cv _mustafa arslan

6
Mustafa Arslan Address: Siteler mah. 499. Sok. No:4 Aliağa/İZMİR Mobile: (+90) 536 964 52 04 E-mail: [email protected] Date of Birth: 02/08/1986 Nationality: Turkish EMPLOYMENT 09/2016- TSGI Engineering Construction Co., Ltd. Instrumentation Supervisor Supervision for site and Instrumentation works for the project design and application procedure Adaptation between site and office sides of the projects and arrangement of the field design changes Supervision for organization and scheduling installation of instruments by the help of relevant drawings or engineering documents as quickly and efficiently as possible. Responsible for arranging the priority of the all plant’s system installations finalization according to needs of due dates and other relevant contracting precedence 08/2013-06/2015 C.A.F. Mechanical Construction Co., Ltd. Instrumentation Engineer Responsible for the Electrical and Instrumentation works for the project design and application procedure Evaluation of the offers and products in the purchase process Supervision for site assembly of electrical-automation works Adaptation between site and office sides of the projects and arrangement of the drawing in such manner

Upload: mustafa-arslan

Post on 16-Feb-2017

21 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: CV _Mustafa ARSLAN

Mustafa Arslan

Address: Siteler mah. 499. Sok. No:4 Aliağa/İZMİRMobile: (+90) 536 964 52 04E-mail: [email protected] of Birth: 02/08/1986Nationality: Turkish

EMPLOYMENT

09/2016- TSGI Engineering Construction Co., Ltd. Instrumentation Supervisor

Supervision for site and Instrumentation works for the project design and application procedure

Adaptation between site and office sides of the projects and arrangement of the field design changes

Supervision for organization and scheduling installation of instruments by the help of relevant drawings or engineering documents as quickly and efficiently as possible.

Responsible for arranging the priority of the all plant’s system installations finalization according to needs of due dates and other relevant contracting precedence

08/2013-06/2015 C.A.F. Mechanical Construction Co., Ltd. Instrumentation Engineer

Responsible for the Electrical and Instrumentation works for the project design and application procedure

Evaluation of the offers and products in the purchase process Supervision for site assembly of electrical-automation works Adaptation between site and office sides of the projects and arrangement of the

drawing in such manner

01/2012-03/2013 Tekfen Construction & Installation Co. Inc. Instrumentation Engineer

Solved issues caused by site conditions and let the work front to keep up continuously and prevented possible obstacles related to failure of workers,

Page 2: CV _Mustafa ARSLAN

unbalanced or lacking material problems and differences between drawings and site conditions.

Organized and scheduled installation of instruments of a plant or a facility by the help of relevant drawings or engineering documents as quickly and efficiently as possible.

Coordinated any given man power to finalize foretold jobs or missions with keeping the work output and efficiency in a good ratio, by evaluating capabilities of foretold man power and distributing individuals to required fields of work.

Has been responsible from arranging the priority of the all plant’s system installations finalization according to needs of due dates and other relevant contracting precedence. Such as putting the fire and gas systems to the top priority for taking safety of the plant granted for the good of the workers and systems themselves.

Supervision of the plant’s safety and efficiency of man power, working systems and ongoing installations by checking the field physically in a balanced and scheduled way.

03/2011-12/2011 Çağsat Bilişim (Myvision) RE-DE and Technical Manager

Researched for the causes of any malfunctions or failures on any member of the system or system itself and looked for solutions to those problems. For avoiding any foreseen problems, tested system and members of the system and provided fixes or improvements to those members to let system to work efficiently.

Trained technicians and coordinated them by creating them schedules and work systems to have total control on installed infotainment systems.

Worked on the developing better designs and applications for the infotainment system for creating new and more compatible options for users and more long-lasting products. Development phase was containing examinations in both physical and application environment of the systems and software testing.

10/2009-02/2011 MSI Funtoro (Asteknoloji) Project Management and Field Analysis Engineering

Managed installations and physical checks for evaluating problems of the vehicle infotainment systems which have been applied to their environment and worked on creating required solutions.

Planned and applied possible improvements to systems which need innovations or upgrading. Coordinated application field and creation environment by being the bond between them. Checked and observed every change happens after applying any software or hardware changes and after all reported the outcomes. I have looked for the best possible subjects for testing new systems and collected data from them.

Page 3: CV _Mustafa ARSLAN

Evaluated and compared other products and alternatives in the market and reported them for possible required improvements and innovations. For keeping up with changing technology and needs of the customers, collected information from customers directly and worked with technical team to upgrade or redesign the systems and its components.

RELEVANT EXPERIENCES

10/2012- Ongoing Khabat Thermal Power Plant Units (North Iraq)As a newly establishing nation, North Iraq has potential operation sites such as “Khabat Thermal Power Plant” and the potential of the area calls companies which want to take a part in the establishment and fulfillment of the country. We took the tanker unloading skids portion of the project and it will be delivered on April of 2015.

03/2012- 02/2013 ASAB Central Degassing Station Full Field Development Project (UAE)For satisfying the worlds growing need of oil, government of UAE established a project on improving the bases and plants for degassing and refining petroleum with the goal of multiplying productivity. Instrumentation and Electrics documentation and installation work was handled by Tekfen. 4 separation trains, 2 gas compressors, 1 inlet facility, 3 substations, 1 control building, 6 reinjection pumps and other componential structures have been completed as cabling, instrument and lighting installation, fire and gas safety equipment and energizing by a team of 8 engineers including me.

03/2011-10/2011 Integration of Android Systems to Vehicle Entertainment Systems and Personal Internet Access Project

After the impact of Android operating systems in every personal handheld, cell phone or computer, we had the innovation of applying Android to infotainment systems. Progressing through physical and software tests took us to the point; being able to let every user to access internet freely on their client screen.

07/2010-03/2011 Vehicle Infotainment Systems Advertisement Management Project (1000 Vehicles)

With the aid of such ability to get nearly instantly feedback from the system applied environments, we were able to send and receive any type of advertisement in really short matter of time. By using cloud storage systems and 3G internet routers it was possible to publish any advertisement, concerning needs of the customers.

Page 4: CV _Mustafa ARSLAN

12/2010-03/2011 Integrated Bus Production Project with Scania and Kiel (Iran)

For expanding the area of the market and satisfying needs of possible demand of near countries, there had been a deal with German seat company Kiel as applying infotainment systems directly to the seats in factory of Scania, Swedish bus company. The project went on as training engineers and technical team for installation and technical support.

02/2006-07/2006 Freshman Design Project

Smell Sensor Integrated Air Cleaner: With the aid of smell sensor alternatives which can be applied to an air conditioner or an air cleaner, it would be possible to reach whole control and conditioning the air or humidity in your house. We worked on preparing the basic structure and ideas for producing such product.

EDUCATION

2004 - 2009 : Fatih University Electronics Engineering (English)

1997 - 2004 : Şişli Anatolian High School

OTHER SKILLS

Languages: English: Advanced German: Basic

French: Basic Turkish: Native

Page 5: CV _Mustafa ARSLAN

Computer: AutoCAD, Microsoft Office; Excel, Word, PowerPoint, C++, Java Programming Languages

PERSONAL INFO

As a member of multiple animal charity groups and a voluntarily worker of poor houses, my first priority and passion is to help to ones who are in the need of help.