RESUME CURRICULUM VITAE (PROFESIONAL RESUME) Sumberwatu , Rt 01 / 01 Sambirejo , Prambanan Sleman , Yogyakarta ( 55572 ) HP 0812839040 7 . E-mail. [email protected] ; [email protected] PERSONAL DATA N a m e : S u k a r j o Date of Birth : Sleman, March 05, 1968 Nationality : Indonesia Marital Status : Married Religion : Moslem Course / Training : Health Safety & Environment Awareness Training Basic Cause Tree & Analysis Training Basic Fire Fighting Training Basic First Aid Training c:krj\resume.doc

Upload: sukarjo-karjox

Post on 09-Jan-2017

151 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CURRICULUM VITAE SUKARJO With Pic

RESUME

CURRICULUM VITAE(PROFESIONAL RESUME)

Sumberwatu , Rt 01 / 01 Sambirejo , PrambananSleman , Yogyakarta ( 55572 )

HP 0812839040 7 . E-mail. [email protected] ; [email protected]

PERSONAL DATA N a m e : S u k a r j o Date of Birth : Sleman, March 05, 1968 Nationality : Indonesia Marital Status : MarriedReligion : Moslem

Course / Training : Health Safety & Environment Awareness Training Basic Cause Tree & Analysis Training Basic Fire Fighting Training Basic First Aid Training Work Permit Training Gas Test Training BOSIET & TSbB Electric Ability Permit Training

SUMMARIES :c:krj\resume.doc

Page 2: CURRICULUM VITAE SUKARJO With Pic

RESUME

Over 15 yrs extensive experience at Oil and Gas Company with cross cultural hands on and SUPERVISING Quality Control of Electric & Instrument Installation, INSPECTION of Electrical & Instrumentation Construction Installation, And to WITNEES of Precommissioning and Commissioning Onshore and Offshore Project.

WORK EXPERIENCES

1. PT.Instech Indonesia Recourses for PETRONAS CARIGALI INDONESIA.Project : Kepodang Gas Development Project ( Compression & Processing Platform and Wellhead Platform WHM-A & WHT-C )

Petronas Carigali Muriah Limited Semarang Centre Java. Period : March 2012 – Present

Classification : Sr.ELECTRIC / INSTRUMENT QC INSPECTOR Responsibility Job : - To Follow-up Quality of Electric & Instrument

Construction & Installation Activity. _ To follow-up and witness Electric & Instrument and

Telecom Precommissioning Activities

2. PT SURVEYOR INDONESIA for HESS ( Indonesia-Pangkah ) LTD.Project : Ujung Pangkah Development Offshore Phase II CPP & AUP Project (Compression & Processing Platform and Utilities & Accommodation Platform ) Ujung Pangkah Gresik East Java.Period : June 2010 – June 2011.

Classification : Sr.ELECTRIC / INSTRUMENT QC INSPECTOR Responsibility Job : - To Follow-up Quality of Electric & Instrument.

Construction & Installation Activity- To follow-up and witnees Electric & Instrument

and Telecom Precommissioning activities

3. PT IDEAL PATRA INDONESIA for TOTAL E & P Indonesie.Project : Peciko Phase 6 EPSC 1 & 2 , LP Compressor Senipah Project, East Kalimantan.Period : January 2009 – February 2010

Classification : Sr.ELECTRIC/INSTRUMENT SUPERVISORc:krj\resume.doc

Page 3: CURRICULUM VITAE SUKARJO With Pic

RESUME

Responsibility Job : - Electric / Instrument Construction and Installation - To follow-up and witnees Electric & Instrument and

Telecom Precommissioning activities

4. PT IDEAL PATRA INDONESIA for TOTAL E & P Indonesie.Project : Peciko Phase 5 EPSC 1 , Satellite Wellhead Platform (SWP-F) Project, East KalimantanPeriod : October 2007 – December 2008

Classification : ELECTRIC/INSTRUMENT SUPERINTENDENTResponsibility Job : To follow-up and to Witnees ; Inspection and Supervising of Electric & Instrument Construction, Installation and Precommissioning activities

5. PT . INDOLA PATRA INDONESIA for TOTAL E & P Indonesie Project : Tunu Phase 10 EPSC 1&2. Gathering Testing Satellite Ax , Ix , Kx , Lx and Wellhead Platform East Kalimantan. Period : September 2005 – October 2007.

Classification : ELECTRIC/INSTRUMENT SUPERVISOR Responsibility job : To follow-up and witness Electric & Instrument

Construction, Installation and Precommissioning activities

6. PT . INDOLA PATRA INDONESIA for TOTAL E & P IndonesieProject : Peciko Phase 3 Satellite Wellhead Platform Project EPSC 1 & 2 and Peciko Phase 4 Satellite Wellhead Platform Project EPSC 1 & 2, for SWP - G , E & K , and Manifold Wellhead Platform – A,B and C. Modification ( Offshore ) Project, East Kalimantan

Period : November 2001 – August 2005

Classification : ELECTRIC/INSTRUMENT SUPERVISORResponsibility Job : To follow-up and witness Electric & Instrument Construction, Installation and Precommissioning activities

7. PT . PERDANA KARYA for VICO INDONESIAProject : BADAK VLP Gas Compressor Project. VICO Indonesia East Kalimantan, Period : August 2001 – October 2001.

Classification : ELECTRIC/INSTRUMENT SUPERVISORResponsibility Job : To follow-up and witness Electric & Instrument Construction, Installation and Precommissioning activities

c:krj\resume.doc

Page 4: CURRICULUM VITAE SUKARJO With Pic

RESUME

8. PT . PERDANA KARYA for VICO INDONESIAProject : NILAM Construction & Modification for NILAM Produce Water Pipeline Project VICO Indonesia East Kalimantan, Period : May 2001 – August 2001

Classification : ELECTRIC/INSTRUMENT SUPERVISORResponsibility Job : To follow-up and witness Electric & Instrument Construction, Installation and Precommissioning activities

9. PT . PERDANA KARYA for VICO INDONESIAProject : NILAM Plant Installation Work for LEMPAKE Manifold F/L Field Phase-1 Project VICO Indonesia East Kalimantan.Period : Dec 2000 – April 2001

Classification : ELECTRIC/INSTRUMENT SUPERVISORResponsibility Job : To Follow-up of :

- Pulling Cable.- Elect/Inst. Construction and Installation- Equipment Installation (Electric/Inst.

Equipment)- Precommissioning and Function Test All

Elect/Inst. Equipments.

9. PT. PERDANA KARYA for VICO INDONESIAProject : NILAM Medium Pressure Gas Compression Project VICO

Indonesia East Kalimantan.Period : April 200 – November 2000

Classification : ELECTRIC/INSTRUMENT SUPERVISORResponsibility Job : To follow-up and witness Electric & Instrument

Construction, Installation and Precommissioning activities

10. PT. KALI RAYA SARI for VICO INDONESIAProject : Field Construction Project VICO Indonesia East Kalimantan

Period : October 1999 – March 2000

Classification : ELECTRIC/INSTRUMENT SUPERVISORResponsibility Job : To follow-up and witness Electric & Instrument Construction, Installation and Precommissioning activities

11. PT . KALI RAYA SARI for VICO INDONESIA

c:krj\resume.doc

Page 5: CURRICULUM VITAE SUKARJO With Pic

RESUME

Project : Field Construction and Flow line Project VICO Indonesia East Kalimantan.

Period : November 1998 – September 1999

Classification : ELECTRIC/INSTRUMENT SUPERVISOR

Responsibility Job : To Follow-up of :- Switch Gear c/w Generator and Termination ,

Function Test/Commissioning.- Head-Tracing System Installation c/w Function

Test.- Dismantle and Replacement DCS/PLC.- New Installation for All Instrument of Gas

Well.

12. PT . KALI RAYA SARI for VICO INDONESIAProject : BADAK Oil and Gas Fire Protection Project Phase-1 VICO

Indonesia East KalimantanPeriod : August 1998 – November 1999

Classification : ELECTRIC / INSTRUMENT SUPERVISORResponsibility Job : To Follow-up of :

- Setting Fire Alarm Panel.- Equipment Installation.- Termination.- Precommissioning and Function Test.

13. PT. WIFGASINDO DINAMIKA INSTRUMENT ENGINEERINGProject : PLTU PAITON Unit 7 & 8 Project, East Java, Nov. 1997 – Aug. 1998.Period : November 1997 – August 1998

Classification : ELECTRIC SUPERVISORResponsibility Job : To Follow-up of :

- Setting Transformer, MCC, SWGR.- Termination 6,6 KV, 20 KV.- Cable Connection (control).- Fire Alarm System.- Paging System.

14. PT. WIFGASINDO DINAMIKA INSTRUMENT ENGINEERINGProject : PT. PETRO OXO NUSANTARA OCTANOL Project, East Java.

Period : April 1997 – November 1997

Classification : ELECTRIC SUPERVISOR.Responsibility Job : To Follow-up of :

- Setting Transformer MCC, SWG, Bush Ductc:krj\resume.doc

Page 6: CURRICULUM VITAE SUKARJO With Pic

RESUME

- Installation Equipment Electric.- Pulling cable & Connection.- Termination 6 KV, 20 KV- Fire Alarm Installation- Paging System Installation- Telecommunication System

15. PT. WIFGASINDO DINAMIKA INSTRUMENT ENGINEERING

Project : PTA. POLYPRIMA Project, ANYAR, West Java. Period : November 1996 – March 1997

Classification : ELECTRIC SUPERVISORResponsibility Job : To Follow-up of :

- Setting Transformer, MCC,SWGR, Bush Duct- Cable Connection.- Cable Termination 6 KV, 20 KV- Under Ground Splicing 20 KV

16. PT. WIFGASINDO DINAMIKA INSTRUMENT ENGINEERINGProject : Condensate Stabilization Unit Senipah Project, TOTAL

Indonesie East Kalimantan. Period : August 1996 – November 1996

Classification : ELECTRIC FOREMAN.Responsibility Job : To Follow-up of :

- Construction and Installation - Termination, Connection Power and Control

Cable

17. PT. WIFGASINDO DINAMIKA INSTRUMENT ENGINEERING.Project : MUTIARA Oil Gas Facilities Expansion Project, VICO Indonesia,

East Kalimantan, Period : August 1995 – August 1996

Classification : ELECTRIC FOREMAN Responsibility Job : To follow-up of :

- Electric Installation.- Connection Power, Control, Equipment.- Commissioning Test for Start-Up.

All the information above in my data’s a true very respect I am to be fired if it’s true.Your Faithfully