d2-s3e. erdenes shivee energy llc mr. galtbaatar davaasuren...the shivee energy complex project of...
TRANSCRIPT
![Page 1: D2-S3e. Erdenes Shivee Energy LLC Mr. Galtbaatar Davaasuren...the Shivee Energy Complex Project of Energy Export. 2015.11 The President of Mongolia and the President of the People’s](https://reader036.vdocuments.mx/reader036/viewer/2022070107/6022542bba88bb09a5235143/html5/thumbnails/1.jpg)
Ulaanbaatar, Mongolia
![Page 2: D2-S3e. Erdenes Shivee Energy LLC Mr. Galtbaatar Davaasuren...the Shivee Energy Complex Project of Energy Export. 2015.11 The President of Mongolia and the President of the People’s](https://reader036.vdocuments.mx/reader036/viewer/2022070107/6022542bba88bb09a5235143/html5/thumbnails/2.jpg)
November of 2015. The President of Mongolia
/TS. Elbegdorj/ and the President of the People’s
Republic of China /Xi Jinping/ have signed a
Memorandum of Understanding to execute the
FEASIBILITY STUDY for the “Shivee Energy
Complex Project of Energy Export” during the
Mongolian President’s visit to the People’s
Republic of China
“
”
![Page 3: D2-S3e. Erdenes Shivee Energy LLC Mr. Galtbaatar Davaasuren...the Shivee Energy Complex Project of Energy Export. 2015.11 The President of Mongolia and the President of the People’s](https://reader036.vdocuments.mx/reader036/viewer/2022070107/6022542bba88bb09a5235143/html5/thumbnails/3.jpg)
...As far as the production of energy, “Shivee
Energy” project is being implemented. First, we
need to build 4 to 5 power plants to ensure the
supply of energy over the next 10 years. By doing
so, we will be capable of fully supplying domestic
energy demands in the next 10 to 15 years…
“
”Prime Minister of Mongolia,
Erdenebat Jargaltulga
![Page 4: D2-S3e. Erdenes Shivee Energy LLC Mr. Galtbaatar Davaasuren...the Shivee Energy Complex Project of Energy Export. 2015.11 The President of Mongolia and the President of the People’s](https://reader036.vdocuments.mx/reader036/viewer/2022070107/6022542bba88bb09a5235143/html5/thumbnails/4.jpg)
About Us
Erdenes Shivee Energy LLC is the largest resource holder joint venture between private and state owned company Erdenes Mongol and AqSora LLC.
AqSora
Our company purpose is to supply fossil fuel and renewable energy resources to the Shivee Energy project.
![Page 5: D2-S3e. Erdenes Shivee Energy LLC Mr. Galtbaatar Davaasuren...the Shivee Energy Complex Project of Energy Export. 2015.11 The President of Mongolia and the President of the People’s](https://reader036.vdocuments.mx/reader036/viewer/2022070107/6022542bba88bb09a5235143/html5/thumbnails/5.jpg)
Description of Shivee Energy project
1. Coal mine with the capacity 20 million tons/per year.
2. Power plant with installed capacity of 5,280 MW.
3. Transmission line with the capability to transmit 4,600 MW ± 660 kV UHV.
4. Renewable power plants with an installed capacity of 15 percent of coal fired power plants.
The Shivee Energy is complex project which is integrating fossil fuel and renewable energy including transmission line for energy export .
![Page 6: D2-S3e. Erdenes Shivee Energy LLC Mr. Galtbaatar Davaasuren...the Shivee Energy Complex Project of Energy Export. 2015.11 The President of Mongolia and the President of the People’s](https://reader036.vdocuments.mx/reader036/viewer/2022070107/6022542bba88bb09a5235143/html5/thumbnails/6.jpg)
Location
The project is located in the Shivee
Ovoo strategic coal deposit area in
Shivee-Gobi and Sumber soum of
Gobisumber province, Mongolia.
The project location lies 200 km to
the southeast of Ulaanbaatar, 400
km to the Mongolian and Chinese
border.
![Page 7: D2-S3e. Erdenes Shivee Energy LLC Mr. Galtbaatar Davaasuren...the Shivee Energy Complex Project of Energy Export. 2015.11 The President of Mongolia and the President of the People’s](https://reader036.vdocuments.mx/reader036/viewer/2022070107/6022542bba88bb09a5235143/html5/thumbnails/7.jpg)
Location
“Erdenes Shivee Energy” renewable resource
“Erdenes Shivee Energy” coal mine “Erdenes Shivee Energy”
power plant
The project is located in the Shivee
Ovoo strategic coal deposit area in
Shivee-Gobi and Sumber soum of
Gobisumber province, Mongolia.
The project location lies 200 km to
the southeast of Ulaanbaatar, 400
km to the Mongolian and Chinese
border.
![Page 8: D2-S3e. Erdenes Shivee Energy LLC Mr. Galtbaatar Davaasuren...the Shivee Energy Complex Project of Energy Export. 2015.11 The President of Mongolia and the President of the People’s](https://reader036.vdocuments.mx/reader036/viewer/2022070107/6022542bba88bb09a5235143/html5/thumbnails/8.jpg)
Resource Data
Approved resource report results are summarized as follows:
• Measured /A/, 27.01 Mt
• Indicated /B/, 663.04 Mt
• Inferred /C/, 613.07 Mt
• A+B+C, 1,303.1 Mt
![Page 9: D2-S3e. Erdenes Shivee Energy LLC Mr. Galtbaatar Davaasuren...the Shivee Energy Complex Project of Energy Export. 2015.11 The President of Mongolia and the President of the People’s](https://reader036.vdocuments.mx/reader036/viewer/2022070107/6022542bba88bb09a5235143/html5/thumbnails/9.jpg)
Resource Data
Approved resource report results are summarized as follows:
• Measured /A/, 27.01 Mt
• Indicated /B/, 663.04 Mt
• Inferred /C/, 613.07 Mt
• A+B+C, 1,303.1 Mt
![Page 10: D2-S3e. Erdenes Shivee Energy LLC Mr. Galtbaatar Davaasuren...the Shivee Energy Complex Project of Energy Export. 2015.11 The President of Mongolia and the President of the People’s](https://reader036.vdocuments.mx/reader036/viewer/2022070107/6022542bba88bb09a5235143/html5/thumbnails/10.jpg)
Project goal
Our goal:Shivee Energy project to be a CORNERSTONE of Northeast Asia Power Interconnection.
Project Developer: ErdenesShivee Energy LLC
![Page 11: D2-S3e. Erdenes Shivee Energy LLC Mr. Galtbaatar Davaasuren...the Shivee Energy Complex Project of Energy Export. 2015.11 The President of Mongolia and the President of the People’s](https://reader036.vdocuments.mx/reader036/viewer/2022070107/6022542bba88bb09a5235143/html5/thumbnails/11.jpg)
Feasibility Study
State Grid Corporation of China selected 3 different institutions in early 2016 through an international open tender to carry out the Feasibility Study for the Shivee Energy Complex Project.
• Shandong Electric Power Engineering Consulting Institute -Power Plant and Transmission Line.
• CCTEG Shenyang Engineering Company - Coal mine.
• The Inner Mongolia Water Resources and Hydropower Survey and Design Institute - Water supply of the complex project.
![Page 12: D2-S3e. Erdenes Shivee Energy LLC Mr. Galtbaatar Davaasuren...the Shivee Energy Complex Project of Energy Export. 2015.11 The President of Mongolia and the President of the People’s](https://reader036.vdocuments.mx/reader036/viewer/2022070107/6022542bba88bb09a5235143/html5/thumbnails/12.jpg)
2016.04.07
Pre feasibility study presentation by State Grid corporation of China
2016.07
Joint meeting between Erdenes Mongol LLC and
Erdenes Shivee Energy LLC with State Grid corporation
2016.08.22-23
Top leaders of State Grid corporation has been visited to Ulaanbaatar for meeting with Ministry of Energy, Ministry of Mining and other related organization.
History of our Cooperation
![Page 13: D2-S3e. Erdenes Shivee Energy LLC Mr. Galtbaatar Davaasuren...the Shivee Energy Complex Project of Energy Export. 2015.11 The President of Mongolia and the President of the People’s](https://reader036.vdocuments.mx/reader036/viewer/2022070107/6022542bba88bb09a5235143/html5/thumbnails/13.jpg)
2017.01.11
Chairman of Global Energy Interconnection Development and Cooperation Organization (GEIDCO), Chairman of China
Electricity Council Mr. Liu Zhenyawith Speaker of parliament of
Mongolia Mr.Enkhbold.
2017.02.23-24
Meeting between top managers from Erdenes
Mongol LLC and ErdenesShivee Energy LLC and
State Grid corporation in Ulaanbaatar.
2017.08.24
Deligation of Erdenes Mongol LLC and Erdenes Shivee Energy LLC has been visited to the State Grid head office for meeting with management team of State Grid corporation of China.
History of our Cooperation
![Page 14: D2-S3e. Erdenes Shivee Energy LLC Mr. Galtbaatar Davaasuren...the Shivee Energy Complex Project of Energy Export. 2015.11 The President of Mongolia and the President of the People’s](https://reader036.vdocuments.mx/reader036/viewer/2022070107/6022542bba88bb09a5235143/html5/thumbnails/14.jpg)
2016.01State Grid Corporation of China selected 3 different institutions in early 2016 through an international open tender to carry out the Feasibility Study for
the Shivee Energy Complex Project of Energy
Export.
2015.11
The President of Mongolia and the President of the People’s Republic of China have signed a Memorandum of Understanding to execute the FEASIBILITY STUDY for the “Shivee Energy Complex Project of Energy Export”.
2016.12*Planned to complete Feasibility study on December, 2016
2016.04
On April 13, 2016, a consultative meeting was held on the project’s PRELIMINARY
FEASIBILITY STUDIES and Mongolia-China energy cooperation.
Time Frame
![Page 15: D2-S3e. Erdenes Shivee Energy LLC Mr. Galtbaatar Davaasuren...the Shivee Energy Complex Project of Energy Export. 2015.11 The President of Mongolia and the President of the People’s](https://reader036.vdocuments.mx/reader036/viewer/2022070107/6022542bba88bb09a5235143/html5/thumbnails/15.jpg)
2017.02
Erdenes Mongol LLC, Erdenes Shivee Energy LLC met with State Grid corporation in Ulaanbaatar of Mongolia and agreed to establish a working group for verify coal resources
IV quarter of 2017*Expected to receive Feasibility study
from State Grid corporation
2016.12 The Feasibility study postponed until IV quarter of 2017
2017.01
State Grid corporation and Erdenes Shivee Energy LLC planned to finish on
IV quarter of 2017
Time Frame
![Page 16: D2-S3e. Erdenes Shivee Energy LLC Mr. Galtbaatar Davaasuren...the Shivee Energy Complex Project of Energy Export. 2015.11 The President of Mongolia and the President of the People’s](https://reader036.vdocuments.mx/reader036/viewer/2022070107/6022542bba88bb09a5235143/html5/thumbnails/16.jpg)
Starting point of Northeast Asia power interconnection
Pre-feasibility Study-Completed – April 2016Feasibility Study-Expected to complete -IV quarter of 2017 by State Grid Corporation of China.
Project development
![Page 17: D2-S3e. Erdenes Shivee Energy LLC Mr. Galtbaatar Davaasuren...the Shivee Energy Complex Project of Energy Export. 2015.11 The President of Mongolia and the President of the People’s](https://reader036.vdocuments.mx/reader036/viewer/2022070107/6022542bba88bb09a5235143/html5/thumbnails/17.jpg)
Thank you for your attention!