LUHUR PRANDIKA ITS CURRICULUM VITAE 1 CURRICULUM VITAE A. PERSONAL DATA B. EDUCATION Material and Metallurgical Engineering, Institut Teknologi Sepuluh Nopermber Surabaya (ITS), graduate in September 2013 GPA : 3.29 / 4 (max) C. KEY QUALIFICATION Having a good analytical skill in Metallurgical Engineering Having the ability to work in both location Having the ability to work in a group. I have had many experiences working as a team, such as in collage student organization and committee. I understand what it means to be a part of something larger than myself and how to work with a group to accomplish a shared goal Having willingness to learn and determined, focus to a goal achivement. D. ACHIEVEMENTS A. Award and Experience Organization 2011/2012 – Himpunan Mahasiswa Teknik Material dan Metalurgi (HMMT FTI – ITS) as a President of Entrepreneurship BSO 2010/2011 – Himpunan Mahasiswa Teknik Material dan Metalurgi (HMMT FTI – ITS) as a Staff of Entrepreneurship Department B. Paper and Project 2013 – Analysis Capacitive Property of Electrochemical Capacitor WO3 From Sol Gel Synthesis With Calcination Temperature Variation Name : Luhur Prandika Date of Birth : Surabaya, 26 July 1991 Address : Jl. Kedondong no.4A , Surabaya, Jawa Timur Phone : 085645106669 Sex : Male Nationality : Indonesian Marital Status : Single Email : [email protected]

Upload: luhur-prandika

Post on 15-Apr-2017

36 views

Category:

Documents


11 download

TRANSCRIPT

Page 1: CV - Luhur Prandika newest

LUHUR PRANDIKA ITS

CURRICULUM VITAE 1

CURRICULUM VITAE

A. PERSONAL DATA

B. EDUCATION

Material and Metallurgical Engineering, Institut Teknologi Sepuluh NopermberSurabaya (ITS), graduate in September 2013

GPA : 3.29 / 4 (max)

C. KEY QUALIFICATION

Having a good analytical skill in Metallurgical Engineering Having the ability to work in both location

Having the ability to work in a group. I have had many experiences working as ateam, such as in collage student organization and committee. I understand what itmeans to be a part of something larger than myself and how to work with a group toaccomplish a shared goal

Having willingness to learn and determined, focus to a goal achivement.

D. ACHIEVEMENTS

A. Award and Experience Organization2011/2012 – Himpunan Mahasiswa Teknik Material dan Metalurgi (HMMT FTI – ITS)

as a President of Entrepreneurship BSO2010/2011 – Himpunan Mahasiswa Teknik Material dan Metalurgi (HMMT FTI – ITS)

as a Staff of Entrepreneurship Department

B. Paper and Project2013 – Analysis Capacitive Property of Electrochemical Capacitor WO3 From Sol GelSynthesis With Calcination Temperature Variation

Name : Luhur Prandika

Date of Birth : Surabaya, 26 July 1991

Address : Jl. Kedondong no.4A , Surabaya, Jawa Timur

Phone : 085645106669

Sex : Male

Nationality : Indonesian

Marital Status : Single

Email : [email protected]

Page 2: CV - Luhur Prandika newest

LUHUR PRANDIKA ITS

CURRICULUM VITAE 2

2012 – Pengaruh Ketinggian Tumpukan Plate Pada Mesin Mesh Belt 1 Terhadap Hasil

Kekerasan After Quenching Di PT FSCM MANUFACTURING INDONESIA

E. LANGUAGE

English : Writing – Good

Speaking – Good

TOEFL Score : 480

F. TRAINING

-Pelatihan Jurnalistik Tingkat Dasar III (Pelatjurdas III), by HMMT FTI ITS, 2010

- SOROT (Social and Responsibility Training), by BEM ITS, 2010

- Pelatihan Karya Tulis Ilmiah (PKTI), by HMMT FTI ITS, 2009

- Matrice Equilibrium (ME), BY HMMT, 2009

- Latihan Keterampilan Manajemen Mahasiswa Tingkat Dasar (LKMM TD), by

HMMT FTI ITS, 2009

- Latihan Keterampilan Manajemen Mahasiswa Pra-Tingkat Dasar VII (LKMM

pra-TD), by BEM FTI ITS, 2009

-Associate Welding Engineer, By : JWES, UI, IWS, Kementrian Perindustrian RI, 2014

G. COMPUTER LITERATE

Microsoft Office PV-Elite

H. EMPLOYMENT RECORD

EMPLOYER : PT FSCM Manufacturing Indonesia - Jakarta

Period : July 2 – Agustus 9, 2012

Position Held : Internship

Description of Duties : Worked under the supervision of Engineering Department Team,Pulogadung

2. EMPLOYEE : PT. Multi Fabrindo GemilangPeriod : November 2013 – Now

Position Held : Engineering, QA/QC Engineer, Welding Engineer, QC Inspector

Page 3: CV - Luhur Prandika newest

LUHUR PRANDIKA ITS

CURRICULUM VITAE 3

Description :

Engineering :

Perform Mechanical calculation for Pressure Vessel, Heat Exchanger, pig launcher.

QA/QC Engineer :

Make ITP for each Project and equipment

Prepare procedure for each project

Prepare WPS list and Welder List for each project

Interpret client standard into procedure

Interpret ASME VIII,IX.

Check the material certificate comply to ASME

Welding Engineer :

Prepare draft for new WPS

Comment the NDE & Welding Map

Witness the welder Test

QC Inspector :

Inspect the equipment for project (Valve), include the hydrotest or pooping test at

vendor

I. PROJECT HANDLE1. Engineering Dept (November 08, 2013 ~ October 01,2014)

a. Mechanical Calculation Heat Exchanger for Sulfindo Cilegon

b. Mechanical Calculation Pressure Vessel for Chandra Asri

Petrochemical

c. Mechanical Calculation Pressure Vessel for Pertamina Pondok

Makmur

d. Helping for Tender

2. Welding Engineer & Qc. Engineer (October 01, 2013 ~ Now)

a. Coordinating all job relevant with welding.

b. Ensure that are welding quality compliance with costumer’

specification and code’s requirements.

Page 4: CV - Luhur Prandika newest

LUHUR PRANDIKA ITS

CURRICULUM VITAE 4

c. Ensuring that welding to be used follow approved WPS & PQR

already stated in welding & NDE Map.

d. Ensuring that welder performed the weld is qualified and certified.

e. Monitoring fabrication from start to finish.

f. Monitor quality control operation and ensuring compliance with

code and specification.

g. Make New WPS as per company needed (Totally 15 WPS)

h. Prepare procedure as per client specification

Page 5: CV - Luhur Prandika newest

LUHUR PRANDIKA ITS

CURRICULUM VITAE 5

LIST PROJECT COMPLETED

1. Proyek Mini Plant Lapangan Jata MusiBanyuasin-Sumatera Selatan

PT. Hokasa Mandiri 2014

2. Fabrication Of Heat Exchanger PT. Sulfindo Adiusaha 20143. EPCC Total Proyek Panas Bumi Kamojang

1X35 MWPT. Rekayasa Industri 2014

4. Badak Mp Re-Staging Badak Central PlantEast Kalimantan

PT. Vico Indonesia 2014

5. Add Isobutane Dryer Facility For HdpeProject Inlet Guard Inlet Y-5223 A/BProject

Isobutane Feed Filter Y-1710 Project

PT. Chandra Asri Petrochemical Tbk 2014

6. Provition Of Rental Kick Off Separator PT. Alam Bersemi Sentosa 20147. Subang Gas Project PT. Gaspro Sentraco 20148. Storage Tank PT. Persada Teknik Mandiri 20149. Mutiara 8 Plant Capacity Upgrading PT. Vico Indonesia 201410. Jasa Perencanaan Pengadaan & Instalasi

Compressor Package Di Skg RantauPanjang & Pangkalan Brandan

PT. Indoturbine / PT. Pertamina Gas 2014

11. Pembangunan Fasilitas ProduksiPermanen Phase-1 Proyek PengembanganPondok Makmur

PT. Pacific Process Engineering / PT.Pertamina Ep

2014

12. OPT Oil Field Service PT. OPT Oil Service 201413. Proyek Pengembangan Gas Matindok

(PPGM) Pembangunan Fasilitas ProduksiGas Donggi

PT. PPE / PT. Rekind / PT. PertaminaEp

2014

14. Pembangunan Fasilitas ProduksiPermanen Phase - 1 Proyek PengembanganPondok Makmur

PT. PPE / PT. RPE / PT. Pertamina Ep 2014

15. Pembangunan Fasilitas ProduksiPermanen Phase - 1 Proyek PengembanganPondok Makmur

PT. RPE / PT. Pertamina Ep 2014

16. Mutiara - 8 Plant Capacity Upgrading(Additional)

PT. Vico Indonesia 2014

17. Replacement Project PT. Nippon Shokubai Indonesia, PT.Hanazono Engineering Indonesia

2014

18. Pengadaan Metering Regulating Station PT. Yuan Sejati - PT. Perusahaan GasNegara

201419. Pembangunan Fasilitas Produksi Gas

Donggi Proyek Pembangunan GasMatindok (PPGM)

PT. Rekayasa Industri, PT. Pertamina Ep 2014

20. Matindok Gas Development Project PT. Pertamina Ep, PT. HanazonoEngineering Indonesia

2014

21. Pondok Makmur Development Project PT. 3 M Indonesia, PT. RPE, PT.Pertamina Ep

2014

22. Pembelian & Pemasangan FasilitasKompresor Untuk Gas Musi Timur FieldPendopo

PT. PMI, PT. Indoturbine, PT. Tripatra,PT. Pertamina Ep - Asset 2

2014

23. Pembangunan Fasilitas Produksi GasDonggi

PT. Jord International, PT RekayasaIndustri, PT. Pertamina Ep

2014

24. Fabrication Of Pressure Vessel & Pre - FabTank

PT. Matra Eng - Const. / PT. PertaminaEp – Asset 3

2015

25. ORF Gresik Station PT. Wika Consortium - Rebana - Kelsri 201526. Matindok Gas Development Project

(MGDP)Konsorsium Wika - Tecknip. PT.Pertamina Ep

2015

27. Kick Of Separator PT. Alam Bersemi Sentosa 201528. Replacement Project PT. Hanazono Engineering Indonesia 201529. Pemanfaatan Gas Lapangan Bukit Tua

PCK2L Pipeline Orf Gresik - PJB GresikPT. Triguna Internusa Pratama 2015

30. Sumpal Compression Project Conocophillips (Grissik) Ltd 2015

Page 6: CV - Luhur Prandika newest

LUHUR PRANDIKA ITS

CURRICULUM VITAE 6

31. Pengadaan Dan Pemasangan Gas CustodyMetering System Di SKG-10 PrabumulihBarat, Prabumulih Field, PT. Pertamina Ep- Asset 2

PT. Pertamina Asset 2 2016

32. Supply Of New Exchanger 3-E-432 PT. Lotte Chemical 201633. ICCS Pipeline Gas Benda PT. pelabuhan indonesia 201634. Pekerjaan Pembangunan Pemasangan Jalur

Pipa Gas Dari Benoa Ke PLTGPesanggaran

PT. Pelabuhan Indonesia III / PT.Menara Gading Putih

2016

35. Jetty No. 3 Project Salt Conveying Facilities PT. Asahimas Chemical Indonesia 201636. Brine Recovery Auto Project PT. Sentra Usahatam Jaya 201637. Under Chute Of Bma Conti K330

(Structure)PT. Sentra Usahatama Jaya 2016

38. Linning Plate SS 304 For Tank Resin Trap PT. Sentra Usahatama Jaya 201639. S10 Project Platform PT. Chevron Geothermal Salak, Ltd

West Java Indonesia2016

40. Sumpal Compression Project Conocophillips (Grissik) Ltd 201641. Pondok Makmur Development Project PT. Pertamina Ep 201642. Brine Recovery Ier Auto Project PT. Sentra Usahatama Jaya 201643. Jetty No. 3 Project Salt Conveying Facilities PT. Asahimas Chemical Indonesia 2016

I declare the details stated to be true and complete.

Cilegon, December 21, 2016

Yours faithfully,

LUHUR PRANDIKA

LUHUR PRANDIKA ITS

CURRICULUM VITAE 6

31. Pengadaan Dan Pemasangan Gas CustodyMetering System Di SKG-10 PrabumulihBarat, Prabumulih Field, PT. Pertamina Ep- Asset 2

PT. Pertamina Asset 2 2016

32. Supply Of New Exchanger 3-E-432 PT. Lotte Chemical 201633. ICCS Pipeline Gas Benda PT. pelabuhan indonesia 201634. Pekerjaan Pembangunan Pemasangan Jalur

Pipa Gas Dari Benoa Ke PLTGPesanggaran

PT. Pelabuhan Indonesia III / PT.Menara Gading Putih

2016

35. Jetty No. 3 Project Salt Conveying Facilities PT. Asahimas Chemical Indonesia 201636. Brine Recovery Auto Project PT. Sentra Usahatam Jaya 201637. Under Chute Of Bma Conti K330

(Structure)PT. Sentra Usahatama Jaya 2016

38. Linning Plate SS 304 For Tank Resin Trap PT. Sentra Usahatama Jaya 201639. S10 Project Platform PT. Chevron Geothermal Salak, Ltd

West Java Indonesia2016

40. Sumpal Compression Project Conocophillips (Grissik) Ltd 201641. Pondok Makmur Development Project PT. Pertamina Ep 201642. Brine Recovery Ier Auto Project PT. Sentra Usahatama Jaya 201643. Jetty No. 3 Project Salt Conveying Facilities PT. Asahimas Chemical Indonesia 2016

I declare the details stated to be true and complete.

Cilegon, December 21, 2016

Yours faithfully,

LUHUR PRANDIKA

LUHUR PRANDIKA ITS

CURRICULUM VITAE 6

31. Pengadaan Dan Pemasangan Gas CustodyMetering System Di SKG-10 PrabumulihBarat, Prabumulih Field, PT. Pertamina Ep- Asset 2

PT. Pertamina Asset 2 2016

32. Supply Of New Exchanger 3-E-432 PT. Lotte Chemical 201633. ICCS Pipeline Gas Benda PT. pelabuhan indonesia 201634. Pekerjaan Pembangunan Pemasangan Jalur

Pipa Gas Dari Benoa Ke PLTGPesanggaran

PT. Pelabuhan Indonesia III / PT.Menara Gading Putih

2016

35. Jetty No. 3 Project Salt Conveying Facilities PT. Asahimas Chemical Indonesia 201636. Brine Recovery Auto Project PT. Sentra Usahatam Jaya 201637. Under Chute Of Bma Conti K330

(Structure)PT. Sentra Usahatama Jaya 2016

38. Linning Plate SS 304 For Tank Resin Trap PT. Sentra Usahatama Jaya 201639. S10 Project Platform PT. Chevron Geothermal Salak, Ltd

West Java Indonesia2016

40. Sumpal Compression Project Conocophillips (Grissik) Ltd 201641. Pondok Makmur Development Project PT. Pertamina Ep 201642. Brine Recovery Ier Auto Project PT. Sentra Usahatama Jaya 201643. Jetty No. 3 Project Salt Conveying Facilities PT. Asahimas Chemical Indonesia 2016

I declare the details stated to be true and complete.

Cilegon, December 21, 2016

Yours faithfully,

LUHUR PRANDIKA