-lanzamiento-del-proyecto-europeo-plataforma-espanola-de-financiacion-de-energia-sostenible-enerinvest

75 AGENEX 09/10/2016 AGENEX participa en el Seminario “Instrumentos financieros innovadores para Energía sostenible” en el marco del proyecto EMPOWERING

Presentación proyecto ENERINVEST en seminario 167

http://www.agenex.net/es/noticias-sp-6631/1378-agenex-participa-en-el-seminario-instrumentos-financieros-innovadores-para-energia-sostenible-en-el-marco-del-proyecto-empowering

76 ESEficiencia 01/03/2016 Agenex participa en el Proyecto Europeo ENERINVEST Anuncio proyecto 541

https://www.eseficiencia.es/2016/03/01/agenex-participa-en-el-proyecto-europeo-enerinvest

77 CICCONSTRUCCION 09/03/2016 EnerInvest quiere promover la inversión de 25 millones de euros en proyectos energéticos en España

Anuncio proyecto 538

http://www.cicconstruccion.com/es/notices/2016/03/enerinvest-quiere-promover-la-inversion-de-25-millones-de-euros-en-proyectos-energeticos-en-espana-68113.php#.WWMqjojyhPY

Page 71: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 24 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Name of Media Publication Date Publication Headline Relevant fact or milestone

Number of copies

(visitors/day) i Link for searching: Url

78 UNIÓN COMERCIAL 02/03/2016 EL PROYECTO ENERINVEST Anuncio proyecto 50 http://blog.tuinstalaciongasnaturalvalencia.com/2016/03/el-proyecto-enerinvest.html

79 PREFIERES.ES 02/03/2016 Agenex participa en el proyecto europeo Enerinvest de energía sostenible Anuncio proyecto 595

http://www.prefieres.es/agenex-tambien-participa-en-el-proyecto-europeo-enerinvest-de-energia-sostenible

80 FINERPOL 11/10/2016 AGENEX - Seminar Funding Sustainable Energy Presentación proyecto ENERINVEST 2.019

https://www.interregeurope.eu/finerpol/news/news-article/331/agenex-seminar-funding-sustainable-energy/

81 CLUSTER DE LA ENERGÍA DE EXTREMADURA

16/03/2016 AGENEX representará a la Plataforma Española de Financiación de Proyectos Energéticos, dentro del proyecto europeo ENERINVEST

Presentación proyecto ENERINVEST 188

http://www.energiaextremadura.org/noticias-del-sector/agenex-representara-a-la-plataforma-espanola-de-financiacion-de-proyectos-energeticos-dentro-del-proyecto-europeo-enerinvest/

82 ESEficiencia 06/04/2016 Presentación oficial de la Iniciativa ENERINVEST Presentación proyecto ENERINVEST 541

https://www.eseficiencia.es/2016/04/06/presentacion-oficial-de-la-iniciativa-enerinvest

83 ENERTIC 08/04/2016 Presentación oficial de la Iniciativa ENERINVEST Presentación proyecto ENERINVEST 314

http://enertic.org/ActualidadDesarrollo?param1=2126&param2=Presentaci%C3%B3n%20oficial%20de%20la%20Iniciativa%20ENERINVEST

84 ENERGIA DE HOY 06/06/2017 ENERINVEST presentará siete proyectos de energía sostenible el próximo 14 de junio en Barcelona

Anuncio del Primer Evento colectivo 154

https://energiadehoy.com/4-sostenibilidad/583-enerinvest-presentara-siete-proyectos-de-energia-sostenible-el-proximo-14-de-junio-en-barcelona

Page 72: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 25 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Name of Media Publication Date Publication Headline Relevant fact or milestone

Number of copies

(visitors/day) i Link for searching: Url

85 EL PERIODICO DE LA ENERGIA

08/04/2016 Navarra participa en una red europea de proyectos de energía sostenible

Presentación proyecto ENERINVEST 3.278

http://elperiodicodelaenergia.com/navarra-participa-en-una-red-europea-de-proyectos-de-energia-sostenible/

86 fevymar.com 01/02/2016 Proyecto Enerinvest, para la financiación de iniciativas sostenibles

Presentación proyecto ENERINVEST 674 http://www.fevymar.com/cont/publi

s/boletines/1723.pdf

87 Europapress 29/01/2017 Más de 30 municipios de la provincia de Huelva recibieron asistencia de la Agencia de la Energía en 2016

General 157.604

http://www.europapress.es/andalucia/huelva-00354/noticia-mas-30-municipios-provincia-huelva-recibieron-asistencia-agencia-energia-2016-20170129145350.html

88 ENERGETIC 08/04/16 Presentación oficial de la iniciativa ENERINVEST Presentación proyecto ENERINVEST 314

http://enertic.org/ActualidadDesarrollo?param1=2126&param2=Presentación oficial de la Iniciativa ENERINVEST

89 ESEficiencia 06/04/16 Presentación oficial de la iniciativa ENERINVEST Presentación proyecto ENERINVEST No results

https://www.eseficiencia.es/noticias/presentacion-oficial-de-la-iniciativa-enerinvest?utm_medium=Newsletter&utm_source=12789

90 HuelvaInformación 15/04/16 Huelva participa en una plataforma de proyectos energéticos

Presentación proyecto ENERINVEST 3.400

http://www.huelvainformacion.es/article/huelva/2263284/huelva/participa/una/plataforma/proyectos/energeticos.html

91 Diputación de Huelva

13/09/16 El proyecto ENERINVEST estrena su página web con la participación de Diputación de Huelva

Lanzamiento de la Web de ENERINVEST 132

http://www.diphuelva.es/b/noticias/7900_el-proyecto-enerinvest-estrena-su-pagina-web

92 La Vanguardia 29/01/17 Más de 30 municipios de la provincia de Huelva recibieron asistencia de la agencia de la energía General 335

http://www.lavanguardia.com/vida/20170129/413818874872/mas-de-30-municipios-de-la-provincia-

Page 73: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 26 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Name of Media Publication Date Publication Headline Relevant fact or milestone

Number of copies

(visitors/day) i Link for searching: Url

recibieron-asistencia-de-la-agencia-de-la-energia-en-2016.html

93 Onda Minera 31/01/17 Varios municipios de la Cuenca Minera recibieron la asistencia energética durante el 2016 General 4.409.372 https://ondaminera.wordpress.com/t

ag/ayuntamiento-de-campofrio/

94 DEXMA 11/04/17 Como presentar proyectos de eficiencia energética para financieros General 1.259

http://get.dexmatech.com/eficiencia-energetica-para-financieros?utm_campaign=Webinars&utm_medium=ResourcesES&utm_source=Referral

95 Huelva Buenas Noticias

05/05/17 Una plataforma online facilitará la información para invertir en proyectos de energía General 14

http://huelvabuenasnoticias.com/2017/05/05/una-plataforma-on-line-facilitara-la-informacion-para-invertir-en-proyectos-sostenibles-de-energia/

96 20minutos 05/05/17 Una plataforma online facilitará la información para invertir en proyectos de energía sostenible General 354

http://www.20minutos.es/noticia/3029987/0/plataforma-online-facilitara-informacion-para-invertir-proyectos-sostenibles-energia/

97 Energías Renovables

02/06/17 Enerinvest presentará siete proyectos de energía sostenible el 14 de junio en Barcelona

Anuncio del Primer Evento colectivo 3

https://www.energias-renovables.com/panorama/enerinvest-presenta-siete-proyectos-de-energia-sostenible-20170602

98 COITIHuelva 10/06/17 Presentación del primer evento colectivo proyecto ENERINVEST

Anuncio del Primer Evento colectivo 34 http://www.coitihuelva.com/pdf/ene

rinvest010617

Page 74: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 27 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Name of Media Publication Date Publication Headline Relevant fact or milestone

Number of copies

(visitors/day) i Link for searching: Url

99 Diputació de Girona

19/04/17 Jornada de trobada entre promotors i inversos de projectes en energia sostenible a Madrid one2one financiero en Madrid 8.853

http://www.ddgi.cat/web/noticia.seam?nivellId=&noticiaId=3802&cid=59180&categoriaId=

100 Diputació de Girona

13/04/17 «ENERINVEST» Llança el mapa d'experiències innovadores de finançament per a projectes d'energia sostenible a Espany i Europa

Campaña de difusión del Mapa de Experiencias 8.853

http://www.ddgi.cat/web/noticia.seam?nivellId=&noticiaId=3798&cid=59180&categoriaId=

101 Diputació de Girona

17/06/16 La Diputació de Girona facilita a 60 pimes i ajuntaments informació sobre finançament en energia sostenible

one2one financiero en Girona 8.853 http://www.ddgi.cat/web/noticia.seam?nivellId=&noticiaId=3496&cid=59180&categoriaId=

102

Programa Beenergi. Publicación como Noticia

21/06/16 La Diputació de Girona facilita a 60 pimes i ajuntaments informació sobre finançament en energia sostenible

one2one financiero en Girona No results

http://beenergi.ddgi.cat/la-diputacio-de-girona-facilita-a-60-pimes-i-ajuntaments-informacio-sobre-financament-en-energia-sostenible/

103

Consell d'Iniciatives Locals per al Medi Ambient de les Comarques de Girona – CILMA

06/07/17 Segona convocatòria del programa d’ajudes per a la renovació de les instal·lacions de l’enllumenat exterior municipal

Asistencia para la presentación de los municipios a subvenciones

No results http://www.cilma.cat/?p=185832

104 Diputació de Barcelona - Sostenible.cat

25/05/17 Jornada tècnica: 1r esdeveniment col·lectiu del projecte ENERINVEST

Anuncio del Primer Evento colectivo 391

http://sostenible.cat/acte/jornada-tecnica-1r-esdeveniment-collectiu-del-projecte-enerinvest

105

Programa Beenergi. Publicación como Noticia

17/06/16 Jornada: Opcions de finançament en energia sostenible one2one financiero en Girona No results

http://beenergi.ddgi.cat/es/evento/opcions-de-financament-en-energia-sostenible/

Page 75: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 28 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Name of Media Publication Date Publication Headline Relevant fact or milestone

Number of copies

(visitors/day) i Link for searching: Url

106 Generalitat de Catalunya - ICAEN

02/05/17 La plataforma Enerinvest, referent en el finançament de projectes d’energia sostenible gràcies a Horizon 2020

General 151.579 http://exteriors.gencat.cat/ca/detalls/noticia/20170502_Enerinvest

107 Generalitat de Catalunya - ICAEN

Ficha del proyecto ENERINVEST General 151.579 http://icaen.gencat.cat/web/.content/10_ICAEN/18_actuacio_internacional/Enllacos/link_ENERINVEST_es.pdf

108

Departament de Medi Ambient de la Generalitat de Catalunya

02/05/17 Programa del 1.º evento colectivo del proyecto ENERINVEST

Anuncio del Primer Evento colectivo 151.579

http://mediambient.gencat.cat/web/.content/home/serveis_i_tramits/agenda_dactivitats/llista_dactivitats/2017/06_Juny/programa-1.-evento-colectivo-del-proyecto-enerinvest-vf.pdf

109 Generalitat de Catalunya - ICAEN

Programa one2one financiero en Girona one2one financiero en Girona 151.579

http://icaen.gencat.cat/web/.content/06_relacions_institucionals_i_comunicacio/02_agenda/actes_i_jornades/arxius/Opcions-de-financament-en-energia-sostenible.pdf

110 Generalitat de Catalunya - ICAEN

09/11/16 Programa del Cicle tècnic: Energia a la indústria - sessió 3

Jornada técnica dónde ECOSERVEIS presentó el proyecto

151.579 http://icaen.gencat.cat/web/.content/50_Actualitat/52_agenda/arxius/PROGRAMA-CE_eficiencia_VF.pdf

111 Generalitat de Catalunya - ICAEN

26/04/17 Programa del XIX Fòrum de l’Energia Sostenible tecnologia, legislació i finançament per a una il•luminació exterior de qualitat, sana i eficient

Jornada técnica dónde ECOSERVEIS presentó el proyecto

151.579 http://icaen.gencat.cat/web/.content/50_Actualitat/52_agenda/arxius/Programa_preliminar_FES2017.pdf

112 EnerAgen 31/03/17 II Encuentro de agencias y organismos públicos en el ámbito de la energía

Jornada técnica dónde EnerAgen presentó el proyecto 151.579

http://icaen.gencat.cat/web/.content/50_Actualitat/52_agenda/arxius/20170331_programa_EnerAgen.pdf

Page 76: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 29 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Name of Media Publication Date Publication Headline Relevant fact or milestone

Number of copies

(visitors/day) i Link for searching: Url

113 ANESE 01/06/17 Primer evento colectivo de ENERINVEST Anuncio del Primer Evento colectivo 371 http://www.anese.es/eventos/prime

r-evento-colectivo-de-enerinvest/

114 Energía de hoy.com

01/06/17 ENERINVEST presentará siete proyectos de energía sostenible el próximo 14 de junio en Barcelona

Anuncio del Primer Evento colectivo 154

https://energiadehoy.com/4-sostenibilidad/583-enerinvest-presentara-siete-proyectos-de-energia-sostenible-el-proximo-14-de-junio-en-barcelona

115 GO BEYOND Consultores

01/06/17 ENERINVEST organiza el 1er Evento Colectivo del Proyecto reuniendo a los agentes clave en energía sostenible

Anuncio del Primer Evento colectivo No results http://gobeyondsl.es/index.php/blog

ok/item/2-enerinvest

116 Prefieres 06/06/17 Enerinvest presentará en una jornada siete proyectos de energía sostenible

Anuncio del Primer Evento colectivo 595

http://www.prefieres.es/enerinvest-presentara-en-una-jornada-siete-proyectos-de-energia-sostenible

117 Tweetcs.com 14/06/17 Resumen de imágenes del 1.º evento colectivo del proyecto ENERINVEST

Anuncio del Primer Evento colectivo 3.206 http://tweetcs.com/EsEnerInvest/

118 CIRCE 04/01/16 Exposición de Ficha del proyecto ENERINVEST como proyecto en Web CIRCE General 115

http://www.fcirce.es/web/data/project.aspx?source=allprojects&id=76950

119 CIRCE 12/04/16 El sector energético nacional se une en el proyecto europeo Enerinvest para promover la financiación en energía sostenible

Lanzamiento proyecto ENERINVEST 313 http://www.fcirce.es/web/data/new.

aspx?source=comActual&id=2482

120 CIRCE 12/10/16 CIRCE participa en una jornada sobre los beneficios intangibles del uso sostenible de la energía a través del proyecto ENERINVEST

Evento colectivo Jornada IN-BEE en Madrid Octubre 2016 215 http://www.fcirce.es/web/data/new.

aspx?source=comActual&id=2561

Page 77: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 30 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Num. Name of Media Publication Date Publication Headline Relevant fact or milestone

Number of copies

(visitors/day) i Link for searching: Url

121 CIRCE 03/04/17 Jornada de encuentro entre promotores e inversores de Proyectos de Energía Sostenible one2one financiero en Madrid 228 http://www.fcirce.es/web/data/new.

aspx?source=comActual&id=2601

122 CIRCE 12/04/17 ENERINVEST lanza el Mapa de Experiencias innovadoras de financiación para proyectos de energía sostenible en España y Europa

Mapa experiencias 249 http://www.fcirce.es/web/data/new.aspx?source=comActual&id=2604

123 L'Escoltador 08/10/16 EnerInvest: instruments financers destinats a les energies sostenibles Presentación Enerinvest No results

https://escoltador.wordpress.com/2016/10/18/enerinvest-instruments-financers-destinats-a-les-energies-sostenibles/

124 Avilared 25/05/16 Ávila participará en el proyecto de energía sostenible 'Enerinvest' Presentación Enerinvest No results

https://avilared.com/not/20701/avila-participara-en-el-proyecto-de-energia-sostenible-enerinvest-

125 Sostenible.cat 14/06/17 Jornada tècnica: 1r esdeveniment col·lectiu del projecte ENERINVEST

Anuncio del Primer Evento colectivo 391

http://sostenible.cat/acte/jornada-tecnica-1r-esdeveniment-collectiu-del-projecte-enerinvest

1 Note 1: Analysis made using Mustat.com (number of visitors accounting tool). It shows the number of copies of the media website.

Page 78: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 31 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

ANNEX 2: SETS OF IMAGES AND GRAPHIC MATERIAL PRODUCED FOR C&D ACTIVITIES OF THE PROJECT

1. Set of some of the images used for the second communication campaign.

Page 79: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 32 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

Page 80: D7.6. 1st Dissemination Report · The identification and involvement of key players in technical, legal, financial management aspects, and policy decision making of SEPs, of the objectives

Página 33 de 33

ENERINVEST WP7 - 1st Dissemination Report-Final version

2. Set of some of the images used for the dissemination campaign of the First Collective Event.

3. Set of some of the images designed for the ENERINTOOL.