cv sak complete
DESCRIPTION
ÂTRANSCRIPT
![Page 1: Cv sak complete](https://reader034.vdocuments.mx/reader034/viewer/2022042706/579090511a28ab7b278bdded/html5/thumbnails/1.jpg)
SARWAT AHMED ABDEL KADER CONSULTANT ARCHITECT
![Page 2: Cv sak complete](https://reader034.vdocuments.mx/reader034/viewer/2022042706/579090511a28ab7b278bdded/html5/thumbnails/2.jpg)
CURRICULUM VITAE
Personal Details Name : Sarwat Ahmed Abdel Kader Ghanima Date of birth : 09 – 03 – 1951 Nationality : Egyptian Tel Nos. Saudi Arabia : +96612 6163964 ext : 132 Fax: : +96612 6922198 Mobile: +966 506601058 Tel Nos. Egypt : +202 38253983 Mobile : +201018886098 Address : Permanent resident in Saudi Arabia P.O. Box 15158 Jeddah 21444 Saudi Arabia Email : [email protected] [email protected] [email protected] [email protected]
Educational & Practical Experiences
Bsc. Of Architecture 1974 from Faculty of Fine Arts – Cairo
AutoCAD studies in Fremont – California, USA 1990
Approved as Consultant Designer for Public Buildings 1992 From Egyptian Syndicate of Engineers Cairo – Egypt.
Master Degree in Architecture from Columbus University USA
Doctorate Degree in Architecture from Columbus University USA (2010)
![Page 3: Cv sak complete](https://reader034.vdocuments.mx/reader034/viewer/2022042706/579090511a28ab7b278bdded/html5/thumbnails/3.jpg)
Career History Saudi Binladen Group Architecture & building Construction ( ABCD ) - Jeddah, Saudi Arabia Period: from: 11-10-2012 Up to Date Position: Technical Team Leader Duties:
Technical Management for under construction projects (Architectural – Civil & structural – ID –Electromechanical & low current )
Following the Design stages for Design & built projects Following the Shop drawings for site use. Following the As Built Documents & Manuals for
Handing over ) Pricing for new projects
Saudi Binladen Group Architecture & building Construction ( ABCD ) - Jeddah, Saudi Arabia Period: from: 01-07-2010 Up to 10-10-2012 Position: Material, Specs & Contract Team Leader Duties:
Studying projects Specification Procurement of material Technical wise Check All Contracts & Purchase Orders :
To be Sure it is Comply with the Client Demand & Consultant Approval
To be Sure it will be Available in time according to Time Schedule
Pricing for new projects Create Data base for Material, suppliers &
Manufacturer Create Data Base for International & National Codes
(ASTM, INT. Code, UBC, Saudi Code, Etc…)
![Page 4: Cv sak complete](https://reader034.vdocuments.mx/reader034/viewer/2022042706/579090511a28ab7b278bdded/html5/thumbnails/4.jpg)
Wedian Contracting & Maintenance - Jeddah, Saudi Arabia Period: from: 01-10-1986 30-06-2010 Position: Studies manager Duties:
Studying project (cost estimation) Working drawings Procurement of material & equipments As-built drawings Buildings Designs
Design of Prince Saud Bin Saad Al-Saud palace annex buildings
Design of Miscellaneous Private Villas & Residence buildings
El- Aamiria construction & Development – Jeddah, Saudi Arabia Period: from: 23-06-1980 till: 31-08-1986 Position: Chief of Technical Office THEN Technical Director Duties:
Working drawings Procurement of material & equipments Dealing with the Suppliers & Manufacturer in both Europe
& USA Dealing with the American Consultant engineers As-built drawings Supervision of Prince Mohamed Bin Fahd palace in Jeddah
![Page 5: Cv sak complete](https://reader034.vdocuments.mx/reader034/viewer/2022042706/579090511a28ab7b278bdded/html5/thumbnails/5.jpg)
Consultant office for Planning, Architecture and Engineering (COPA) Period: from: 01-06-1976 till: 25-03-1980 Position: Architect Designer Duties: Sharing in Designing of:
Fifth of May City – Helwan – Egypt
Joint Egyptian German venture with Orl plan office (Stuttgart-Germany) & Wild plan office (Stuttgart-Germany)
10th of Ramadan city – Ismailia Cairo high way Joint Egyptian Swedish venture with SWECO office (Sweden)
Participate in designing of:
1st Stage Development Area Residential Area Neighborhood No. 3 Main city center City Main Hospital
Central Organization for Major Projects – Egyptian Ministry of Defense , Design Dept. Period: from: 30-10-1974 till: 30-06-1977 Position: Architect Designer Duties: Sharing in Designing of:
Alexandria main Military Hospital Manshiyat al-bakry Military Hospital Kobry el-quba Military Hospital
![Page 6: Cv sak complete](https://reader034.vdocuments.mx/reader034/viewer/2022042706/579090511a28ab7b278bdded/html5/thumbnails/6.jpg)
![Page 7: Cv sak complete](https://reader034.vdocuments.mx/reader034/viewer/2022042706/579090511a28ab7b278bdded/html5/thumbnails/7.jpg)
![Page 8: Cv sak complete](https://reader034.vdocuments.mx/reader034/viewer/2022042706/579090511a28ab7b278bdded/html5/thumbnails/8.jpg)
![Page 9: Cv sak complete](https://reader034.vdocuments.mx/reader034/viewer/2022042706/579090511a28ab7b278bdded/html5/thumbnails/9.jpg)
![Page 10: Cv sak complete](https://reader034.vdocuments.mx/reader034/viewer/2022042706/579090511a28ab7b278bdded/html5/thumbnails/10.jpg)
![Page 11: Cv sak complete](https://reader034.vdocuments.mx/reader034/viewer/2022042706/579090511a28ab7b278bdded/html5/thumbnails/11.jpg)
![Page 12: Cv sak complete](https://reader034.vdocuments.mx/reader034/viewer/2022042706/579090511a28ab7b278bdded/html5/thumbnails/12.jpg)
![Page 13: Cv sak complete](https://reader034.vdocuments.mx/reader034/viewer/2022042706/579090511a28ab7b278bdded/html5/thumbnails/13.jpg)
![Page 14: Cv sak complete](https://reader034.vdocuments.mx/reader034/viewer/2022042706/579090511a28ab7b278bdded/html5/thumbnails/14.jpg)
![Page 15: Cv sak complete](https://reader034.vdocuments.mx/reader034/viewer/2022042706/579090511a28ab7b278bdded/html5/thumbnails/15.jpg)
![Page 16: Cv sak complete](https://reader034.vdocuments.mx/reader034/viewer/2022042706/579090511a28ab7b278bdded/html5/thumbnails/16.jpg)
![Page 17: Cv sak complete](https://reader034.vdocuments.mx/reader034/viewer/2022042706/579090511a28ab7b278bdded/html5/thumbnails/17.jpg)
![Page 18: Cv sak complete](https://reader034.vdocuments.mx/reader034/viewer/2022042706/579090511a28ab7b278bdded/html5/thumbnails/18.jpg)
![Page 19: Cv sak complete](https://reader034.vdocuments.mx/reader034/viewer/2022042706/579090511a28ab7b278bdded/html5/thumbnails/19.jpg)
![Page 20: Cv sak complete](https://reader034.vdocuments.mx/reader034/viewer/2022042706/579090511a28ab7b278bdded/html5/thumbnails/20.jpg)
![Page 21: Cv sak complete](https://reader034.vdocuments.mx/reader034/viewer/2022042706/579090511a28ab7b278bdded/html5/thumbnails/21.jpg)