d-wave installation - eehpcwg.llnl.gov · operated by los alamos national security, llc for the...

15
Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA UNCLASSIFIED November 2018 D-WAVE Installation Loren A. Serna & Ron R. Velarde, LANL Presented by Josip Loncaric, LANL LA-UR-18-30711

Upload: others

Post on 04-Sep-2019

2 views

Category:

Documents


0 download

TRANSCRIPT

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA

UNCLASSIFIED

November 2018

D-WAVE InstallationLoren A. Serna & Ron R. Velarde, LANL

Presented by Josip Loncaric, LANLLA-UR-18-30711

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA

UNCLASSIFIED

Introduction

§ Ising: LANL’s D-Wave 2X system– Quantum annealing computer, and– A physics experiment which operates at 10 mK,

300 times cooler than interstellar space§ Tight facility requirements

– Low vibration & other disturbances– Highly reliable power and cryogenic cooling– …at much lower power than HPC

§ Installation steps

Slide 2

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA

UNCLASSIFIED

Slide 3

Vibration Isolation Concrete Pad Installation and Prep

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA

UNCLASSIFIED

Slide 4

Sump Pump Installation

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA

UNCLASSIFIED

Slide 5

Wall Prep for D-WAVE Enclosure

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA

UNCLASSIFIED

UPS & Sheet Metal Installation

Slide 6

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA

UNCLASSIFIED

Slide 7

Make-Up Water Piping to Closed Loop System

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA

UNCLASSIFIED

Slide 8

Installed PDU & UPS

125 KVA PDU

250 KVA UPS

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA

UNCLASSIFIED

Slide 9

Closed Loop Piping, Refrigerant Piping and Pumps. N+1 Pumps

3ea. 0.75 HP Closed Loop Pumps Running @ 3GPM

Chemical Pot Feeder

CRAC Refrigerant Piping

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA

UNCLASSIFIED

Generator Transfer Switch & Mechanical Equipment Controls

Slide 10

Generator Transfer Switch Mechanical Equipment Controls

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA

UNCLASSIFIED

Installed Outdoor Condensers, Indoor Chillers, & Indoor CRAC Units. All Are N+1

Slide 11

4 Ton & 8 Ton Condenser Units

4 Ton CRAC

8 Ton CRAC

2ea. 3 Ton Closed Loop Chillers

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA

UNCLASSIFIED

Sump Pump and 120 Gallon Closed Loop Tank

Slide 12

120 Gallon Storage Tank For The Closed Loop

Sump Pump, Electrical & Mechanical Piping

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA

UNCLASSIFIED

Liquid Nitrogen Dewars. N+1Dewars

Slide 13

2ea. Liquid Nitrogen Dewars

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA

UNCLASSIFIED

D-WAVE Electrical & Mechanical Infrastructure

Slide 14

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA

UNCLASSIFIED

D-WAVE

Slide 15