cv siam update 31-10-2016

19
1 | Page CURRICULUM VITAE 2016 CERTIFICATION IMCA AIR DIVING SUPERVISOR Cert. No. 6002 Sept 2004 IMCA SURFACE SUPPLIED DIVER Cert.No.SS/DASSESS/072 5/12/2001 ASSISTANT AIR DIVING SUPERVISOR Cert. No.(2002/53) 21 Dec. 2002 CSWIP 3.1U - NDT INSPECTION DIVER Cert. No.(754075/622650) 10 Aug. 2011 IMO 1 OIL SPILL RESPONSE TRAINING. 28 th Apr. to the 2 nd May 2014 IUCN Marine Biodiversity Management Training Workshop 19 to 20 October 2014 Safety Certificate: BOSIET (OPITO) Certificate No.: 058550103021561091 Included “HUET with EBS” ( OPITO Approved ) Valid until 02 / 02 / 2019 H2S & BREATHING APARATUS ( OPITO Approved ) Valid until 02 / 02 / 2017 SAFE LIFTING OPERATION. Valid until 03 / 02 / 2018 PIRMT TO WORK (PTW) 04 / 02 / 2015 RISK ASSESSMENT 04 / 02 / 2015 MANAGEMENT OF CHANGE 04 / 02 / 2015 HAZARD IDENTIFICATION 04 / 02 / 2015 ACCIDENT / INCIDENT INVESTIGATION 04 / 02 / 2015 ADMA/OPCO & ZADCO SAFETY INDUCTION COURSE. All the jobs has been done on vessels: DP2 V, DSV and D.L.B BARGES most of the sizes. Nationality : Egyptian Place of birth Egypt SIAM RAMADAN AHMED SAYED Date of Birth : 01-02-1964 Tel : 002-03-5622240 Mobile : 002-01227378580 & 00971-506495306 Email: [email protected] Passport Number: A09925045 Valid until 16/06/2020 Sea man book Number: 198113 Valid until 30/01/2021 Marital status: married

Upload: siam-sayed

Post on 08-Feb-2017

15 views

Category:

Documents


1 download

TRANSCRIPT

1 | P a g e

CURRICULUM VITAE

2016

CERTIFICATION

IMCA AIR DIVING SUPERVISOR Cert. No. 6002 Sept 2004

IMCA SURFACE SUPPLIED DIVER Cert.No.SS/DASSESS/072 5/12/2001 ASSISTANT AIR DIVING SUPERVISOR Cert. No.(2002/53) 21 Dec. 2002 CSWIP 3.1U - NDT INSPECTION DIVER Cert. No.(754075/622650) 10 Aug. 2011 IMO 1 OIL SPILL RESPONSE TRAINING. 28

th Apr. to the 2

nd May 2014

IUCN Marine Biodiversity Management Training Workshop 19 to 20 October 2014

Safety Certificate:

BOSIET (OPITO) Certificate No.: 058550103021561091

Included “HUET with EBS” ( OPITO Approved ) Valid until 02 / 02 / 2019

H2S & BREATHING APARATUS ( OPITO Approved ) Valid until 02 / 02 / 2017

SAFE LIFTING OPERATION. Valid until 03 / 02 / 2018

PIRMT TO WORK (PTW) 04 / 02 / 2015

RISK ASSESSMENT 04 / 02 / 2015

MANAGEMENT OF CHANGE 04 / 02 / 2015

HAZARD IDENTIFICATION 04 / 02 / 2015

ACCIDENT / INCIDENT INVESTIGATION 04 / 02 / 2015

ADMA/OPCO & ZADCO SAFETY INDUCTION COURSE.

All the jobs has been done on vessels: DP2 V, DSV and D.L.B BARGES most of the sizes.

Nationality : Egyptian

Place of birth Egypt

SIAM RAMADAN AHMED SAYED Date of Birth : 01-02-1964

Tel : 002-03-5622240

Mobile :

002-01227378580 &

00971-506495306

Email: [email protected]

Passport Number: A09925045 Valid until 16/06/2020

Sea man book Number: 198113 Valid until 30/01/2021

Marital status: married

2 | P a g e

CURRICULUM VITAE

2016

EXPERIENCE – WORK HISTORY

DATE CONTRACTOR TASK POSITION VESSEL CLIENT

04 May - 06 Sep. 2016

MUTAWA Marine

ANCHOR HANDLING & MOORING MAINTENANCE

Mooring Maintenance &

Positioning (Including laying & recovery of Gravity anchors)

Monitoring during Jacking Down barges / Rigs.

Minor repairs of ship’s hull, cleaning intakes etc.

Video record & photograph work on sea bed structures

Anomaly reporting Scour and debris survey Seabed survey and pipeline

marking for rig approach Recovery of dropped items Provide support for

conductor guide Inspection of seabed

mooring, base plate and anchor pile

Collection of soil samples Sand bagging Provide support in running

anchor wire

Diving Supervisor

MUT-305 DSV

ADMA / OPCO

Fields: ZAKUM

UMM ALSHAIF

DAS ISLAND

HAIR DELMA

NASR FIELD

SATAH

TOTAL ABK

UMM AL DALAKH

UMM LULU

ZIRKU

Abu Dhabi

Aug. - 31Des. 2015 MUTAWA

Marine

8'' J-TUBE & ANODES Installation Old Anodes Removal (Hot

Cutting). Clamps and 8'' J-tube

installation 8'',12'',16'' Riser Clamp

Installation Impact, Torque wrench

tightens. Butterfly, Sled and Single

anodes installation CP Measure pre and post

electrical continuity bolts connecting.

GVI and Still photo As Built video survey

Diving Supervisor

MUT-13 DSV

ADMA / OPCO / NPCC

Zakum and Umm Elshaiff

fields Abu Dhabi

3 | P a g e

CURRICULUM VITAE

2016

May - July 2015 MUTAWA

Marine

Pre-Engineering Survey for Boat Landing & Riser Finder Replacement & 8'' J-TUBE & Anodes Installation

Boat landing and riser finder members marine growth removal using HP.W Jet and hand tools

Measurements & GVI & CVI Anodes Replacement. J-tube clamps installation Impact and torque wrench

spanner tighten. CP Measure pre and post

electrical continuity bolts connecting.

8'' J-tube Installation GVI and Still photo As Built video survey

Diving Supervisor

DSV MUTAWA

13

ADMA / OPCO / NPCC

Zakum and Umm Elshaiff

fields Abu Dhabi

April - May 2015 MUTAWA

Marine

8'' J-TUBE & ANODES Installation Old Anodes Removal. J-tube clamps installation Impact, Torque wrench

tighten. Butterfly, Sled and Single

anodes installation CP Measure pre and post

electrical continuity bolts connecting.

8'' J-tube Installation GVI and Still photo As Built video survey

Diving Supervisor

DSV MUTAWA

13

ADMA / OPCO / NPCC

Zakum and Umm Elshaiff

fields Abu Dhabi

Jul 2014 – Oct 2014 MUTAWA

Marine

(IRM) Inspection, Repair and Maintenance

UT of the Loading Jetty P/Fs Anodes Replacement & CP

Reading GVI /Maintenance of

flowing Buoys: 16 Maritime Exclusion Zone

(MEZ), 6 cardinals, 2 laterals, and 7

coral GVI of the Hull Tug Boats,

Navy Boats and Patrol Boats Current Sensor Inspection,

Cleaning

Diving Supervisor

SRP YLNG Company

4 | P a g e

CURRICULUM VITAE

2016

Feb2014–Mar 2014 I.N.W 24'' Riser Repairing Cold Cutting using Hydraulic

Wax Cutter Machine 24'' Riser Cleaning using

hydraulic grandeur Smart Flange Plus

Connector installation Installation new Riser

Portion Tighten using 100% Hydra

tight Subsea Bolts tensioners,

Leak Test Post installation video

survey.

Diving Supervisor

M/V 55 GUPCO/BP

Sep 2011 –Oct 2012 CCC Inspection Job for P/Fs P/Fs: IS-30 & IS-19 & PS-1W & PS-1Q & IS-15 & IS-12 All job using Underwater Positioning Nodes and Members:

General Visual Inspection (GVI)

Grit blast Cleaning SA 2.5 level

Cathode Potential(CP) Ultrasonic Thickness (UT) Alternating Current Field

measurement (ACFM) Flooded Member Detection

(FMD)

Inspection.

Diving

Supervisor

DP2 Vessel ZAKHER PILECAN

OXY QATAR

June 2012 I.N.W Inspection Job Drilling Rig UWILD for Drilling Rig:

Grit Blast cleaning SA 2.5 level.

GVI of the spud cans welds Area

MPI for the cleaned welds. UT for the ABS required

area Still Photo Survey. Post installation video

survey for Inspected welds areas

Inspection.

Diving

Supervisor

DSV PEGASUS11

TRANS OCEAN/BP

5 | P a g e

CURRICULUM VITAE

2016

Apr 2010 – Jul 2010 Mutawa Marine

Various jobs 14” Pipelines and Risers # Project # 8053For: IGD HAP pipeline campaign # Project # 7079 For: WHT US-251 Pipe laying Campaign # Project # 9068For: 8” Pipe laying of Pipelines & Risers at Mubarraz Field 14'' & 3'' Pipe laying – (2 P/L’s)

Connect hold back cable to P/F legs.

Connect hold back cable to 14''P/Lpuling head.

Stinger installation in the Barge.

Stinger check and 14'' P/L Profile.

Surveying on the P/Ls Cross over’s.

Pre Laying temporary concrete sleeper's installation.

Floating buoys on the P/Ls and removal.

Disconnect lay down head. 14''Riser installation

Cutting of D.M.A wire between P/F leg and 14'' P/L puling head.

Old Riser fender removal (Using U.W Cutting Torch).

Riser & Spool Metrology Measure.

Barge Davits connect to 14''P/L.

Attaching Air Bags Removal and break the old

grouting spillage from the spool piece route using hydraulic jack hammer.

Tie in riser/ Spool Piece installation @ 14''Riser clamps.

Excavate under the spool piece using Air Lift.

New P/F Boat Landing installation. Disconnect davits from 14''P/L. Spool Piece Knee brace removal. Post construction video survey.

Diving Supervisor

NPCC DLP 750 Barge

For 24 Hours

Operation

ADMA/OPCO

6 | P a g e

CURRICULUM VITAE

2016

Nov 2009–Feb 2010 Mutawa Marine

Installation 30''Sleeves(Protection Clamps) between30''P/L and concrete Sleepers at crossing Area. # Project #6021 Das Island & Raas Al Qilla Scope of work includes24 Hours Operation for:

Marking the Sleeves locations on the 30'' P/L on the concrete Sleepers.

Lifting 30'' P/L 2m using Air Bags.

Sleeves/Sleepers Installation.

Air Bags disconnect, recovery surface

Bolts tighten using Turk spanner.

30'' P/L Sleeves/Sleepers post installation survey

Diving Supervisor

NPCC DLP 750 Barge

For 24 Hours

Operation

GASCO

7 | P a g e

CURRICULUM VITAE

2016

Feb2009– Sep 2009 Mutawa Marine

14'' Riser Clamps Installation for the flowing ( 9 ) Plat forms:

ZK 172 P/F &ZK 129 P/F &ZK 39 P/F &ZK 149 P/F &ZK 116 P/F &ZK 246 P/F &U.SH 82 P/F

14'' Riser Clamps measurement and marking location.

Riser Clamps Installation and tighten using hydraulic impact wrench

Riser Clamps Alignment checks.

18'' steel Pipe Temporary sleeper replacement by Grouting bags sleeper installation

Grout Bag install, Grouting under P/L

Removal 18'' steel Pipe Temporary sleeper from under 14'' P/L Using U.W Hot Cutting Torch and Recovery to surface following for (8) Crossings :

CL4PX13 &CL4PX 8 &CL4PX10 &CL4PX16 CL4PX11 &CL4PX 9

&CL5PX19 &CL5PX18

Diving Supervisor

DSV MARCAP-II

ADMA/OPCO Zakum field &

Umm shaif field

8 | P a g e

CURRICULUM VITAE

2016

Oct 2008–Dec 2008 Mutawa Marine

Various jobs 14” Pipelines and Risers 14'' P/L Tie in Spools and Risers installation for following : 9 tie in ZK119-ZK135 & ZK288-ZK135 & ZK255-ZK135

ZK256-ZK113 & ZK113-ZK255 & ZK255-ZK113

ZK255-ZK120 & ZK120-ZK255 & ZK120-ZK151

Cutting of D.M.A wire between P/F leg and 14'' P/L puling head.

Old Riser fender removal (Using U.W Cutting Torch).

Riser & Spool Measurements using U.W Spool Piece Metrology.

Barge Davits connect to 14''P/L and side walk

Attaching Air Lift Bags to 14''P/L.

Removal and break the old grouting spillage from the spool piece route using hydraulic jack hammer.

Tie in riser/ Spool Piece installation @ 14''Riser clamps.

Excavate under the spool piece using Air Lift.

New P/F Boat Landing installation.

Disconnect davits from 14''P/L.

Spool Piece Knee brace removal.

Diving Supervisor

NPCC DLP 750 Barge

For 24 Hours

Operation

ADMA/OPCO Zakum field

Jul 2008 – Sep 2008 Mutawa Marine

14'' Riser Clamps Installation 14'' Riser Clamps

measurement and marking location.

Riser Clamps Installation and tighten using hydraulic impact wrench

Riser Clamps Alignment checks.

Diving Supervisor

DSV MARCAP-II

ADMA/OPCO Zakum field &

Umm shaif field

9 | P a g e

CURRICULUM VITAE

2016

Apr2008– May2008

PMS Petroleum

Marine Services

Old Plat Form Supporting (Helal P/F)

supporting clams installing Two bracing panels Three conductors

Installation 12'' P/L Demolition

Using Cold cutting hydraulic cutter machine.

Removal the 12'' P/L pieces and lifting to the surface.

Assistant Diving

Operation Manager

Tim Barge GUPCO(BP)

Feb. – Mar. 2008

PMS Petroleum

Marine

Services

Various jobs 24” Pipeline, Crossing and J-TUBs 24'' P/L from SFNY 900 to TP-17

(60 Tons) Gravity anchor survey to located and marking

Pipe laying including sea bed survey

Stinger check, pipe line profile

Pre Laying temporary sleeper in crossing location installation

Alignment frame deployment using Underwater Positioning Transponder Beacon survey

Disconnecting lay down cable

Gravity anchor removal and lifting to the surface.

Wet store for 24'' spools on seabed.

6'' J-TUBs No. of 18 Riser electric cable guide wire installation

Diving Supervisor

DLP Barge PMS 12For 24 Hours Operation

Saudi ARAMCO SFNY Field

10 | P a g e

CURRICULUM VITAE

2016

Dec2007 – Jan 2008 PMS Petroleum

Marine Services

22''Gas P/L Repairing

Repair at 22'' P/L using MORGRIP mechanical connectors.

Excavating under P/L Cutting 22'' P/L using

hydraulic cold wrench cutter 22'' P/L Concrete removal

using hydraulic cutting disk and hydraulic jack hammer

polyethylene removal and Chamfering P/L end

Grit blast Cleaning SA3 level, Grind seam weld

4 MORGRIP mechanical connectors installation

Miso-tech sonar support for P/L survey at bad visibility and during deployment of A-frame and spool piece

Installation for 2 spool pieces using air lift bags and A-frame and Tighten Flanges bolts using impact wrench and hydra tight equipment.

Diving Supervisor

DP2Barge PMS 17For 24 Hours Operation

NOSPCO

Sep2007 – Oct 2007

PMS Petroleum

Marine Services

Laying 30'' P/L F/L ZULF 370 to ZULF TP

Survey and marking to the existing 30"P/L pipelines at assigned location

Marking crossing at assigned location

30'' riser clamps location at the P/F measuring and marking

30'' Spool piece measurement using U.W Spool Piece Metrology.

Diving Supervisor

DLP Barge PMS 12For 24 Hours Operation

Saudi

ARAMCO ZULF Field

11 | P a g e

CURRICULUM VITAE

2016

Feb – Jun 2007

PMS Petroleum

Marine Services

Free Span Correction 20" Trunk P/L from

P/F Morgan 36 to MWF P/F

Free Span Correction: Using grout bags and Sand cement bags support Post installation video survey

Assistant Diving

Operation Manager

Tim Barge GUPCO(BP)

Aug–Sep 20067

PMS Petroleum

Marine Services

22" P/L laying

Pre laying Pitch hull survey 3'' wire for 22'' P/L pulling

head transferring to the shore.

Connect hold back cable to 22'' P/L pulling head.

Stinger installation in the Barge.

Stinger check and 22'' P/L Profile.

Cross over’s installation of temporary concrete sleepers.

Floating buoys removal and. Disconnects lay down head.

Offshore Platform Structure Installation(North Siena). Notes : (new plat form installation)

Installing plat form including sea bed survey.

Debris Removal. Sand bags at legs mud

mate's installation. 22'' Spool Piece Tie in

installation. Barge Pampers Installation Boat landing installation Stabbing guide clamp

installation. Disconnect 6'' wire it lifting

Platform. After P/F installation: Post installation video

survey Recording

Diving Supervisor

DLP Barge PMS 12For 24 Hours Operation

NOSPCO

12 | P a g e

CURRICULUM VITAE

2016

Apr 2006 – Jul 2006

PMS Petroleum

Marine

Services

Laying 16" Pipeline and PLEM & SPM Maintenance Laying 16" Pipeline from the pitch to the PLEM.SPM

Pre laying Pitch hull survey 3'' wire for 16'' P/L pulling

head transferring to the shore.

Connect hold back cable to 16'' P/L pulling head.

Stinger installation in the Barge.

Stinger check and 16'' P/L Profile.

Video survey for the crossing P/Ls and the SPM anchor chains.

Inspection and fixation of all under water PLEM flanges.

Configuration check for 8" hoses

Replacement of 8" hoses.

Diving Supervisor

DLP Barge PMS 12For 24 Hours Operation

SUCO

Sues

13 | P a g e

CURRICULUM VITAE

2016

Mar – Apr 2006

PMS Petroleum

Marine Services

Tow Crossings Repairing

Pipe Lines Repairing:

M36–M160 12" & 22'' P/Ls: Tow Crossings Repairing using PLEDCO Clamp and Hydra tight Connector

12'' P/L concrete and bully Ethylene removal by hydraulic grinder.

12'' P/L Grit blast Cleaning SA3 level

12'' PLEDCO Clamp installation at two sides.

12'' spool piece measurement and installation.

Tighten with hydra bolt tensional

12'' P/L pressure test. 22'' P/L concrete and bully

Ethylene removal by hydraulic grinder.

22'' P/L Grit blast Cleaning SA3 level.

22'' Hydra tight connector installation at two sides.

22'' spool piece measurement and installation.

Tighten with hydra bolt tensional

22'' P/L pressure test. Post installation video

survey Recording. Laying 20" pipeline Offshore Loading Jetty Platform Structure Installation

20" P/L Pre- Laing Survey Mattress installation. 60 t Concrete Sleeper

installation. Concrete blocks installation

using U.W position system.

Diving Supervisor

DLP Barge PMS 12For 24 Hours Operation

GUPCO(BP) Morgan Field

14 | P a g e

CURRICULUM VITAE

2016

Sep 2005 –Oct 2005

PMS Petroleum

Marine Services

Offshore Loading Jetty Platform Structure Installation

DUBA Offshore Loading Jetty Platform Structure Installation

J. Type riser installation. No of 3 Impressed Current

Anode installations. Painting platform piles using

splash zone. Trenching Impressed

Current Anode cable covering by sand cement bags.

Post installation As Built Video survey.

Diving Supervisor

DLP Barge PMS 12For 24 Hours Operation

Saudi ARAMCO

DUBA Offshore

Feb – Jun 2005

PMS Petroleum

Marine Services

Various jobs 18” Pipeline MORGAN 55 P/F

Cutting 18" Riser using cold cutting machine

Conductor clamp installation

18" Riser clamp and riser installation

18" Spool piece installation

Diving Supervisor

DLP Barge PMS 12For 24 Hours Operation

GUPCO(BP) Morgan Field

15 | P a g e

CURRICULUM VITAE

2016

July 2004 – Jan 2005

PMS Petroleum

Marine

Services

Various jobs Laying, Free span Correction and P/F Structure Installation Laying 22"P/L Simian , 22"P/L Sappier

Notes: Pipe laying including sea bed survey for the pre lay supports, pre lay supports, beach pull, buoyancy tanks removal, stinger check, pipe line profile, disconnecting lay down cable, video survey for the P/L and Free Spans.

Offshore Platform Structure Installation

(ROSITA) New plat form installation

Installation of the: barge pampers, boat landing stabbing guide clamp and boat landing.

Platform 6'' lifting wire disconnecting

Platform GVI and video survey after P/F installation.

Ass. Diving Supervisor IMCA Air

Diver

DLP Barge PMS 12For 24 Hours Operation

Technip

Jan – May 2004

PMS Petroleum

Marine Services

Laying 4.5" Cold Coil Pipeline

Laying 160' water depth free spans

crossings and tie-ins Risers clamps installation Two risers installation

6No. of the Spool Pieces

installation.

Ass. Diving Supervisor IMCA Air

Diver

Barge PMS 17For 24

Hours Operation

AGIBA

16 | P a g e

CURRICULUM VITAE

2016

Nov 2003 – Dec 2003

PMS Petroleum

Marine Services

Various Jobs: Decks installation, piles injection, 26", 12" , 3" P/L Laying, Risers, Spools, Free span

Decks installation, piles

injections 26", 12" , 3" Risers and

Spools (No. of 15 spools + No. of 6 risers) installations at platforms of PORT FOUAD RPP, NOURAS-A,NOURAS-B and DARFEEL p/fs

26",12",3" Pipelines hydro test, radius jacket injection

18" pipeline VCR for all Mattresses installation

while laying

Ass. Diving Supervisor IMCA Air

Diver

DLP Barge PMS 12For 24 Hours Operation

PETROBEL

Aug 2003 – Nov 2003

PMS Petroleum

Marine Services

Riser Clamps Tie In Spool Submerged Stinger

12" Riser Clamps

Installation. 12'' Riser Installation. 12'' Tie In Spool Piece

Installation. Floating the Submerged

Stinger@ 35 meter W/D using Air bags.

Ass. Diving Supervisor IMCA Air

Diver

DLP Barge PMS 12For 24 Hours Operation

GUPCO(BP) Morgan Field

17 | P a g e

CURRICULUM VITAE

2016

May 2002 – Apr 2003

PMS Petroleum

Marine Services

Lot of the Various Jobs: Carry out the following duties:-

Two 8" Risers installations 8" KESMA P/L (piggy back)

laying, free spans, crossings &riser tie ins

Submerged Fishing Boat lifting up from 44 meter W/D using air bags and Barge Big Rig

July 59P/F (24"-18" & 12") P/Ls Repairing using PLEDCO Clamp, HYDRO TEC &SMART FLANGES

R1-R4 8" pipeline free span corrections and crossings

HAPPY P/F centralization conductors clamp installations

Repairing 18" Morgan P/L leakage

Offshore Platform (EDFOU) Structure Installation

Ass. Diving Supervisor IMCA Air

Diver

DLP Barge PMS 12For 24 Hours Operation

GUPCO(BP) Morgan Field Morgan-8 & Morgan-36

Mar 2002 – Apr 2002

PMS Petroleum

Marine Services

24'' & 36'' P/L and Spool Piece Flanges installation

24'' Burullus P/L Shifting and

alignment using air Lift, Air Bags & Barge Davits.

24'' Spool Piece Flanges installation, Hydra tight

36" burullus P/L lifting up (was buried 60:90 cun.) using Air Lift, Air Bags & Barge Davits.

IMCA Air Diver

DLP Barge PMS 12For 24 Hours Operation

STOLT

Sep 2001

PMS Petroleum

Marine

Services

8" P/L Laying, Risers, Spools, Free span crossing.

R1 – R4 P/F 8" riser clamps installation

Morgan-36 8''pipeline laying

8''Riserinstallation, tie in Free spans correction and

crossings

IMCA Air Diver

DLP Barge PMS 12For 24 Hours Operation

GUPCO(BP) Morgan Field

18 | P a g e

CURRICULUM VITAE

2016

Apr 2001 – august 2001

PMS Petroleum

Marine Services

12'' & 9'' & 3'' P/L Spool Piece Flanges installation

12" & 3" PORT FOUAD P/F

pipelines hydro test 12" & 3" PORT FOUAD

(S.W1-S.W2) P/Fs Riser's installation, No of (2

risers 12"and3" Riser). Spool Pieces installation, No

of(3 spools 12'' & 9 &3"spools).

6" & 4" TEMSAH P/F Risers replacement, By Air diving & Sat. diving teams

IMCA Air Diver

DLP Barge PMS 12For 24 Hours Operation

PETROBEL

Aug 2000 – Mar 2001

PMS Petroleum

Marine Services

Visual inspection for sea

lines and anchor chains Inspect fixation of all under

water Fangs. Hoses configuration checks Replacement of 8" hose and

hose string (GVI) & Video survey

Air Diver

DLP Barge PMS 12For 24 Hours Operation

Sues S.P.O.CO

Feb1995– Aug 2000

PETROLEUM PROJECT & TECHNICAL

SUPPORT CO.

(PETROJET)

Various Jobs.

All kinds of underwater installation i.e.

Plat forms, riser clamps, anodes, risers, spool pieces, jackets. PLEMS, valves, grout bags support etc.

PLEDCO clamps, smart flanges, mess alignment & hydro Tech flanges.

Boat landing & riser guard. PLEM installations with all

of its facilities base PLEM-Guiro-Piles-Manifold-PLEM- cover protection installation, etc)

Marine growth cleaning, Sand blasting, Painting splash zone area

Air Diver PETROJET 11, 12, 17

Barges

PETROBEL & GUPCO & AGYBA

19 | P a g e

CURRICULUM VITAE

2016

Apr 1994 – Jan 1995

MARIDIVEOIL &

SERVICES

COMPANY

Marine growth cleaning, sand blasting, painting splash zone area

Cutting & welding Under water clamps,

conductors, anodes etc installations

Grouting operations Sea bed survey Drilling Rigs Leg

penetration.

Air Diver

PETROBEL &GUPCO

Jun 1993– Apr 1994

Free-lance

diver at

different

jobs with

RED SEA Marine Works

Company

Marine growth cleaning, sand blasting, painting splash zone area

Cutting & welding Under water clamps,

conductors, anodes etc installations

Grouting operations Sea bed survey Drilling Rigs Leg penetration.

Air Diver

PETROBEL &GUPCO