cv updated february 2017

18
ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY CURRICULUM-VITAE Name : MUSTAFA KAMEL MOHAMED EL-ZEINY Birth Date : May 04, 1952 Cairo Nationality : Egyptian Marital Status : Married Religion : Muslim Languages : English, Arabic – The Mother Tongue Latest Job Title : Senior Project Coordinator at Abu Dhabi Company for Onshore Oil Operations (ADCO), Terminals and Pipelines Asset- Fujairah Terminal Address : Abu Dhabi, Al NAHYAN CAMP Villa 27 P.O 45124 Address (Egypt) : Rehab City, Group no. 62, Building no. 9, flat no.2 New Cairo – Egypt Mobile Phone no. UAE +971-504120107, Egypt +2-0100- 7420456, 8/14/2022 Page: 1/12

Upload: mustafa-el-zeiny

Post on 21-Feb-2017

121 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: CV updated  February 2017

ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY

CURRICULUM-VITAE

Name : MUSTAFA KAMEL MOHAMED EL-ZEINY

Birth Date : May 04, 1952 Cairo

Nationality : Egyptian

Marital Status : Married

Religion : Muslim

Languages : English, Arabic – The Mother Tongue

Latest Job Title : Senior Project Coordinator at

Abu Dhabi Company for Onshore Oil Operations (ADCO), Terminals and Pipelines Asset- Fujairah Terminal

Address : Abu Dhabi, Al NAHYAN CAMP Villa 27 P.O 45124

Address (Egypt) : Rehab City, Group no. 62, Building no. 9, flat no.2

New Cairo – Egypt

Mobile Phone no. UAE +971-504120107, Egypt +2-0100-7420456,

E-mail Address : [email protected] , [email protected]

Educational Qualification : B.Sc. In Mechanical Engineering, 1976 (Helwan University)

5/1/2023 Page: 1/12

Page 2: CV updated  February 2017

ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY

CURRICULUM-VITAE

Summary of Experience

More than 30 years as Senior Piping/ Mechanical Engineer and Senior Project Engineering

Coordinator in Oil and Gas Industry and Oil Storage and Export Terminals in the fields of

Engineering, Procurement, and Construction Supervision for On-shore Projects.

Extensive Experience in the Review of Project Design Documents/ Drawings, providing

Technical Support and coordinate all Project Activities/Milestones with Project

PMC/Contractor/Engineering Consultants from FEED Stage until commissioning.

Participation and providing support in all ADCO Share Holders Health Check and Project

Startup Review Sessions carried out for Fujairah ADCOP Project as well as all Project

Engineering & HSE Review Sessions such as HAZOP, PHSER, etc...

Extensive Experience in Piping Design in accordance with international Standards such as API,

ASME/ANSI, ASTM, and NFPA Standards.

Extensive Experience in Design of Piping layouts, Isometric Drawings, Material take off, Pipe

Supports and Stress Analysis Calculation.

Experience in Fixed/Floating Roof Tanks Design in accordance with API Standard 650

Preparation of Terms of Reference (TOR) for Conceptual, Basic, FEED, and Detailed

Engineering.

Consultant Bid Technical Evaluation and Clarifications.

Extensive Experience in Procurement Technical Services.

Preparation of Enquiry Packages and Material Requisitions for Process Equipment and Piping

Material including Technical Specifications and Data Sheets.

Bid Technical Evaluation, Clarifications for Vendor Quotations

Experience in Construction Supervision, preparation of Piping Spool Sheets and Work Shop

Drawings

Management of Engineering Staffs in Multinational and International Environments

Conversant with ARAMCO, ADCO& SHELL DEP Specifications

5/1/2023 Page: 2/12

Page 3: CV updated  February 2017

ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY

CURRICULUM-VITAE

Computer Skills including the following Software’s:-

CAESAR II for Piping Stress Analysis Calculation.

PIPENET for Flow Analysis (Pipe Sizing and Pressure Drop Calculation).

Microsoft Office.

Summary of Main Positions.

1) From July,2007 till July 2016 for Abu Dhabi Company for Onshore Oil Operations

(ADCO) as Senior Mechanical/Piping Engineer and as Senior Project Engineering

Coordinator for ADCOP Project at Fujairah.

2) From July 2005 until June 2007 for Abu Dhabi Company for Onshore Oil Operations

(ADCO) as Senior Project Coordinator at ADCO JDA Terminal.

3) From July, 2003 till July, 2005 for Abu Dhabi Company for Onshore Oil Operations

(ADCO) as Senior Mechanical Engineer in the Engineering & Major Projects

Department.

4) From December 2002 until July 2003 for Pan Emirates Engineering Ltd. Abu Dhabi as

Mechanical/Piping Head of Department.

5) For Consolidated Contractors Company (CCC), Saudi Arabia for 3 years as Project

Chief Office Engineer Managing the Engineering Staff on the Field.

6) For Petroleum Projects and Technical Consultation Company (PETROJET), EPC,

Egypt for 14 years as Piping Design Dept. Head, Senior Piping Material Engineer,

Senior Piping Design Engineer, and Piping Construction Engineer.

5/1/2023 Page: 3/12

Page 4: CV updated  February 2017

ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY

CURRICULUM-VITAE

Experience History:

From July 2005 to July 2016 for Abu Dhabi Company for Onshore Oil Operations (ADCO) As Senior Project Coordinator at ADCO Terminal/Pipelines Asset Supporting technically all Major Projects in Fujairah & Jebel Dhanna Terminals/Tank Farms

Main duties as follow:-

1. Review of all Project Design Documents/ Drawings including P&ID, GA, Piping

Layout, Major Equipment including tank and Pump Data Sheets/Specifications.

2. Provide Technical Support and coordinate all Project Activities/Milestones with

Project PMC/Contractor/Engineering Consultants from FEED Stage until

commissioning.

3. Participation in all Project Engineering / HSE Review Sessions such as

HAZID/HAZOP/PHSER etc.

4. Participation in all Project 3D Model Review Sessions

5. Participation and providing support in all ADCO Share Holders Health Check and

Project Startup Review Sessions carried out for Fujairah ADCOP Project

Main Projects: -

1) ADCOP Project including new Fujairah Terminal/Tank Farm, 48” CS Pipeline of 404

KM and Main/Intermediate Pumping Stations at Habshan and Sweihan

2) FEED Engineering for Fujairah Four Additional Tanks at Fujairah Terminal

3) JDA Farm Facilities Upgrade Project at Jebel Dhanna Terminal

4) Refurbishment of One Million Barrel Floating Roof Tanks at Jebel Dhanna Terminal

5) FEED Engineering for Jebel Dhanna Tank Farm Extension (Two Additional Floating

5/1/2023 Page: 4/12

Page 5: CV updated  February 2017

ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY

CURRICULUM-VITAE

From June, 2003 to July 2005 for Abu Dhabi Company for Onshore Oil Operations (ADCO) As Senior Mechanical Engineer in the Engineering & Major Projects Department Supporting technically all Major Projects in Jebel Dhanna Terminal and Tank Farm (the Main Oil Export Terminal in Abu Dhabi)

Main duties as follow:-

1)1) Review, comment and Approve consultant Engineering Deliverables Review, comment and Approve consultant Engineering Deliverables such as such as

Project Specifications / Data Sheets., Piping / Mechanical Drawings, Material Project Specifications / Data Sheets., Piping / Mechanical Drawings, Material

Requisitions and Engineering Calculations.Requisitions and Engineering Calculations.

2)2) Preparing Scope of Works / Terms of Reference for new Projects.Preparing Scope of Works / Terms of Reference for new Projects.

3)3) Prepare engineering works for PMRF”s (Plant Modification Request Forms) Prepare engineering works for PMRF”s (Plant Modification Request Forms)

including Drawings, Specifications, Data Sheets and Bill of Material.including Drawings, Specifications, Data Sheets and Bill of Material.

4) Consultant/ Contractor Bid Tech. Evaluation.

5)5) Technical Support during Project Construction, Answering Clarification raised by Technical Support during Project Construction, Answering Clarification raised by Operations /Contractors during Construction Phase. Operations /Contractors during Construction Phase.

6)6) Vendor Bid Technical Evaluation/ Clarification for Project Material such as Piping Vendor Bid Technical Evaluation/ Clarification for Project Material such as Piping Material, Valves, mechanical/ Process equipment, i.e. Pumps, Compressors, Tank Material, Valves, mechanical/ Process equipment, i.e. Pumps, Compressors, Tank Seals, Mixers, Roof Drain System and fixed Foam System Seals, Mixers, Roof Drain System and fixed Foam System

Main Projects: -

1) Tank Farm Facilities ( Oil Piping, Fire water System, Closed Drain System ) Upgrade

Project at Jebel Dhanna Terminal

2) Refurbishment of One Million Barrel Floating Roof Tanks at Jebel Dhanna Terminal

3) Preparation of Terms of Reference for Conceptual and for Basic/ FEED Engineering

for Jebel Dhanna Tank Farm Extension (Two Additional Floating Roof Tanks of One

Million Barrel) including facilities ; Filling / Loading Lines, Fire Water Main and

Closed Drain System.

From January, 2003 to June, 2003 for Pan Emirates Engineering Ltd., Abu Dhabi

As Piping/Mechanical Head of Department.

5/1/2023 Page: 5/12

Page 6: CV updated  February 2017

ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY

CURRICULUM-VITAE

Main duties as follow:-

1. Piping & Mechanical Detailed Engineering

2. Preparation of PC Tender Documents and Construction Packages

Main Projects: -

4) Installation of Side Entry Mixes on new 30” Nozzles for GASCO Tanks 6D-151A/B

5) Shah Infill Wells Project (Sy-040, Sy-041, Sy-042, Sy, &043) for Abu Dhabi

Company for Onshore Oil Operations (ADCO).

6) Asab Artificial Lift (Wells (Sb-052, Sb-107&Sb-135) for Abu Dhabi Company for

Onshore Oil Operations (ADCO).

From March 2001 to December 2002 for Private Consulting Engineering, work in Oil and Gas industry in Egypt

From December, 1999 To February, 2001 for CCC( EPC Company) as a Chief Office Engineer in Hawiyah Gas Plant Project , Saudi Arabia managing Engineering Section on Field for the Following Duties:-

1) Piping Isometric Detailing, Spooling, and Reporting of B.O.M. using Taliso / Talisman

Programs.

2) Piping, Pipe Supports Equipment, Structural Steel Material Control, and Release to

Fabrication Shop and Field.

3) Issue for Fabrication Spool Sheets and Workshop Drawings for Pipe Supports and

Structural Modification.

4) Pipe Supports and Structural Steel Material Procurement for CCC Scope of Supply

According to Project Technical Specifications and Armco Standards.

5) Control of Field Erection Material and Release for Construction using Talisman Program.

6) Preparation of Field Valve Testing lists Providing Hydro test Requirements for each Valve

According to Project Specification and Applicable Codes and Release Valves for Testing

as per Project Requirements and Aramco Standards.

5/1/2023 Page: 6/12

Page 7: CV updated  February 2017

ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY

CURRICULUM-VITAE

7) Engineering changes and revisions control and issuance of modifications to Fabrication

Shop and Site.

8) Control and checking of field RFI’s and Issuance of RFI’s for Engineering mismatches

between P&ID, GAs, ISOs Drawings, Project Specification, and Aramco Standards.

9) Splitting and Issuing of Test Packs for Project Testing Systems, Control and Updating

Test Packs for all modifications.

10) Issue As-built drawings for all disciplines.

From December, 1997 to November, 1999 for CCC as a Chief Office Engineer in Yanpet Ethylene Expansion Project in Yanbu, Saudi Arabia leading the Engineering Department on Field for the following duties:-

1) Piping Isometrics Checking, Spooling using TALISO Program.

2) Preparing detailed Workshop drawings for Pipe Supports and Issue Material Requisition

for Standard Pipe Supports.

3) Piping & Pipe Support Material Control using Talisman Program.

4) Issue Piping Spools and Pipe Supports for Fabrication and Erection.

5) Split Project Turnover System to Test Systems and Issuance of Test Packs to QC Dept.

6) Checking Project Engineering Documents such as P&ID, Line List, and ISO’s and GAD.

7) Control and Issue RFI’s for Engineering and Site Problems.

8) Get Approval for Accepted Material Substitutions to Increase Fabrication / Erection

Progress.

9) Control Project Specifications and Spec Waiver Issues.

10) Creating ISO Drawings, Specifying Branch Connection for Pipe Rack SFR’s.

11) Field As-Building P&ID’s and Isometrics.

5/1/2023 Page: 7/12

Page 8: CV updated  February 2017

ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY

CURRICULUM-VITAE

From August 1996 until December 1997 for Petrolem Projects and Technical Petrolem Projects and Technical

Consultation Company (PETROJET)Consultation Company (PETROJET), EPC, EPC, Egypt as a Project Office Engineer in Ammonia / Urea Fertilizer Abu Qir III (Mech.) Project in Alexandria.

Duties as follows:

1) Project Contract and Correspondence

2) Project Technical Documentation

3) Project Quantity Surveying, Cost Control and Preparing Monthly Invoices.

4) Piping Isometric Workshop Drawings.

5) Project Work Progress Calculations.

6) Project Material Control and Material Procurement.

From 1989 till August 1996 for Petrolem Projects and Technical Consultation Petrolem Projects and Technical Consultation

Company (PETROJET)Company (PETROJET), EPC, EPC, Egypt ,Head Office (Cairo) as

Piping Design Dept. head.

Main duties as follows:

1) Process Piping Systems Engineering including Pipe Sizing, Pump Head, and NPSH

calculation using PIPENET Software.

2) Piping Detailed Engineering including Piping Arrangement Plans and Piping Isometric

Drawings.

3) Piping Stress Analysis Calculations using CAESAR II Software.

4) Preparation of Project Bill of Material

5) Preparation of Project Material Specifications for Process Equipment, Piping Material,

Valves, Pumps, Plates, etc. According to International Codes API, ASME, ANSI, ASTM,

etc...

6) Material Inquiry Technical Packages preparation.

7) Vendor Bid Technical Evaluation/ Clarification.

5/1/2023 Page: 8/12

Page 9: CV updated  February 2017

ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY

CURRICULUM-VITAE

Main Projects: -

1) Expansion of SUMED Storage Capacity at SIDI KRIR Terminal (Alex.)

Duration: November 1994 to August 1996

Duties Include the Following: -

Engineering and Supply of 6 X 120,000 M³ New Crude Oil Floating Roof Tanks

and related 48” Process Piping Network (about 6km) and Hydraulic Operated Ball

and Gate Valves.

Engineering and Supply of New Boosting Pump Station with Total Capacity 3 X

4600 M³/HR.

Engineering and Supply of Fire Fighting System (24” Main Ring).

Engineering and Supply of 12” Oily Sewer System including Oily Sewer Pumps.

Engineering and Supply of 20” Surface Drainage System.

Engineering and Supply of 2” Hydraulic Oil System.

2) Extension of ASSUIT Refinery Storage Capacity

Duration: 1992 to 1994

Duties Include the Following:

Supply of New 15,000 M³ Kerosene Fixed Roof Tank.

Supply of New 5,000 M³ Naphtha Floating Roof Tank.

Supply of New Cooling Tower.

Supply of New LPG Cigar Tank.

Engineering and Supply of Related Process Piping Networks including Pump

Stations.

Engineering and Supply of Fire Fighting System (24” Loop).

Engineering and Supply of Sewer System.

3) Extension of ASSUIT Refinery Storage Capacity

Duration: 1991 to 1992 5/1/2023 Page: 9/12

Page 10: CV updated  February 2017

ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY

CURRICULUM-VITAE

Duties Include the Following:

Supply of New 55,000 M³ Crude Oil Floating Roof Tank.

Supply of two New 33,000 M³ Fuel Oil Fixed Roof Tanks.

Engineering and Supply of Process Piping Networks including Pump Stations.

Engineering and Supply of Fire Fighting System (24” Loop).

Engineering and Supply of Sewer System.

Engineering and Supply of Steam and Steam Tracing Lines for Fuel Oil Lines.

4) Upgrade of SUMED Storage Capacity at SUMED Terminals SIDI KRIR (Alex.) and EIN SOKHNA. (SUEZ)

Duration: 1989 to 1991

Duties Include the Following:

Engineering and Supply of 4 X 100,000 M³ New Crude Oil Floating Roof Tanks and

Related 48” Process Piping Network and Hydraulic Operated Ball and Gate Vales.

Engineering and Supply of Fire Fighting System (24” Main Ring).

Engineering and Supply of 12” Oily Sewer System.

Engineering and Supply of 20” Surface Drainage System.

Engineering and Supply of 2” Hydraulic Oil System.

From 1987 until 1989 for PETROJET Head Office (Cairo) as a Piping Material Engineer in Tech. Sector.

Duties as follows:

1) Develop of Project Materials Specifications for Equipment, Pumps, Pipes, Piping

Fittings, Valves, Plates, etc. According to International Codes API, ASME, ANSI,

ASTM, etc...

2) Develop of Technical Packages for Material Enquiries and Purchase Orders for

Petrochemical projects.

3) Vendor Bid Tech. Evaluation/ Clarification.

5/1/2023 Page: 10/12

Page 11: CV updated  February 2017

ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY

CURRICULUM-VITAE

4) Tendering and Cost Estimate.

Main Projects: -

1) Upgrade of SUMED Storage Capacity at SUMED Terminals SIDI KRIR (Alex.) and

EIN SOKHNA (SUEZ)

2) Green Beach and EL-Zahraa Tourist Villages Supply of PVC and Galvanized Piping

Valves for Water Pumping System.

3) GPC Platforms Material for Two Platforms including Pipes for Piles, Jackets, Decks,

Sheet Plates and Sections approximately 1800 ton.

From 1986 until 1987 for PETROJET (EPC Company) Head Office (Cairo) as Piping Design Engineer

Duties as follows: -

1) Process Piping Systems Engineering including Pipe Sizing, Pump Head, and NPSH

Calculations.

2) Piping Detailed Engineering including Piping Arrangement Plans and Piping Isometric

Drawings.

3) Piping Stress Analysis Calculations.

4)Specifying Project Materials and Equipment like Pipe, Piping Fittings, Valves, Pumps,

Boilers, Plates, etc.

5)Material Inquiries Issue.

6)Vendor Bid Tech. Evaluation/ Clarifications

Main Projects: -

ASSUIT Cement Factory Fuel Oil Facilities, Barge Unloading Facilities for Fuel Oil,

Unloading Pump Station, Steam Boilers, Water Treatment Plant, Transfer Pump Station,

and 12Km 12” Insulated Pipeline to Cement Factory.

From 1984 until 1986 for PETROJET as Piping Construction Engineer in SUCO ZEIT Bay Project.

5/1/2023 Page: 11/12

Page 12: CV updated  February 2017

ENG. MUSTAFA KAMEL MOHAMED EL-ZEINY

CURRICULUM-VITAE

Worked as Piping Construction Engineer for the following duties:-

1) Fabrication of piping spools according to isometric drawings and Fabrication of Pipe

Supports

2) Erection of piping spools according to P&ID, ISO’s and GAD

¨ From 1980 till 1984 for SEBHA Construction Co. in Libya as a Construction Supervision Engineer for the Following Projects, which have been executed by European subcontractors: -

1)Fuel Tanks and Related Piping System

2)SEBHA Tourist Hotel Mechanical works

From 1976 until 1980 in Military Service