Sayed Ali AbdelAzeem Mahmoud Piping Construction Engineer
Atfeeh,GIZA,Egypt. PHONE : 002-01142427525 E-mail: [email protected]
002-01095136381 [email protected]
1
PERSONAL INFORMATION
Date & Place of Birth :22/8/1988 , Atfeeh ,Giza
Military Service : Exempted.
Nationality : Egyptian
Martial Status : Married.
EDUCATION
Graduation: B.SC. in Petroleum & Mining Engineering Department, Faculty of
Engineering, Cairo University, Egypt
Graduation Year : May2011
B.Sc. project: Oil shale.
B.Sc.project evaluation: Excellent.
QUALIFICATIONS Advanced Excel ( using popular equations in work as Vlookup , If , Count if ,Count ifs ,
Sum if , Sum ifs , Text , Right , Left , Sub total , Pivot Table , charts , …………. etc )
OSHA Construction and General Training Program
AutoCAD 2D
ICDL
C#
VBA
I look forward to learning :
PRIMA VIRA & PMP
TOEFL
SKILLS
:Language Skills
- Arabic (Mother Language)
- English (speech, write and read very Well)
- French (good)
Personal Skills: Self-learning and self-motivating skills
Team Work and Working under Pressure.
Time Management.
Totally committed to any work requirement unconditionally
Communication, presentation, and Leadership Skills.
Sayed Ali AbdelAzeem Mahmoud Piping Construction Engineer
Atfeeh,GIZA,Egypt. PHONE : 002-01142427525 E-mail: [email protected]
002-01095136381 [email protected]
2
SUMMARY OF EXPERIENCE More Than 5 Years Of Working Experience In The Field Of Mechanical And Piping Engineer, Construction and Installation Related To Oil Petroleum And Gas Fields As Well As Steam Power Plants, Waste Water Treatment Plants & Fire Fighting Systems As A Mechanical Piping Engineer Areas Of Expertise Includes Review , Understanding And Interpret Piping Engineering Drawings.
P &ID’s , Isometrics, And Mechanical Engineering Drawings Prefabrication, Installation, Erection Of Equipment & Related Piping To Equipment’s ,Pre-Comm. , Activates includes Hydro Testing, Flushing, Related Standards And Codes, Field Work Mechanical / Piping Eng. Loop Testing , Punch Listing, Commissioning , Insulation Sand Blast & Painting .
HIGHLIGHTS:
Experienced in erection-fabrication of piping, taking bill of quantity & as built drawings.
Using advanced excel equations in my work to overcome large sheets .
Expertise in piping construction of Oil, Gas, Refinary & Petrochemical plants/pipelines.
Familiar in inspection of piping, hydro testing, coating, painting & insulation.
Experienced in project execution under controlled cost, schedule and quality implementing client policy on health, safety and environment.
Coordinating with QA-QC inspection team to perform technical inspection of on going works to ensure and achieve required quality.
Preparing progress reports & action plan .
(April 2015 – till now ): “ piping construction Engineer ”
Project : : Egyptian Refining Company, Mostorod, Egypt
An Oil Refinery located in Mostorod area, Cairo, Egypt with capacity 140,000 BPD Operates different units as NHT, CCR, DHT, HCU, HPU, VDU, DCU, DEU, Sour Water Stripping Unit. Amine Treatment and Regeneration Unit Utilities, Sulfur Recovery Unit, and TGU
JICON scope workshop Piping fabrication ( 600 000 DI ) include C.S , SS &A.S .
Client : : ERC .
Main Contractor: GS E & C .
Sub Contractor : JICON EGYPT FOR PETROLEUM SERVICE
My Responsibilities:
Check latest revision for drawings & preparing materials before issuing them to fitters.
Monitor day to day work progress and prepare the weekly and monthly report
Ensure in coordination with piping supervisor that execution of works are to the required daily target
Report to the Construction Manager about the current work progress
Record hold , deleted & Modified drawings and follow them
Contact with QC department and record welded Joints.
Co-ordinate with the main-contractor to achieve the targets and schedule set by the planning .
Classify project into three areas and follow them for fit-up, welding & painting using equations to connect with
attachment files from qc department & painting department
Make files for searching for spools that will travel to site and follow with searchers
Sayed Ali AbdelAzeem Mahmoud Piping Construction Engineer
Atfeeh,GIZA,Egypt. PHONE : 002-01142427525 E-mail: [email protected]
002-01095136381 [email protected]
3
( Augusts 2014 – April 2015): “Piping Construction Engineer”
Project : EEP2 “ Ethydco Ethylene project ” Ameriya – Alexandria ,Egypt.
Client : Enppi And Toyo Engineering Corporation.
Main Contractor: PETROJET.
Sub contractor : I.E.M.S.A Construction
My Responsibilities:
Preparation of field piping system test packages ,including system limit on P&ID and piping
Review the Piping Design documents (P&ID, Isometric, Supports Details, orientation drawings and vendor drawings
Preparing work Packages for construction activities and method of statements
Motivate workers to attain the production schedules
Preparation of field piping system test packages, including system limit on P&ID and piping Isometrics.
Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.
(October 2013 – Augusts 2014): Piping Construction Engineer
Project: Egyptian Hydrocarbon Company "EHC" Project, Elain Elsokhna, Suez
Client: ThyssenKrupp UHDE GUMBH
Main Contractor: Hassan Allam Sons "HAC" & Drake and Skull.
Sub contractor : I.E.M.S.A Construction
My Responsibilities:
After receiving Weld maps, reviewing Piping & Instrumentation Diagram "P&ID", and all required technical specifications.
Preparing the required material “Pipes”, Valves, Supports, and fittings of each line.
Monitoring the daily progress of all scope till submitting to the client and clearing any punch items or comments if any.
Reviewing the Time Schedule with planning department and finding solutions for any delay.
(April, 2013 – October, 2013): “MATERAL ENGINEER
Project: Sulfuric Acid Plant , Alfayoum, Egypt
Client: ElNasr Company for Intermediate Chemicals “NCIC” “Egyptian Armed Forces” .
Main Contractor : I.E.M.S.A Construction
Sayed Ali AbdelAzeem Mahmoud Piping Construction Engineer
Atfeeh,GIZA,Egypt. PHONE : 002-01142427525 E-mail: [email protected]
002-01095136381 [email protected]
4
My Responsibilities:
Prepare Material Take Off & Purchase Orders.
Prepare the cutting sheet (nesting report) distribution material for each item in the project.
Study of Project Drawings, Check Material takes off for the Project, Receiving and Inspection of
Material against backing list and purchase order Making Over, Short &
Damage Reports (O, S & D)
Issuing To the fabrication site according to Drawing and checking the
certificates for the Received
Material According To Project Specifications and Standards, Material Traceability
Report, Off-Cuts
Sending back And Surplus and Left-over Status, Trans Surplus and Left-over to
Client Warehouse.
Understanding all company activities are carried as per approved quality plan.
Filing all reports definitely with each item according to scope of work.
Familiar with isometrics and different drawings.
Familiar with the most used codes and standards
(December 2012 – April 2013): “Technical Office Engineer”
Project: PDH Fabrication, Alamriya, Alexandria
Client: ThyssenKrupp Uhde Gumbh
Main Contractor : I.E.M.S.A Construction
My Responsibilities:
Making the Weld Maps of Isometrics classifying shop joints and field joints.
Preparing the required material for erection of lines.
Monitoring the daily progress of welding activities, and reporting the management.
Reviewing the Quantity surveys of monthly invoices.
(October 2012 – December 2012): “piping construction Engineer” at “EL NOUR COMPANEY”. Project: Assuit Thermal Power Plant (Removal and Replacement of Bottom for the Storage Tank (4000 M3).
My Responsibilities:
Making the Weld Maps of Isometrics classifying shop joints and field joints.
Study, recording, for all disadvantage of the bottom tank before starting work.
Preparation of all drawing and productivity of all area required.
Fabrication and Installation of steel structure.
Fabrication, Welding and Installation all kinds of pipes.
Follow up, sanding blast and painting inspection with daily report.
Calculation Area of the Tank & Amount of Gallons.
Received both of Sanding blast and paint for Shell and Bottom of the Tank.
Dry Film Thickness & Volume Solid for every production painting type.
Sayed Ali AbdelAzeem Mahmoud Piping Construction Engineer
Atfeeh,GIZA,Egypt. PHONE : 002-01142427525 E-mail: [email protected]
002-01095136381 [email protected]
5
(JULY 2011 – November 2012): “Piping Construction Engineer” at “EL NOUR COMPANEY”.
Project : Shoubra El Khima Thermal Power Station Unit #1 (4*315 MW)
My Responsibilities:
Rehabilitation of furnace water wall panels.
Rehabilitation of super heater.
Fabrication and Erection of piping for unit.
Piping fabrication and erection diameter up to (36inch) material.
TRAINING IN:
Summer training of 2010 :- Shoubra El-khamia Power Station
Summer training of 2009 :- ALKORIMAT POWER STATION 3 (BOILER) Summer training of 2008 :- ALKORIMAT POWER STATION 3 (TURBINE)