d-phase operations period (dop): 1 june – 30 november 2007 d-phase
DESCRIPTION
MAP D-PHASE: D emonstration of P robabilistic H ydrological and A tmospheric S imulation of flood E vents in the Alpine region http://www.map.meteoswiss.ch/d-phase. D-PHASE Operations Period (DOP): 1 June – 30 November 2007 www.d-phase.info. - PowerPoint PPT PresentationTRANSCRIPT
MAP D-PHASE:
Demonstration of Probabilistic Hydrological and Atmospheric Simulation
of flood Events in the Alpine region
http://www.map.meteoswiss.ch/d-phase
D-PHASE Operations Period (DOP): 1 June – 30 November 2007
www.d-phase.info
Distributed real-time end-to-end forecasting system
End-to-end forecasting system
Atmospheric models: ensembles
• COSMO-LEPS (COSMO)– 10 km; +132h; COSMO-LEPS EFI (MeteoSwiss)
• MOGREPS (Met Office, United Kingdom)
– 25 km; +54h
• SREPS (INM, Spain)– 25 km, +72h
• PEPS (SRNWP)– 7 km, +42h
• COSMO-SREPS (COSMO)– 10 km, +72h
• micro-PEPS (DWD for D-PHASE)– 2 km; +18h
• LAMEPS-AT (ZAMG)– 20 km; fc+72h
End-to-end forecasting system
Atmospheric models: high resolution
• MM5 (University of Hohenheim)– 2 km; +24h
• COSMO-models (COSMO)– 2.2 km; +18h– 2.8 km; +30h, +48h, +21h
• AROME (Météo-France)– 4 km (output grid); +30h
• MOLOCH (ISAC-CNR, Italy)– 2.2 km; +39h
• GEM-LAM (EC, Canada)– 2.5 km; +24h
• MOLOCH, MM5, and WRF outside of COPS domain• ALADIN and QBOLAM at coarser resolution
End-to-end forecasting system
Hydrological catchments
Some numbers about D-PHASE
Organisation
• Steering Committee– Dorninger, Staudinger (A), Rotach, Schär (CH), Volkert,
Wulfmeyer (D), Bouttier, Richard (F), Buzzi, Frustaci, Ranzi, Rossa (I), Mylne (UK)
• Working Groups– WG-DI: Data interface
chair: Andrea Montani, ARPA-SIM (I)– WG-HEU: Hydrology and end users
co-chairs: Roberto Ranzi, U Brescia (I), Christoph Hegg, WSL (CH)
– WG-VER: Verificationchair: Manfred Dorninger, U Vienna (A)
– WG-DP: Data policychair Mathias Rotach, MeteoSwiss (CH)
• Project Coordinator: marco.arpagaus [at] meteoswiss.ch
• http://www.map.meteoswiss.ch/d-phase
Common (centralised) platforms
Visualisation Platform (VP): • to visualise (display) all products and
all alerts;main source of information for forecasters and end users (used also for COPS mission planning team);
• interface for (some of) the users to submit their feedback on the available products and alerts, respectively,
• realised by Next Generation Software (Salzburg).
• www.d-phase.info
Common (centralised) platforms
Data Archive (DA)• to archive all data, alerts, and feedbacks;
mainly for verification purposes• also stores all COPS and GOP data• physically based at the MPI in Hamburg• model data in GRIB1 format (GRIB1-details
);• obs in netCDF format
Timetable
D-PHASE Operations Period (DOP): 1 June – 30 November 2007
Next Scientific Meeting:19 – 22 May 2008 in Bologna (Italy)for info,
www.smr.arpa.emr.it/dphase-cost