current status of asian highway network in cambodia … · current status of asian highway network...

16
1 CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA Ministry of Public Works and Transport KINGDOM OF CAMBODIA 6th Meeting of the Working Group on the Asian Highway Network 3-4 November 2015, SEOUL, KOREA

Upload: lekiet

Post on 07-Jul-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA … · CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA ... (National census 2012) ... Graph of Government Budget Allocation

1

CURRENT STATUS OF ASIAN HIGHWAY NETWORK

IN CAMBODIA

Ministry of Public Works and TransportKINGDOM OF CAMBODIA

6th Meeting of the Working Group on the Asian Highway Network3-4 November 2015, SEOUL , KOREA

Page 2: CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA … · CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA ... (National census 2012) ... Graph of Government Budget Allocation

I. OVERVIEW

Capital Phnom Penh

Area 181,035 Km2

Population 14.47 millions(National census 2012)

Annual Population Growth

1.54 % (2010-2012)

Urban Population 20 %

GDP Growth 7.2 %

GDP per capita US$ 1,006.80 (WB, 2013)

Currency Riel (1USD=4000Riels)

Major Ports Sihanoukville Port and Phnom Penh Port

Length of National Roads

12,331 km (2013)

Length of Railroad 652 km

Length of Asian Highway Route

1,486.80 km

Number of Major Vehicle

1.90 million vehicles (2013)about 80% are used in the Capital City

2

Page 3: CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA … · CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA ... (National census 2012) ... Graph of Government Budget Allocation

Oddar Meanchey

Banteay Meanchey

Siem Reap

Battambang

Pailin Pursat

Preah Vihear

Kampong Thom

Stung Treng

KratieMondul Kiri

Ratanak Kiri

Kampong Cham

Prey Veng

Svay RiengTakeo

Kandal

Phnom PenhKampong Speu

Koh Kong

Kampot

Kep

Sihanoukville

Kampong Chhnang

Road Class Road Length (km)

1-Digit National Roads 2,258 Km

2-Digits National Roads 3,342 Km

3-4 Digits Provincial Roads 6,607 Km

Rural Road 35,000 Km

Total Length 47,207 Km

Road Class Share under MPWT

PR, 3 & 4 digits 54.1%

NR, 1 digits 17.3%

NR, 2 digits28.6%

II. Cambodian Road Network

3

Page 4: CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA … · CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA ... (National census 2012) ... Graph of Government Budget Allocation

4

II. Cambodian Road Network (Cont.)

Pavement Condition:Road Types Road

Length (km)Asphalt

PavementAC / DBST

%

1 Digit National Roads (1, 2, 3, …, 9) 2,258 2,258 100%2 Digits National Roads (11, 52,…. etc.) 3,342 1,868 56%Provincial Roads 6,607 1,000 15%Rural Roads 35,000 - -

TOTAL 47,207 5,126ROAD DENSITY 0.26 km/km2

National Road #1 National Road #7

Page 5: CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA … · CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA ... (National census 2012) ... Graph of Government Budget Allocation

5

I.3 Pavement Type:

AC

DBST/SBST

Laterite

Earth

LEGEND

II. Cambodian Road Network (Cont.)

Page 6: CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA … · CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA ... (National census 2012) ... Graph of Government Budget Allocation

III. Asian Highwaysin Cambodia

6

Page 7: CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA … · CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA ... (National census 2012) ... Graph of Government Budget Allocation

7

There are 2 (+1) Asian AHW lines crossing Cambodia

III. Asian Highway in Cambodia

Page 8: CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA … · CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA ... (National census 2012) ... Graph of Government Budget Allocation

8

RoadNo.

Itinerary Total length (km)

AH1 Poipet (Cambodia-Thai Border) - Serei Saophoan - Phnom Penh - Baveth (Cambodia-Vietnam Border)Current Condition:

- All paved with AC or DBST, Number of Lanes: 2- One bridge at Neak Loeung was newly constructed under Japan Grant Aid- Plan to upgrade to 4 lanes starting from RN 5- Plan Expressway (Phnom Penh-Bavet, under Jica’s F/S)

573.00

AH11 Sihanoukville - Phnom Penh - Kampong Cham - Stung Treng- Tropeang Kreal (Cambodia - Laos Border)Current Condition:

- All paved with AC or DBST, Number of Lanes: 2- Under upgrading to 4 lanes from Phnom Penh to Skun (75km)- Plan Expressway (Sihanoukville-Phnom Penh, under China’s F/S)

762.80

AH21NewProposal

Sisophon junction with AH1 – (Cambodia-Vietnam Border) Current Condition:

- Under rehabilitation 90% Completed- Number of Lanes: 2, DBST, One bridge across Mekong River at Stung Trengwas already constructed.

600.00

TOTAL LENGTH OF ASIAN HIGHWAY IN CAMBODIA (Km) 1,935.80

Status of ASIAN Highways

III. Asian Highway in Cambodia (Cont.)

Page 9: CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA … · CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA ... (National census 2012) ... Graph of Government Budget Allocation

2000

2002

2006

9

Improvement of National Road No.1Phnom Penh‐Neak Loeung, 60km(Japan Grant Aid)

Stage 1:Construction of 2 bridgesat St. 42 and st.47,Completed in 2006

Stage 2:Construction of Road , one Bridge and Culverts betweenst. 13+100 and st. 56 (Neak Loeung),completed Feb. 2009

Stage 3:Construction of Road    between st. 4+000 and st.  13+100,completed March 2011

Stage 4:Construction of Road betweenst. 0+000 (Eastern side of Monivong bridge) and st.4+000On Going, planned to complete in March 2017

AH1 Improvement Projects

III. Asian Highway in Cambodia (Cont.)

Page 10: CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA … · CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA ... (National census 2012) ... Graph of Government Budget Allocation

A Cable‐Stayed Bridge across the Mekong River, through the AH1, (Bangkok‐Phnom Penh‐Ho Chi Minh)Bridge Length ....... 2,215mWidth.................... 13.50mCompleted in March 2015,

Location 10

AH1 Improvement Projects

III. Asian Highway in Cambodia (Cont.)

Page 11: CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA … · CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA ... (National census 2012) ... Graph of Government Budget Allocation

11

Improvement of National Road No. 5 (Japan Yen Loan)

SCOPE OF WORKS:‐Widening to 4 lanes + New 4 bypasses

The Project divided into 3 sections:A. North Section:Length: 84.74km (51.48+9.34+23.92)2 bypasses: Sri Sophon:      9.34km and

Battambang: 23.92kmConstruction will start in late 2015

B. South Section:Length: 135.40km2 bypasses: Kg. Chhnang and OudongConsultant Selection will finish inJune 2015

C. Middle Section:Length: C1: 112.60km + C2: 35.70kmRequest proposal for Consultant Selection.

The entire project is planned to complete by 2020.

A

B

C1

C2

AH1 Improvement Projects

III. Asian Highway in Cambodia (Cont.)

Page 12: CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA … · CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA ... (National census 2012) ... Graph of Government Budget Allocation

12

Expressway Plan (1)

No. Route Length Operation

E1 Phnom Penh – Bavet 135 km 2020

E3 Phnom Penh – Sihanoukville 210 km 2020

E5 Phnom Penh – Poipet 355 km 2025

E6 Phnom Penh – Sri Sophon 400 km 2030

E7 Phnom Penh – Laos Border 355 km 2030

E9 Siem Reap – Vietnam Border 390 km 2030

E10 Krong Kep – Koh Kong 220 km 2030

UE Phnom Penh Ring Road 155 km 2025

2,200 km

Preliminary Schedule of Expressway developmentSource: Jica Preliminary Data collection survey, September 2013

E1: Under Preparatory Studyby JICA since March 2015

The Study on Phnom Penh‐Bavet Expressway 

E1

III. Asian Highway in Cambodia (Cont.)

Page 13: CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA … · CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA ... (National census 2012) ... Graph of Government Budget Allocation

Plan to put in operation in 2020

13

Expressway Plan (2)

III. Asian Highway in Cambodia (Cont.)

The Study on Phnom Penh‐Sinanoukville Expressway (AH11) 

E2

Page 14: CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA … · CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA ... (National census 2012) ... Graph of Government Budget Allocation

14

III. Asian Highway in Cambodia (Cont.)

ASIAN HW Road Sign

ASIAN HW Road Sign has been included in our Road Sign standard and installed on AH1 and AH11

Page 15: CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA … · CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA ... (National census 2012) ... Graph of Government Budget Allocation

15

For keeping the Road Network sustainable the Government increases the budget for Road Maintenance every year.

$ 369,468,639

Graph of Government Budget Allocation for Road Maintenance from 2006-2011

Maintenance Works include:- Routine Maintenance- Periodic Maintenance- New Construction- Flood & Emergency Rehabilitation

12%19%

36%

33%

Routine Maintenance (12%)Periodic Maintenance (19%)New Construction (36%)Flood & Emergency (33%)

The Share of Budget in Road Maintenance Works in 2011

IV. ROAD MAINTENANCE

Page 16: CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA … · CURRENT STATUS OF ASIAN HIGHWAY NETWORK IN CAMBODIA ... (National census 2012) ... Graph of Government Budget Allocation

16

Thank youfor your attention