cv & projects updated

of 25 /25
C U R R I C U L U M V I T A E FULL NAME: DIMITRAKOPOULOS CHARALAMBOS NATIONALITY: GREEK RESIDENCE: PYRGOS / Prefecture Of ILIAS / GREECE FAMILY STATUS: MARRIED (2 CHILDREN) DATE OF BIRTH: 8 th of September 1973 PROFESSION: Civil Engineer Contact: +30 6981031504 (mobile) email: [email protected] linkedin : Charalambos Dimitrakopoulos Skype id: lambis_dimitrakopoulos EDUCATION / SKILLS U n i v e r s i t y: T e c h n o l o g i c a l E d u c a ti o n a l I n s ti tu ti o n o f A th e n s . S p e c i a l t y: ´ C I V I L & I N F R A S T R U C T U 5( (1*,1((5,1*µ ( ro ad s, highw ay s, h a rb o rs , re ta i n i n g w a l l s , h y d ra u l i c & i rr i g a ti o n w o rk s , s e w a g e , c u l v e rt s , d ra i n a g e s , e c t) Y e a r o f gr a d u a t i o n : 1 9 9 8 G r a d u a t i o n D e gr e e 6 , 8 x M e m b e r o f t h e P r o j e c t M a n a ge m e n t I n s t i t u t e ( P M I ) . M e mb e r I D : 2 3 9 0 9 1 9 x C h a r t e r e d m e m b e r o f t h e C i v i l & i n f r a s t r u c t u r e T e c h n o l o gi c a l E n gi n e e r s G r e e k A c c o s i a t i o n M e mb e r I D : 2 5 3 2 3 L a n gu a ge s s p o k e n : E n g l i s h ( f l u e n tl y ) ² Frenc h ( fluently ) C o m p u t e r s o f t w a r e : O f f i c e 2 0 0 7 ² A uto CA D 208/09 ² Primavera Pro j ec t Planer D r i v e r L i c e n s e : Y e s ( i n te rn a ti o n a l ) E q u i p m e n t m a n i p u l a t i o n : L e i c a T S 0 2 to ta l s ta ti o n / H i ta c h i 1 0 6 c ra w l e r c ra n e ma n i p u l a ti o n / C a t 9 5 0 H W h e e l L o a d e r ma n i p u l a ti o n . INTERESTS - HOBBIES Literature ± Computer hardware ± Photography ± Languages ± Classical Music ± Puzzles Availability Immediate (Notice period 15~30 days for relocation & visa arrangements)

Author: charalambos-dimitrakopoulos

Post on 15-Jul-2015

42 views

Category:

Engineering


3 download

Embed Size (px)

TRANSCRIPT

CURRICULUM VITAE

CURRICULUM VITAE

FULL NAME:DIMITRAKOPOULOS CHARALAMBOS

NATIONALITY:GREEK

RESIDENCE:PYRGOS / Prefecture Of ILIAS / GREECE

FAMILY STATUS:MARRIED (2 CHILDREN)

DATE OF BIRTH:8th of September 1973

PROFESSION:Civil Engineer

Contact:+30 6981031504 (mobile) email: [email protected]: Charalambos Dimitrakopoulos

Skype id: lambis_dimitrakopoulos

EDUCATION / SKILLSUniversity:Technological Educational Institution of Athens.

Specialty:Civil & Infrastructure Engineering (roads, highways, harbors, retaining walls, hydraulic & irrigation works, sewage, culverts, drainages, ect)

Year of graduation: 1998

Graduation Degree 6, 8 Member of the Project Management Institute (PMI). Member ID: 2390919 Chartered member of the Civil & infrastructure Technological Engineers Greek AccosiationMember ID: 25323

Languages spoken:English (fluently) French (fluently) Computer software:Office 2007 AutoCAD 2008/09 Primavera Project PlannerDriver License:Yes (international) Equipment manipulation:Leica TS02 total station / Hitachi 106 crawler crane manipulation /Cat 950H Wheel Loader manipulation.

INTERESTS - HOBBIESLiterature Computer hardware Photography Languages Classical Music Puzzles

AvailabilityImmediate (Notice period 15~30 days for relocation & visa arrangements) EXPERIENCE

May 2014 ~ today (staff)Municipality of Pyrgos GreeceLead Engineer of urban & rural road maintenance works.Supervisor Engineer in significant Projects financed by the Municipality of Pyrgos.

May 2013 ~ May 2014 (contract)JP Contractors Nig. LtdSite Engineer / foreman on road & infrastructure works at Imo State in Nigeria.Project Manager at the Company's asphalt plant.Site Engineer-foreman on asphalt works

December 2009 ~ May 2013(staff)Municipality of Pyrgos GreeceSite engineer on road construction and infrastructure maintenance works. Cost engineer & Supervisor engineer in significant Projects financed by the Municipality of Pyrgos.Lead Engineer of urban & rural road works executed by the Municipality of Pyrgos with its own fleet of heavy machinery.

July 2008 ~ December 2009 (contract)Theodosis Constructions S.A. Construction Engineer , Cost Engineer & Quantity Surveyor for Private Building Projects (turn key luxurious houses & blocks of flats) & Public Projects (retaining walls optical fiber- schools- churches earthworks-infrastructure)Site engineer-foreman for frameworks & reinforced concrete works.

August 2005 ~ July 2008 (contract)Egnatia Odos S.A. Supervisor Site Manager during the construction of Komotini~Alexandroupoli Highway. Role: Quantity Surveyor Cost Engineer Project Engineer

September 2004 ~ August 2005 (contract)Ergodomiki S.A.Site Manager & Quantity Surveyor during the framework construction of the main repair shop of KOSMOCAR S.A. & the framework construction of the Head Office of EUROBANK ERGASIAS S.A. in Athens Site engineer-foreman for frameworks & reinforced concrete works.

December 2002 ~ September 2004 (staff)Olympic Village 2004 S.A.Supervisor Engineer & Quantity Surveyor during the construction of the athletes houses in the Olympic Village for the Olympic Gamesof 2004 in Athens.

September 2001 ~ September 2002 (contract)ERGODRAGAGE S.A.Site Manager of aggregates quarrying (sand & gravel) using dredge-boat & drag line in TCHAD in Central Africa.

June 2000 ~ September 2001 (staff)KLEARXOS ROUTSIS S.A.Construction engineer responsible of naval works during theconstruction of the extension of Piraeus harbor (Queen Mary II dock at Themistocles Pier)

March 1997~June 2000 (contract)ELTER S.A.Construction engineer during the construction of natural gas pipe-line (PE) network in Athens. Role: Quantity Surveyor Cost Engineer Schedule control engineer

February 1995 ~ March 1997 (staff)ANTONIOS ZACHAROPOULOS S.A. & KRUGER A.S.Office & technical assistant for the construction sites of sewage & water treatment plants.

Major Public Projects (in Greece & abroad) Harbor of Piraeus Olympic Village Komotini Alexandoupolis Highway Egnatia Odos subsector Mesti-Makri 15.4 Construction of the Creche Building Complex at Karatoula Ilias financed by the Church of Cyprus The expansion of the MGBEE road from Olru to Ideato South at Imo State (Nigeria)

Projects Certifications available upon request

REFERENCES

Upon Request

PROJECTS INDEX

May 2014 ~ today (stuff)Municipality of Pyrgos Greece

Lead Engineer of urban & rural road maintenance works.Supervisor Engineer in significant Projects financed by the Municipality of Pyrgos.

May 2013 ~ May 2014 (contract)JP Contractors Nig. Ltd

This was my recent international position as Site Engineer, working for an Irish Contractor.The Project title was the Expansion of the MGBEE road from Orlu to Ideato South including the anti-erosion works. The budget of the Project was 2.602.414.000 (12.333.715)My salary agreement was at 40.000 annually (not including accommodation, transport, flight tickets every 3 months)My responsibility was the organization of the group of labors & the machines, in order to achieve the maximum productivity.Brief Project Description: Construction of the drainage system (1m width & 1m height) on both sides of the road & connection with the natural water-sources Excavation of the extension of the road (double side expansion) Backfilling with laterite. Construction of the infrastructure of the road (30 cm of stone base) Construction of the road demarcation Construction of the asphalt layer (5cm compacted)

During the rainy season, I constructed the Asphalt Plant of the Company & I trained the Asphalt Operator, the loader operator, the mechanic & the labors.The manufacturer of the plant was the Indian Company Capious and the model of the plant was the DM 60-90

December 2009 ~ May 2013(stuff)Municipality of Pyrgos Greece

As Lead Engineer of Urban & Rural Road works, I was responsible of evaluating the citizens requests, scheduling & monitoring the daily plan using the Municipalitys fleet of heavy machinery (1 loader, 1 Crawler Excavator, 6 JCB loader backhoes, 8 trucks, 2 graders )

As Supervisor Engineer I was responsible for the onsite construction of the Public Projects financed by the Municipality. My additional role was to monitor the implementation of the quality tests and the inspection of the safety measures. I was also responsible for the Cost Control of the Projects & for the compliance with the Time-Schedule.Major Public Projects 1. Solid Waste ManagementBudget:550.0002. Erosion Control project at St. GeorgiosBudget:203.0003. Erosion control project at SkafidiaBudget:300.0004. Restoration of the old hospital Manolopoulioafter the earthquakes on 1993 & 2008Budget:1.200.0005. 2nd project of permanent Traffic interventions at Pyrgos town. Budget:320.0006. Construction of the Skourochori SkafidiaintersectionBudget:114.0007. Redevelopment of the old square at EleonasBudjet:128.000

As site Engineer, I was charged of the construction of multiples urban road works executed by the labors and the machinery of the Municipality of Pyrgos. The projects were supervised by the Technical Department of the Municipality. The budget was ~ 750.000

July 2008 ~ December 2009 (contract)Theodosis Constructions S.A.

Construction Engineer , Cost Engineer & Quantity Surveyor for Private Building Projects (turn keyluxurious houses & blocks of flats) & Public Projects (retaining walls optical fiber- schools- churchesPublic buildings - earthworks-infrastructure)

Site superintendent on frameworks & reinforced concrete works.

My salary agreement was 2.000 monthly

August 2005 ~ July 2008 (contract)Egnatia Odos S.A.

The 1st Project subject was: the expansion of the old National road from Komotini to Alexandroupoli , Subsector Mesti~Makri (17Km) the expansion of the Motorway from Komotini to Alexandroupoli , Subsector Mesti Makri (14.7 Km) The Project budget was 21.000.000

The 2nd Project subject was: The construction of the slip resistance asphalt layer from New Karvali to Xrisoupoli (14.5 Km) >>>>>> of the Alexandroupolis Ring Road (20,5 Km) >>of the remaining asphalt works from New Karvali to Alexandroupolis The Project budget was 24.000.000My salary agreement was 27.000 annually (including accommodation, transport and life-assurance)My role, as a member of the supervising team, considering the field works, was the daily monitoring of the executed earthworks & the concrete works (extensions of existing culverts & retaining walls), the monitoring of the explosions, the inspection of the safety measures, the control of the infrastructure construction, the implementation of the quality tests , the monitoring of the asphalt works & the control of the safety barrier installation works.

Considering the office job, I was the Lead Quantity Surveyor with extra duties as Cost Controller assistant.

September 2004 ~ August 2005 (contract)Ergodomiki S.A.

The Project subject was the construction of the concrete structure of: The main work-shop of Kosmocar S.A. (2.200 m2 surface, 2 floors + 1 basement) at Elefsina The construction of EUROBANK ERGASIAS S.A. main office(4.300 m2 surface, 6 floors + 4 basements + treasury) in Athens

My salary agreement was 1.800 monthly

My responsibility as site Engineer was the daily scheduling of the works (frameworks setting concrete casting frameworks striping), the guidance of the craftsmen and the labors, the quality tests, the monitoring of the work progress.Considering the paper work, I was in charge of the Quantity Surveillance and the verification of the subcontractors payrolls.

December 2002 ~ September 2004 (staff)Olympic Village 2004 S.A.

Athletic compoundOlympic villageMain Fire Station

The Project subject was: The construction of the athletes houses in the Olympic Village for the Olympic Games of 2004 in Athens The construction of the roads and the roads infrastructure inside the Olympic Village The construction of the connecting roads

The project Budget was 100.000.000

Additional projects: The construction of the athletic compound (1 football stadium, 2 indoor multipurpose gymnasiums, 1 swimming pool constructed according to the Olympic standards, 4 tennis playgrouns). Budget: 4.500.000 The construction of the main Fire Station of Parnitha Mountain. Budget: 600.000

My responsibility as Site Engineer Foreman, was to monitor the works progress, to ensure the safety & the quality, and make sure that everything was executed according to the regulations and the instructions of the Olympic Committee.Considering the office work, my duty was the Quality and the Quantity surveillance.

My salary agreement was 1.500 monthly, including assurance.

September 2001 ~ September 2002 (contract)ERGODRAGAGE S.A.

This is my first attempt to work abroad, so I came to an agreement with a Greek Contractor who was planning to construct a quarry.

My responsibilities in Greece: I was responsible to choose the appropriate machinery, (1 crawler crane Hitachi of 40tn, 1 truck Mercedes 2626, 1 vibrating screen). I was monitoring the construction of the screen, & the maintenance of the crane and the truck. I was trained to operate the crawler crane as drag-line I organized the custom-clearance, the shipping and the expedition.

My responsibilities in Chad I organized the custom clearance and the transport from Duala (the Cameroonian harbor) to NDjamena. I assembled the vibrating screen and I trained the mechanic, the operators & the labors.

My salary agreement was 1.500 monthly in Greece during the fabrication and the expedition & 3000 in Africa

June 2000 ~ September 2001 (staff)KLEARXOS ROUTSIS S.A.

Brief Project description: Silt dredging from the sea bottom Underwater drilling and placement of the explosives Underwater explosions Underwater excavations with clamshells and floating excavator Construction of the concrete blocks Construction of the underwater infrastructure Positioning of the blocks Construction of the upper structure

The budget of the Project was 16.727.806

My responsibility as naval Engineer was the daily measurement of the depth of the sea bottom, the scheduling and the monitoring of the underwater blasts, the guidance of the clamshells and the floating excavator,, the scheduling of the blocks positioning and the surveillance of the immersion.

March 1997~June 2000 (contract)ELTER S.A.

The Project was the construction of natural gas pipe-line (PE) basic network of 4bars pressure, in the sectors 16,17,18,21,22,68,71,73 & 83 of Attika

The budget of the Project was 5.282.465

My responsibility as junior site Engineer was the daily scheduling of the works (machines & labors), the inspection of the safety measures, the quality tests & the monitoring of the pipe welders.Considering the paper work, I was in charge of the Quantity & Cost Surveillance as well as the time-scheduling using Primavera software.

February 1995 ~ March 1997 (staff)ANTONIOS ZACHAROPOULOS S.A. & KRUGER A.S.I started working on 1995 at a reputed Contractor, specialized on water treatment plants, during my early years as a student. I had the chance to work side by side with very experienced Engineers and that was the source of my passion for the constructions. Slowly slowly from a shy office assistant I was transformed to a useful cadre and I took in charge the office support of the working sites. The support was: Correspondence with the authorities Control of the subcontractors payrolls Detailed construction drawings according to tech. specifications