cv muhammad nadeem khan
TRANSCRIPT
Muhammad Nadeem khan
Contract No. +971 0558310627
Email: [email protected]
CIVIL SURVEYOR/ CIVIL INSPECTOR
Objective
To obtain a full time position in the field of Civil Engineering that utilizes my analytical
and interpersonal skills.
Approvals
Approved from Abu Dhabi municipality.
Approved from Al Ain Municipality.
Approved from DAFZ Authority Dubai.
Approved from private Department of IMG Group Dubai.
EXECUTIVE PROFILE
A talented result driven Civil SURVEYOR with 14 years utilizing the experience as well as
comprehensive background in various Roads Metro rail, Bridges and Infrastructure
Projects pipeline for storm, waste water, house connection, DI, HDPE pipe for potable
water pipe line, street lighting, street furniture, soft & hard landscaping projects with
different Consultants and contractor .
PPRROOFFEESSSSIIOONNAALL WWOORRKK HHIISSTTOORRYY
Since March 2016 to Till Date
Company / Employer : Dar Al Hendesa Nazih Talib&Partner
Project :Construction of Internal Roads, infrastructure for
Al Wathba south Abu Dhabi
Project Value : Dhs. 54 million.
Client : Abu Dhabi Municipality.
Position : Land surveyor
Since March 2015 to Feb 2016
Company / Employer : Jouzy Axianta international Dubai
Project: P37 infra& building construction DAFZ Dubai.
IMG theme park infra&road project.
Project Value: Dhs. 95 million.
Developer : IMG Group.
Position : Land surveyor/inspector
Duties:
Supervision & checking of all site activities earth work future duct, kerb stone & flash kerb
and asphaltic concrete work for Dual Carriageway, all the internal roads & parking
according to the approved drawings & specifications
Supervise and Checking for laying of main sewer pipe line (100-450.dia GRP pipe), storm
water line (280-315U PVC), and RC pipe (400-1000 dia.) construction of main hole, catch
basin and inlet chamber.(180-560dia Hdpe pipe)(600-900dia DI pipe for potable water
line&, house connection line, construction of gate valve chamber, washout chamber ,Air
Release valve chamber, Flow meter and control valve chamber ,Poll box for House
connection and Hydrostatic pressure test etc.
Preparation of Daily progress reports and monthly progress reports and forwarding to RE
for further action.
Controlling the Quality of surveying work as approved one reporting all deviation from
the specification and approval drawing to RE.
Design survey, setting out for road, bridges culverts, storm water pipe line and other
related work for roads.
Checking all as-built drawings for the completed works to comply with that on site
From sep 2014 to March 2015.
Company / Employer International consulting company
Position : Civil surveyor
Project : internal Road, Parking stage 6 in Al Ain Region
Duties
Checking & Supervision for construction activities in Road works including concrete slab
for slope protection and stabilization of slope with shotcrete concrete and repair of
exciting culverts and grouted riprap in their chutes area.
Checking shop drawings for all civil, building construction work prepared by contractor,
revising horizontal& vertical alignment for building works.
Preparation of Daily progress reports and monthly progress reports and
forwarding to RE for further action.
Led squad to achieve and maintain highest ranking for health, safety & environment
standard at site.
From Dec2013 till to Sep 2014
Company / Employer : A L E C Construction
Position : Sr Surveyor
Project : Expansion of dubai airport C4,cargo terminal
Extension of abu dhai air port Terminal 3
baggage
building construction.
Contractor :A L E C Construction
Client : A DAC
Project Value : AED 260,000,000
Duties:
Checking shop drawings for all civil, building construction work prepared by contractor,
revising horizontal& vertical alignment for building works.
Conduct joint survey to check construction activates as per Dwg and specification.
Controlling the Quality of work reporting all deviation from the specification and approval
drawing to construction team
Coordinate with technical specialists and site personnel in identifying and resolving
complex technical problem.
Provided technical advice and guidance to site staff to ensure that critical or urgent
situation and quickly addressed.
Ensured a positive work environment and awareness by all staff at the site of project goals
and objectives various phases of construction to prevent delays.
Led squad to achieve and maintain highest ranking for health, safety & environment
standard at site.
From July 2012 to Nov 2013
Company / Employer : Crown engineering consultancy.
Position : Land surveyor
Project : Adnoc Head Quarter & DCP building project.
Client : Adnoc Abu Dhabi
Duties:
Checking shop drawings for all civil, building construction work prepared by contractor,
revising horizontal& vertical alignment for building works.
Followed by district cooling plant connection,& Chilled water as per site condition.
Conduct joint survey to check construction activates as per Dwg and specification.
Controlling the Quality of work reporting all deviation from the specification and approval
drawing to construction team
Coordinate with technical specialists and site personnel in identifying and resolving
complex technical problem.
Provided technical advice and guidance to site staff to ensure that critical or urgent
situation and quickly addressed.
Ensured a positive work environment and awareness by all staff at the site of project goals
and objectives various phases of construction to prevent delays.
Led squad to achieve and maintain highest ranking for health, safety & environment
standard at site.
From July2007 To June 2011
Employer : Obayashi corporation JTMJV Dubai
Position : Land surveyor
Project : Dubai metro rail project.
Project Value: Dhs. 16 billion.
Clint RTA Dubai.
Duties:
Conduct joint survey to check construction activates as per Dwg and specification.
Controlling the Quality of work reporting all deviation from the specification and approval
drawing to construction team
Coordinate with technical specialists and site personnel in identifying and resolving
complex technical problem.
Provided technical advice and guidance to site staff to ensure that critical or urgent
situation and quickly addressed.
Ensured a positive work environment and awareness by all staff at the site of project goals
and objectives various phases of construction to prevent delays.
Led squad to achieve and maintain highest ranking for health, safety & environment
standard at site.
From February 2004 To Dec 2006
Employer : Arab Korean Genco.
Contractor & Engineers
Position : Land Surveyor
Project : internal Road, Parking in Al Ain
Duties:
Preparation daily report and monthly working schedule for works fixing level on site for
civil works and getting check from consultant.
Arranging site activities to daily work schedule.
Controlling all machineries and labor works.
Site Measurements for interim payment certificate.
From July 2002 To Jan 2004
Employer Hakas PVT LTD.
Contractor & Engineers
Position : Land Surveyor
Project : Islamabad,Muree,Dual,carriageway
Duties:
Preparation daily report and monthly working schedule for works fixing level on site for
civil works and getting check from consultant.
Arranging site activities to daily work schedule.
Controlling all machineries and labor works.
Site Measurements for interim payment certificate.
PPRROOFFEESSSSIIOONNAALL QQUUAALLIIFFIICCAATTIIOONN
S.S.C (From Board of secondary education mirpur board AK,Pakistan
Diploma of Associate Engineer (Civil) from Punjab Board of Technical Education)
Technical Expertise
Used Leica GPS 1200,
Leica Total station TCA 1201A, 1205 Laser level, Sokkia250RX To
Station, , Topcon GPT 700I,7500, Digital level, Auto level etc.
COMPUTER SKILLS
Microsoft Office (MS WORD, MS EXCEL)
Internet Browsing
LLAANNGGUUAAGGEESS
English Fluent in reading , writing and speaking
Urdu Mother Language and fluent in RRS.
Arabic Excellent in Reading, Writing & Speaking.
PERSONAL INFORMATION
Date of Birth : 10.08.1977
Nationality : Pakistan
Marital Status : Married
Languages : English, Urdu & Arabic
Driving License : Holder of Valid Driving License