Page 1: CV  Majeed Mahmood -  QS

HOME ADRESS

Village Mahalam Khurd Post office Usman Wala Tehsil & District Kasur Punjab Pakistan

PRESENT ADRESS

AL Muntazah 31 No Street Doha Qatar

SKILLS

Auto Cad Experience 5 years MS Excel Experience 7 years MS Word Experience 7 years

MAJEED MAHMOOD

POSITION : QUANTITY SURVEYOR EMAIL : [email protected] MOBILE NO : 0097433768444

TOTAL EXPERIENCE 4 YEARS 8 MONTH

1. QUANTITY SURVEYOR • AL JABER ENGINEERING (QATAR) • NOVEMBER 2015 - TO DATE Project NEW ORBITAL HIGHWAY AND TRUCK RESPONSIBILITIES Material Take off for procurement Comparison of drawings Tender to Construction drawings Preparation of back up data for Monthly payment applications Quantity Take off for additional works (Variation orders) Preparation of Quantities for completed work with coordination of construction team. PROJECT DESCRIPTION It is the infrastructure Project having the cost of 1.7 Billion Dollar including Road Works , Bridges ,Under passes, Stone Pitching works & road side drain ,Storm Drainage Network , Irrigation Water Network, Electrical Works, Traffic Single Works, Telecom, Security System Department (SSD ) , Extra Low Voltage (ELV), and project is located in Mesaieed towards Salwa road Qatar

Page 2: CV  Majeed Mahmood -  QS

2. QUANTITY SURVEYOR • AL JABER ENGINEERING (QATAR) • APRIL 2014 - TO NOVEMBER 2015 Project CONSTRUCTION OF CP07A-1B WATERFRONT COMMERCIAL/SEEF LUSAIL INFRASTRUCTURE WORKS NORTH RESPONSIBILITIES Material Take off for procurement Comparison of drawings Tender to Construction drawings Preparation of back up data for Monthly payment applications Quantity Take off for additional works (Variation orders) Preparation of Quantities for completed work with coordination of construction team. PROJECT DESCRIPTION It was the infrastructure Project having the cost of 140 million Qatari Riyals including Road Works , Potable Water Network, Foul Drainage Network ,Storm Drainage Network , Irrigation Water Network, Electrical Works, Traffic Single Works, Telecom, Security System Department (SSD ) , Extra Low Voltage (ELV), District Cooling Network , Pneumatic Waste Collection (PWC) ,Gas Network , Substations and LRT Station and project is located in Lusail Qatar

3. QUANTITY SURVEYOR • ZAFAR JAVEED & COMPANY • JUNE 2012 - TO JUNE 2014 Project ASIAN DEVELOPMENT BANK ASSISTED FARM TO MARKET ROADS PROJECT PHASE-II DISTRICT SIALKOT RESPONSIBILITIES Preparation of X- Sections form Survey data provided by Surveyor Quantity calculation for Earth Work form X- Sections Quantity calculation for Concrete and Brick Works for box Culverts Assisted Quantity Section in preparation of weekly and monthly Progress report

Page 3: CV  Majeed Mahmood -  QS

PROJECT DESCRIPTION It was the Highway Project, the cost of Project was US$ 50 Million. The length of the Project was 32 Kms, 6Kms in Urban area having 3 lanes each side and 24Kms around the city, this road was specially designed for flow of heavy traffic. The Project consisted 1 No Flyovers, 7 No Reinforced Earth Ramps, 102 No Box Culverts,1 No Causeway,1No Bridge ,Under passes, Stone Pitching works & road side drain.

EDUCATION QUALIFICATION

• 3 Years Diploma of Associate Engineer in CIVIL Technology form Punjab Board of Technical Education Lahore-Pakistan (2012)

• Secondary School Certificate (2009)

PERSONAL DATA

Language : English and Urdu (Writing and Speaking) Nationality : Pakistani Passport No : QW 0154431 Religion : Islam Marital Status : Single Date of birth : 6th September 1992