current projects 2010-n°172
DESCRIPTION
World projectsTRANSCRIPT
1 1 / 73
COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
820 2011
800 2011
2300 2012
1300 2012
805 2012
405 2012
4700 2013
1700 2013
2100 2013
533 2013
1000 2013
1070 2013
1200 2013
2110 2014
3110 2014
2700 2014
1200 2014
524 2014
415 2013
1250 2012
85 2011
84 2011
300 2012
6140 2020
2011
1900 2014
1450 2014
196 2014
1500 2014
463 2014
272 2012
1255 2014
MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010
DATE OF AWARD
COMPLETION DATE
July 2008 Abu Dhabi Shuweihat S2 IWPP Project (Power) GDF SUEZ SAMSUNG/KOREA-SIEMENS/GERMANY Powergen
July 2008 Abu Dhabi Shuweihat S2 IWPP Project (Desalination) GDF SUEZ DOOSAN/KOREA Water/desal
January 2009 Abu Dhabi SAS Project Package A Adco PETROFAC Production
January 2009 Abu Dhabi SAS Project Package B Adco TECNICAS REUNIDAS/SPAIN-CCC Production
March 2009 Abu Dhabi Bab Gas Compression Project Adco SK ENG/KOREA Production
May 2009 Abu Dhabi IGD Project (Offshore portion) Adma Opco NPCC/UAE Production
July 2009 Abu Dhabi IGD Project (Habshan 5 Plant) Gasco JGC/J - MAIRE TECNIMONT/ITALY Gas/treatment
July 2009 Abu Dhabi IGD Project (Habshan 5 Offsites & Utilities) Gasco HYUNDAI ENG Gas/treatment
July 2009 Abu Dhabi IGD Project (Ruwais 4th NGL Train) Gasco PETROFAC / GS ENGINEERING Gas/treatment
July 2009 Abu Dhabi IGD Project (Ruwais Storage Tanks) Gasco CB&I/USA Storage
July 2009 Abu Dhabi IGD Project (Das Island Gas Plant) Adgas HYUNDAI HEAVY INDUSTRIES/SOUTH KOREA Gas/treatment
July 2009 Abu Dhabi Borouge 3 Project (ethane cracker) Borouge LINDE/GERMANY Petrochemical
October 2009 Abu Dhabi Ruwais Fertilizer Expansion Fertil SAMSUNG/KOREA-UHDE/GERMANY Petrochemical
November 2009 Abu Dhabi Ruwais Refinery (CDU Package) Takreer SK ENG/KOREA Refining
November 2009 Abu Dhabi Ruwais Refinery (RFCC Package) Takreer GS ENGINEERING/SOUTH KOREA - TARGET ENG Refining
November 2009 Abu Dhabi Ruwais Refinery (O&U Package) Takreer SAMSUNG ENGINEERING Refining
November 2009 Abu Dhabi Ruwais Refinery (Tankage Package) Takreer DAEWOO/SOUTH KOREA - CB&I/USA Storage
November 2009 Abu Dhabi Ruwais refinery (Marine Facilities Package) Takreer GS ENGINEERING/SOUTH KOREA Refining
November 2009 Abu Dhabi Asab 3 Project Gasco TECHNIP/ABU DHABI Gas/treatment
December 2009 Abu Dhabi Bab & Qusahwira Fields Devlpt Adco NPCC/UAE Production
January 2010 Abu Dhabi Pipeline between Thamama C & Asab Gasco DODSAL/UAE Transportation
January 2010 Abu Dhabi Mirfa-Habshan Nitrogen Pipeline Elixier DODSAL/UAE Transportation
February 2010 Abu Dhabi Bida El Qemzan Field Devlpt Adco VECO/USA (CH2M HILL) Production
March 2010 Abu Dhabi Construction of Four Nuclear Plants Kepco HYUNDAI ENG / SAMSUNG ENG / KOPEC Powergen
April 2010 Abu Dhabi Ruwais Isomerate Quality Improvement Pjt Takreer LITWIN/F Refining
April 2010 Abu Dhabi Shah Gas Project (Processing Plant) Adnoc SAIPEM/ITALY Gas/treatment
April 2010 Abu Dhabi Shah Gas Project (Sulfur Recovery Unit) Adnoc SAIPEM/ITALY Gas/treatment
April 2010 Abu Dhabi Shah Gas Project (Pipelines Package) Adnoc SAIPEM/ITALY Transportation
April 2010 Abu Dhabi Shah Gas Project (Offsites&Utilities) Adnoc SAMSUNG ENGINEERING Gas/treatment
April 2010 Abu Dhabi Shah Gas Project (Gas Gathering System) Adnoc TECNICAS REUNIDAS/SPAIN-PUNJLLOYD/INDIA Gas/treatment
May 2010 Abu Dhabi IRP Project (Tankage portion) Takreer DAEWOO/SOUTH KOREA Storage
May 2010 Abu Dhabi Borouge 3 Project (Polyolefins Package) Borouge TECNIMONT/ITALY-SAMSUNG ENGINEERING Petrochemical
2 2 / 73
COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010
DATE OF AWARD
COMPLETION DATE
400 2014
935 2014
463 2013
350 2012
350 2012
1600 2011
2800 2012
1970 2011
2100 2011
3000 2012
500 2011
4200 2012
2011
405 2011
1640 2012
143 2011
156 2011
54 2011
2200 2012
673 2012
1800 2012
2600 2012
1090 2012
1500 2013
233 2012
800 2011
580 2011
150 2011
4000 2012
1800 2011
2011
645 2011
2011
May 2010 Abu Dhabi Borouge 3 Project (LDPE Package) Borouge TECNIMONT/ITALY-SAMSUNG ENGINEERING Petrochemical
May 2010 Abu Dhabi Borouge 3 Project (Offsites & Utilities) Borouge HYUNDAI ENG Petrochemical
May 2010 Abu Dhabi Ruwais Base Oil Production Facilites Takreer HYUNDAI ENG Refining
May 2010 Abu Dhabi Zakum Central Super Complex Demothballing Adma Opco NPCC/UAE Production
June 2010 Abu Dhabi Lower Zakum Field Adma Opco J.RAY McDERMOTT Production
June 2007 Algeria Arzew Fertilizer Complex Sorfert UHDE/GERMANY-OCI ALGERIA Petrochemical
July 2007 Algeria Skikda LNG Train Reconstruction Sonatrach KBR/USA Gas/treatment
November 2007 Algeria Terga/Ain Temouchent Power Plant Sonelgaz ALSTOM/F-ORASCOM/EG Powergen
November 2007 Algeria Koudiet Edraouch Power Plant Sonelgaz GENERAL ELECTRIC/USA-IBERDROLA/SPAIN Powergen
March 2008 Algeria Mers el Hadjaj Ammonia-Urea Complex Sonatrach/Bahwan MITSUBISHI HEAVY IND/J-DAEWOO ENG Petrochemical
July 2008 Algeria Rhourde Nouss Field Development Sonatrach JGC/JAPAN Gas/treatment
July 2008 Algeria Arzew LNG Plant Sonatrach SAIPEM/ITALY - CHIYODA/JAPAN - DAEWOO ENG Gas/treatment
July 2008 Algeria Skikda Storage Tanks (Skikda Lng Pjt) Sonatrach ENTREPOSE CONTRACTING/F Storage
November 2008 Algeria Arzew Refinery Expansion Naftec HYUNDAI ENG / HANWHA CORP / DAEWOO Refining
November 2008 Algeria Hassi Messaoud LPG Facility Sonatrach SAIPEM/ITALY - SHAW/USA Gas/treatment
November 2008 Algeria Alrar Power Plant Expansion Sonatrach BONATTI / GAVAZZI IMPIANTI Powergen
November 2008 Algeria GREO Gas Pipeline (packages 1-2-3) Sonelgaz COSIDER/KANAGHAZ/ENAC/ERCIYAS-T Transportation
November 2008 Algeria GREO Gas Pipeline (package 5 ) Sonelgaz GUNSAYIL/TURKEY Transportation
March 2009 Algeria EL Merk Field Devlpt (CPF Package) Sonatrach/Anadarko PETROFAC - ORASCOM Production
March 2009 Algeria El Merk Field Devlpt (Flowlines/Gathering) Sonatrach/Anadarko ABB SARPI/ALGERIA - PETROJET/EGYPT Production
March 2009 Algeria MLE Field Development Sonatrach/ENI SAIPEM/ITALY Production
May 2009 Algeria Skikda Refinery Upgrading Sonatrach SAMSUNG/KOREA Refining
June 2009 Algeria Hamra Gas Processing Facilities Sonatrach LAVALIN/Canada Gas/treatment
June 2009 Algeria Gassi Touil Gas Processing Facilities Sonatrach JGC/JAPAN Gas/treatment
June 2009 Algeria Haoud Berkaoui Gas Flaring Sonatrach ABB SARPI/ALGERIA Gas/treatment
June 2009 Algeria GK-3 Pipeline (pack 1 & 2) Sonatrach PETROJET/EGYPT Transportation
June 2009 Algeria GK-3 Pipeline (pack 3) Sonatrach SAIPEM/ITALY Transportation
October 2009 Algeria El Merk Field Devlpt (Pipelines) Sonatrach/Anadarko BONATTI /ITALY Transportation
February 2007 Angola Soyo LNG Project Angola LNG BECHTEL/USA Gas/treatment
December 2007 Angola Pazflor Project (Subsea Package) Total TECHNIP/F - ACERGY Production
February 2008 Angola Pazflor Project (FPSO & Topsides) Total DAEWOO/SOUTH KOREA - KBR/USA Production
July 2008 Angola Block 31 PSVM Pjt (subsea flowlines - umbilicals)BP TECHNIP/F Production
July 2008 Angola Block 31 PSVM Pjt (FPSO) BP MODEC/SINGAPORE - TOYO ENGINEERING/JAPAN Production
3 3 / 73
COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010
DATE OF AWARD
COMPLETION DATE
1000 2011
520 2011
550 2011
110 2010
2011
670 2011
348 2012
5000 2011
2011
620 2011
868 2011
2011
2800 2013
1700 2011
2011
2300 2014
550 2013
2060 2013
170 2010
2014
750 2013
2014
826 2011
2011
2011
314 2011
251 2011
414 2011
500 2012
616 2014
2012
2013
1250 2011
July 2008 Angola Block 31 PSVM Pjt (URF Risers) BP HEEREMA MARINE CONTRACTORS Production
July 2008 Angola Block 31 PSVM Pjt (Umbilicals) BP SUBSEA 7 - AKER SOLUTIONS Production
December 2008 Angola Pipeline Network for Soyo LNG Angola LNG SPIE CAPAG/F - ACERGY Transportation
September 2009 Angola Block 17/18 GEP Phase 2 Project Total E&P Angola ACERGY GROUP Production
July 2009 Angola Kizomba Satellites Devlpt (TieBack) Esso Exploration Angola SAIPEM/ITALY - PONTICELLI/F - AMEC Production
December 2007 Argentina El Rio Turbio Power Plant YACIMIENTO CARBONIFERO ISOLUX CORSAN/SPAIN Powergen
August 2009 Argentina La Plata CCR Plant YPF ODEBRECHT Refining
March 2008 Australia North Rankin 2 Project North West Shelf Venture HHI/SOUTH KOREA-EOS-McDERMOTT Production
August 2008 Australia Fishermann's Landing LNG Project LNG Ltd SK ENG/KOREA - LAING O'ROURKE Gas/treatment
November 2008 Australia Southern Seawater Desalination Project Water Corporation TECNICAS REUNIDAS/SPAIN-AJ LUCAS Water/desal
February 2009 Australia Adelaide Desalination Plant Ministry ACCIONA AGUA/SPAIN-McCONNELL DOWELL Water/desal
March 2009 Australia Reindeer Gas Project (onshore Portion) Apache / Santos CLOUGH/AUSTRALIA - J.HOLLAND Gas/treatment
June 2009 Australia Collie Urea Project Perdaman Chemicals SAMSUNG/KOREA-IKPT/INDONESIA Petrochemical
July 2009 Australia Wonthaggi Desalination Plant Victoria Government DEGREMONT/F - THIESS/AUSTRALIA Water/desal
September 2009 Australia Reindeer Gas Project (wellhead platform) Apache / Santos SHENZHEN CHIWAN SEMBAWANG ENG/CHINA Production
September 2009 Australia Gorgon LNG Plant Chevron/ExxonMobil/Shell KJVG (KBR/JGC/CLOUGH/HATCH) Gas/treatment
October 2009 Australia Gorgon LNG Pjt (Storage Tanks) Chevron/ExxonMobil/Shell CB&I/USA Storage
October 2009 Australia Gorgon LNG Pjt (LNG modules) Chevron/ExxonMobil/Shell HYUNDAI HEAVY IND/SOUTH KOREA-COOEC/CHINA Gas/treatment
October 2009 Australia Devil Creek Development Project Apache / Santos SAPURAACERGY Transportation
February 2010 Australia Curtis LNG Plant QGC / BG Group BECHTEL/USA Gas/treatment
April 2010 Australia Morwell coal-fired power plant HRL Corporation CNEEC/CHINA Powergen
May 2010 Australia Gladstone LNG Project (Upstream Portion) Santos / Petronas FLUOR AUSTRALIA Production
August 2008 Austria Mellach Combined Cycle Power Plant Verbund Austrian Power SIEMENS/AUSTRIA - AE&E/AUSTRIA Powergen
August 2008 Bahrain Addur IWPP (Power Package) Suez Energy / GIC Kuwait HYUNDAI/KOREA Powergen
August 2008 Bahrain Addur IWPP (Desalination Package) Suez Energy / GIC Kuwait DEGREMONT/F Water/desal
August 2008 Bahrain Sitra Base Lube Oil Plant Bapco / Neste SAMSUNG/KOREA Petrochemical
February 2010 Bangladesh Chandpur & Sylhet Power Plants Government CHENGDA ENG/CHINA - SHANGHAI ELECTRIC Powergen
December 2008 Belgium Tessenderlo Power Plant T-Power SIEMENS/GERMANY-FABRICOM GTI-PAUWELS INT Powergen
June 2010 Bolivia Margarita Gas Processing Plant Repsol YPF TECNICAS REUNIDAS/SPAIN Gas/treatment
May 2010 Bosnia Stanari Thermal Electric Plant EFT Group DONGFANG ELECTRIC CORP/CHINA Powergen
November 2008 Botswana Morupule B Power Station Botswana Power Corp CNEEC/CHINA - SBW/CHINA Powergen
November 2008 Botswana Mmamabula Energy Project CIC Energy SHANGHAI ELECTRIC GROUP/CHINA Powergen
January 2008 Brazil P-57 Platform Petrobras SBM OFFSHORE/NETHERLANDS Production
4 4 / 73
COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010
DATE OF AWARD
COMPLETION DATE
1600 2011
150 2011
241 2011
1500 2011
1400 2011
845 2011
160 2011
343 2012
200 2010
100 2011
1000 2013
1300 2013
200 2011
8900 2012
623 2013
824 2013
1000 2013
250 2012
175 2011
2012
500 2011
150 2011
1900 2012
195 2011
380 2013
2011
1310 2011
40 2011
8000 2014
53 2011
2011
2011
January 2008 Brazil Itaqi/Maranhao & Pecem Power Plants MPX TECNIMONT/ITALY Powergen
March 2008 Brazil Refap HDS Unit Petrobras SKANSKA/BRAZIL Refining
March 2008 Brazil Vittoria Gas Treatment Plant Petrobras MAIRE TECNIMONT/BRAZIL - ALUSA Gas/treatment
July 2008 Brazil Repar Refinery Upgrading (delayed coker) Petrobras CAMARGO CORREA/PROMON Refining
July 2008 Brazil Repar Refinery Upgrading (interconnections) Petrobras INTERPAR/BRASIL Refining
September 2008 Brazil P-55 Platform Petrobras QUEIROZ GALVAO - IESA - UTC ENGENHARIA Production
September 2008 Brazil Supply of Equipment for North East Refinery Petrobras LARSEN & TOUBRO/INDIA Refining
October 2008 Brazil Pecem II Power Station MPX MAIRE TECNIMONT/BRAZIL Powergen
March 2009 Brazil Tambau Urugua & P-56 Development Petrobras SUBSEA 7 Transportation
July 2009 Brazil Refap Refinery Upgrading (interconnections) Petrobras SKANSKA/BRAZIL Refining
October 2009 Brazil Papa Terra TLWP P-61 Petrobras FLOATEC/USA Production
October 2009 Brazil Papa Terra FPSO P-63 Petrobras BW OFFSHORE/QUIP CONSORTIUM Production
October 2009 Brazil Roncador Field (P-55 connection) Petrobras SUBSEA 7 / BRAZIL Transportation
December 2009 Brazil Abreu e Lima Refinery Petrobras CAMARGO CORREA-CNEC-ODEBRECHT Refining
March 2010 Brazil Comperj Refinery (DAV Portion) Petrobras SKANSKA/BRAZIL-PROMON-ENGEVIX Refining
March 2010 Brazil Comperj Refinery (UHC Portion) Petrobras ALUSA/BRAZIL Refining
March 2010 Brazil Comperj Refinery (delayed coker) Petrobras TECHINT/BRAZIL - ANDRADE GUTTIEREZ Refining
May 2010 Brazil Cabo Power Plant Energetica Suape II WARTSILA/FINLAND Powergen
March 2010 Cameroon Kribi Power Plant Kribi Power Devlpt Cy WARTSILA/FINLAND Powergen
June 2010 Cameroon Limbe Refinery Upgrade 1st Phase Sonara FOSTER WHEELER Refining
November 2007 Canada North West Upgrader Pjt (Gasifier unit) North West Upgrading LURGI/GERMANY-KBR/USA Gas/treatment
April 2008 Canada Vancouver LNG Peak Shaving Project Terasen Gas HORTON CBI Storage
June 2008 Canada Regina Refinery Expansion Project CCRL COLT WORLEYPARSONS/CANADA Refining
August 2008 Canada Horizon Expansion project Canadian Natural Resources TECHNIP/ITALY Production
November 2009 Canada Oakville Power Plant Transcanada AKER SOLUTIONS Powergen
January 2008 Chile Mejillones Power Plant Suez / Antofagasta Minerals COBRA/SPAIN Powergen
April 2008 Chile Construction of two power plants Aes Gener POSCO ENGINEERING/SOUTH KOREA-ANSALDO/I Powergen
January 2009 Chile Mejillones Sulfuric Acid Plant Noracid OUTOTEC/FINLAND Petrochemical
December 2006 China Construction of 4 nuclear Plants SNPTC SHAW/USA - WESTINGHOUSE/USA Powergen
December 2008 China Huizhou Acrylic Acid Plant CNOOC Energy LURGI/GERMANY Petrochemical
January 2009 China Fujian LNG Terminal Project CNOOC Fujian LNG CB&I/USA Storage
June 2009 China Yinchuan LNG Plant Ningxia Hanas Nat Gas Cy TECHNIP/MALAYSIA-CHINA Gas/treatment
5 5 / 73
COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010
DATE OF AWARD
COMPLETION DATE
1400 2011
2012
1030 2012
1400 2013
1000 2013
322 2011
187 2011
50 2010
10000 2014
1200 2012
1800 2014
132 2010
2010
55 2010
330 2013
367 2012
120 2011
101 2012
375 2011
214 2011
2012
2011
2012
2010
2010
100 2011
2012
2012
600 2012
1500 2011
750 2012
2011
August 2009 China Nanjing Petrochemical Complex Expansion BASF - YPC TOYO/JAPAN Petrochemical
September 2009 China Shanghai Polycarbonate Resin Plant Mitsubishi Gas Chemical TOYO/JAPAN Petrochemical
November 2009 China Zheijiang Ningbo LNG Terminal CNOOC CNOOC/CHINA - CHENGDA ENGINEERING Gas/treatment
November 2009 Colombia Cartagena Refinery Expansion Reficar CB&I/USA Refining
June 2009 Czech republic Pocerady Power Plant CEZ SKODA PRAHA Powergen
July 2009 Cyprus Vasilikos Power Plant Expansion Electricity Authority J&P AVAX/GREECE - HITACHI POWER EUROPE Powergen
December 2008 Ecuador Esmeraldas Refinery Rehabilitation Petroecuador SK ENG/KOREA Refining
March 2009 Ecuador Monteverde Storage Facilities Flopec CB&I/USA Storage
January 2010 Ecuador Refineria del Pacifico Petroecuador-PDVSA SK ENG/KOREA Refining
August 2009 Equatorial Guinea Aseng FPSO Noble Energy SBM OFFSHORE/NETHERLANDS-KEPPEL SHIPYARD Production
August 2007 Egypt Mostorod Refinery Egyptian Refining Cy MITSUI/J - GS ENGINEERING/SOUTH KOREA Refining
January 2008 Egypt Sidi Krier & El Atf Power Plants Delta Electricity ANSALDO ENERGIA Powergen
August 2008 Egypt Khalda 5th Gas Processing Train Khalda Petroleum Cy PETROFAC Gas/treatment
February 2009 Egypt Alexandria Delayed Coker Expansion Midor TECHNIP/ITALY Refining
February 2010 Egypt Ain Sokhna Power Plant East Delta Electricity Cy DOOSAN/KOREA Powergen
June 2010 Egypt West Delta Deep Marine Phase VIIIa Devlpt Burullus Gas Cy TECHNIP/F Production
June 2008 Finland Porvoo Isomerization Unit Neste Oil NESTE JACOBS/FINLAND Refining
March 2010 Finland Forssa Power Plant Fingrid ANSALDO ENERGIA Powergen
March 2008 France Bayet Power Plant Atel (3CB) ANSALDO ENERGIA Powergen
June 2008 France Beynes underground gas storage facility GDF LITWIN/F Storage
June 2009 France Etrez Gas Storage Expansion Project Storengy JACOBS ENGINEERING/FRANCE Storage
September 2009 France Gonfreville Cracker Expansion Total Petrochemicals TECHNIP/F Petrochemical
January 2010 France Cere la Ronde Gas Storage Expansion Pjt Storengy JACOBS ENGINEERING/FRANCE Storage
June 2007 Fujairah Fujairah II Power Project IP / Marubeni ALSTOM/F Powergen
June 2007 Fujairah Fujairah II Desalination Project IP / Marubeni SIDEM/F Water/desal
April 2010 Fujairah Fujairah Oil Terminal Expansion Vopak Horizons BELLELI/ITALY Storage
May 2010 Gabon Anguille Field Wellhead Platform Total SAIPEM/ITALY - EIFFEL/F Production
May 2007 Germany Construction of 2 coal-biomass Power Plants Electrabel HITACHI POWER EUROPE Powergen
October 2007 Germany Lünen Power Plant Trianel Power SIEMENS/GERMANY-A-TEC/AUSTRIA-IHI/J Powergen
March 2008 Germany Mainz combined Heat & Power Plant Mainz-Wiesbaden AG SIEMENS/GERMANY-AE&E/AUSTRIA-IHI/J Powergen
April 2008 Germany Hamm power plant RWE ALSTOM/F Powergen
June 2008 Germany Wilhelmshaven LNG Plant E.ON TECNIMONT/I-SOFREGAZ/F-VINCI/F-ENTREPOSE Gas/treatment
6 6 / 73
COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010
DATE OF AWARD
COMPLETION DATE
2011
2010
673 2013
2011
2010
2010
1560 2011
170 2011
360 2011
72 2011
731 2012
2011
1220 2012
250 2011
3000 2014
1128 2011
841 2012
743 2010
144 2010
720 2011
152 2010
835 2011
514 2012
428 2011
2500 2012
550 2012
1100 2012
2010
262 2011
2011
209 2011
143 2010
July 2009 Germany Etzel Crystal Gas Storage Project EDF / ENBW ENERGIE TECHNIP/GERMANY Storage
August 2009 Germany Connect Project Phase I Shell Deutschland GmbH TECHNIP/GERMANY Refining
November 2009 Germany Mannheim 9 Power Project Grosskraftwerk Mannheim ALSTOM/F Powergen
March 2010 Germany Krefeld-Uerdingen Chlorine Plant Bayer Materialscience AG UHDE/GERMANY Chemical
August 2008 Ghana Jubilee FPSO Tullow Ghana Ltd MODEC/USA Production
October 2009 Ghana Jubilee Field (subsea) Tullow Ghana Ltd TECHNIP/USA Production
May 2008 Greece Elefsis Refinery Upgrade Hellenic Petroleum TECNICAS REUNIDAS/SPAIN Refining
July 2008 Greece Thessaloniki Refinery Upgrade Hellenic Petroleum FOSTER WHEELER ITALIANA Refining
November 2008 Greece Corinth Power Plant Motor Oil Hellas/Mytilineos METKA/GREECE Powergen
December 2008 Greece Nea Messambria Compressor Station Desfa STROYTRANSGAZ/RUSSIA Transportation
August 2009 Greece Megalopolis Power Plant Public Power Corp METKA/GREECE Powergen
August 2008 Hungary Szazhalombatta Hydrocracking Complex MOL Hungarian Oil&Gas TECNICAS REUNIDAS/SPAIN Refining
May 2007 India Mundra Ultra Mega Power Project Tata Power Cy DOOSAN/KOREA - TOSHIBA/J Powergen
November 2007 India Kochi LNG Terminal (storage tanks) Petronet IHI/JAPAN Storage
November 2007 India Krishnapatnam Power Plant Coastal Andhra Power RELIANCE ENERGY LTD/INDIA Powergen
January 2008 India North Chennai Power Station Tamil Nadu Electricity BHEL/INDIA Powergen
February 2008 India Anpara D Power Station UPRVUNL BHEL/INDIA Powergen
February 2008 India Construction of two power plants in Gurajat GSEG - GSPC BHEL/INDIA Powergen
March 2008 India Mumbai Lube Oil Base Stock Plant Hindustan Petroleum LARSEN & TOUBRO/INDIA Refining
March 2008 India Mumbai High Offshore Field (PRP-2 Project) ONGC LEIGHTON AUSTRALIA Transportation
June 2008 India Barauni MSQ Upgradation Project Indian Oil Corporation PUNJ LLOYD/INDIA Refining
June 2008 India Delhi Power Plant Pragati Power Corp PPCL BHEL/INDIA Powergen
June 2008 India Pallatana Power Plant in Tripura ONGC Tripura Power Cy BHEL/INDIA-GE/USA Powergen
June 2008 India Bokaro Power Plant Damodar Valley Corp BHEL/INDIA Powergen
June 2008 india Sasan Ultra Mega Power Project Reliance Industries RELIANCE INFRASTRUCTURE LTD/INDIA Powergen
July 2008 India Mettur Power Plant Expansion Tamil Nadu Electricity BGR ENERGY/INDIA Powergen
July 2008 India Kalisindh Thermal Power Project RRVUNL BGR ENERGY/INDIA Powergen
August 2008 India Guwahati/Digboi MS Quality Upgradation Pjt Indian Oil Corporation UHDE/INDIA Refining
August 2008 India Goindwal Sahib Power Plant GVK Power Ltd BHEL/INDIA Powergen
September 2008 India Bharuch Nitric Acid Plant GNVFC UHDE/INDIA Petrochemical
September 2008 India Chhabra Thermal Power Plant Expansion RRVUNL BHEL/INDIA Powergen
November 2008 India Hydrogen Units at Bhatinda Refinery HPCL-Mittal LARSEN & TOUBRO/INDIA Refining
7 7 / 73
COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010
DATE OF AWARD
COMPLETION DATE
2010
267 2012
1430 2012
245 2012
435 2012
2011
3200 2013
561 2012
968 2012
2012
265 2011
362 2011
2012
316 2011
150 2011
2012
2011
2011
269 2012
334 2012
2012
80 2011
545 2011
1180 2012
312 2012
334 2011
828 2013
113 2011
2011
415 2012
198 2011
278 2011
November 2008 India SRU Units at Bhatinda Refinery HPCL-Mittal TOYO INDIA Refining
November 2008 India Kakatiya Thermal Power Generating Unit APGenco BHEL/INDIA Powergen
December 2008 India Dahej Ethylene Plant OPAL LINDE/GERMANY-SAMSUNG/SOUTH KOREA Petrochemical
December 2008 India Bina Power Plant Jaiprakash Power Ventures BHEL/INDIA Powergen
December 2008 India Mauda Super Thermal Power Project NTPC BHEL/INDIA Powergen
January 2009 India Mangalore Refinery Expansion (CDU/VDU) MRPC JACOBS ENGINEERING / INDIA Refining
January 2009 India Tilaiya Ultra Mega Power Project Government RELIANCE POWER/INDIA Powergen
February 2009 India Sri Damodaram Sanjeevaiah Thermal Power APPDCL TATA PROJECTS/INDIA Powergen
February 2009 India Malwa Thermal Power Project MPPGC BHEL/INDIA - LARSEN & TOUBRO/INDIA Powergen
March 2009 India Paradip Refinery (EPCM-1) Indian Oil Corporation FOSTER WHEELER/UK Refining
April 2009 India Mangalore Refinery Expansion (DHT/HGU) MRPC LARSEN & TOUBRO/INDIA Refining
April 2009 India Mumbai High North ICP-R Platform ONGC GUNANUSA/INDONESIA-AFCON/INDIA Production
April 2009 India Paradip Refinery (EPCM-2) Indian Oil Corporation UHDE INDIA Refining
May 2009 India Avantha Bhandar Thermal Power Project Korba West Power Cy Ltd BHEL/INDIA Powergen
May 2009 India Bela Thermal Power Project Ideal Energy Projects Ltd BHEL/INDIA Powergen
June 2009 India Paradip Refinery (EPCM-4) Indian Oil Corporation TOYO INDIA Refining
June 2009 India Vizag Formaldehyde Plant Kanoria Chemicals UHDE/INDIA Chemical
June 2009 India Aditya Power Plant Hindalco Industries BHEL/INDIA Powergen
July 2009 India Jharkland Power Plant APNRL BHEL/INDIA Powergen
July 2009 India Chandrapur Super Thermal Power Station Mahagenco BGR ENERGY/INDIA Powergen
July 2009 India KOCHI LNG Terminal (liquefaction facilities) Petronet CTCI/TAIWAN Gas/treatment
August 2009 India Mangalore Refinery CHTU Project MRPC TECNIMONT INDIA Refining
August 2009 India Derang Thermal Power Project Jindal India Thermal Power BHEL/INDIA Powergen
August 2009 India Mumbai High North Process Platform ONGC LARSEN & TOUBRO/INDIA Production
August 2009 India Mangalore Polypropylene Unit MRPC EIL/INDIA Petrochemical
August 2009 India Marwa Thermal Power Project Chhattisgarh State Power BGR ENERGY/INDIA Powergen
August 2009 India Nigrie Supercritical Thermal Power Plant Jaypee Group LARSEN & TOUBRO/INDIA - MHI/INDIA Powergen
September 2009 India Mangalore Coke drum structure package MRPC PUNJ LLOYD/INDIA Refining
September 2009 India Mangalore CDU/VDU n°1 revamping MRPC TOYO INDIA Refining
September 2009 India Vemagiri Power Plant GMR Energy LARSEN & TOUBRO/INDIA Powergen
September 2009 India Meenaskshi Power Plant Meenaskshi Energy THERMAX/INDIA Powergen
September 2009 India B-22 Field Development ONGC NPCC/UAE Production
8 8 / 73
COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010
DATE OF AWARD
COMPLETION DATE
150 2012
720 2011
2011
1070 2011
2015
1490 2013
1200 2012
212 2012
162 2011
464 2013
1200 2012
1000 2013
2100 2013
446 2012
1300 2012
735 2012
223 2012
240 2013
312 2012
224 2012
1500 2012
235 2012
2011
1400 2013
650 2012
2012
315 2012
2013
2013
618 2012
235 2012
689 2013
October 2009 India Vizag Diesel Hydrotreat Project Hindustan Petroleum TECHNIP/INDIA Refining
October 2009 India Mumbai Diesel Hydrotreat Project Hindustan Petroleum TOYO INDIA Refining
October 2009 India Mangalore Refinery Delayed Coker BOP MRPC TOYO INDIA Refining
October 2009 India Jindal Power Plant Expansion Jindal India Thermal Power BHEL/INDIA Powergen
October 2009 India Haripur Nuclear Power Plant Nuclear Power Corp ATOMSTROYEXPORT Powergen
November 2009 India Koradi Power Station Mahagenco LARSEN & TOUBRO/INDIA Powergen
November 2009 India Prayagraj Thermal Power Project Prayagraj Power Generation BHEL/INDIA Powergen
December 2009 India Bharuch Ammonia Plant GNFC LARSEN & TOUBRO/INDIA Petrochemical
December 2009 India RS-12 Well Platform at Mumbai High Field ONGC NPCC/UAE Production
January 2010 India Panipat & Bathinda Ammonia Conversion Pjt National Fertilizers Ltd LARSEN & TOUBRO/INDIA Petrochemical
January 2010 India Maharashtra coal-fired power plant Lanco Mahanadi Power Ltd LANCO INFRATECH Ltd Powergen
January 2010 India Raipur-Chhattisgarh Coal-Fired Power Plant GMR Energy DOOSAN/KOREA Powergen
February 2010 India Godhna Power Plant Karnataka Power Corp LARSEN & TOUBRO/INDIA Powergen
March 2010 India Mangalore Aromatics Complex ONGC Mangalore Petr LARSEN & TOUBRO/INDIA Petrochemical
March 2010 India Nasik & Amravati coal-fired power plants Elena Power Infrastr. Ltd BHEL/INDIA Powergen
March 2010 India Paradip Captive Power Plant Indian Oil Corporation BHEL/INDIA Powergen
March 2010 India Tadali Power Plant Dhariwal Infrastructure PUNJ LLOYD/INDIA Powergen
March 2010 India Nangal Ammonia Plant Conversion Pjt National Fertilizers Ltd TECNIMONT INDIA Petrochemical
March 2010 India Paradip FCC Reactor Regenerator Pjt Indian Oil Corporation LARSEN & TOUBRO/INDIA Refining
March 2010 India Mumbai High North Phase II ONGC LARSEN & TOUBRO/INDIA Production
April 2010 India Jharsuguda coal-fired power plant Vedanta Resources SEPCO/CHINA Powergen
April 2010 India Deen Dayal Wellhead Platform Gujarat State Petroleum LARSEN & TOUBRO/INDIA Production
April 2010 India Cuddalore Refinery (Inside Battery Limit) Nagarjuna Oil Corp PUNJ LLOYD/INDIA Refining
April 2010 India Karnataka Power Plant Raichur Power Corp Ltd BHEL/INDIA Powergen
May 2010 India Manali Resid Upgradation Project Chennai Petroleum JACOBS ENGINEERING / INDIA Refining
May 2010 India Cuddalore Refinery (DHDS Package) Nagarjuna Oil Corp SAMSUNG ENGINEERING INDIA Refining
May 2010 India Mallavaram Onshore Gas Terminal GSPC EIL/INDIA Gas/treatment
May 2010 India Babrala Fertilizer Expansion (ammonia pack) Tata Chemicals HALDOR TOPSOE/DENMARK Petrochemical
May 2010 India Babrala Fertilizer Expansion (urea pack) Tata Chemicals SAIPEM/ITALY Petrochemical
May 2010 India B-193 Field Devlpt (platform) ONGC SWIBER HOLDINGS / SIME DARBY Production
May 2010 India D-1 Field Devlpt (platforms/pipelines) ONGC ESSAR OFFSHORE SUBSEA / IOEC Production
June 2010 India Gautami Power Plant Expansion Pjt GVK Gautami Power HYUNDAI ENG / LARSEN & TOUBRO Powergen
9 9 / 73
COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010
DATE OF AWARD
COMPLETION DATE
66 2012
540 2011
300 2011
889 2011
240 2010
605 2012
2012
2011
430 2011
173 2011
240 2012
1720 2011
628 2011
320 2010
310 2011
284 2011
2012
2011
2011
340 2012
5500 2014
1800 2012
1000 2012
1400 2013
1800 2012
81 2010
80 2011
170 2012
451 2012
470 2012
592.5 2011
375 2011
June 2010 India Hazira Additional Gas Processing faciities ONGC LARSEN & TOUBRO/INDIA Gas/treatment
September 2007 Indonesia Cirebon Thermal Power Plant PT Cirebon Electric Power DOOSAN/KOREA Powergen
December 2007 Indonesia Balongan Refinery Expansion Pertamina TOYO/JAPAN - PT REKAYASA/INDONESIA Refining
April 2008 Indonesia 2 power plants in East Java and Aceh PT PLN CNEEC/CHINA - SINOHYDRO/CHINA Powergen
August 2008 Indonesia Muara Tawar Combined Cycle Power Plant PT PLN ALSTOM/F-MARUBENI/J Powergen
December 2008 Indonesia Adipala Power Plant PT PLN CNTIC/CHINA Powergen
December 2008 Indonesia Donggi-Senoro LNG Terminal PT Donggi Senoro LNG JGC/JAPAN Gas/treatment
January 2009 Indonesia Tanjung Priok CCGT Power Plant PT PLN MITSUBISHI HEAVY IND/J Powergen
May 2009 Indonesia Gajah Baru Field Development Premier Oil Natuna SMOE/INDONESIA - PT SAIPEM/INDONESIA - NISCONI Production
June 2009 Indonesia Bontang Ammonium Nitrate Plant PT Kaltim Nitrate Indonesia PT REKAYASA/INDONESIA Petrochemical
April 2010 Indonesia South Mahakam Field (platform/pipelines) Total PT NISCONI Production
March 2007 Iran Esfahan Refinery Upgrading Project Esfahan Oil Refining Cy DAELIM/KOREA - LURGI/G-UHDE/G Refining
April 2007 Iran Lorestan & Mahabad Polyethylene Plants Bakhtar Petrochemical Cy NARGAN/IRAN-TECNIMONT/I Petrochemical
February 2007 Iran Nioc LNG Project (tankage Project) NIOC LNG DAELIM/KOREA - KHATAM AL ANBIA Storage
September 2007 Iran Tehran Refinery Upgrading Phase II NIORDC IGC/IRAN-ODCC/IRAN-D&I/IRAN Refining
April 2008 Iran South Pars Phase 12 (epc-1) Petropars ARAS CONSORTIUM Storage
October 2008 Iran Imam Khomeini Propane Dehydrogenation NIPC UHDE/GERMANY Petrochemical
December 2008 Iran Three Ammonia-Urea Complexes NIPC HAMPA ENGINEERING CONTRACTOR/IRAN Petrochemical
March 2009 Iran Assaluyeh Ammonia Plant Star Aria Ammonia Chem Cy CHINA TCC / MEHVAR SAZAN Petrochemical
March 2009 Iran Assaluyeh ESBR Plant Assaluyeh Sadaf Chemical TECNIMONT/I-NARGAN/IRAN Petrochemical
May 2009 Iran South Pars Phase 20-21 NIOC OIEC/IRAN Production
June 2009 Iran South Pars Phase 12 (epc-3) Petropars TECNIMONT/ITALY-NARGAN-DORRIZ-GAMMA Gas/treatment
June 2009 Iran Tombak Liquefaction Plant Iran LNG GS ENGINEERING/SOUTH KOREA-PIDECO/IRAN Gas/treatment
October 2009 Iran Assaluyeh Gas Sweetening Plant Pars Oil & Gas Cy GS ENGINEERING/SOUTH KOREA Gas/treatment
October 2009 Iran South Pars Phase 12 (epc-2) Petropars DAELIM/SOUTH KOREA - SAZEH-KAYSON-IIND Gas/treatment
August 2008 Iraq Samawah Refinery Upgrading Ministry of Oil CICSCO/USA Refining
July 2009 Iraq Akas and Al Mansuria Fields Devlpt Scop BGR ENERGY/INDIA Production
September 2009 Iraq Hilla & Al Taji Power Plants Ministry SNC LAVALIN/CANADA - URUK GROUP Powergen
November 2009 Israel Ashdod Desalination Plant Mekorot SADYT/SPAIN - MINRAV/ISRAEL Water/desal
May 2010 Israel Mishor Rotem Power Plant OC Power Ltd DAEWOO/SOUTH KOREA Powergen
February 2008 Italy Livorno Offshore LNG Terminal Olt LNG SAIPEM/ITALY Gas/treatment
March 2008 Italy San Severo combined-cycle power plant Atel (Progetto EnPlus) ANSALDO ENERGIA Powergen
10 10 / 73
COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010
DATE OF AWARD
COMPLETION DATE
644 2012
150 2010
1500 2011
500 2011
193 2011
650 2012
105 2010
2600 2012
1040 2013
27 2011
1600 2014
320 2010
649 2011
544 2010
2600 2012
123 2011
724 2013
890 2013
900 2013
25 2011
650 2011
650 2011
540 2011
432 2012
7000 2014
344 2010
500 2011
637 2010
720 2010
6800 2014
825 2011
2014
July 2009 Italy Aprilia Power Plant Sorgenia ANSALDO ENERGIA Powergen
September 2009 Italy Priolo Power Plant Reconstruction Isab Energy FLUOR/UK Powergen
November 2009 Italy Aquila FPSO Eni SAIPEM/ITALY Production
July 2008 Jordan Al Qatrana Independent Power Project Kepco / Xenel LOTTE E & C / SOUTH KOREA Powergen
September 2009 Jordan Samra Power Plant Expansion Phase 3 Samra Electric Power Cy HANWHA ENGINEERING - ALSTOM Powergen
May 2010 Jordan Fertilizer Plant (Jifco Pjt) JPMC/IFFCO LAVALIN EUROPE Petrochemical
April 2008 Kazakhstan Kashagan 4th Gas Compressor Train Agip Kco PETROFAC Gas/treatment
May 2009 Kazakhstan Kashagan Phase One Hook-Up Agip KCO AKER SOLUTIONS - SAIPEM Production
October 2009 Kazakhstan Atyrau Aromatics Complex Kazmunaigas SINOPEC ENGINEERING/CHINA Petrochemical
November 2009 Kazakhstan Atyrau Refinery Modernization Kazmunaigas ROMINSERV/KAZAKHSTAN Refining
March 2010 Kazakhstan Atyrau Polypropylene Plant KPI SINOPEC ENGINEERING/CHINA Petrochemical
March 2008 Kuwait Shuwaikh Desalination Plant MEW DOOSAN/KOREA Water/desal
May 2008 Kuwait Gas Booster Station GS 160 KOC SNAMPROGETTI/ITALY Gas/treatment
November 2008 Kuwait Pipeline between BS 131 & Mina Al Ahmadi KOC PETROFAC Transportation
August 2009 Kuwait Subiya Power Plant MEW HYUNDAI HEAVY INDUSTRIES - GE/USA Powergen
October 2009 Kuwait Gas Compressors at GC 7, 8 &21 KOC SAIPEM/ITALY Gas/treatment
December 2009 Kuwait Gas Booster 132 Project KOC SK ENG/KOREA Gas/treatment
June 2010 Kuwait Mina Al Ahmadi 4th LPG Recovery Unit KNPC DAELIM/KOREA Gas/treatment
June 2010 Kuwait Gas Booster Station BS-171 KOC SAIPEM/ITALY Gas/treatment
May 2009 Liberia Bushrod Product Storage Terminal Expansion Liberia Petroleum Refining ZAKHEM INT CONSTRUCTION/UK Storage
March 2007 Libya Tripoli West Power Plant Expansion Phase 2 Gecol HYUNDAI ENG/DOOSAN Powergen
October 2007 Libya Al Khalij Power Plant Gecol HYUNDAI/KOREA Powergen
December 2007 Libya Sarir Power Plant Gecol HYUNDAI/KOREA Powergen
April 2009 Lithuania Combined-cycle Power plant Lietuvos Elektrine AB IBERDROLA INGENIERA/SPAIN Powergen
May 2007 Malaysia Trans-Peninsula Pipeline Transpen RANHILL ENGINEERS & CONSTRUCTORS/ML Transportation
February 2008 Malaysia Salam Power Plant Tenaga Nasional BhD CNEEC/CHINA Powergen
March 2008 Malaysia Sabah-Sarawak Pipeline Petronas Carigali PUNJ LLOYD/INDIA - DAILOG E&C Transportation
April 2008 Malaysia Sabah Oil Platforms Petronas Carigali SIME DARBY ENGINEERING/MALAYSIA-MISC Production
October 2008 Malaysia Tangga Barat, Kumang, Kinabalu Gas Pjts Petronas Carigali MMHE/MALAYSIA - SIME DARBY ENGINEERING Production
December 2008 Malaysia Putrana Refinery El-One Resources HAMPA ENGINEERING CONTRACTOR/IRAN Refining
March 2009 Malaysia Gumusut-Kakap Field Devlpt Sabah Shell Petroleum ACERGY GROUP/SAPURACREST Production
July 2009 Malaysia Sungai Limau Refinery (Kedah) Merapoh Resources SK ENG/KOREA Refining
11 11 / 73
COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010
DATE OF AWARD
COMPLETION DATE
174 2012
630 2011
2010
268 2011
244 2011
638 2013
633 2012
345 2012
981 2012
620 2014
50 2011
2012
31 2011
2012
1400 2013
750 2011
2012
1176 2011
592 2010
470 2010
2012
2011
1000 2012
1000 2011
195 2011
600 2011
992 2011
60 2011
2011
2013
159 2012
70 2011
January 2010 Malaysia Tanjung Bin Oil Terminal ATT Tanjung Bin Sdn Bhd PEC Ltd/SINGAPORE Storage
March 2008 Mexico Manzanillo LNG Plant CFE SAMSUNG/KOREA Gas/treatment
October 2008 Mexico Baja Sulphuric Acid Plant MMB LAVALIN/Canada Petrochemical
May 2009 Mexico Poza Rica Cryogenic Plant Pemex ICA FLUOR - LINDE PROCESS PLANTS Gas/treatment
June 2009 Mexico La Cangrejera Aromatics Exp Phase 1 Pemex Petrochemicals DRAGADOS/SPAIN-ACS-SENERMEX Petrochemical
August 2009 Mexico Cadereyta & Madero Clean Fuels Project Pemex ICA FLUOR Refining
September 2009 Mexico Tabasco Cogeneration Plant Pemex ABENGOA MEXICO - ABENER Powergen
February 2010 Mexico Salamanca & Tula Refineries Clean Fuels Pjt Pemex SAIPEM/ITALY Refining
February 2010 Mexico Manzanillo Power Plant Modernization CFE ACS SERVICIOS/COBRA/INELECTRA Powergen
February 2010 Mexico Salina Cruz & Minatitlan Clean Fuels Pjt Pemex ICA FLUOR Refining
April 2010 Mexico Salamanca Sulfur Recovery Unit Pemex ISOLUX/TECNA/TECHNIP Refining
November 2009 Morocco Mohammedia Refinery Topping 4 Pjt Samir TECNICAS REUNIDAS/SPAIN - TEKFEN/T Refining
November 2009 Morocco Mohammedia Bitumen Plant Samir POERNER/AUSTRIA Refining
October 2009 Myanmar Yetagun Compression Platform Petronas Carigali NIPPON STEEL/THAILAND Production
November 2009 Myanmar Shwe Gas Development Pjt Daewoo International HYUNDAI HEAVY INDUSTRIES/SOUTH KOREA Production
April 2007 Netherlands Sloe Power Plant at Vlissingen Delta Energy / EDF SIEMENS/GERMANY Powergen
May 2007 Netherlands Maasvlakte coal-biomass power plant Electrabel HITACHI POWER EUROPE Powergen
July 2007 Netherlands Maasvlakte LNG Terminal Gate Terminal TECHINT/I-SENER/SP-ENTREPOSE/F-VINCI/F Gas/treatment
January 2008 Netherlands Lelystad FlevoCentrale Project Electrabel Nederland ALSTOM/F Powergen
February 2008 Netherlands Rijnmond II Power Plant Intergen SIEMENS/GERMANY Powergen
February 2008 Netherlands Magnum Power Plant Nuon MITSUBISHI HEAVY IND/J - PONTICELLI/F Powergen
June 2008 Netherlands Moerdijk Power Plant Essent TECNICAS REUNIDAS/SPAIN-GE Powergen
June 2008 Netherlands Claus Power Plant Expansion Essent ALSTOM/F Powergen
June 2008 Netherlands Rotterdam Biodiesel Plant Neste Oil TECHNIP/ITALY Bio
June 2008 Netherlands Rotterdam Hydrogen Plant Air Liquide LURGI/GERMANY Gas/treatment
June 2008 Netherlands Sluiskil Urea Plant Yara UHDE/GERMANY Petrochemical
May 2009 Netherlands Rotterdam Combined-Cycle Power Plant Enecogen SIEMENS/GERMANY Powergen
August 2009 Netherlands Pernis Refinery Diesel Hydtrotreat Shell CB&I LUMMUS/NETHERLANDS Refining
November 2009 Netherlands Rotterdam Hydrogen Plant Air Products TECHNIP/NETHERLANDS Gas/treatment
November 2009 Netherlands Bergermeer Gas Storage Project Taqa Energy FLUOR/NETHERLANDS Gas/treatment
March 2010 Netherlands Rotterdam Tank Terminal Euro Tank Terminal BV VERWATER-AUDEX BV Storage
March 2010 Netherlands Rotterdam Terminal Tank Dutch Botlek Tank Terminal POLIMEX MOSTOSTAL/POLAND Storage
12 12 / 73
COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010
DATE OF AWARD
COMPLETION DATE
2012
120 2012
3500 2012
2012
1600 2011
1300 2011
2010
567 2011
1160 2012
190 2010
200 2013
500 2011
2011
2012
179 2012
120 2011
690 2011
175 2012
218 2011
395 2013
294 2013
1100 2013
2012
350 2011
1000 2013
220 2013
1700 2013
132 2010
100 2011
100 2011
4000 2012
April 2010 Netherlands Hemweg 9 Power Plant Nuon SIEMENS/GERMANY Powergen
April 2010 New Caledonia Koniambo Power Plant Xstrata DOOSAN/KOREA Powergen
June 2007 Nigeria Brass LNG Project Brass Lng Ltd BECHTEL/USA Gas/treatment
Unofficial (03/07) Nigeria Olokola Lng Project OK LNG TECHNIP-F/SNAMPROGETTI/I Gas/treatment
February 2008 Nigeria Usan Field Development (FPSO Package) Total/Elf Petroleum Nigeria HYUNDAI HEAVY IND/SOUTH KOREA Production
March 2008 Nigeria Usan Field Development (URF-OLT)Package Total/Elf Petroleum Nigeria SAIPEM/ITALY Production
July 2008 Nigeria Lagos Beach Compression Station (LBCS) WAGPCo ENTREPOSE CONTRACTING/F Gas/treatment
September 2008 Nigeria Bilabri, Owaneri, Orobiri gas Pjt (LNG-FPSO) Flex Lng SAMSUNG HEAVY/KOREA Gas/treatment
October 2008 Nigeria OML58 Upgrade Project Phase 1 Total E&P Nigeria SAIPEM/I - PONTICELLI Production
May 2009 Nigeria Revamping of three wellhead Plaforms Mobil Nigeria ACERGY GROUP Production
October 2009 Nigeria Bonga North-West Field Subsea Devlpt Shell Nigeria SAIPEM/ITALY Transportation
October 2009 Nigeria Escravos Gas Development Chevron Nigeria ACERGY Production
November 2009 Nigeria Kaduna Power Station Ministry of Power ROCKSON ENG / NUOVO PIGNONE Powergen
February 2010 Nigeria O.U.R. Pipeline Project TEPNG ZAKHEM BAYWOOD JV Transportation
April 2010 Nigeria Utorogu-Ughelli Gas Pipeline Shell Petroleum Nigeria DAEWOO/SOUTH KOREA Transportation
May 2010 Nigeria Offshore Installation Work at Oso ExxonMobil ACERGY GROUP Production
February 2007 Norway Skarv FPSO BP Norge AS SAMSUNG HEAVY/KOREA - AKER KVAERNER Production
July 2007 Norway Karsto Gas Treatment Plant Expansion Statoil MW KELLOGG/UK Gas/treatment
February 2009 Norway Kollsnes Gas Plant Upgrade Gassco AKER SOLUTIONS Gas/treatment
September 2009 Norway Goliat Field Development (subsea portion) Eni AKER SOLUTIONS Production
October 2009 Norway Goliat Field Development (infield pipelines) Eni TECHNIP/NORWAY Production
February 2010 Norway Goliat Field Development (FPSO) Eni HYUNDAI HEAVY IND/SOUTH KOREA - CB&I Production
March 2010 Norway Ekofisk 2/4L Jacket ConocoPhillips AKER SOLUTIONS Production
July 2009 Oman Kauther Gas Compression Project PDO PETROFAC - AL HASSAN ENG Gas/treatment
November 2009 Oman Salalah Independent Power & Water Pjt Sembcorp Utilities SEPCO III/CHINA - HYFLUX/SINGAPORE Powergen
December 2009 Oman Saih Nihayda Gas Compression Pjt PDO GS ENGINEERING/SOUTH KOREA Gas/treatment
May 2010 Oman Barka 3 / Sohar 2 IPP Projects GDF SUEZ GS ENGINEERING/SOUTH KOREA -SIEMENS/GER Powergen
January 2008 Pakistan Mahmood Kot Refinery Diesel HDS Unit Parco CNCEC/CHINA-HYUNDAI ENGINEERING Refining
April 2009 Pakistan Guddu & Naudero Power Plants Walters Power Int PROENERGY EPC SERVICES/USA Powergen
September 2009 Panama Panama Terminal Expansion Project Petroterminal de Panama CB&I/USA Storage
February 2008 Papua New Guinea Napa-Napa LNG Plant Liquid Niugini Gas BECHTEL/USA Gas/treatment
13 13 / 73
COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010
DATE OF AWARD
COMPLETION DATE
4500 2013
1000 2013
450 2013
430 2013
2010
350 2012
1200 2015
300 2011
513 2013
580 2012
789 2012
526 2011
90 2010
2012
903 2014
910 2011
455 2011
47 2011
2011
900 2011
214 2012
3200 2011
2070 2011
2011
2010
800 2011
550 2011
610 2012
1200 2013
62 2011
650 2013
1000 2014
December 2009 Papua New Guinea PNG LNG Project (LNG Plant) ExxonMobil CHIYODA/J-JGC/J Gas/treatment
December 2009 Papua New Guinea PNG LNG Project (Hides Gas Plant) ExxonMobil CB&I/USA-CLOUGH/AUSTRALIA Gas/treatment
December 2009 Papua New Guinea PNG LNG Project (Offshore Pipelines) ExxonMobil SAIPEM/ITALY Transportation
December 2009 Papua New Guinea PNG LNG Project (Onshore Pipelines) ExxonMobil SPIE CAPAG/F Transportation
September 2008 Peru Las Flores Thermo-Electric Power Station Duke Energy Egenor SIEMENS/GERMANY Powergen
October 2009 Peru Chilca Power Plant Conversion Kalipa Generacion POSCO ENGINEERING/SOUTH KOREA Powergen
December 2009 Peru Talara Refinery Expansion Petroperu TECNICAS REUNIDAS/SPAIN Refining
December 2007 Philippines Cebu Power Plant Kepco DOOSAN/KOREA Powergen
February 2008 Philippines Batangas Ethylene/Propylene Plant JG Summit DAELIM/KOREA Petrochemical
March 2009 Philippines Mariveles Power Plant GN Power CNEEC/CHINA Powergen
June 2008 Poland LMG Project PGNIG TECHNIP KTI/ITALY / PBG POLAND Production
October 2008 Poland Wierzchowice Gas Storage Expansion PGNIG TECNIMONT/ITALY-SOFREGAZ/F-PBG POLAND Storage
October 2008 Poland Gdansk Refinery Upgrading (deasphalting) Grupa Lotos TECHNIP/ITALY Refining
April 2010 Poland Polaniec Biomass Power Station GDF Suez FOSTER WHEELER POLAND Powergen
June 2010 Poland Swinoujscie LNG Terminal Polish LNG SAIPEM/TECHINT/PBG-PL Gas/treatment
August 2007 Portugal Sines Refinery Upgrading Galp Energia TECNICAS REUNIDAS/SPAIN Refining
August 2007 Portugal Porto Refinery Upgrading Galp Energia FLUOR/UK Refining
October 2008 Portugal Sines Steamcracker Furnaces Repsol TECHNIP/NETHERLANDS Petrochemical
October 2008 Portugal Sines Polyethylene Plant Repsol TECNICAS REUNIDAS/SPAIN Petrochemical
March 2008 Portugal Abrantes Power Plants Elecgas SIEMENS/GERMANY Powergen
May 2009 Portugal Sines LNG Terminal Expansion Ren Atlantico SOMAGUE/PORTUGAL Gas/treatment
November 2007 Qatar Qafco-V Expansion Project Qafco SNAMPROGETTI/I-HYUNDAI/SOUTH KOREA Petrochemical
March 2008 Qatar Ras Laffan C IWPP Project (power part) Suez/Mitsui HYUNDAI ENG/MHI-J Powergen
March 2008 Qatar Ras Laffan C IWPP Project (desalination part) Suez/Mitsui SIDEM/F Water/desal
April 2008 Qatar Qafco-V Storage Project Qafco CB&I/USA Storage
September 2008 Qatar Strategic Gas Transmission Project Qatar Petroleum PUNJ LLOYD/INDIA Transportation
May 2009 Qatar Mesaieed Polyethylene Plant (LDPE-3 Pjt) Qapco UHDE/GERMANY - TEKFEN/T Petrochemical
October 2009 Qatar Qafco-VI Expansion Project Qafco SAIPEM/I - HYUNDAI/SOUTH KOREA Petrochemical
February 2010 Qatar Plateau Maintenance Project (PMP) Qatargas TECHNIP/F-CHIYODA/J Gas/treatment
March 2010 Qatar Idd Al Shargi Pipelines Upgrading Pjt Occidental Petroleum NPCC/UAE Transportation
March 2010 Qatar Messaieed & Dukhan Gas Sweetening Pjts Qatar Petroleum PETROFAC Gas/treatment
April 2010 Qatar Ras Laffan Gas Recovery Pjt Qatargas FLUOR/USA Gas/treatment
14 14 / 73
COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010
DATE OF AWARD
COMPLETION DATE
200 2013
600 2011
97 2011
140 2010
2011
2012
800 2011
1000 2012
646 2012
2013
2010
2010
2010
139 2011
508 2011
2011
2010
695 2012
284 2011
2010
2010
123 2012
2200 2014
973 2012
4800 2014
2012
855 2012
18 2012
2000 2011
500 2011
2011
2011
May 2010 Qatar Ras Laffan Helium Plant Rasgas AIR LIQUIDE/F - CHIYODA AL MANA ENG Gas/treatment
March 2008 Romania Brazi Power Plant Petrom METKA/GREECE-GE/USA Powergen
April 2008 Romania Petromidia Refinery Hydrogen Plant Rompetrol TECHNIP/NETHERLANDS Refining
July 2008 Romania Petrobrazi Refinery Clean Fuels Project Petrom UHDE/GERMANY Refining
March 2010 Romania Navoradi High Polyethylene Plant Expansion Rompetrol ROMINSERV/ROMANIA Petrochemical
April 2010 Romania Petrobrazi Refinery Modernization Petrom FOSTER WHEELER Refining
October 2007 Russia Khabarovsk Refinery Expansion Alliance Oil Corp TECNICAS REUNIDAS/SPAIN Refining
December 2007 Russia Tobolsk PDH Plant Tobolsk Polymer TECNIMONT/ITALY Petrochemical
December 2007 Russia Tobolsk Polypropylene Plant Tobolsk Polymer LINDE/GERMANY Petrochemical
February 2008 Russia Ikra Project Rusvinyl TECHNIP/F Petrochemical
March 2008 Russia Perm Polystyrene Plant Sibur Khimprom CHEMIEANLAGENBAU CHEMNITZ/GER Petrochemical
April 2008 Russia Perm EthylBenzene Plant Sibur Khimprom TOYO/JAPAN Petrochemical
April 2008 Russia Irkusk Vinyl Chloride Plant Sayankhimplast UHDE/GERMANY Petrochemical
May 2008 Russia Melamine Plant at Nevinnomyssky Azot Eurochem LURGI/GERMANY Petrochemical
May 2008 Russia Yajvinskaya Gres CCGT Power Plant OGK-4 ENKA/TURKEY Powergen
May 2008 Russia Krasnodar gas-fired power plant TGK-8 E4 GROUP/RUSSIA - MHI/JAPAN Powergen
July 2008 Russia Nizhnekamsk Refinery (Fired Heaters) Taneco (Tatneft) FOSTER WHEELER ITALIANA Refining
August 2008 Russia Nyaganskaya & Tyumen TPP2 projects TGK-10 E4 GROUP/RUSSIA - SIEMENS/GERMANY Powergen
August 2008 Russia Kstovo Ethylene Plant Expansion Sibur Neftekhim TECHNIP/NETHERLANDS Petrochemical
October 2008 Russia Noyabrsk Gas Processing Expansion Pjt Sibur FLUOR/UK - STROYTRANSGAZ/RUSSIA Gas/treatment
March 2009 Russia Portovaya Gas Treatment Unit Gazkomplektimpex SIIRTEC NIGI/ITALY Gas/treatment
April 2009 Russia Novy Urengoy Polyethylene Plant NUGCC (Gazprom) TECNIMONT/ITALY Petrochemical
May 2009 Russia Taif-NK Nizhnekamsk Refinery Upgrading Taif-NK LURGI/GERMANY Refining
May 2009 Russia Mendeleevsk Fertilizer Complex JSC Ammoni MITSUBISHI HEAVY IND/J Petrochemical
June 2009 Russia Volgodonsk Nuclear Units 3 & 4 Energoatom NN-AEP/RUSSIA Powergen
October 2009 Russia Astrakhan Refinery Modernization Gazprom Komplektatsiya LURGI/GERMANY Refining
May 2010 Russia Urengoi Thermal Power Plant OGC-1 TECHNOPROMEXPORT/RUSSIA Powergen
June 2010 Russia Bratsk Chlorine Dioxide Plant Ilim Group AKER SOLUTIONS Chemical
September 2007 Russia-Germany Nord Stream Pipeline Gazprom-Norstream SAIPEM/ITALY Transportation
March 2008 Salvador Construction of a coal-fired power plant AES POSCO ENGINEERING/SOUTH KOREA Powergen
May 2007 Saudi Arabia Manifa Field Platforms Saudi Aramco J.RAY MCDERMOTT Production
September 2007 Saudi Arabia Offshore Maintain Potential Program (LTA) Saudi Aramco SAIPEM/TAQA/AL RUSHAID Production
15 15 / 73
COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010
DATE OF AWARD
COMPLETION DATE
962 2011
1000 2011
450 2011
2850 2012
3000 2011
800 2013
1800 2013
501 2013
500 2013
195 2013
293 2011
2500 2013
2500 2013
2000 2013
1200 2011
1300 2011
500 2011
2011
158 2011
353 2011
1700 2013
1700 2013
500 2013
700 2013
900 2013
1300 2013
420 2013
745 2013
247 2013
300 2013
720 2012
300 2011
December 2007 Saudi Arabia Jubail NCP Complex (Polyolefins Pack) Saudi Polymers Cy DAELIM/KOREA Petrochemical
December 2007 Saudi Arabia Jubail NCP Complex (Ethylene Pack) Saudi Polymers Cy JGC/JAPAN Petrochemical
June 2008 Saudi Arabia Manifa Offshore Pipelines Saudi Aramco VALENTINE MARITIME/UAE Transportation
July 2008 Saudi Arabia Shoaiba Power Plant Phase III SEC ALSTOM/F Powergen
July 2008 Saudi Arabia PP10 Power Plant SEC ARABIAN BEMCO Powergen
July 2008 Saudi Arabia Manifa Project (Utilities & Storage) Saudi Aramco JGC/JAPAN Gas/treatment
July 2008 Saudi Arabia Manifa Project (Central Processing Facilities) Saudi Aramco SAIPEM/ITALY Gas/treatment
August 2008 Saudi Arabia Manifa Project (Gas Processing Plant) Saudi Aramco GS ENGINEERING/SOUTH KOREA Gas/treatment
August 2008 Saudi Arabia Manifa Project (Power Plant) Saudi Aramco TECNICAS REUNIDAS/SPAIN Powergen
August 2008 Saudi Arabia Manifa Project (pipeline package) Saudi Aramco NACAP/NETHERLANDS Transportation
November 2008 Saudi Arabia Jeddah Desalination Expansion Phase 3 SWCC DOOSAN/KOREA - WETICO/SAUDI Water/desal
November 2008 Saudi Arabia Jazan Power Plant MMC/BINLADEN/CHALCO CPI POWER ENGINEERING/CHINA Powergen
July 2009 Saudi Arabia Rabigh Independent Power Project Kepco / Acwa Power SEPCO III/CHINA - DONGFANG ELECTRIC CORP Powergen
January 2009 Saudi Arabia Yanbu Refinery Clean Fuels Project Samref WORLEYPARSONS/USA Refining
February 2009 Saudi Arabia Karan Gas Pjt (offshore package) Saudi Aramco J.RAY MCDERMOTT Production
February 2009 Saudi Arabia Karan Gas Pjt (onshore package) Saudi Aramco HYUNDAI ENG Production
February 2009 Saudi Arabia Karan Gas Pjt (cogeneration/utilities) Saudi Aramco PETROFAC Production
February 2009 Saudi Arabia Karan Gas Pjt (sulfur recovery unit) Saudi Aramco GS ENGINEERING/SOUTH KOREA Production
February 2009 Saudi Arabia Ras Abu Ali Plant Upgrade Saudi Aramco BONATTI/ITALY Production
April 2009 Saudi Arabia Ras Tanura / Riyadh Pipeline Saudi Aramco NACAP/NETHERLANDS Transportation
June 2009 Saudi Arabia Jubail Refinery (Satorp Pjt - Package One) Saudi Aramco / Total TECNICAS REUNIDAS/SPAIN Refining
July 2009 Saudi Arabia Jubail Refinery (Satorp Pjt - Package 2A) Saudi Aramco / Total TECHNIP/ITALY Refining
July 2009 Saudi Arabia Jubail Refinery (Satorp Pjt - Package 2B) Saudi Aramco / Total DAELIM/KOREA Refining
July 2009 Saudi Arabia Jubail Refinery (Satorp Pjt - Package 3) Saudi Aramco / Total SAMSUNG/KOREA Refining
July 2009 Saudi Arabia Jubail Refinery (Satorp Pjt - Package 4) Saudi Aramco / Total SAMSUNG/KOREA-CHIYODA/JAPAN Refining
July 2009 Saudi Arabia Jubail Refinery (Satorp Pjt - Package 5A) Saudi Aramco / Total TECHNIP/ITALY - CTCI/TAIWAN Refining
July 2009 Saudi Arabia Jubail Refinery (Satorp Pjt - Package 5B) Saudi Aramco / Total SK ENG/KOREA Refining
July 2009 Saudi Arabia Jubail Refinery (Satorp Pjt - Package 6) Saudi Aramco / Total ROTARY ENGINEERING/ PETRO STEEL/SAUDI Storage
July 2009 Saudi Arabia Jubail Refinery (Satorp Pjt - Package 9) Saudi Aramco / Total DAYIM PUNJ LLOYD/SAUDI Storage
July 2009 Saudi Arabia Jubail Refinery (Satorp Pjt - Package 8) Saudi Aramco / Total GULF CONSOLIDATED CONTRACTORS Transportation
July 2009 Saudi Arabia Yanbu Power Plant Exp Phases 5 & 6 Marafiq HANWHA ENGINEERING & CONSTRUCTION Powergen
July 2009 Saudi Arabia Jubail Air Separation Unit National industrial Gases SAMSUNG/KOREA Gas/treatment
16 16 / 73
COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010
DATE OF AWARD
COMPLETION DATE
2014
1850 2011
325 2011
400 2012
288 2010
2012
2012
141 2012
1000 2013
1600 2013
70 2012
2011
2011
2011
2011
2011
2011
2011
2000 2013
450 2013
818 2010
175 2010
594 2013
628 2013
250 2012
490 2013
1021 2014
4900 2015
4000 2017
315 2010
2010
242 2014
Aout 2009 Saudi Arabia Yanbu Refinery (Utilities package) Saudi Aramco/ConocoPhillips KBR/USA Refining
September 2009 Saudi Arabia Al Qurayyah Power Plant Conversion Pjt SEC ARABIAN BEMCO - DOOSAN HEAVY Powergen
October 2009 Saudi Arabia Jubail Low Density Polyethylene Plant Saudi Kayan DAELIM/KOREA Petrochemical
December 2009 Saudi Arabia Jubail Petrochemical Plant Arabian Chlor Vinyl Cy DAELIM/KOREA Petrochemical
January 2010 Saudi Arabia Al Qassim Power Plant Expansion SEC ARABIAN BEMCO Powergen
January 2010 Saudi Arabia Jubail Amines Complex Saudi Kayan CTCI/TAIWAN Petrochemical
January 2010 Saudi Arabia Jubail Refinery Clean Fuels Project Sasref JGC/JAPAN Refining
January 2010 Saudi Arabia Wasea Bulk Plant Saudi Aramco SINOPEC ENGINEERING/CHINA Storage
March 2010 Saudi Arabia Safaniya Field Upgrading Pjt Saudi Aramco J.RAY MCDERMOTT Production
June 2010 Saudi Arabia Riyadh PP9 Power Plant GDF Suez HYUNDAI HEAVY IND/SOUTH KOREA Powergen
September 2009 Serbia Pancevo Refinery Modernization NIS CB&I LUMMUS/NETHERLANDS Refining
September 2007 Singapore Jurong 2nd Petrochemical Pjt (Ethylene part) ExxonMobil SHAW GROUP/USA Petrochemical
September 2007 Singapore Jurong 2nd Petrochemical Pjt (Power Plant) ExxonMobil SHAW GROUP/USA Powergen
September 2007 Singapore Jurong 2nd Petrochemical Pjt (PE Units) ExxonMobil MITSUBISHI HEAVY IND/J Petrochemical
September 2007 Singapore Jurong 2nd Petrochemical Pjt (PP Unit) ExxonMobil MITSUI ENG/JAPAN Petrochemical
September 2007 Singapore Jurong 2nd Petrochemical Pjt (Elastomers) ExxonMobil MITSUI ENG/JAPAN Petrochemical
September 2007 Singapore Jurong 2nd Petrochemical Pjt (O&U) ExxonMobil FOSTER WHEELER/WORLEYPARSONS Petrochemical
October 2007 Singapore Jurong 2nd Petrochemical Pjt (aromatics) ExxonMobil FOSTER WHEELER/USA Petrochemical
October 2007 Singapore Jurong Aromatics Project Jurong Aromatics Corp SK ENG/KOREA Petrochemical
November 2007 Singapore Jurong Aromatics Project (Offsites/Utilities Jurong Aromatics Corp SEMBAWANG E&C/SINGAPORE Petrochemical
January 2008 Singapore Tuas Biodiesel Plant Neste Oil TECHNIP/ITALY & SINGAPORE Bio
January 2008 Singapore Tuas Hydrogen Plant Neste Oil AIR LIQUIDE/SINGAPORE Gas/treatment
April 2009 Singapore Jurong Oil Storage Project JTC Corp HYUNDAI ENG Storage
February 2010 Singapore Jurong LNG Terminal Singapore Lng Corp SAMSUNG/KOREA Gas/treatment
February 2010 Singapore Tembusu Power Plant Tuas Power MARUBENI/JAPAN Powergen
June 2010 Singapore Jurong Butyl Rubber Plant Lanxess FOSTER WHEELER Petrochemical
December 2009 Slovenia Söstanj coal-fired steam power plant Termoelektrama Sostanj ALSTOM/F Powergen
November 2007 South Africa Medupi Power Station Eskom ALSTOM/F-HITACHI POWER EUROPE Powergen
February 2008 South Africa Bravo Power Station Eskom ALSTOM/F-HITACHI POWER AFRICA Powergen
May 2008 South Africa Durban-Gautenberg Fuel Pipeline Project Transneft ENTREPOSE CONTRACTING/F-GROUP FIVE Transportation
September 2008 South Africa Sasolburg Chemical Plant Senmin International FOSTER WHEELER SOUTH AFRICA Chemical
August 2008 South Africa Koeberg PBMR Demonstration Power Plant PBMR LAVALIN/CANADA - MURRAY & ROBERTS Powergen
17 17 / 73
COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010
DATE OF AWARD
COMPLETION DATE
96 2011
2012
176 2012
1500 2011
974 2011
582 2011
562 2010
2014
3400 2017
2011
4750 2011
1300 2011
2011
320 2011
2010
510 2011
290 2011
686 2012
550 2013
454 2011
477 2010
400 2011
910 2012
58 2010
33 2011
60 2012
2012
540 2011
2010
2011
820 2011
2010
March 2010 South Africa Secunda CAN Plant Sasol Nitro LAVALIN/Canada Petrochemical
March 2010 South Africa Sasolburg Wax Expansion Sasol FOSTER WHEELER SOUTH AFRICA Petrochemical
May 2010 South Africa Sasolburg Nitric Acid Plant Omnia UHDE/GERMANY Petrochemical
April 2008 South Korea Incheon Hydrocracker SK Energy SK ENG/KOREA Refining
June 2008 South Korea Onsan Aromatics Complex S-Oil SAMSUNG/KOREA Petrochemical
October 2008 South Korea Daesan Refinery Heavy Oil Project Hyundai Oilbank HYUNDAI ENG Refining
November 2008 South Korea Yeosu Desulfurization Unit GS Caltex Corp GS ENGINEERING/SOUTH KOREA Refining
November 2008 South Korea Taean IGCC n° 1 Power Plant Kowepo DOOSAN/KOREA Powergen
January 2010 South Korea Incheon Tidal Power Plant KHNP GS ENGINEERING/SOUTH KOREA Powergen
June 2010 South Korea Daesan NCC Plant Revamping Project Samsung Total TOYO KOREA Petrochemical
February 2007 Spain Cartagena Refinery Expansion Repsol TECNICAS REUNIDAS/SPAIN Refining
February 2008 Spain Cartagena Refinery Expansion (O&U portion) Repsol FLUOR/SPAIN Refining
March 2008 Spain Cartagena Delayed Coker Complex Repsol FOSTER WHEELER IBERIA Refining
April 2008 Spain El Musel LNG Terminal Enagas FLUOR/SPAIN Gas/treatment
May 2008 Spain Besos 5 Power Plant Endesa GE ENERGY/F Powergen
August 2008 Spain Soto de Ribera Power Station HC Energia ALSTOM/F-DURO FELGUERA/SPAIN Powergen
September 2008 Spain Compostilla Power Station Expansion Endesa MHI/JAPAN - INITEC/SPAIN Powergen
December 2008 Spain Granadilla & Arinaga LNG Terminals Gascan TECNICAS REUNIDAS/SPAIN Gas/treatment
June 2010 Suriname Paramaribo Refinery Expansion Project Staatsolie SAIPEM/ITALY Refining
March 2008 Syria Jidar Gas Processing Facilities Hayan Petroleum PETROFAC Gas/treatment
April 2008 Syria Ebla Gas Project PetroCanada PETROFAC Gas/treatment
June 2008 Syria Tishreen Power Plant PEEGT BHEL/INDIA Powergen
July 2009 Syria Deir Ali Power Plant PEEGT METKA/GREECE-ANSALDO/I Powergen
October 2008 Syria Arab Gas Pipeline 2nd Phase Syrian Gas Cy STROYTRANSGAZ/RUSSIA Transportation
April 2009 Sweden Nynäshamn LNG Terminal Nynäshamns Gasterminal NCC/SWEDEN Storage
June 2010 Sweden Nynäshamn Sulphur Recovery Unit Nynas TECHNIP KTI Refining
August 2009 Taiwan Lin Yuan Naphtha Cracker 6 CPC CTCI/TAIWAN - CB&I LUMMUS Refining
January 2008 Thailand Map Ta Phut LNG Regasification Plant PTT Lng Co Ltd GS ENGINEERING/SOUTH KOREA Gas/treatment
March 2008 Thailand Map Ta Phut Acrylic Plant Thai MMA CHIYODA/J Petrochemical
March 2008 Thailand Platong 2 Gas Project Chevron J.RAY McDERMOTT/SINGAPORE Production
June 2008 Thailand Map Ta Phut Power Plant Gheco-One (Suez) DOOSAN/KOREA Powergen
June 2008 Thailand Map Ta Phut Phenol Plant PTT Phenol Cy TOYO THAI / THAILAND Petrochemical
18 18 / 73
COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010
DATE OF AWARD
COMPLETION DATE
302 2011
2010
2011
2010
2011
71 2011
58 2010
33 2011
222 2011
124 2011
43 2011
131 2012
2010
700 2011
220 2012
540 2011
2010
2010
662 2012
2012
1500 2013
585 2010
1400 2012
3900 2012
654 2013
1460 2011
94 2010
872 2011
325 2012
2013
300 2011
7000 2012
July 2008 Thailand Combined-cycle Power plant Glow Energy MARUBENI/JAPAN - BLACK&VEATCH/USA Powergen
September 2008 Thailand Map Ta Phut Epichlorohydrin Plant Solvay TOYO THAI / THAILAND Petrochemical
October 2008 Thailand Greater Bongkot Gas Pjt (CPP) PTT Thailand HYUNDAI HEAVY IND/SOUTH KOREA-GUNANUSA Production
November 2008 Thailand Map Ta Phut Hydrogen Peroxide Plant MTP-HP / Solvay TOYO THAI / THAILAND Petrochemical
December 2008 Thailand Map Ta Phut Propylene Oxide Plant MTP-HPPO Manufacturing FOSTER WHEELER THAILAND Petrochemical
April 2009 Thailand Prachinburi Bio Ethanol Plant tba SUMATEC CORP/MALAYSIA Bio
May 2009 Thailand 3 EPC contracts Various Customers TOYO THAI / THAILAND Petrochemical
July 2009 Thailand Map Ta Phut Storage Tank PTT Tank Terminal ROTARY ENGINEERING Storage
August 2009 Thailand Map Ta Phut Clean Fuels Project PTTAR SK ENG/KOREA Refining
September 2009 Thailand Rayong Power Plant IRPC MARUBENI/JAPAN Powergen
January 2010 Thailand Chachaengsao Ethanol Plant Impress Ethanol Co Ltd KNM GROUP/MALAYSIA Bio
January 2010 Thailand TNP2 Power Plant International Power Ltd JURONG ENGINEERING/SINGAPORE Powergen
January 2009 Trinidad Tobago Angostura Gas Export Platform Project BHP Billion Trinidad J.RAY MCDERMOTT Production
February 2009 Trinidad Tobago La Brea Power Plant Trinidad Generation Unltd MAN FERROSTAAL/GERMANY Powergen
November 2009 Trinidad Tobago Pointe a Pierre ULSD Project Petrotrin SAMSUNG/KOREA Refining
April 2008 Tunisia Ghannouch Power Plant Steg ALSTOM/F Powergen
July 2008 Tunisia La Skhira Sulfuric Acid Plant Tifert TECHNIP/F - PIRECO Petrochemical
April 2008 Turkey Bandirma Power Plant Enerjisa Power Cy MITSUBISHI HEAVY IND/J - A-TEC/AUSTRIA Powergen
October 2009 Turkey Denizli Power Plant RWE & Turcas METKA/GREECE Powergen
November 2009 Turkey Aliaga Ethylene Plant Expansion Petkim SHAW GROUP/USA Petrochemical
November 2009 Turkey Izmit Refinery Upgrading Project Tupras TECNICAS REUNIDAS/SPAIN Refining
February 2008 Turkmenistan Malay-Bagtyyarlik Gas Pipeline TurkmenGaz STROYTRANSGAZ/RUSSIA Transportation
December 2009 Turkmenistan Southern Yoloten Gas Pjt (Gas Processing 1) TurkmenGaz HYUNDAI ENG / LG Int Gas/treatment
December 2009 Turkmenistan Southern Yoloten Gas Pjt (Gas Processing 2) TurkmenGaz PETROFAC Gas/treatment
January 2010 Turkmenistan Mary Fertilizer Complex Turkmenhimiya KAWASAKI PLANT SYSTEMS/JAPAN Petrochemical
February 2007 UK Pembroke Power Plant RWE Npower ALSTOM/F Powergen
May 2008 UK Drax Biomass Processing facility Drax Group ALSTOM/F Powergen
October 2008 UK Portland Gas Project Portland Gas CB&I/UK Storage
September 2009 UK Gaia Biomass Power Plant Gaia Power Tees Valley AKER SOLUTIONS/UK Powergen
March 2010 UK Stublach Storage Above-Ground Works Storengy JACOBS ENGINEERING Gas/treatment
February 2009 Uruguay La Teja Refinery Desulfurisation Project Ancap ASTRA EVANGELISTA/ARGENTINA Refining
August 2006 USA Port Arthur Refinery Expansion Motiva Enterprises BECHTEL-USA / JACOBS ENGINEERING Refining
19 19 / 73
COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010
DATE OF AWARD
COMPLETION DATE
2000 2011
3800 2012
2012
1000 2011
2012
1300 2011
1900 2012
2000 2012
1100 2011
2200 2011
2016
275 2011
500 2010
9800 2016
1200 2011
2010
2011
400 2011
2010
2012
2011
2011
2010
7600 2018
619 2011
600 2011
2012
2012
100 2011
250 2013
400 2012
280 2012
October 2006 USA Prairie State Energy Power Plant Peabody Energy BECHTEL/USA Powergen
October 2006 USA Whiting Refinery Upgrade BP FLUOR/USA Refining
April 2007 USA Whiting SRU & Hydrotreater Project BP JACOBS ENGINEERING Refining
April 2007 USA Little Gipsy Re-Power Project Entergy SHAW/USA Powergen
April 2007 USA Southwest Virginia Power Plant Dominion SHAW/USA Powergen
May 2007 USA John W.Turk Electric Generating Plant Swepco SHAW GROUP/USA-BABCOCK&WILCOX Powergen
January 2008 USA Detroit Refinery Expansion Marathon Oil FLUOR/USA Refining
January 2008 USA Edwardsport Power Station Duke Energy BECHTEL/USA - GE/USA Powergen
February 2008 USA Pascagoula LNG Terminal Gulf LNG Energy AKER KVAERNER/USA - IHI/USA Gas/treatment
March 2008 USA Port Arthur Refinery Expansion Total FLUOR/USA Refining
April 2008 USA Vogtle Nuclear Plant Georgia Power Cy SHAW GROUP/WESTINGHOUSE Powergen
May 2008 USA Construction of a gas-fired power plant Duke Energy Carolinas SHAW/USA Powergen
May 2008 USA Cooper River Fiber Plant Dupont BE&K ENGINEERING/AKER SOLUTIONS Chemical
May 2008 USA VC Summer Nuclear Units SCE&G/Santee Cooper SHAW GROUP/WESTINGHOUSE Powergen
August 2008 USA St Charles & Port Arthur Hydrocrackers Valero Energy FLUOR/USA Refining
August 2008 USA Port Arthur Expansion Project (2 units) Valero Energy TECHNIP/USA Refining
August 2008 USA Whiting Refinery Delayed Coker BP FOSTER WHEELER/USA Refining
October 2008 USA Nevada Gas-Fired Power Plant NV Energy SHAW/USA Powergen
October 2008 USA Corpus Christi Diesel Desulfurization Unit Flint Hills Resources JACOBS ENGINEERING Refining
October 2008 USA Jordan Cove LNG Project Jordan Cove Energy KIEWIT-BLACK&VEATCH-ENTREPOSE/F-VINCI/F Gas/treatment
November 2008 USA Jack County Generating Unit 2 Brazos Electric Power FLUOR/USA Powergen
December 2008 USA Wood River Coker Refinery Expansion Pjt WRB Refining Co FLUOR/USA Refining
January 2009 USA Bayton & Baton Rouge Diesel Projects ExxonMobil JACOBS ENGINEERING Refining
January 2009 USA Levy County Nuclear Plant Progress Energy Florida SHAW GROUP/WESTINGHOUSE Powergen
April 2009 USA Bear Garden Power Station Dominion Virginia Power FLUOR/USA Powergen
April 2009 USA Richmond County Power Plant Progress Energy Florida BE&K CONSTRUCTION CY Powergen
April 2009 USA Detroit Refinery (Hydrogen Plant) Marathon Oil TECHNIP/USA / AIR PRODUCTS Refining
October 2009 USA Luling Hydrogen Plant Monsanto TECHNIP/USA / AIR PRODUCTS Gas/treatment
October 2009 USA Temple LNG Expansion UGI LNG Inc CB&I/USA Storage
January 2010 USA Flambeau River Biofuels Project Flambeau River Biofuels AMEC/USA - MIRON CONSTRUCTION Bio
March 2010 USA Toledo Reformer 3 Project BP-Husky KBR/USA Refining
May 2010 USA Elk Hills Gas Processing Plant Occidental of Elf Hills CB&I/USA Gas/treatment
20 20 / 73
COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
MAIN CURRENT INTERNATIONAL PROJECTS - Update July 1st, 2010
DATE OF AWARD
COMPLETION DATE
2015
1400 2015
505 2012
2011
980 2011
1500 2013
2000 2012
900 2012
2011
1650 2012
250 2011
429 2012
1300 2013
1000 2011
700 2011
1400 2014
990 2014
June 2010 USA Sabine Pass LNG Terminal Expansion Cheniere Energy BECHTEL/USA Gas/treatment
June 2010 USA Coleto Creek 2 Power Project International Power/STEC ZACHRY INDUSTRIAL INC Powergen
November 2009 Uzbekistan Navoi Thermal Power Plant Uzbekenergo INITEC ENERGIA - MHI/JAPAN Powergen
January 2008 Venezuela El Tablazo Low Density Polyethylene Plant Polinter TECNIMONT/ITALY Petrochemical
October 2008 Venezuela Tamare & Bachaquero Power Plants Enelven MAN FERROSTAAL/GERMANY Powergen
June 2009 Venezuela Termocentro Combined Cycle Power Plant Electricidad de Caracas DURO FELGUERA/SPAIN Powergen
July 2009 Venezuela Cumana Power Plant (Antonio Jose de Sucre) PDVSA IBERDROLA INGENIERA/SPAIN Powergen
May 2008 Vietnam Ca Mau Fertilizer Plant Petrovietnam Wuhuan Engineering / CNMIEC-CHINA Petrochemical
January 2009 Vietnam Vung Tae CO2 Recovery Unit Petrovietnam SAMSUNG/KOREA Petrochemical
April 2009 Vietnam Vung Ang 1 & Nhon Trach 2 Power Plants Petrovietnam LILAMA GROUP Powergen
May 2009 Vietnam Hai Phong Polyester Plant Petrovietnam-Vinatex HYUNDAI ENG Petrochemical
July 2009 Vietnam Mao Khe Power Plant Vinacomin KAIDI ELECTRIC POWER/CHINA Powergen
October 2009 Vietnam Vinh Tan Thermal Power Plant Electricity of Vietnam SHANGHAI ELECTRIC GROUP/CHINA Powergen
October 2009 Vietnam Chim Sao FPSO Premier Oil EMAS OFFSHORE/SINGAPORE - SAIPEM - KEPPEL Production
November 2009 Vietnam Te Giac Trang FPSO Hoang Long JO BUMI ARMADA/MALAYSIA-KEPPEL SHIPYARD Production
March 2010 Vietnam Duyen Hai Thermo Power Plant Electricity of Vietnam DONG FANG ELECTRIC CORP CHINA Powergen
June 2010 Vietnam Nghi Son Power Plant Electricity of Vietnam MARUBENI/JAPAN Powergen
21 / 73
FIRM PROJECTS AWARDED TO ASIAN COMPANIES
Award Date Contractor Final Destination Project Name End User Scope / Situation
March 2009 CLOUGH AUSTRALIA AUSTRALIA APACHE/SANTOS
September 2009 CLOUGH AUSTRALIA AUSTRALIA CHEVRON/EXXONMOBIL/SHELL
December 2009 CLOUGH AUSTRALIA PAPUA NEW GUINEA EXXONMOBIL
May 2010 FLUOR AUSTRALIA AUSTRALIA SANTOS / PETRONAS
September 2009 KBR AUSTRALIA AUSTRALIA CHEVRON/EXXONMOBIL/SHELL
March 2008 LEIGHTON AUSTRALIA INDIA ONGC
February 2010 CHENGDA ENG CHINA BANGLADESH GOVERNMENT
March 2009 CHINA TCC CHINA IRAN ASSALUYEH AMMONIA PLANT STAR ARIA AMMONIA CHEMICAL CY
September 2009 CHINA AUSTRALIA APACHE/SANTOS
January 2008 CNCEC CHINA PAKISTAN PARCO
February 2008 CNEEC CHINA MALAYSIA TENAGA NASIONAL Bhd
April 2008 CNEEC CHINA INDONESIA PT PLN
November 2008 CNEEC CHINA BOTSWANA MORUPULE B POWER PLANT BOTSWANA POWER CORPORATION
March 2009 CNEEC CHINA PHILIPPINES GN POWER
April 2010 CNEEC CHINA AUSTRALIA HRL CORPORATION Scope : coal-fired 550mw
Contractor's nationality
REINDEER GAS PROJECT(Devil Creek gas plant)
three months after the cancellation of the contract, CLOUGH has been re-awarded the onshore portion of the project, on a smaller basis. Clough will supply the engineering, design works, procurement of materials and equipment, fabrication ans assembly of all modules for the facilityIn september 2009 J.HOLLAND, part of Leighton Group, informed that they won a USD 138M contract for construction work
GORGON LNG PLANTUSD 2,3 BILLION
Scope : the plant will include three 5 Million t/y LNG trains and a 300 tonnes joules/day domestic gas plant. The contract has been awarded to KJVG consortium including KBR, JGC, CLOUGH and HATCHChevron and its partners have taken the final investment decision mid september. The plant will be built in modular mode.
PNG LNG PROJECT(Hides Gas Plant)
Scope : Hides Gas Conditioning Plant including nearby wellheads and associated piping and infrastructure.Contract won in association with CBI (as leader with 65%)
GLADSTONE LNG PROJECT(upstream portion)
the upstream scope comprises all coal seam gas and associated water gathering and processing infrastructure for the Fairview and Roma fieldsFLUOR AUSTRALIA selected as preferred Upstream Contractor. EPC contract to be signed once a final investment decision is done. In the interim Fluor will start early works activities
GORGON LNG PLANTUSD 2,3 BILLION
Scope : the plant will include three 5 Million t/y LNG trains and a 300 tonnes joules/day domestic gas plant. The contract has been awarded to KJVG consortium including KBR, JGC, CLOUGH and HATCHChevron and its partners have taken the final investment decision mid september. The plant will be built in modular mode.
MUMBAI HIGH FIELD (PRP-2 PROJECT) - USD 720 M
The project, PRP - 2 (Pipeline Replacement Project - 2), involves engineering, procurement and installation of over 200 kilometres of fixed and flexible pipelines of various diameterscontract value for Leighton : USD 720M
CHANDPUR POWER PLANTUSD 146 M
Scope : 150mw combined-cyclethe government has signed the contract with Chengda Eng early february - turnkey contract
Scope : capacity of 720t/d on Haldor Topsoe technologyEPC contract awarded to CHINA TIANCHEN CHEMICAL ENGINEERING CORPORATION (CHINA-TCC) with the local MEHVAR SAZAN
CHIWAN SEMBAWANG ENGINEERING
REINDEER GAS PROJECT(wellhead platform)
The chinese company has won the contract to build the 2000t wellhead platform
MAHMOOD KOT REFINERY DIESEL HDS UNIT - USD 132 M
Scope : a 26,000b/d diesel hydrodesulfurization unit.PARCO has signed an agreement with a consortium including the chinese CNCEC and the korean HYUNDAI ENGINEERING - Work will start in March
SALAM COAL-FIRED POWER PLANTUSD 344 M
Scope : a 300mw plantThe chinese CHINA NATIONAL ELECTRIC EQUIPMENT CORPORATION (CNEEC) has been awarded the contract. 35% of the contract value will be given out to local companies
2 POWER PLANTS IN EAST JAVA AND ACEH - USD 889 M
PT PLN has awarded the contract to build the Tanjung Awar-Awar Power plant in East Java to CNEEC with PT PENTA ADI SAMUDRA. Contract value USD 642M - Capacity 700mwThe contract to build the Nagan Raya Plant has gone to the chinese SINOHYDRO - Capacity 220mw - Contract value USD 247,4M
Scope : coal-fired power plant 4x150mwconstruction contract signed with CNEEC with SBW - Work to start in february 2009
MARIVELES POWER PLANTUSD 580M
Scope : 600mw (2x300mw)EPC contract for CNEEC
MORWELL POWER PLANTUSD 750M
22 / 73
FIRM PROJECTS AWARDED TO ASIAN COMPANIES
Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
November 2009 CNOOC CHINA CHINA CNOOC
December 2008 CNTIC CHINA INDONESIA PT PLN
April 2010 COOEC CHINA AUSTRALIA CHEVRON/EXXONMOBIL/SHELL
November 2008 CPI POWER ENG CHINA SAUDI ARABIA MMC / BINLADEN / CHALCO
March 2010 CHINA VIETNAM ELECTRICITY OF VIETNAM
May 2010 CHINA BOSNIA EFT GROUP
July 2009 KAIDI ELECTRIC CHINA VIETNAM VINACOMIN
April 2010 SEPCO CHINA INDIA VEDANTA RESOURCES
July 2009 SEPCO III CHINA SAUDI ARABIA KEPCO/ACWA POWER INT
November 2009 SEPCO III CHINA OMAN SEMCORP UTILITIES
November 2008 CHINA BOTSWANA MMAMABULA ENERGY PROJECT CIC ENERGY
October 2009 CHINA VIETNAM ELECTRICITY OF VIETNAM
February 2010 CHINA BANGLADESH GOVERNMENT
October 2009 CHINA KAZAKHSTAN KAZMUNAIGAZ
January 2010 CHINA SAUDI ARABIA SAUDI ARAMCO
March 2010 CHINA KAZAKHSTAN KPI
ZHEJIANG NINGBO LNG TERMINALUSD 1 BILLION
Scope : capacity 3 million t/y in a first phase to be completed in 2012CNOOC will take care of the procurement & construction, CHENGDA in charge of detailed design. In consortium with TGE GAS ENGINEERING GmbH.An EPC contract will be awarded for the storage tanks
ADIPALA POWER PLANTUSD 605 M
The coal-fired power plant will have a capacity of 660mwcntic = China National Technical Import & Export Corporation
GORGON LNG PLANT (second-tier modules) - USD 180M
Scope : 157 modules. The contract includes project management, shop design, materials procurement, construction...
JAZAN POWER PLANTUSD 2,5 BILLION
Scope : 2400mwthe power plant will supply power to the aluminium smelter planned by MMC CORPORATION / SAUDI BINLADEN / CHALCOWork to start in 2009
DONG FANG ELECTRIC CORP
DUYEN HAI THERMO POWER PLANTUSD 1,4 B
Scope : 1245mw EPC contract signed with DONG FANG ELECTRIC CORPORATION
DONG FANG ELECTRIC CORP
STANARI THERMAL ELECTRIC POWER PLANT - USD 616M
Scope : 300mwTurnkey contract for Dongfang Electric, financing at 25% by EFT, balance by a consortium of chinese and european banks
MAO KHE POWER PLANTUSD 429M
Scope : 2x440mwEPC contract for Kaidi Electric, work to start immediately, commissioning in 42 months
JHARSUGUDA COAL FIRED POWER PLANT - USD 1,5 B
Scope : 1980mw (3x660mw)SHANGHAI ELECTRIC POWER CONSTRUCTION CORPORATION (SEPCO) has won the contract
RABIGH INDEPENDENT POWER PROJECT - USD 2,5 BILLION
Scope : 1200mw (oil-fired)The South Korean KEPCO with ACWA POWER INT has been selected by SEC to carry out the project. Their named EPC contractors are SHANDONG ELECTRIC POWER CONSTRUCTION CORPORATION (SEPCO III) and DONGFANG ELECTRICContract signed in July 2009, postponed due to difficulties in securing financing, commissioning expected in 2013 instead of 2012
SALALAH POWER & WATER INDEPENDENT PROJECT - USD 1B
Scope : 400mw power - 15 million g/d desalinationIn November 09, Sembcorp has been awarded the BOO contract, its nominated EPC contractor is Shandong Electric Power Cy (Sepco3)Sepco3 has awarded the contract for the desalination package to Hyflux/Singapore in November 09
SHANGHAI ELECTRIC GROUP
Scope : 1320mw - SHANGHAI ELECTRIC GROUP selected as epc contractor. Work to start mid-2009 - PARSONS BRINCKERHOFF/USA is the engineer
SHANGHAI ELECTRIC GROUP
VINH TAN THERMAL POWER PLANTUSD 1,3 B
Scope : 1224mwEPC contract for Shanghai Electric
SHANGHAI ELECTRIC GROUP
SYLHET POWER PLANTUSD 105M
Scope : single cycle power plantturnkey contract
SINOPEC ENGINEERING
ATYRAY AROMATICS COMPLEXUSD 1,04 B
Scope : 133,000t/y of benzene - 496,000t/y of paraxylene on Axens technology. The work will also cover a catalytic reforming unitturnkey contract for Sinopec
SINOPEC ENGINEERING
WASEA BULK PLANTUSD 141 M
scope : construction of oil tanks, pumps, substations + civil & structural works.SINOPEC has won the contract with a very low offer
SINOPEC ENGINEERING
ATYRAU POLYPROPYLENE PLANTUSD 1,6 B
KPI owned by Kazmunaigas and SAT & Cy. The project is part of a petrochemical complex initially planned with Lyondellbasell. As Lyondellbasell dropped from the project, KPI decided to go alone in a first phase and has signed a contract with SINOPEC ENGINEERING for a 450,000t/y polypropylene plant. Financing to come from Eximbank of China
23 / 73
FIRM PROJECTS AWARDED TO ASIAN COMPANIES
Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
June 2009 TECHNIP CHINA CHINA YINCHUAN LNG PLANT NINGXIA HANAS NATURAL GAS CY
May 2008 WUHUAN ENG CHINA VIETNAM PETROVIETNAM
January 2008 BHEL INDIA INDIA TAMIL NADU ELECTRICITY BOARD
February 2008 BHEL INDIA INDIA UPRVUNL
February 2008 BHEL INDIA INDIA GSEG - GSPC
June 2008 BHEL INDIA INDIA
June 2008 BHEL INDIA SYRIA PEEGT
June 2008 BHEL INDIA INDIA ONGC TRIPURA POWER CY
June 2008 BHEL INDIA INDIA DAMODAR VALLEY CORPORATION
August 2008 BHEL INDIA INDIA GVK POWER LTD
September 2008 BHEL INDIA INDIA
November 2008 BHEL INDIA INDIA APGenco
December 2008 BHEL INDIA INDIA JAIPRAKASH POWER VENTURES
December 2008 BHEL INDIA INDIA NTPC
Scope : capacity of 400,000t/y, Air Products liquefaction processcontract to be executed by Technip in Kuala Lumpue and Shanghaithe contract covers engineering, supply of main equipment, procurement and construction management services for facilities (natural gas pre-treatment, liquefaction, LNG storage and loading, offsites, buildings & other infrastructures)
CA MAU FERTILIZER PLANTUSD 900 M
The plant will produce 800,000t/y of fertilizersPetrovietnam has awarded the EPC contract to the chinese companies WUHUAN ENGINEERING and CHINA NATIONAL MACHINERY IMPORT & EXPORT CORPORATION
NORTH CHENNAI POWER PLANTUSD 1128 M
Scope : 600mwcontract won againt international biddingIn July 2008 BHEL has signed a second contract to set up a 600mw unit, contract value USD 503M
ANPARA D POWER PLANTUSD 841 M
Scope : 1000mw BHEL's scope includes design, engineering, manufacture, suply, erection & commissioning of boiler turbine generator package with associated auxiliaries and balance of the plant
CONSTRUCTION OF TWO POWER PLANTS IN GUJARAT - USD 743 M
1) a USD 270m contract with Gujarat Sate Energy Generation Cy to set up a combined-cycle power plant at Hazira on an epc basis - capacity 350mw2) a USD 473M contract with GSPC Piparav Power Company to build a combined-cycle power plant near Pipavav - capacity 700mw
DELHI POWER PLANTUSD 835 M
PRAGATI POWER CORPORATIONPPCL
Scope : 1371mwBHEL's contract includes design, engineering, manufacture, supply, erection of gas & steam turbines, generators, associated auxiliaries and balance of the plant equipment
TISHREEN POWER PLANTUSD 400 M
Scope : 400mwBHEL's contract includes design, engineering, manufacture, supply, erection of the main plant equipment with associated auxiliaries and balance of the plant
PALLATANA POWER PLANT IN TRIPURAUSD 514 M
Scope : 740mwBHEL has won the contract with GE against ALSTOMcommissioning between 42 and 45 months turnkey contract
BOKARO POWER PLANTUSD 428 M
Scope : 500mw BHEL's contract cover design, engineering, manufacture, supply, erection of steam turbines, generators, boilers, associated auxiliaires and balance of the plant
GOINDWAL SAHIB POWER PLANTUSD 262 M
Scope : 2x270mwBHEL's contract covers design, engineering, manufacture, supply, erection and commissioning of steam turbines, generators, boilers and auxiliaries
CHHABRA THERMAL POWER STATION EXPANSION - USD 209M
RRVUNL(Rajasthan Rajia Vidyut Utpadan
Nigam Ltd)
Scope : units 3 & 4 : 2x250mw unitsBHEL supplied the first two units
KAKATIYA THERMAL POWER GENERATING UNIT - USD 267M
Scope : 600mwBHEL's scope includes design, engineering, manufacture, supply, erection & commissioning of steam turbines, generators, boilers, associated auxiliaries? Control & instrumentation
BINA POWER PLANTUSD 245M
2X250MWThe thermal plant will be located at Bina in Madhya Pradesh - BHEL’s scope covers design, engineering, manufacture, supply, erection, testing and commissioning of Boilers, Steam Turbines, Turbo-Generators and associated auxiliaries along with state-of-the-art Controls and Instrumentation system including Generator and Station transformers
MAUDA SUPER THERMAL POWER PROJECT USD 435 M
1000mwBHEL's scope covers design, engineering, manufacture, supply & erection of steam generators & turbine generators along with associated auxiliaries & instrumentation
24 / 73
FIRM PROJECTS AWARDED TO ASIAN COMPANIES
Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
February 2009 BHEL INDIA INDIA MPPGC
May 2009 BHEL INDIA INDIA KORBA WEST POWER CY Ltd
May 2009 BHEL INDIA INDIA IDEAL ENERGY PROJECTS Ltd
June 2009 BHEL INDIA INDIA HINDALCO INDUSTRIES
July 2009 BHEL INDIA INDIA
August 2009 BHEL INDIA INDIA JINDAL INDIA THERMAL POWER
October 2009 BHEL INDIA INDIA JINDAL INDIA THERMAL POWER
November 2009 BHEL INDIA INDIA
March 2010 BHEL INDIA INDIA
March 2010 BHEL INDIA INDIA INDIAN OIL CORPORATION
April 2010 BHEL INDIA INDIA RAICHUR POWER CORPORATION
July 2008 BGR ENERGY INDIA INDIA TAMIL NADU ELECTRICITY BOARD
July 2008 BGR ENERGY INDIA INDIA
July 2009 BGR ENERGY INDIA INDIA MAHAGENCO
MALWA THERMAL POWER PROJECTUSD 968 M
Scope : 2x600mwBHEL's contract (USD 618M)includes design, engineering, manufacture, supply, erection & commissioning of steam turbines, generators, boilers and associated auxiliariesIn november 2009 LARSEN & TOUBRO won the turnkey contract (USD 350M) for the design, engineering, manufacture, supply, erection & commissioning of balance of plant systems
AVANTHA BHANDAR THERMAL POWER PROJECT - USD 316M
Scope : 600mwBHEL's contract includes design, engineering, manufacture, supply, erection and commissioning of Boiler, Steam Turbine, Generator along with associated auxiliariesthe plant will be located in Chhatisgarh
BELA THERMAL POWER PROJECTUSD 150 M
Scope : 270mwBHEL's contract includes design, engineering, manufacture, supply, erection and commissioning of Boiler, Steam Turbine, Generator along with associated auxiliariesThe plant will be located at Bela in Nagpur District/Maharashtra
ADITYA POWER PLANT The plant will be built at Hindalco's aluminium sitethe captive power plant will have a capacity of 900mw (6x150mw)BHEL will supply generators, turbines, boilers and set up the core plant
JHARKLAND POWER PLANTUSD 269M
APNRL(Adhunik Power & Natural Resources
Ltd)
Scope : 270mwBHEL's scope covers design, engineering, manufacture, supply, erection & commissioning of Steam Turbine, Generator and Boiler along with associated auxiliariesIn december 2009 BHEL secured a repeat order from APNRL for a second unit with the same capacity (270mw)
DERANG THERMAL POWER PJTUSD 545 M
Scope : 2x600mwBHEL's contract covers design, engineering, manufacture, supply, erection & commissioning of steam turbines, generators, boilers along with associated auxiliaries
JINDAL SUPER THERMAL POWER PLANT EXPANSION - USD 1,07 B
Scope : expansion by 2400mw (4x600mw)The contract covers design, engineering, manufacture, supply, erection of boilers, steam turbines turbo-generators and associated auxiliaries
PRAYAGRAJ THERMAL POWER PROJECT - USD 1,2 B
PRAYAGRAJ POWER GENERATION CY
Scope : 3x660mwBHEL's contract covers design, engineering, manufacture, supply, erection & commissioning of steam turbines, generators and boilers, along with associated auxiliaries
NASIK & AMRAVATI COAL-FIRED POWER PLANTS - USD 1,3 B
ELENA POWER & INFRASTRUCTURES Ltd
Each site involves 5 units of 270mwBHEL's scope : design, engineering, manufacture, supply, erection & commissioning of steam turbines, generators & boilers with associated auxiliaries
PARADIP CAPTIVE POWER PLANTUSD 735M
Scope : 376mw for the upcoming refineryBHEL's contract covers design, engineering, manufacture, supply, erection of the plant with associated balance of the plant
SUPERCRITICAL THERMAL POWER PROJECT - USD 1,4 B
Scope : 2 coal-fired thermal units of 800mw in RaichurRPCL is a JV between BHEL and Karnataka Power Corp - BHEL's scope : engineering, manufacture, supply, erection & commissioning
METTUR POWER PLANT EXPANSIONUSD 550 M
Scope : expansion by 600mwBGR ENERGY has won the contract against BHEL, the contract covers the design, engineering, supply of boiler, steam turbine generator and complete balance of plant equipment
KALISINDH THERMAL POWER PROJECT - USD 1,1 BILLION
RRVUNL(Rajasthan Rajia Vidyut Utpadan
Nigam Ltd)
Scope : 2x600mw The contract covers design, engineering, supply of boiler, steam turbine generator and complete Balance of Plant equipments
CHANDRAPUR SUPER THERMAL POWER STATION EXPANSION
Scope : expansion 2x500mwBGR ENERGY will provide engineering, procurement & construction of Balance of Plant, work duration 33 months
25 / 73
FIRM PROJECTS AWARDED TO ASIAN COMPANIES
Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
July 2009 BGR ENERGY INDIA IRAQ SCOP
August 2009 BGR ENERGY INDIA INDIA CHHATTISGARH STATE POWER CY
August 2009 EIL INDIA INDIA MRPC
May 2010 EIL INDIA INDIA GSPC Part of the Deen Dayal Project
May 2010 ESSAR OFFSHORE INDIA INDIA ONGC
January 2009 JACOBS ENGINEERIN INDIA INDIA MRPC
May 2010 JACOBS ENGINEERIN INDIA INDIA CHENNAI PETROLEUM
January 2010 LANCO INFRATECH INDIA INDIA LANCO MAHANADI POWER Scope : 2x660mw
March 2008 LARSEN&TOUBRO INDIA INDIA HINDUSTAN PETROLEUM
September 2008 LARSEN&TOUBRO INDIA BRAZIL PETROBRAS
November 2008 LARSEN&TOUBRO INDIA INDIA HPCL-MITTAL
April 2009 LARSEN&TOUBRO INDIA INDIA MRPC
August 2009 LARSEN&TOUBRO INDIA INDIA ONGC
August 2009 LARSEN&TOUBRO INDIA INDIA JAYPEE GROUP
September 2009 LARSEN&TOUBRO INDIA INDIA GMR ENERGY
AKAS & AL MANSURIA FIELDS DEVLPT - USD 80M
the contract includes engineering, procurement and supply of key utilities : gas and fire detection systems, gas generators, water systems….Both gas projects will have a combined capacity to produce 110 million cf/d
MARWA THERMAL POWER PROJECTUSD 334M
Scope : 2x500mwBGR ENERGY has been awarded the balance of plant contract, contract won against Larsen & Toubro and TATA Projects
MANGALORE POLYPROPYLENE PLANT - USD 312 M
Scope : a 440,000t/y polypropylene unitEIL has won the contract against TOYO, UHDE, JACOBS and TECHNIP.
MALLAVARAM ONSHORE GAS TERMINAL - USD 315 M
D-1 FIELD DEVLPT (platforms, pipelines)USD 235M
Scope : three unmanned wellhead platforms along with associated pipelines, subsea maniflds and modification at the D-1 wellhead platformcontract won in association with IRANIAN OFFSHORE ENGINEERING & CONSTRUCTION
MANGALORE REFINERY EXPANSION PHASE 3 (CDU/VDU Units)
part of the Upgradation & Expansion Phase III Project.JACOBS ENGINEERING INDIA has been awarded the enginering, procurement & construction management contract for the crude distillation and the vacuum distillation units.EIL is the consultantContract confirmed by JACOBS in March 09, work will also covera a LPG treatment unit and ATF merox unit.
MANALI RESID UPGRADATION PJTUSD 650M
Jacobs will provide project management consultancy and engineering, procurement & construction management services. Scope of work includes process packages for the utility & offsite facilities, a detailed feasibility report, PMC services for execution of a coker block and sulfur block and EPCM services for the balance of the project. The Resid Upgradtion Project involves a delayed coker, revamping of the hydrcracker, a sulfur recovery unit + utilities
MAHARASHTRA COAL-FIRED POWER PLANT - USD 1,2B
MUMBAI LUBRICATING OIL BASE STOCK PLANT
Scope : capacity 200,000t/y - Part of the Quality Upgrading ProjectL&T's scope include design, detailed engineering, procurement, supply, transportation, fabrication, construction and installationJACOBS ENGINEERING will provide project management services, ExxonMobil the technology
SUPPLY OF EQUIPMENT FOR THE NORTH EAST REFINERY - USD 160M
L&T has won the contract to manufacture and supply ten hydrotreating reactors and twelve coke drums for the planned refinery
HYDROGEN UNITS AT BHATINDA REFINERY - USD 143 M
Scope : 2 hydrogen Generation Units (capacity 44,000t/y) based on Haldor Topsoe Technology L&T's contract covers detailed enginering, procurement, supply, transportation, fabrication, construction, mechanical completion
MANGALORE REFINERY EXPANSION PHASE 3 (HGU/DHT units)USD 265 M
L&T's contract covers a diesel hydrotreating unit capa 3,7 MMt/y (Axens Technology) and a hydrogen Generation unit capa 70,000t/y (Haldor Topsoe technology) - L&T in charge of the design, engineering, procurement, supply, construction, installation & commissioning
MUMBAI HIGH NORTH PROCESS PLATFORM - USD 1,18 B
L&T will be responsible for survey, engineering, procurement, fabrication, installation and commissioning for major process, living quarters and twin flare platforms, all connected by bridges, in addition to the three compression modules. Over 80,000 tonnes of structures, process facilities and utilities will be erected in the high seas.
NIGRIE SUPERCRITICAL THERMAL POWER PROJECT - USD 828M
Scope : 1320mw contract won in association with Mitsubishi Heavy Industries India, the project represents an investment of USD 1,65 Billion
VEMAGIRI POWER PLANTUSD 415 M
Gas-fired power plant 2x384mwL&T’s scope includes the design, detailed engineering supply, instalaltion & commissioning of the plant on a turnkey basis.L&T SARGENT & LUNDY will carry out the plant integration & detailed engineering
26 / 73
FIRM PROJECTS AWARDED TO ASIAN COMPANIES
Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
November 2009 LARSEN&TOUBRO INDIA INDIA MAHAGENCO
December 2009 LARSEN&TOUBRO INDIA INDIA
January 2010 LARSEN&TOUBRO INDIA INDIA NATIONAL FERTILIZERS Ltd
February 2010 LARSEN&TOUBRO INDIA INDIA KARNATAKA POWER CORP
March 2010 LARSEN&TOUBRO INDIA INDIA
March 2010 LARSEN&TOUBRO INDIA INDIA INDIAN OIL CORPORATION
March 2010 LARSEN&TOUBRO INDIA INDIA ONGC
June 2010 LARSEN&TOUBRO INDIA INDIA ONGC
April 2010 LARSEN&TOUBRO INDIA INDIA
March 2008 PUNJLLOYD INDIA MALAYSIA PETRONAS CARIGALI
June 2008 PUNJLLOYD INDIA INDIA INDIAN OIL CORPORATION
September 2008 PUNJLLOYD INDIA QATAR QATAR PETROLEUM
September 2009 PUNJLLOYD INDIA INDIA MRPC
March 2010 PUNJLLOYD INDIA INDIA DHARIWAL INFRASTRUCTURE
KORADI POWER STATIONUSD 1,49 B
Scope 1980mwL&T's scope includes design, engineering, manufacture, supply, erection & commissioning of super-critical boilers, steam turbine generators & associated auxiliaries besides balance of plant equipment
BHARUCH AMMONIA PLANTUSD 212 M
GNFC(Gujarat Narmada Valley Fertilizers)
Scope : an ammonia unit capacity 1120t/d based on Haldor Topsoe technologycontract to be executed on a lump sum turnkey basis by L&T's Engineering & Construction Division
PANIPAT & BATHINDA AMMONIA CONVERSION PJT - USD 464M
the projects involve changeover of the feestock of the 900t/d ammonia plants from fuel oil to natural gas. L&T's turnkey contract include basic engineering, detailed engineering, procurement, construction, interconnection with existing facilities - Gas synthesis technology supplied by Haldor Topsoe
GODHNA THERMAL POWER PLANTUSD 2,1 B
Scope : 1600mw (2x800)L&T has signed a JV with Karnataka Power. Work to start by the end of 2010
MANGALORE AROMATICS COMPLEXUSD 446M
ONGC MANGALORE PETROCHEMICALS
Scope : the complex will produce paraxylene & benzene as well as other products like hydrogen, heavy aromatics and LPGUOP will supply the technology for the paraxylene & benzene unitsepc contract
PARADIP FCC REACTOR REGENERATOR PROJECT USD 312 M
Scope : 4,17 Million t/y Fluidized Catalytic Cracker Reactor Regeneration using Indmax technology for converting heavy distillate and residue into LPG/light distillate productL&T's scope : residual and detailed engineering, procurement, supply, manufacture, fabrication, construction & commissioning on a lumpsum turnkey basis
MUMBAI HIGH NORTH PHASE IIUSD 224 M
Scope : construction of four wellhead platforms, each with 12 slots with remote well testing and monitoring facilities from the NQ complex at Mumbai High Northengineering work to be carried out by L&T Valded in Bangalore, Chennai and Faridabad
HAZIRA ADDITIONAL GAS PROCESSING FACILITIES - USD 66M
Scope : a 6,3 million cm/ gas sweetening unit, a gas dehydration unit with the same capacity, a cooling water system, associated utilities
DEEN DAYAL WELHEAD PLATFORMUSD 235M
GUJARAT STATE PETROLEUM CORP
contract won against Afconsengineering, procurement, fabrication and installation of the wellhead platform.
SABAH-SARAWAK GAS PIPELINEUSD 500 M
Scope : 512km diam 36" pipeline + metering stations & compressor stationsThe contract has been awarded to a consortium led by PUNJLLOYD and including DIALOG E&C Sdb Bhd
BARAUNI MSQ UPGRADATION PROJECT - USD 152M
Scope : a 274,000t/y reformer splitter - a 183,000t/y naphta hydrotreating unit a 126,000t/y isomerisation unit, a 403,000t/y Prime G+ unit & offsites/utilitiesContract value for PunjLLoyd : USD 152M - Axens will supply technology for the process units, work to be complete in 23 months
STRATEGIC GAS TRANSMISSION PROJECT - USD 800 M
Scope : laying of 211km of pipelines with associated stations and infrastructure. The 363 pipeline will transport 2 Billion cf/d of sweet lean gas from Ras Laffan to different consumers
MANGALORE COKE DRUM PACKAGEUSD 113M
Punj Lloyd will provide engineering, procurement & construction of the coke drum structure package of the delayed coker unit for the Phase 3 project. CB&I LUMMUS provided the basic engineering process design of the 3 million t/y delayed coker unit
TADALI POWER PLANTUSD 223M
Dhariwal Infrastructure is part of RPG GroupPunj Lloyd's contract cover engineering procurement & construction of complete balance of plant systems for the 2x300mw plant
27 / 73
FIRM PROJECTS AWARDED TO ASIAN COMPANIES
Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
April 2010 PUNJLLOYD INDIA INDIA NAGARJUNA OIL CORP
November 2007 RELIANCE ENERGY INDIA INDIA COASTAL ANDHRA POWER
June 2008 RELIANCE INFRA INDIA INDIA RELIANCE ENERGY
January 2009 RELIANCE POWER INDIA INDIA GOVERNMENT
May 2010 SAMSUNG ENG INDIA INDIA NAGARJUNA OIL CORP
February 2009 TATA PROJECTS INDIA INDIA
August 2009 TECNIMONT INDIA INDIA MRPC
March 2010 TECNIMONT INDIA INDIA NATIONAL FERTILIZERS Ltd
October 2009 TECHNIP INDIA INDIA HINDUSTAN PETROLEUM
September 2009 THERMAX INDIA INDIA MEENAKSHI ENERGY
November 2008 TOYO INDIA INDIA HPCL-MITTAL
June 2009 TOYO INDIA INDIA MANGALORE REFINERY (EPCM-4) INDIAN OIL CORPORATION
September 2009 TOYO INDIA INDIA MRPC
October 2009 TOYO INDIA INDIA HINDUSTAN PETROLEUM
CUDDALORE REFINERY (Insiide Battery Limit)
Relocation of a german refinery (Mobil Woerth) in Cuddalore. capacity 6 Million t/yPUNJLLOYD 's contract covers the installation of inside Battery Limit and interconnection pipe rack : setting up of crude & vacuum distillation units, gasoline and saturated gas plant and catalytic hydro-desulfurization & isomerization units : construction-related procurement, civil works, structural works, mechanical equipment erection. Long delayed project, ABB LUMMUS was awarded the basic enginering, detailed engineering, procurement and construction management Once installed, the refinery will be expanded to 15 Million t/y
KRISHNAPATNAM POWER PLANTUSD 3 BILLION
Scope : 4000mwReliance Power has won the contract against Larsen & Toubro
SASAN ULTRA MEGA POWER PROJECT - USD 2,5 Billion
Scope : 3960mw to be commissioned in different stages within 42 months for the first 660mw, the 5 others with an interval of 3 monthsEPC contract for Reliance Infrastructure
TILAIYA ULTRA MEGA POWER PLANT - USD 3,2 B
Scope : 4,000mwRELIANCE will receive the Letter of Intent early February 09, formal contract to be signed within one month
CUDDALORE REFINERY (DHDS Project)
Scope : the diesel hydro desulfurization unit will have a capacity of 125,000b/dSAMSUNG ENGINEERING INDIA will be in charge of the design, procurement, construction & commissioning - Completion in March 2012
SRI DAMODARAM SANJEEVAIAH THERMAL POWER PROJECTUSD 561 M
APPDCL(Andhra Pradesh Power Devlpt)
Scope : coal-fired power plant 2x800mwTATA PROJECTS has won the EPC contract for the balance of plant, BHEL will supply the boilers and LARSEN & TOUBRO the turbines under separate contracts
MANGALORE REFINERY CHTU PROJECT - USD 80M
Scope : construction of a heavy coker gas oil hydrotreating unit, part of the Phase III Expansion projectlump sum turnkey contract for TICB, commissioning by the end of 2011
NANGAL AMMONIA PLANT CONVERSION PJT - USD 240M
Scope : revamping of the existing plant for feestock changeover from Fuel Oil/Low Sulphur Heavy Stock to re-liquified natural gas. Capacity of the ammonia plant will remain at 950t/d. The project includes also the revamping of utilities & Offsiteslumpsum turnkey contract inclusing technologu liecensign, engineering, procurement, construction & commissioning
VIZAG DIESEL HYDROTREAT PROJECT - USD 150M
Scope : a diesel hydrotreat unit 2,2 Million t/y - A hydrogen generation unit 36,000t/yTechnip has been awarded the lump sum tunrkey contract, confirmation by Technip in April 2010, followed by New Delhi office - TOYO INDIA is the Project Management Consultant
MEENAKSHI POWER PLANTUSD 198 M
capacity 2x135mwturnkey contract for Thermax who will also supply the water treatment & effluent systems
CONSTRUCTION OF SRUs AT BHATINDA REFINERY
Scope : 2 x 300t/d sulphur recovery units based on Prosernat process, TEIL's scope of work includes detailed engineering, construction management and procurement services
Scope : a Propylene Recovery Unit 1,9 Mmt/y and a 4,17 Mmt/y FCC IndmaxTOYO's contract covers project management, detailed engineering, procurement, construction management & supervision.
MANGALORE CDU/VDU N°1 REVAMPING
Scope : revamping of the crude/vacuum distillation units n°1TEIL's scope includes residual process design and detailed engineering, project management, procurement, supply, fabrication & commissioning
MUMBAI DIESEL HYDROTREAT PROJECT - USD 720M
Scope : a 2,2 Million t/y diesel hydrotreat unit, UOP processTEIL's scope of contract includes residual process design, detailed engineering, procurement, supply, storage, fabrication & mechanical completion
28 / 73
FIRM PROJECTS AWARDED TO ASIAN COMPANIES
Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
October 2009 TOYO INDIA INDIA MANGALORE DELAYED COKER BOP MRPC
August 2008 UHDE INDIA INDIA INDIAN OIL CORPORATION
September 2008 UHDE INDIA INDIA BHARUCH NITRIC ACID PLANT GNVFC
April 2009 UHDE INDIA INDIA PARADIP REFINERY (EPCM-2) INDIAN OIL CORPORATION
June 2009 UHDE INDIA INDIA VIZAG FORMALDEHYDE PLANT
April 2009 GUNANUSA INDONESIA INDIA ONGC
April 2010 PT NISCONI INDONESIA INDONESIA TOTAL
June 2009 PT REKAYASA INDONESIA INDONESIA PT KALTIM NITRATE INDONESIA
May 2009 SAIPEM INDONESIA INDONESIA PREMIER OIL NATUNA
May 2009 SMOE INDONESIA INDONESIA PREMIER OIL NATUNA
March 2008 CHIYODA JAPAN THAILAND MAP TA PHUT ACRYLIC PLANT
July 2008 CHIYODA JAPAN ALGERIA SONATRACH
July 2009 CHIYODA JAPAN SAUDI ARABIA
December 2009 CHIYODA JAPAN PAPUA NEW GUINEA EXXONMOBIL
February 2010 CHIYODA JAPAN QATAR QATARGAS
November 2007 IHI JAPAN INDIA PETRONET LNG two LNG storage tanks with 155,000 m3 of capacity
TEIL's contract covers the Balance of Plant of Delayed Coker Unit (3 MMT/y-ABB Lummus design) excluding the coke drum structure awarded to Punjlloyd in September 09 - EIL is the Project Management Consultant
GUWAHATI/DIGBOI MS QUALITY UPGRADATION PROJECT
Scope : isomerisation units with naphta hydrotreating units at both refineries + an indmax Gasoline splitter (Lurgi technology) at Guwahati and a naphtha splitter and a reformate splitter at DigboiUHDE INDIA selected as EPCM contractor by IOCL
Scope : 300t/d. UHDE's contract covers provess license, basic & detailed engineering, procurement and supply of equipment, civil works, erection & commissioning. The client is Gujarat Narmada valley Fertilizers
Scope : vacuum oil gas hydrotreater 5,4MMt/y (Axens) - Diesel Hydrotreater 5,2 MMt/y (Shell Global). UHDE INDIA 's scope : PMC, engineering, procurement. Long lead items procurement between May and July 09
KANORIA CHEMICALS & INDUSRIES LTD
Scope : capacity of 300t/d -UHDE INDIA's contract includes detailed engineering, procurement, project management, supervision. Basi engineering performed by Formox of Sweden
MUMBAI HIGH NORTH ICP-R PROCESS PLATFORM - USD 362M
Scope : engineering, procurement, construction & installation of the platform (topsides 7300t - jacket 3600t) and a flare tripod
SOUTH MAHAKAM FIELD(platforms/pipelines) - USD 240M
construction, transport, installation of 3 tripod platforms at Main Stupa, East Mandu and West Stupa fields + 80km of subsea pipelines
BONTANG AMMONIUM NITRATE PLANT - USD 173M
Scope : capacity of 300,000t/yPT REKAYASA has won the USD 173M contract, work to start in summer 2009
GAJAH BARU FIELD DEVELOPMENTUSD 430 M
Scope : a central processing platform (topsides 8200 tons), wellhead platform (topsides 900 t)3km subsea pipeline (16")Contract won in association with SMOE/INDONESIAPT SAIPEM INDONESIA's scope include engineering design, procurement, transportation and installation of the platforms and the subsea pipeline
GAJAH BARU FIELD DEVELOPMENTUSD 430 M
Scope : a central processing platform (topsides 8200 tons), wellhead platform (topsides 900 t)3km subsea pipeline (16")Contract won in association with PT SAIPEM INDONESIASMOE's scope : part procurement, construction engineering, construction, hook-up and commissioning of two platform. Share of the contract USD 156M In August 2009 NISCONI won the EPCI contract to fabricate the deck and jackets or the 2 platforms
THAI MMA(Mitsubishi Rayon/SCG Chemicals)
Scope : capacity 20,000t/yCHIYODA/JAPAN will be in charge of engineering & procurement while CHIYODA/THAILAND will undertake construction works
ARZEW LNG PLANT(GL3Z)USD 4,2 BILLION
Scope : capacity of 4,7 million t/y of LNGSAIPEM/SNAMPROGETTI in joint venture with CHIYODA has been awarded the lump sum turnkey contract
JUBAIL REFINERY(SATORP PJT)PACK-4 - Coker - USD 900M
SAUDI ARAMCOTOTAL
Scope : Coker Unit capacity 100,000b/donshore work will be performed by Chiyoda Petrostar as leader and Samsung Saudi Arabia
PNG LNG PROJECT(LNG Plant) - USD 4,5 B
Scope : capacity 6,6 million t/y (2 trains) including facilities for processing & treating natural gas, liquefaction, storage & loadingcontract won by CHIYODA, as leader, and JGC
PLATEAU MAINTENANCE PROJECT (PMP)USD 1,2 B
The project will enable Qatargas to maintain its current production level of 10 million t/y of LNGScope : a new acid gas removal unit, a new sulphur recovery unit and moridication to utility systems for handling increased feedgas rates to the existing trains.Contract won in association with TECHNIP
KOCHI LNG TERMINAL(storage tanks) - USD 250 M
29 / 73
FIRM PROJECTS AWARDED TO ASIAN COMPANIES
Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
December 2007 JGC JAPAN SAUDI ARABIA
July 2008 JGC JAPAN SAUDI ARABIA SAUDI ARAMCO
July 2008 JGC JAPAN ALGERIA SONATRACH
December 2008 JGC JAPAN INDONESIA DONGGI-SENORO LNG TERMINAL PT DONGGI SENORO LNG
June 2009 JGC JAPAN ALGERIA SONATRACH
July 2009 JGC JAPAN ABU DHABI GASCO
September 2009 JGC JAPAN AUSTRALIA CHEVRON/EXXONMOBIL/SHELL
December 2009 JGC JAPAN PAPUA NEW GUINEA EXXONMOBIL
January 2010 JGC JAPAN SAUDI ARABIA SASREF
January 2010 JAPAN TURKMENISTAN TURKMENHIMIYA
July 2008 MARUBENI JAPAN THAILAND GLOW ENERGY
September 2009 MARUBENI JAPAN THAILAND IRPC Scope : 220mw - Combined heat & power plant
February 2010 MARUBENI JAPAN SINGAPORE TUAS POWER
JUBAIL NCP COMPLEX(ethylene pack)USD 1.2 BILLION
SAUDI POLYMERS CY (NATIONAL CHEVRONPHILLIPS/SIIG)
Scope : a 1,2 million t/y ethylene plant, a 200,000t/y methathesis plant on ABB LUMMUS technology and a 100,000t/y 1-hexene plant on Chevron Phillips TechnologyContract won by JGC in December 2007, work to start in January scheduled for completion in September 2011
MANIFA PROJECT (Utilities/Storage)USD 800 M
JGC's contract covers package two of the Manifa project, involving utilities, storage and shipping facilities for the central processing facilitiescontract to be executed by JGC/Japan and JGC Gulf International in Saudicommissioning deferred to 2013 instead of 2011
RHOURDE NOUSS FIELD DEVELOPMENT - USD 500M
Scope : an oil separation and treatment unit with a capacity of 1000 cubic meters per day and a compression station with capacity of 8 million cm/d + a boosting unit for the compression of 20 million cm/d of gas
the terminal will have a capacity of 2,1 million tonnes/yearJGC/JAPAN selected as EPC contractor, still in negotiations with the client for final prices.PT DONGGI SENORO is a jv between MEDCO, PERTAMINA and MITSUBISHI
GASSI TOUIL GAS PROCESSING FACILITIES - USD 1,5 BILLION
EPC contract covering the construction of gas processing facilities with a throughput of 12 million cubic meters a day, gas gathering and pipelines at the Gassi Touil field - the facilities will also produce 1000t/d of LPG and 1600t/d of condensates. The gas will be sent to the Arzew LNG plant
IGD PROJECT (HABSHAN 5 GAS PROCESSING PLANT - USD 4,7 B
scope : engineering, procurement, construction and commissioning of the following core units : Gas Processing Unit (2 Billion cf/d), Sulphur Recovery Units (5000t/d), NGL Recovery unit (1,2 Billion cf/d). JGC won the contract with the italian Maire Tecnimont, JGC leader of the consortiumIn January 2010 KHARAFI/KUWAIT won a USD 700M subcontract and CCC a USD 300M subcontract for civil, mechanical & electrical works.
GORGON LNG PLANTUSD 2,3 BILLION
Scope : the plant will include three 5 Million t/y LNG trains and a 300 tonnes joules/day domestic gas plant. The contract has been awarded to KJVG consortium including KBR, JGC, CLOUGH and HATCHChevron and its partners have taken the final investment decision mid september. The plant will be built in modular mode.
PNG LNG PROJECT(LNG Plant) - USD 4,5 B
Scope : capacity 6,6 million t/y (2 trains) including facilities for processing & treating natural gas, liquefaction, storage & loadingcontract won by CHIYODA, as leader, and JGC
JUBAIL REFINERY CLEAN FUELS PROJECT - USD 100M
Scope : upgrade of super claus units, a off-gas treating unit, a sour water stripper. The project aims at meeting the US refinery emissions regulations by removing sulphur dioxide from air emissions JGC selected in January 2010, waiting for official confirmation
KAWASAKI PLANT SYSTEMS
MARY FERTILIZER COMPLEXUSD 654M
Scope : 1200t/d of ammonia - 1925t/d ureaK.PLANT, part of Kawasaki Heavy Industries, has won the contract with SojizK.PLANT will be responsible for the engineering and the supply of equipment while Sojitz will be responsible for coordination & financing In January 2010 MW KELLOGG selected to provide license technology and basic engineering design
COMBINED-CYCLE POWER PLANTUSD 302M
Scope : 380mw to be located at Map Ta Phut/RayongMARUBENI will be responsible for procurement of main equipment of the plant such as gas turbine generator and steam turbine generator from Siemens as well as overall civils and installation works. BLACK&VEATCH will be the technical maanger, responsible for engineering, plant equipment procurement, construction management, start-up & commissioning
RAYONG POWER PLANTUSD 124M
TEMBUSU POWER PLANTUSD 250 M
Scope : biomass and clean coal generation plant, part of a utilities complex102mw - engineering, procurement & construction contract
30 / 73
FIRM PROJECTS AWARDED TO ASIAN COMPANIES
Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
June 2010 MARUBENI JAPAN VIETNAM ELECTRICITY OF VIETNAM
August 2007 MITSUI ENG JAPAN EGYPT EGYPTIAN REFINING CY
September 2007 MITSUI ENG JAPAN SINGAPORE EXXONMOBIL
September 2007 MITSUI ENG JAPAN SINGAPORE EXXONMOBIL
September 2007 JAPAN SINGAPORE EXXONMOBIL
February 2008 JAPAN NETHERLANDS MAGNUM PLANT NUON
March 2008 JAPAN ALGERIA
April 2008 JAPAN TURKEY BANDIRMA POWER PLANT
September 2008 JAPAN SPAIN ENDESA
January 2009 JAPAN INDONESIA PT PLN
May 2009 JAPAN RUSSIA JSC AMMONI
December 2007 TOYO JAPAN INDONESIA PERTAMINA
April 2008 TOYO JAPAN RUSSIA PERM ETHYLBENZENE PLANT SIBUR KHIMPROM
NGHI SON POWER PLANTUSD 990M
Scope : coal-fired ower plant 600mwMarubeni's scope : engineering, procurement, delivery of equipment & construction. Steam turbines to be procured from Fuji Eectric Systems, boilers from Foster Wheelerpartly financing by Japan
MOSTOROD REFINERYUSD 1, 8 BILLION
150,000b/dturnkey contract awarded to a consortium including MITSUI and GS ENGINEERINGMay 2009 : Project halted due to financing, both EPC contractors have been offered a 30% share in the project, negotiations with Export Import Bank of South Korea and JBIC/JAPAN expected to be closed in October 2009 enabling work to start early 2010.Project to be commissioned in 2013 instead of 2011
JURONG 2nd PETROCHEMICAL COMPLEX (PP UNIT)
Scope : a 450,000t/y polypropylene unitMITSUI ENGINEERING has been awarded the EPC contract for the PP units and for the steam cracker furnaces in association with HEURTEY PETROCHEM
JURONG 2nd PETROCHEMICAL COMPLEX (Elastomers Unit)
Scope : a 300,000t/y specialty elastomers unitMITSUI ENG has been awarded the engineering, procurement & construction contract
MITSUBISHI HEAVY IND
JURONG 2nd PETROCHEMICAL COMPLEX (Polyethylene Units)
Scope : 2 polyethylene units 650,000t/yMHI/JAPAN has been awarded the engineering procurement & construction for the 2 PE units and for polyolefins finishing, packaging and shipping
MITSUBISHI HEAVY IND
Scope : 1300mwMHI will supply the three gas turbines, steam turbine generators, heat recovery steam generators and balance of the plant. BALLAST NEDAM has been awarded a € 130M subcontract by MHI for the civil works Work was halted in May 2008 as all the permits were not obtained, all the authorizations have been given in July 2009 and work will restart on site in september. Ponticelli is a MHI's subcontractor
MITSUBISHI HEAVY IND
MERS EL HADJAJ AMMONIA-UREA COMPLEX - USD 3 BILLION
SONATRACH / SUHAI BAHWAN(El Djazairia El Omania Lil Asmidal)
Scope : ammonia capacity 4000t/d - urea capacity 7,000t/dMHI/JAPAN and DAEWOO ENGINEERING/SOUTH KOREEA have won the EPC contract with an offer of USD 2,415 Billion - The official EPC contract has been signed mid-april
MITSUBISHI HEAVY IND
ENERJISA POWER CY(Verbund / Sabanci)
Scope : 920mwMHI in association with the austrian A-TEC has been given the green light to implement the project
MITSUBISHI HEAVY IND
COMPOSTILLA POWER PLANT EXPANSION - USD 290 M
Units 6 & 7 : 2x400mwMHI has received the turnkey contract. Scope : each unit will include a gas turbine, a steam turbine, a generator and a heat recovery steam generatorCivil engineering, installation work and procurement of other auxiliary equipment to be done by a spanish consortium led by INITEC and including COBRA and ACCIONA
MITSUBISHI HEAVY IND
TANJUNG PRIOK CCGT POWER PLANT
Scope : 750mw combined-cycle power plantturnkey contract for MHI
MITSUBISHI HEAVY IND
MENDERLEEVSK FERTILIZER COMPLEX - USD 973M
Scope : production of 717,000t/y ammonia, 230,000t/y of methanol, 380,000t/y of ammonium nitrate - Haldor Topsoe Technology agreement signed between the client and MHI and SOJITZ CORPORATION. MHI will act as EPC contractor
BALONGAN REFINERY EXPANSIONUSD 300 M
Expansion of the propylene production from 1000t/d to 1700t/dToyo has won the USD 300M contract, work to start in january 08Official contract signed on January 22 with TOYO and PT REKAYASA. The project is called ROPP (RCC Off-Gas to Propylene), ABB LUMMUS will supply the technology
Scope : capacity 220,000t/y on Badger TechnologyTOYO has signed the EPC contract
31 / 73
FIRM PROJECTS AWARDED TO ASIAN COMPANIES
Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
August 2009 TOYO JAPAN CHINA BASF YPC
September 2009 TOYO JAPAN CHINA MITSUBISHI GAS CHEMICAL
November 2009 BUMI ARMADA MALAYSIA VIETNAM HOANG LONG JOINT OPERATING
January 2010 KNM GROUP MALAYSIA THAILAND IMPRESS ETHANOL Co Ltd
October 2008 MMHE MALAYSIA MALAYSIA PETRONAS CARIGALI
May 2007 MALAYSIA MALAYSIA TRANSPEN
October 2009 SAPURAACERGY MALAYSIA AUSTRALIA APACHE/SANTOS
April 2008 SIME DARBY ENG MALAYSIA MALAYSIA PETRONAS CARIGALI
October 2008 SIME DARBY ENG MALAYSIA MALAYSIA PETRONAS CARIGALI
April 2009 SUMATEC CORP MALAYSIA THAILAND TBA
NANJING PETROCHEMICAL COMPLEX EXPANSION - USD 1,4B
Expansion & construction of 14 process units, among them the expansion of the ethylene cracker by 140,000t/y, of the ethylene oxide plant by 80,000t/y, construction of EO derivatives plants, a new amines complexTOYO will perform engineering, procurement and construction management, it will form an integrated project team with FLUOR and DAELIM to manage the project. TOYO will form a global TOYO team comprising Toyo China and Toyo Korea for 4 of the process units
SHANGHAI POLYCARBONATE RESIN PLANT
scope : capacity of 80,000t/yConstruction work will start in 2010
TE GIAC TRANG FPSOUSD 700M
The field is also called White RhinocerosThe FPSO will have a production capacity of 45,000b/d and a storage capacity of 1 million barrels. Bumi Armada will convert a Suezmax tankerthe malaysian company is associated with VietsopetroIn march 2010 KEPPEL SHIPYARD won a USD 140M subcontract for conversion work : fabrication & installation of accomodation works, turret support structure & topside modules
CHACHAENGSAO BIOETHANOL PLANT - USD 43M
Scope : capacity of 200,000 litres per dayproject to be executed by KNM subsidiaries KNM Process Systems Sdn Bhd and KNM Projects Co Ltd in Thailand
TANGGA BARAT, KINABALU & KUMANG PROJECTS - USD 720 M
MMHE's contract : a topside and a jacket for Tangga Barat's CPP and a topside for Kinabalu central processing platform (contract value USD 337M)SIME DARBY's contract : two drilling platforms's topsides for Kumang and Tangga Barat projects, a topside for Kumang's CPP and a drilling platform jacket for Kinabalu project (USD 314M)RAMUNIA FABRICATORS a drilling platfom jacket and a CPP jacket for Kumang and a drilling platform jacket for Tangga Barat(USD 39M ) - OILFAB Sdn Bhd (USD 28,6M) : a drilling platform jacket, flare module and bridge for Tangga Barat, a drilling platfom jacket, flare module, bridge and tripod for the Kumang Pjt
RANHILL ENGINEERS & CONSTRUCTORS
TRANS-PENINSULA PIPELINEUSD 7 B
Scope : a 300km 48" pipeline across Malaysia's northern states of Kedah, Perak and Kelantan. RANHILL will undertake the engineering, procurement & construction, PT TRIPATRA will undertake engineering design and project management. Pipes will be supplied by Bakrie & Brothers
DEVIL CREEK DEVELOPMENT PJTUSD 170M
The project will recover & process the gas reserves from the Reindeer gas fieldSapuraAcergy's contract covers the transportation & installation of 91km 16" rigid pipeline including subsea tie-in together with a wellhead platform and a topside processing modulecontract to be executed from Kuala Lumpur & Perth offices
SABAH OIL PLATFORMSUSD 637 M
Petronas has awarded SIME DARBY and MISC contracts to build oil platforms offshore Sabah.
TANGGA BARAT, KINABALU & KUMANG PROJECTS - USD 720 M
SIME DARBY's contract : two drilling platforms's topsides for Kumang and Tangga Barat projects, a topside for Kumang's CPP and a drilling platform jacket for Kinabalu project (USD 314M)MMHE's contract : a topside and a jacket for Tangga Barat's CPP and a topside for Kinabalu central processing platform (contract value USD 337M)RAMUNIA FABRICATORS a drilling platfom jacket and a CPP jacket for Kumang and a drilling platform jacket for Tangga Barat(USD 39M ) - OILFAB Sdn Bhd (USD 28,6M) : a drilling platform jacket, flare module and bridge for Tangga Barat, a drilling platfom jacket, flare module, bridge and tripod for the Kumang Pjt
PRACHINBURI BIO ETHANOL PLANTUSD 500 M
Scope : 500,000 litres per day with biogas plant & organic fertiliser plant. EPC Contract signed in association with EC CHEMICAL BIO CO LTD/THAILAND
32 / 73
FIRM PROJECTS AWARDED TO ASIAN COMPANIES
Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
June 2009 TECHNIP MALAYSIA CHINA YINCHUAN LNG PLANT NINGXIA HANAS NATURAL GAS CY
January 2008 AIR LIQUIDE SINGAPORE SINGAPORE NESTE OIL
October 2009 EMAS OFFSHORE SINGAPORE VIETNAM PREMIER OIL
June 2010 FOSTER WHEELER SINGAPORE SINGAPORE LANXESS
March 2008 J.RAY McDERMOTT SINGAPORE THAILAND CHEVRON
January 2010 JURONG ENG SINGAPORE THAILAND INTERNATIONAL POWER
July 2008 MODEC SINGAPORE ANGOLA BP ANGOLA
January 2010 PEC Ltd SINGAPORE MALAYSIA ATT TANJUNG BIN Sdn Bhd
July 2009 ROTARY ENGINEERIN SINGAPORE SAUDI ARABIA
July 2009 ROTARY ENGINEERIN SINGAPORE THAILAND MAP TA PHUT STORAGE TANK PTT TANK TERMINAL CY
November 2007 SEMBAWANG E&C SINGAPORE SINGAPORE JURONG AROMATICS CORP
May 2010 SWIBER OFFSHORE SINGAPORE INDIA ONGC
February 2007 DAELIM SOUTH KOREA IRAN NIOC LNG
Scope : capacity of 400,000t/y, Air Products liquefaction processcontract to be executed by Technip in Kuala Lumpue and Shanghaithe contract covers engineering, supply of main equipment, procurement and construction management services for facilities (natural gas pre-treatment, liquefaction, LNG storage and loading, offsites, buildings & other infrastructures)
TUAS HYDROGEN PLANTUSD 175M
Scope : capacity of 100,000m3 per hourAIR LIQUIDE in Singapore, SOXAL, will build, own and operate the plant
CHIM SAO FPSOUSD 1 BILLION
the FPSO will be converted from a Suezmax tanker, it will have an oil storage between 600,000 and 1 million barrels, and a production capacity of 50,000b/dEmas is part of Ezra HoldingsSAIPEM won in December 09 the transportation & installation of the platform & subsea pipelines, umbilicals & pipelines end manifolds in addition to the detailed engineering for infield pipelinesKEPPEL SHIPYARD has won the subcontract for the conversion of the tanker into a FPSO (accomodation upgrade, fabrication & installation of topside modules and turret mooring system, flare tower, structural steel and new piping system
JURONG BUTYL RUBBER PLANTUSD 490 M
Scope : capacity of 100,000t/y FOSTER WHEELER ASIA PACIFIC selected to provide engineering, procurement services and construction management services
PLATONG 2 GAS PROJECT J.RAY McDermott's contract covers the full Engineering, Procurement, Construction & Installation for the central processing platform (19,000 tonnes) and the associated living quarters platform, flare tripod and 3 bridges
TNP2 POWER PROJECTUSD 131M
Scope : 110mw gas-firedJurong Engineering (part of IHI) has won the turnkey EPC contract
BLOCK 31 PSVM PROJECT(FPSO)
The FPSO will have a production capacity of 157,000b/d and storage capacity of 1,6 million barrelsMODEC has been awarded a frame agreement for the suply of the FPSO under an EPCI contract, the agreement covers an option for a second FPSO in the areaIn October 2008 TOYO has been awarded the detailed topsides engineering work
TANJUNG BIN OIL TERMINALUSD 174M
the oil terminal will have a storage capacity of 841,000 cubic metersthe contract will be executed by PEC's subsidiary Audex Pte Ltd
JUBAIL REFINERY PROJECTPACKAGE 6 - USD 745 M
SAUDI ARAMCOTOTAL
The package covers the refinery tank farm covering 62 atmospheric storage tanks and 8 bullett tanks. Work outside Saudi to be managed by Rotary Engineering in Singapore (USD 384M), inside Saudi by Petrosteel (JV between Rotary Engineering & Rafid Group
the tank will store ammoniaRotary Eng's contract covers the supply of equipment and materials, engineering, construction, commissioning & start up
JURONG AROMATICS PROJECT(Offsites & Utilities) - USD 450M
Sembawang E&C will be responsible for the engineering, procurement, construction of all the ancillary facilities, including product tankage, receiving & exporting jetties, power and steam cogeneration plant, wastewater treatment unitIn February 09, project postponed due to problems in securing the financing, financing expected to be closed by mid-2009
B-193 FIELD (PLATFORM PACKAGE)USD 618M
Scope : six-slot process platformcontract in joint-venture with SIME DARBY/MALAYSIA
NIOC LNG PROJECT (TANKAGE PROJECT) - USD 320 M
Scope : two 140,000m3 LNG tanks and three 30,000m3 LPG storage tanksDAELIM will carry out the contract with a subsidiary of Khatam Al Anbia. Technip and JGC carried out the FEED
33 / 73
FIRM PROJECTS AWARDED TO ASIAN COMPANIES
Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
March 2007 DAELIM SOUTH KOREA IRAN ESFAHAN OIL REFINING CY
December 2007 DAELIM SOUTH KOREA SAUDI ARABIA
February 2008 DAELIM SOUTH KOREA PHILIPPINES JG SUMMIT
July 2009 DAELIM SOUTH KOREA SAUDI ARABIA
October 2009 DAELIM SOUTH KOREA SAUDI ARABIA SAUDI KAYAN
October 2009 DAELIM SOUTH KOREA IRAN PETROPARS
December 2009 DAELIM SOUTH KOREA SAUDI ARABIA ARABIAN CHLOR VINYL CY
June 2010 DAELIM SOUTH KOREA KUWAIT KNPC
February 2008 DAEWOO SOUTH KOREA ANGOLA TOTAL
March 2008 DAEWOO SOUTH KOREA ALGERIA
February 2009 DAEWOO SOUTH KOREA ALGERIA SONATRACH
November 2009 DAEWOO SOUTH KOREA ABU DHABI TAKREER
April 2010 DAEWOO SOUTH KOREA NIGERIA SHELL PETROLEUM NIGERIA
May 2010 DAEWOO SOUTH KOREA ISRAEL OC POWER Ltd
May 2010 DAEWOO SOUTH KOREA ABU DHABI TAKREER
May 2007 DOOSAN SOUTH KOREA INDIA TATA POWER CY
September 2007 DOOSAN SOUTH KOREA INDONESIA PT CIREBON ELECTRIC POWER
ESFAHAN REFINERY UPGRADINGUSD 1720 M
The production of the gasoline will be boosted from 9 million liters to 12 millions. The contract will be executed by DAELIM, UHDE, LURGI and the local companies NAMVARAN, NARGAN and CHEGALESH. Technip is the project management consultant. The upgrading involves construction of several units
JUBAIL NCP COMPLEX(Polyolefins Complex)USD 962,3 M
SAUDI POLYMERS CY(ARABIAN CHEVRON PHILLIPS/SIIG)
Scope : high density polyethylene (550,000t/y), low density polyethylene (550,000t/y) polypropylene (400,000t/y) polystyrene (200,000t/y)DAELIM has won the epc contract - NCP is a joint venture between Chevron Phillips and Saudi Industrial Investment Group
BATANGAS ETHYLENE/PROPYLENE PLANT - USD 513 M
Daelim has won the USD 513M contract to build an ethylene plant (capacity 350,000t/y) and a propylene plantIn December 09, the client is going ahead with the project as financing is secured, work to start in March 2010 for commissioning in 2013 instead of 2010 initially foreseen. Lummus will supply the technology
JUBAIL REFINERY(SATORP PJT)PACK-2A SULFUR
SAUDI ARAMCOTOTAL
Scope : Sulphur & Amine Unitsestimated contract value USD 500M
JUBAIL LOW DENSITY POLYETHYLENE PLANT - USD 325M
Scope : 300,000t/ythe contract was awarded in 2007 to Simon Carves/UK but not converted into a lump sum turnkey. DAELIM announced the award in October 09
SOUTH PARS PHASE 12 (EPC-2)USD 1,8 BILLION
The package covers liquid processing facilitiesDAELIM has won the contract in association with the local companies SAZEH, KAYSON and IIND
JUBAIL PETROCHEMICAL PLANTUSD 400 M
Scope : a 300,000t/y ethylene dichloride unit, a 250,000t/y caustic soda unitArabian Chlor Vinyl is a joint-venture between Maaden and Sahara Petrochemical Cy
MINA AL AHMADI 4th LPG RECOVERY UNIT - USD 890M
The facility will treat 850 million cf/d of natural gasepc contract for Daelim, work will take 3 years to complete
PAZFLOR PROJECT (FPSO & TOPSIDES)
The FPSO is design with a processing capacity of 200,000 barrels per day, 150 million cf/d of gas and a storage capacity of 1,9 million barrels of crudeDAEWOO SHIPBUILDING & MARINE ENGINEERING (DSME) has been awarded the contract, KBR/USA will provide topsides engineering, procurement and interface design services
MERS EL HADJAJ AMMONIA-UREA COMPLEX - USD 3 BILLION
SONATRACH / SUHAI BAHWAN(El Djazairia El Omania Lil Asmidal)
Scope : ammonia capacity 4000t/d - urea capacity 7,000t/dMHI/JAPAN and DAEWOO ENGINEERING/SOUTH KOREA have won the EPC contract with an offer of USD 2,415 Billion - The official EPC contract has been signed mid-april - DAEWOO's share of the contract is USD 626,5 M
ARZEW LNG PROJECT(storage tanks)
DAEWOO has been awarded a subcontract by SAIPEM, contract value USD 280,3 M for storage facilities
RUWAIS REFINERY(Tankage Package) - USD 1,2 B
Scope : 67 tanks + interconnecting pipingcontract value : USD 1,2 BillionIn June 2010, DAEWOO subcontracted the propylene storage tanks to CB&I
UTOROGU/UGHELLI GAS PIPELINEUSD 179M
Scope : 100km gas lineWork to start in May 2010 for commissioning in 2012
MISHOR ROTEM POWER PLANTUSD 470M
Scope : 440mw - OC Power Ltd is owned by Israel Corporation and Veoliaturbines to be supplied by Mitsubishi Power
IRPP PROJECT PHASE IIUSD 272M
Part of the Inter Refineries Pipelines Project Phase II - Work will involve construction of 16 storage tanks to be commissioned in November 2012
MUNDRA ULTRA MEGA POWER PROJECT - USD 1,22N
Scope : 4000mwDOOSAN has been selected by Tata PowerTOSHIBA/JAPAN signed the contract to supply the five steam turbine generators
CIREBON THERMAL POWER PLANTUSD 540 M
Scope : 700mwEPC contract for Doosan. PT CEP is a joint-venture formed by Korea Midland Power and Samtan of Korea, Marubeni/Japan and Tripatra/Indonesia
34 / 73
FIRM PROJECTS AWARDED TO ASIAN COMPANIES
Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
November 2007 DOOSAN SOUTH KOREA KUWAIT MEW
December 2007 DOOSAN SOUTH KOREA PHILIPPINES KEPCO
June 2008 DOOSAN SOUTH KOREA THAILAND
July 2008 DOOSAN SOUTH KOREA ABU DHABI GDF SUEZ
November 2008 DOOSAN SOUTH KOREA SOUTH KOREA TAEAN IGCC n°1 KOWEPO
November 2008 DOOSAN SOUTH KOREA SAUDI ARABIA SWCC
January 2010 DOOSAN SOUTH KOREA INDIA GMR ENERGY
February 2010 DOOSAN SOUTH KOREA EGYPT EAST DELTA ELECTRICITY
April 2010 DOOSAN SOUTH KOREA NEW CALEDONIA XSTRATA
August 2007 GS ENGINEERING SOUTH KOREA EGYPT EGYPTIAN REFINING CY
January 2008 GS ENGINEERING SOUTH KOREA THAILAND PTT LNG Co Ltd
August 2008 GS ENGINEERING SOUTH KOREA SAUDI ARABIA SAUDI ARAMCO
November 2008 GS ENGINEERING SOUTH KOREA SOUTH KOREA GS CALTEX
February 2009 GS ENGINEERING SOUTH KOREA SAUDI ARABIA SAUDI ARAMCO
June 2009 GS ENGINEERING SOUTH KOREA IRAN IRAN LNG
July 2009 GS ENGINEERING SOUTH KOREA ABU DHABI GASCO
SHUWAIKH DESALINATION PLANTUSD 320 M
The plant will utilise Reverse Osmosis technology and will be able to produce 30 million gallons per day of desalinated water.DOOSAN has won the construction contractcontract signed on March 10
CEBU COAL-FIRED POWER PLANTUSD 300 M
Scope : 100mwDOOSAN HEAVY will be responsible for the entire project from engineering to production
MAP TA PHUT POWER PLANTUSD 820M
GHECO-ONE(SUEZ)
Scope : coal-fired power 700mw DOOSAN HEAVY has won the contract against Alstom & Siemens
SHUHEIHAT S2 IWPP PROJECT(Desalination Package) USD 800 M
Scope : capacity of 100 millions g/dGDF SUEZ has won the IWPP Project, its named epc contractor for the desalination plant is DOOSAN HEAVY
The Integrated Gasification Combined Cycle Power plant (300mw) will be converting 2600 tonnes per day of coal into powerSHELL has signed the coal gasification and gas treatment license constract with Kowepo. DOOSAN is the named FEED and EPC contractor
JEDDAH DESALINATION EXPANSION PHASE 3 - USD 293 M
The plant, using reverse osmosis technology, will have a production capacity of 240,000 cubic meters per day. DOOSAN HEAVY will carry out the contract with the local WETICO
RAIPUR-CHHATTISGARH COAL FIRED POWER PLANT - USD 1B
Scope : 1370mwDOOSAN's contract covers the engineering, procurement & construction for the whole project
AIN SOKHNA POWER PLANTUSD 330M
Scope : 2x650mwDOOSAN has won a USD 330M for the supply & equipment of the plant (boilers). Civil works still to be awarded.
KONIAMBO POWER PLANTUSD 120M
Scope : 270mwthe plant will serve the nickel mine project
MOSTOROD REFINERYUSD 1, 8 BILLION
150,000b/dturnkey contract awarded to a consortium including MITSUI and GS ENGINEERINGMay 2009 : Project halted due to financing, both EPC contractors have been offered a 30% share in the project, negotiations with Export Import Bank of South Korea and JBIC/JAPAN expected to be closed in October 2009 enabling work to start early 2010.Project to be commissioned in 2013 instead of 2011February 2010, financing will be in place during the second quarter of 2010, commissioning now in 2014April 2010 : Financing close in July 2010, work will start shortly after - some long lead items have already been bought
MAP TA PHUT LNG REGASIFICATION TERMINAL - USD 540 M
A consortium led by GS ENGINEERING & CONSTRUCTION, including DAEWOO ENGINEERING, KOREA GAS CORP and HANYANG CORP has won the contract, work to start in February 2008
MANIFA PROJECT (Gas Processing Package) - USD 501 M
The gas plant will have the capacity to produce 90 million cf/d of gas and 66,400b/d of sour condensate - package 4 of the Manifa ProjectCommissioning deferred to 2013 instead of 2011
YEOSU DESULFURIZATION UNITUSD 562 M
the unit will produce 113,000b/d of cleaner burning fuels Commissioning in December 2010
KARAN GAS PROJECT(sulfur recovery unit)
Scope : 640t/dGS Engineering has still to confirm the contract announced by Aramco
TOMBAK LIQUEFACTION PLANTUSD 1 BILLION
Scope : capacity of 10,8 Million t/y (two trains 5,4 Mmt/y)GS E&C will carry out the contract with the local PIDECO
IGD PROJECT (RUWAIS 4th NGL TRAIN) - USD 2,1 BILLION
The facility will produce 4761t/d of ethane, 7657t/d of propane, 9364t/d of butane, 5546t/d of paraffinic naphtha and 6712t/d of condensate return.Contract won in association with PETROFAC
35 / 73
FIRM PROJECTS AWARDED TO ASIAN COMPANIES
Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
October 2009 GS ENGINEERING SOUTH KOREA IRAN PARS OIL & GAS CY
November 2009 GS ENGINEERING SOUTH KOREA ABU DHABI TAKREER
November 2009 GS ENGINEERING SOUTH KOREA ABU DHABI TAKREER
December 2009 GS ENGINEERING SOUTH KOREA OMAN PDO
January 2010 GS ENGINEERING SOUTH KOREA SOUTH KOREA KHNP
May 2010 GS ENGINEERING SOUTH KOREA OMAN GDF SUEZ
November 2008 HANWHA E&C SOUTH KOREA ALGERIA NAFTEC
July 2009 HANWHA E&C SOUTH KOREA SAUDI ARABIA MARAFIQ
September 2009 HANWHA E&C SOUTH KOREA JORDAN SAMRA ELECTRIC POWER GY
March 2007 HYUNDAI SOUTH KOREA LIBYA GECOL
October 2007 HYUNDAI SOUTH KOREA LIBYA GECOL
November 2007 HYUNDAI SOUTH KOREA QATAR QAFCO
December 2007 HYUNDAI SOUTH KOREA SAUDI ARABIA ARABIAN AMINES CY
ASSALUYEH GAS SWEETENING PLANT - USD 1,4 Billion
The plant will be able to process 3,900 million cf/d of gas from South Pars 6-7-8. GE E&C's scope include the overall construction process from designing to purchasing construction materials, building and test running. Work to start in November. Contract won in association with the local IRANIAN INTERNATIONAL GENERAL CONTRACTOR
RUWAIS REFINERY (RFFC Package)USD 3,11 B
Scope : residue fluidized catalytic cracking package (127,000b/d)work to start in December 2009 - Commissioning January 2014In June 2010 Target Engineering won a USD 115M subcontract for civil works, steel structures, piping works
RUWAIS REFINERY (Marine Facilities Package ) - USD 524M
Scope : a jetty, marine loading arms, main export pipeline, a fire water pump house - Contract value USD 524M
SAIH NIHAYDA GAS COMPRESSION PROJECT - USD 220M
Scope : installation of 3 gas compressor units supplied by GE OIL & GAS, air coolers, separators and auxiliary works.Epc lump sum turnkey contract - work to take 43 months to complete
INCHEON TIDAL POWER PLANTUSD 3,4 B
the tidal power plant will have a capacity of 1,32 million KW/hwork will start in the second half of 2011 for commissioning in 2017project still waiting for approvals from regulators
BARKA 3 / SOHAR 2 IPP PROJECTSUSD 1,7 B
In May 2010 GDF SUEZ has been awarded the contract for the construction & operation of the two gas-fired power plants, each with a capacity of 744MW. GDF has a 46% stake and is leader of a consortium including the japanese SOJITZ and SHIKOKU and local companies.Named EPC contractors are GS ENGINEERING/SOUTH KOREA and SIEMENS/GERMANY
ARZEW REFINERY UPGRADINGUSD 405 M
The capacity of the refinery will be boosted from 60,000b/d to 90,000b/d + rehabilitation of existing units to meet Euro IV normscontract signed with a consortium led by HYUNDAI ENGINEERING and including HANWHA E&C and DAEWOO
YANBU POWER PLANT EXPANSIONPHASES 5 & 6 - USD 720 M
The project will add 2x250mwHANWHA selected as EPC contractor, Doosan Heavy Industries and Siemens are subcontractors for the supply of turbines/generators and other parts needed for the expansion
SAMRA POWER PLANT EXPANSION PHASE 3 - USD 193M
The project involves two gas turbine stations with a total generating capacity of 286mw,, increasing the total capacity to 900mwIn October 09, ALSTOM won the contract for two gas turbines, generators and auxiliaries, contract value : € 100m
TRIPOLI WEST POWER PLANT EXPANSION PHASE 2
Scope : 4x350mwGecol has selected Hyundai to install the turbines and carry out the electromechanical works, Doosan Heavy to install the boiler, Daewoo Engineering to do civil works and Archirodon/Greece for the offshore works - Financing still to be settled HYUNDAI has been officially awarded the contract in october 2007DAEWOO pulls out of the project in March 2009, financing still not settled
AL KHALIJ POWER PLANTUSD 650 M
Scope 4x350mwHDEC has won the turnkey contract
QAFCO-V EXPANSION PROJECTUSD 3,2 BILLION
Scope : two ammonia plants with a total production of 4600t/d and an urea plant with a capacity of 3850t/dSNAMPROGETTI with HYUNDAI have received the Letter of Intent in November 2007, work will start in January 2008 ; the project will also include upgrade of existing facilities
JUBAIL ETHYLENE AMINES PROJECTUSD 200 M
Scope : 27,000 tonnes/year - Products : ethylenediamine, diethylenetriamine, triethylenetramineARABIAN AMINES is a joint-venture between Zamil Group and Huntsman.Contract awarded to a consortium of HANWHA ENGINEERING and HYUNDAI ENGINEERING. JACOBS is the project management consultant and carried out the FEED for the outside battery limits, BURNS & McDONNELL ENGINEERING is the inside battery limits FEED contractor
36 / 73
FIRM PROJECTS AWARDED TO ASIAN COMPANIES
Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
December 2007 HYUNDAI SOUTH KOREA LIBYA GECOL
January 2008 HYUNDAI SOUTH KOREA PAKISTAN PARCO
April 2008 HYUNDAI SOUTH KOREA QATAR SUEZ/MITSUI
August 2008 HYUNDAI SOUTH KOREA BAHRAIN ADDUR IWPP (Power Package)
October 2008 HYUNDAI SOUTH KOREA SOUTH KOREA HYUNDAI OILBANK
November 2008 HYUNDAI SOUTH KOREA ALGERIA NAFTEC
February 2009 HYUNDAI SOUTH KOREA SAUDI ARABIA SAUDI ARAMCO
April 2009 HYUNDAI SOUTH KOREA SINGAPORE JTC CORP
May 2009 HYUNDAI SOUTH KOREA VIETNAM
July 2009 HYUNDAI SOUTH KOREA ABU DHABI GASCO
October 2009 HYUNDAI SOUTH KOREA QATAR QAFCO
December 2009 HYUNDAI SOUTH KOREA TURKMENISTAN TURKMENGAZ
March 2010 HYUNDAI SOUTH KOREA ABU DHABI KEPCO
May 2010 HYUNDAI SOUTH KOREA ABU DHABI
May 2010 HYUNDAI SOUTH KOREA ABU DHABI TAKREER
SARIR POWER PLANTUSD 540 M
Scope : 855mwHyundai's share of the contract is 250M USD, SIEMENS will supply three 285mw turbines
MAHMOOD KOT REFINERY DIESEL HDS UNIT - USD 132 M
Scope : a 26,000b/d diesel hydrodesulfurization unit.PARCO has signed an agreement with a consortium including the chinese CNCEC and the korean HYUNDAI ENGINEERING - Work will start in March
RAS LAFFAN C IWPP PROJECT(power package)
SUEZ/MITSUI has won the IWPP Project, agreement signed in March 2008. Scope : 2730mwHYUNDAI ENGINEERING & CONSTRUCTION has received the preliminary contract in April, formal contract to be signed in May, contract value USD 2,07 Billion. MHI/JAPAN will supply the turbines
SUEZ ENERGYGULF INVESTMENT CORP
Suez Energy with Gulf Investment Corp/Kuwait have won the IWPP. . HYUNDAI is the named EPC contractor for the power package (1234mw)
DAESAN REFINERY HEAVY OIL PROJECT - USD 582 M
Scope : the expansion will allow for conversion of high-sulfur fuel to higher value refining products : a 52,000b/d residue fluidized catalytic cracking and a 66,000b/d atmospheric residue desulfurization unit. Once completed the heavy fuel capacity will be raised to 116,000b/d from 64,000. In june 08 SHAW/USA was selected to provide FEED, project management and procurement of critical equipment
ARZEW REFINERY UPGRADINGUSD 405 M
The capacity of the refinery will be boosted from 60,000b/d to 90,000b/d + rehabilitation of existing units to meet Euro IV normscontract signed with a consortium led by HYUNDAI ENGINEERING and including HANWHA E&C and DAEWOO
KARAN GAS PROJECT(onshore portion ) USD 1,3 B
Scope : construction of a gas processing facility at Khursaniyah to accommodate around 1.8 billion standard cubic feet per day of high pressure sour gas from the offshore Karan field. consisting of gas handling, sweetening, dehydration, acid gas enrichment, and supplementary propane refrigeration + recovery of 900 tonnes a day of sulphur
JURONG OIL STORAGE PROJECTUSD 594 M
the first phase involves the construction of 5 caverns with a total capacity of 1n48 million cubic meters. Work to start by the end of the year
HAI PHONG POLYESTER PLANTUSD 250 M
PETROVIETNAMVINATEX DINH YU
Scope : capacity 500t/dEPC contract for HYUNDAI ENGINEERING - work duration 25 months
IGD PROJECT (HABSHAN 5 OFFSITES & UTILITIES)USD 1,7 BILLION
Scope : Offsites & Utilities Contract value : USD 1,7 Billion
QAFCO-VI EXPANSION PJTUSD 610 M
Scope : a urea unit 3850t/d + associated utilitiescontract awarded to the same consortium who is presently carrying out Qafco-V. Saipem in association with HYUNDAI
SOUTH YOLOTEN GAS PJT(gas processing) - USD 1,4 B
construction of a gas processing plant with a capacity of 10 Billion cubic meters a yearcontract won by a consortium HYUNDAI ENG / LG INTERNATIONAL
CONSTRUCTION OF FOUR NUCLEAR PLANTS - USD 5,59 B
In December 2009 KEPCO won the USD 20 B deal to build 4 nuclear plants with ENEC. KEPCO has awarded in March 2010 construction subcontracts to HYUNDAI ENGINEERING (USD 5,59B), SAMSUNG ENG (USD 2,52B) and KOPEC (USD 569M)
BOROUGE 3 PROJECT(O&U Package)USD 935M
BOROUGE(Adnoc/Borealis)
Scope : Offsites & Utilities (buildings, storage and basic processing facilities, seawater cooling systems....
RUWAIS BASE OIL FACILITIES PROJECT - USD 463M
Scope : the facility will be able to produce 500,000t/y of Group III base oils as well as 100,000 t/y of group II base oils. The project comprises a new pre-distillation, hydroisomerizatio and product distillation units, revamping of the existing hyrocracker units, new storage tanks and integration with existing facilities
37 / 73
FIRM PROJECTS AWARDED TO ASIAN COMPANIES
Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
June 2010 HYUNDAI SOUTH KOREA INDIA GVK GAUTAMI POWER
February 2008 HYUNDAI HEAVY IND SOUTH KOREA NIGERIA TOTAL/ELF PETROLEUM NIGERIA
March 2008 HYUNDAI HEAVY IND SOUTH KOREA AUSTRALIA NORTH WEST SHELF VENTURE
October 2008 HYUNDAI HEAVY IND SOUTH KOREA THAILAND PTT THAILAND
July 2009 HYUNDAI HEAVY IND SOUTH KOREA ABU DHABI ADGAS
August 2009 HYUNDAI HEAVY IND SOUTH KOREA KUWAIT MEW
October 2009 HYUNDAI HEAVY IND SOUTH KOREA AUSTRALIA CHEVRON/EXXONMOBIL/SHELL Scope : 48 modules weighing 190,000tonnes
November 2009 HYUNDAI HEAVY IND SOUTH KOREA MYANMAR DAEWOO INTERNATIONAL
February 2010 HYUNDAI HEAVY IND SOUTH KOREA NORWAY ENI
June 2010 HYUNDAI HEAVY IND SOUTH KOREA SAUDI ARABIA GDF SUEZ
July 2008 LOTTE E&C SOUTH KOREA JORDAN KEPCO/XENEL
March 2008 POSCO E&C SOUTH KOREA SALVADOR AES
GAUTAMI POWER PLANT EXPANSION PROJECTUSD 689M
Scope : combined cycle 800mwHYUNDAI ENGINEERING selected in association with L&T.
USAN FIELD DEVELOPMENT (FPSO PACKAGE)
The FPSO will have a processing capacity of 160,000b/d of oil and 175 MMcf/d of gas and will store about 2 million barrels of oilThe FPSO will be delivered in October 2011
NORTH RANKIN 2 PROJECTUSD 4,6 BILLION
Scope : a second offshore platform including gas compression facilities, utilities and new living quarters, the platform will be connected by a 100m ridge to the existing North Rankin A platform + tie-insHHI has won the USD 320M contract for the construction of the topsides. EOS, a joint-venture between KBR and WORLEYPARSONS has been awarded the detailed engineering & procurement services, PT McDERMOTT INDONESIA for the substructure, bridges & piles. HEEREMA MARINE CONTRACTORS the USD 110M contract for the transport & installation of the substructure
GREATER BONGKOT SOUTH GAS PROJECT (CPP)
The HHI's contract covers the construction of a fixed central processing platform weighing about 22,000 tonnes plus bridge links and a flare tower. The platform will feature a topsides weighing 17,000 tonnes and be anchored by a 5,000 tonne steel jacketIn January 2009 GUNANUSA/INDONESIA has won the third package of the project, covering a living quarters platform and a flare jacket
IGD PROJECT ( GAS ISLAND GAS PLANT ) - USD 1 BILLION
The plant will consist of 24 modules with a capacity of 283 millions cm/d of gas
SUBIYA POWER PLANTUSD 2,6 Billion
Scope : 2,000mw combined cycle HHI has won the contract with GE/USA. HHI will carry out the engineering, procurement & construction, GE will supply 3 combined-cycle power blocks, including six Frame 9FA gas turbines, three steam turbines, nine generators and a turbine and plant level control protection system. GE will also operate and maintain the plant for seven years
GORGON LNG PJT (LNG MODULES)USD 2,06 B
SHWE GAS PROJECTUSD 1,4 BILLION
HHI's turnkey contract covers a 40,000 ton offshore gas platform, a subsea production system, subsea pipelines and an onshore gas terminalthe gas platform will produce 500 million cf/d of gas in March 2013contract officially signed in February 2010
GOLIAT FIELD DEVELOPMENT (FPSO PACKAGE) - USD 1,1 BILLION
HHI has won the contract for the Floating Production Storage and Offloading unit, designed done by Sevan MarineHHI has awarded the USD 50M contract to CB&I to provide detailed engineering for topsides The FPSO will produce 100,000b/d of crude oil and 3,9 million cubic meters of gas per day and will be able to store 1 million barrels of oil
RIYADH PP9 POWER PLANTUSD 1,6 BILLION
Scope : 1730mwGDF SUEZ has signed the agreement with SEC to build and operate the power plant in association with SOJITZ/JAPAN and AL JOMAIH.HYUNDAI HEAVY INDUSTRIES is the named EPC contractor
AL QATRANA INDEPENDENT POWER PROJECT - USD 500 M
The korean KEPCO with XENEL INDUSTRIES selected as preferred bidder for the 373mw project, a formal contract will be signed in May 09, its named epc contractor is LOTTE ENGINEERING & CONSTRUCTION, project to be partially financed by Eximbank/Korea and World Bank
CONSTRUCTION OF A COAL-FIRED POWER PLANT - USD 500M
Scope : 260mwPOSCO E&C has signed the EPC contract, work will start in July 2008 for commissioning in september 2011
38 / 73
FIRM PROJECTS AWARDED TO ASIAN COMPANIES
Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
April 2008 POSCO E&C SOUTH KOREA CHILE AES GENER
October 2009 POSCO E&C SOUTH KOREA PERU KALIPA GENERACION
February 2007 SAMSUNG SOUTH KOREA SINGAPORE ISLAND POWER CY PTE
August 2007 SAMSUNG SOUTH KOREA SINGAPORE TEMASEK
March 2008 SAMSUNG SOUTH KOREA MEXICO CFE
June 2008 SAMSUNG SOUTH KOREA SOUTH KOREA S-OIL
July 2008 SAMSUNG SOUTH KOREA ABU DHABI GDF SUEZ
August 2008 SAMSUNG SOUTH KOREA BAHRAIN BAPCO / NESTE
December 2008 SAMSUNG SOUTH KOREA INDIA
January 2009 SAMSUNG SOUTH KOREA VIETNAM VUNG TAE CO2 RECOVERY UNIT PETROVIETNAM
May 2009 SAMSUNG SOUTH KOREA ALGERIA SONATRACH
June 2009 SAMSUNG SOUTH KOREA AUSTRALIA
July 2009 SAMSUNG SOUTH KOREA SAUDI ARABIA
CONSTRUCTION OF TWO POWER PLANTS - USD 1310M
POSCO E&C has won two contracts : - the Angamos coal-fired power plant in Antofagasta : 520mw, contract value USD 870M- the Campiche coal-fired power plant at Ventanas : 270mw, contract value USD 440MIn may 2008 ANSALDO won the € 75M contract from POSCO to supply the steam turbines and generators
CHILCA POWER PLANT CONVERSION - USD 350M
The plant will be converted into a combined cycle with an annual generating capacity of 830mw. Contract won against Siemens & Abengoa
JURONG ISLAND POWER PLANTUSD 651 M
Scope : 785mw - Island Power Cy Pte is an INTERGEN's affiliatethe contract has been awarded to a consortium of SIEMENS and SAMSUNG, financing will be secured during the first quarter of 2007Official contract signed early July 07, SAMSUNG will perform integration of the steam turbine generators and will supply main & auxiliary systems and perform civil and assembly work
PULAU SERAYA COMBINED CYCLE POWER PLANT - USD 680 M
Scope : 800mw and 300 tons of steam per hourContract won in association with SIEMENS who will supply two steam turbines, the heat recovery steam generators, the electrical, instrumentation and control equipmentSAMSUNG's share of the contract : USD 190M
MANZANILLO LNG PLANTUSD 900 M
Scope : two LNG tanks, a regasification facility (500MMcf/d) , and a pierCFE has awarded the contract to build and operate the plant to consortium Terminal KMS de GNL including KOREA GAS, MITSUI/J, SAMSUNG. The EPC works will be carried out by SAMSUNG E&CIn August 2008 SAMSUNG confirmed the award of the turnkey contract
ONSAN AROMATICS COMPLEXUSD 974 M
Scope : a 900,000t/y paraxylene unit and a 280,000t/y benzene unitSAMSUNG has received the Letter of intent in June 08
SHUHEIHAT S2 IWPP PROJECT(Power Package) USD 820 M
Scope : 1500mwGDF SUEZ has been awarded the IWPP Project, its named EPC contractor is SAMSUNGSAMSUNG will carry out the EPC contract in partnership with SIEMENSWork to start in December
SITRA BASE LUBE OIL PLANTUSD 314 M
Scope : capacity of 400,000t/y of lube oillumpsum turnkey contract for Samsung - Commissioning in April 2011
DAHEJ PETROCHEMICAL PLANT(ETHYLENE PACKAGE)USD 1,43 BILLION
OPAL(ONGC PETRO ADDITIONS)
Scope : capacity of 1,1 Million t/y of ethylene and 340,000t/y of propylenecontract awarded to a consortium of LINDE/GERMANY and SAMSUNGLINDE's share of the contract is EUROS 350M, they will be responsible for the technology, the basic engineering and the supply of critical componentsSAMSUNG's share of the contract is USD 960M, covering the detail engineering, the supply of the remaining components, the construction and assembly
Scope : capacity of 250t/d based on MHI processEngineering, procurement, construction & commissioning contract for Samsung
SKIKDA REFINERY UPGRADINGUSD 2,6 BILLION
the refinery's capacity will be boosted from 15 Million t/y to 16,6 Million t/yrehabilitation & modernization + nex units (isomerization, paraxylene, benzene)SAMSUNG ENGINEERING has won the EPC contract, commissioning expected during the second half of 2012
COLLIE UREA PLANTUSD 2,8 BILLION
PERDAMAN CHEMICALS & FERTILISERS
Scope : capacity of 2 million t/y of ureaSAMSUNG ENGINEERING selected as lead contractor for the epc contract in association with IKPT/INDONESIAconstruction work to start in 2010
JUBAIL REFINERY(SATORP PJT)PACK-3 - AromaticsUSD 700M
SAUDI ARAMCOTOTAL
Scope : paraxylene 700,000t/y - Benzene 140,000t/y - 200,000t/y Polymer Grade Propylene
39 / 73
FIRM PROJECTS AWARDED TO ASIAN COMPANIES
Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
July 2009 SAMSUNG SOUTH KOREA SAUDI ARABIA
July 2009 SAMSUNG SOUTH KOREA SAUDI ARABIA NATIONAL INDUSTRIAL GASES CY
October 2009 SAMSUNG SOUTH KOREA ABU DHABI FERTIL
November 2009 SAMSUNG SOUTH KOREA ABU DHABI TAKREER
November 2009 SAMSUNG SOUTH KOREA TRINIDAD&TOBAGO PETROTRIN
February 2010 SAMSUNG SOUTH KOREA SINGAPORE SINGAPORE LNG CORP
March 2010 SAMSUNG SOUTH KOREA ABU DHABI KEPCO
April 2010 SAMSUNG SOUTH KOREA ABU DHABI ADNOC
May 2010 SAMSUNG SOUTH KOREA ABU DHABI
May 2010 SAMSUNG SOUTH KOREA ABU DHABI
February 2007 SAMSUNG HEAVY SOUTH KOREA NORWAY BP NORGE
September 2008 SAMSUNG HEAVY SOUTH KOREA NIGERIA FLEX LNG
JUBAIL REFINERY(SATORP PJT)PACK-4 - Coker - USD 900M
SAUDI ARAMCOTOTAL
Scope : Coker Unit capacity 100,000b/donshore work will be performed by Chiyoda Petrostar as leader and Samsung Saudi ArabiaIn January 2010, NESMA & PARTNERS has been awarded the subcontract for civil works, structural steel, mechanical, piping erection, instrumentation, insulation....
JUBAIL AIR SEPARATION UNITUSD 300M
Scope : the plant will produce gaseous oxygen (3550t/d), nitrogen (3600t/d), and argon (150t/d)Samsung will execute the licensing, engineering, procurement and construction under a lump sum turnkey contract
RUWAIS FERTILIZER PLANT EXPANSION - USD 1,2 B
Scope : a 2,000t/d ammonia unit - a 3500t/d urea unitSAMSUNG has won the contract on a lump sum turnkey basis in partnership with UHDE/GERMANY
TAKREER REFINERY (O&U Package)USD 2,7,B
Scope : offsites & utilities including a sour water stripper, wastewater treatment facilities, nitrogen production units, steam generation units, steam condensate recovery unit - Contract still to be confirmed
POINTE A PIERRE ULSD PROJECTUSD 220M
Scope : a 40,000b/d Ultra Low Sulphur Diesel Unitlump sum turnkey contract for Samsung Engg
JURONG LNG TERMINALUSD 628M
scope : initial capacity of 3,5 Million t/ySLNG has selected SAMSUNG as EPC contractor, FLUOR could be involvedFOSTER WHEELER ASIA PACIFIC has been appointed Project Management ConsultantFLUOR selected by SAMSUNG in February 2010 to provide engineering and related management services, contract to be executed by Fluor in Singapore, Manilla and Houston
CONSTRUCTION OF FOUR NUCLEAR PLANTS - USD 5,59 B
In December 2009 KEPCO won the USD 20 B deal to build 4 nuclear plants with ENEC. KEPCO has awarded in March 2010 construction subcontracts to HYUNDAI ENGINEERING (USD 5,59B), SAMSUNG ENG (USD 2,52B) and KOPEC (USD 569M)
SHAH GAS PROJECT (Offsites & Utilities) - USD 1,5 Billion
The project will treat 1 Billion cubic feet a day of sour gasEngineering, Procurement & Construction of the Offsites & utilities
BOROUGE 3 PROJECT(POLYOLEFINS PACKAGE)USD 1,255 B
BOROUGE(Adnoc/Borealis)
Scope : two polyethylene units, each with a capacity of 540,000t/y and two polypropylene units, each with a capacity of 480,000t/y - BORSTAR technology - Contract won in association with SAMSUNG. TECNIMONT leader of the consortium, its share of the contract is USD 910M for the two packages (see hereunder)
BOROUGE 3 PROJECT(LDPE Package) - USD 400M
BOROUGE(Adnoc/Borealis)
Scope : a low density polyethylene unit with a capacity of 350,000t/y - LyondellBasell technology Contract won in association with SAMSUNG. TECNIMONT leader of the consortium, its share of the contract is USD 910M for the two packages (see above)
SKARV FPSOUSD 690 M
SHI has won the contract to supply BP with a FPSO which will be able to produce 90,000b/d of oilOfficial award made in July 2007In September 2007 AKER KVAERNER has been awarded the engineering, procurement and construction management assistance contract for the 16,000 tonnes topsides, contract value USD 360M
BILABRI, OWANERI, OROBIRI GAS PJT (LNG-FPSO)
the LNG-FPSO will have a capacity of 1,7 million tons of LNG and a storage capacity of 170,000m3 of LNG and 50,000m3 of condensate
40 / 73
FIRM PROJECTS AWARDED TO ASIAN COMPANIES
Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
October 2007 SK ENGINEERING SOUTH KOREA SINGAPORE JURONG AROMATICS CORP
April 2008 SK ENGINEERING SOUTH KOREA SOUTH KOREA SK ENERGY
August 2008 SK ENGINEERING SOUTH KOREA AUSTRALIA
December 2008 SK ENGINEERING SOUTH KOREA ECUADOR PETROECUADOR
March 2009 SK ENGINEERING SOUTH KOREA ABU DHABI ADCO
July 2009 SK ENGINEERING SOUTH KOREA SAUDI ARABIA contract value USD 420M covering plant utilities (water, power, steam…)
July 2009 SK ENGINEERING SOUTH KOREA MALAYSIA MERAPOH RESOURCES
August 2009 SK ENGINEERING SOUTH KOREA THAILAND PTTAR
November 2009 SK ENGINEERING SOUTH KOREA ABU DHABI TAKREER
December 2009 SK ENGINEERING SOUTH KOREA KUWAIT KOC
January 2010 SK ENGINEERING SOUTH KOREA ECUADOR
June 2010 TOYO SOUTH KOREA SOUTH KOREA DAESAN NCC REVAMPING PROJECT
September 2009 CTCI TAIWAN SAUDI ARABIA
July 2009 CTCI TAIWAN INDIA PETRONET LNG
JURONG AROMATICS PROJECTUSD 2 BILLION
JAC partners include Glencore, SK Energy, Noor/Kuwaitscope : 800,000t/y paraxylene, 200,000t/y orthoxylene, 450,000t/y of benzene and 2,5 million tonnes of oil productsSK ENG & CONSTRUCTION has been awarded the lumpsum turnkey contract - UOP will supply the technology In February 09, project postponed due to problems in securing the financing, financing expected to be closed by mid-2009 In May 09, project once more delayed, financing to be secured during the second half of the year, enabling work to start early 2010.
INCHEON HYDROCRACKERUSD 1,52 Billion
Scope : capacity of 40,000b/dwork to start in June 08, epc to be carried out by SK E&C
FISHERMAN's LANDING LNG PROJECT
LNG LtdGladstone LNG Pty Ltd
Scope : capacity of 1,5 million t/ySKEC signed in August 08 an engineering & construction service contract with LNG Ltd, the korean will form a joint-venture with Laing O'Rourke to enter into an EPC contract in December 2008
ESMERALDAS REFINERY REHABILITATION & MODERNIZATION USD 187 M
The project will boost the capacity of the refinery by 20%, to 100,000b/dcontract signed on December 29, work to start immediately
BAB GAS COMPRESSION PROJECTUSD 805 M
scope : intallation of 3 gas compressor units at the field, part of Bab field expansion project. Work will also involve flare & pig launchers, trunk lines and a 25km tie-in with habshan fieldfeed done by Technip.
JUBAIL REFINERY(Satorp Project)Pack 5B - Plant Utilities
SAUDI ARAMCOTOTAL
SUNGAI LIMAU REFINERY (KEDAH STATE)
Scope 350,000b/dSKEC selected as EPC contractor, work to start by the end of 2009. The chinese CNPC will take a share in the project
MAP TA PHUT REFINERY CLEAN FUELS PROJECT
Scope : a diesel desulphurisation unit that will produce 85,700b/d of diesel with sulphur below 10 ppmSKEC signed the contract in association with the local Thai Woo Ree Engineering Co Ltd
RUWAIS REFINERY (CDU Package)USD 2,11 B
Scope : package one : crude distillation unit & associated downstream unitsCommissioning in 2014 - the refinery will be built alongside the existing one, capacity 400,000b/d
GAS BOOSTER 132 ProjectUSD 724M
Scope : a gas booster station with a capacity of 250 Million cf/d, compressors, gathering centers and pipeline network between the GCs and the boosting station. Work to start in January 2010
REFINERIA DEL PACIFICOUSD 10 B
PETROECUADORPDVSA
Scope : 300,000b/dAfter having been selected to carry out the study, The Ministry announced in January 2010 that SKEC will carry out the EPC contract. However financing has still to be set up. In March 2010 SKEC signed a USD 260M contract to undertake basic engineering
SAMSUNG TOTAL PETROCHEMICALS
Scope : revamping of the Naphtha Cracking Center which will expand the capacity of ethylene from 840,000t/y to 940,000t/y and propylene from 550,000t/y to 600,00t/y - Commissioning in December 2011
JUBAIL REFINERY(Satorp Project)Pack 5A - Offsites & Utilities
SAUDI ARAMCOTOTAL
Scope : Offsites & Utilities (interconnection, process control..)contract awarded to Technip with CTCI, estimated contract value : USD 1,3 BCTCI confirmed the contract award in Sept 09, in charge of engineering & procurement services for Flare and Cooling Water Systems
KOCHI LNG TERMINAL(liquefaction facilities)
Capacity 2,5 Million t/yCTCI has signed the contract in August on a lump-sum basis, the storage tanks are being built by IHI. WHESSOE is the Project Manager.
41 / 73
FIRM PROJECTS AWARDED TO ASIAN COMPANIES
Award Date Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
August 2009 CTCI TAIWAN TAIWAN LIN YUAN NAPHTHA CRACKER 6 CPC
January 2010 CTCI TAIWAN SAUDI ARABIA JUBAIL AMINES COMPLEX SAUDI KAYAN
December 2008 FOSTER WHEELER THAILAND THAILAND MTP HPPO MANUFACTURING
October 2009 THAI NIPPON STEEL THAILAND MYANMAR PETRONAS CARIGALI
June 2008 TOYO THAI THAILAND THAILAND MAP TA PHUT PHENOL PLANT PTT PHENOL CY
September 2008 TOYO THAI THAILAND THAILAND SOLVAY
November 2008 TOYO THAI THAILAND THAILAND
May 2009 TOYO THAI THAILAND THAILAND VARIOUS CUSTOMERS
April 2009 LILAMA GROUP VIETNAM VIETNAM PETROVIETNAM
CTCI will provide the engineering, procurement and consortium services for the 720,000t/y (CB&I Lummus technology)CB&I LUMMUS has been awarded a USD 40M subcontract from CTCI to supply eight heaters
Scope : 210,000t/ySamsung terminated the contract awarded in 2007, a new tender was issued by Saudi Kayan with CTCI selected in January 2010
MAP TA PHUT PROPYLENE OXIDE PLANT
Scope : capacity of 390,000t/yFW's contract covers the engineering, procurement & construction management of the facility + the power, utilities & infrastructuresthe client is a subsidiary of Siam Styrene Monomer Cy, a JV between Dow Chemical and Siam Cement Group
YETAGUN COMPRESSION PLATFORM
the topsides of the platform will be built in Thailand, the steel kacket in Indonesia (Batam). The contract includes also tie-in & modification work on existing platform
Scope : capacity of 150,000t/y based on Mitsubishi TechnologyToyo Thai's contract includes detailed engineering, procurement of equipment & materials and construction on a lump-sum turnkey basis
MAP TA PHUT EPICHLOROHYDRIN PLANT
Scope : capacity of 100,000t/y based on Solvay technologyTOYO THAI has received the Letter of Intent for the engineering, procurement service and construction management
MAP TA PHUT HYDROGEN PEROXIDE PLANT
MTP HPSOLVAY
Scope : 2 units - total capacity 330,000t/yMTP HP is a joint venture between Dow Chemical & Solvay
3 EPC CONTRACTS USD 58 M
for Ube Industries : a 1,6 hexanediol plantfor AGC Chemicals : a chlor-alkali project to produce caustic soda and chlorinefor PTT : a Lube Base Oil Pilot-Scale Production Unit EPC contracts for TTCL - Commissioning in 2010 & 2011
VUNG ANH 1 & NHON TRACH 2 POWER PLANTS - USD 1,65 B
The Vung Ang 1 will have a capacity of 1200mw, to be delivered in two phases, the first 600mw in april 2012, the second 600mw in march 2013 The Nhon Trach 2 will have a capacity of 750mw, work is starting in April commissioning within 30 monthsJuly 2009 : Vung Ang : TOSHIBA/JAPAN will supply the steam turbines, BABCOCK & WILCOX BEEIJING CY has the USD 180M contract to supply two 600mw boilers
42 / 73
FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES
Award date Contractor Project Name End User Scope / Situation
August 2008 SIEMENS AUSTRIA AUSTRIA
November 2009 POERNER AUSTRIA MOROCCO SAMIR
June 2009 SKODA PRAHA CZECH REPUBLIC CZECH REPUBLIC CEZ
May 2010 HALDOR TOPSOE DENMARK INDIA TATA CHEMICALS
June 2008 NESTE JACOBS FINLAND FINLAND NESTE OIL
January 2009 OUTOTEC FINLAND CHILE NORACID
March 2010 WARTSILA FINLAND CAMEROON KRIBI POWER DEVLPT CY
May 2010 WARTSILA FINLAND BRAZIL ENERGETICA SUAPE II
December 2007 ACERGY FRANCE ANGOLA TOTAL
December 2008 ACERGY FRANCE ANGOLA ANGOLA LNG
March 2009 ACERGY FRANCE MALAYSIA SABAH SHELL PETROLEUM
May 2009 ACERGY FRANCE NIGERIA MOBIL PRODUCING NIGERIA
September 2009 ACERGY FRANCE ANGOLA TOTAL E&P ANGOLA
October 2009 ACERGY FRANCE NIGERIA CHEVRON NIGERIA
May 2010 ACERGY FRANCE NIGERIA EXXONMOBIL
Contractor's nationality
Final Destination
MELLACH COMBINED CYCLE POWER PLANT - USD 826M
VERBUND AUSTRIAN THERMAL POWER GmbH
Scope : 800mw SIEMENS AUSTRIA is the main contractor, the austrian AE&E will supply the aste heat boilers - Work will start early 2009
MOHAMMEDIA REFINERY BITUMEN UNIT - USD 31M
Scope : a 270,000t/y bitumen plant + two tanks each with capacity of 5,500 cubic metersafter having carried out the engineering, POERNER will act as general contractor on a lump sum tunrkey basis
POCERADY POWER PLANTUSD 1 BILLION
Scope : 841mwCEZ has signed the construction contract with Skoda Praha, gas turbines to be supplied by SIEMENS/GERMANY
BABRALA FERTILIZER PLANT EXPANSION (ammonia package)
Scope : 2,200t/d Haldor Topsoe selected as technology supplier and EPCM contractor
PORVOO ISOMERISATION UNITUSD 120 M
the unit will be able to process 600,000t/y of existing gasoline fractions into higher value, premium-quality gasoline, it wil increase the total gasoline ouput by 200,000t/y - Work will start in 2009
MEJILLONES SULFURIC ACID PLANT - USD 40 M
Scope : capacity of 600,000t/yOUTOTEC's scope of contract covers engineering, process equipment and supervisory services
KRIBI POWER PLANTUSD 175M
Scope : 216mwWARTSILA, selected in November 2009, signed the contract in March 2010 - Turnkey contract - Commissioning end of 2011 - financing in place
CABO POWER PLANTUSD 250 M
Scope : 380mwturnkey contract for Wartsila - Energetica Suape II is owned by CIBE PARTICIPACAO & PETROBRAS
PAZFLOR PROJECT (SUBSEA PACKAGE) - USD 1,8 B
Pazflor involves 4 fields : Perpetua, Hortensia, Zinia and AcaciaACERGY's share is USD 700M, work will involve 55km of water injection rigid flowlines, gas injection and gas export lines, umbilicals & jumpers and installation of manifolds, 3 subsea sepration units with associated umbilicals and the FPSO mooring lines. Fabrication in Angola - Technip's share of the contract is USD 1,1 Billion
PIPELINE NETWORK FOR SOYO LNG - USD 550 M
ANGOLA LNG has awarded the contract to SPIE CAPAG and ACERGYACERGY's share of the contract is USD 250M. Scope : engineering, procurement, fabrication and installation of approx 50km of pipelines, including the shore approach and above water tie-Ins toghether with the offshore crossing
GUMUSUT-KAKAP FIELD DEVLPTUSD 825 M
Scope : engineering, procurement, transportation & installation of : - flowlines, jumpers, steel catenary risers, pipeline end terminations anf flowline inline structures - an oil export pipeline and catenary riser - mooring wires, chain & piles for a semi-submersible floating production system. Contract won in association with Sapuracrest
REVAMPING OF 3 WELLHEAD PLATFORMS - USD 190M
The wellhead platforms are located in water depths of 35mthe contract includes an option for 5 further platformsengineering & work to start immediately, engineering support to be provided by Glocal Oceon Engineers Nigeria Ltd
BLOCK 17/18 GEP Phase 2USD 110M
Acergy's contract covers the installationn of 70km 24" pipeline rom block 2, together with associate"d jumper, PLET and tie-ins, to the Neashore/onshore pipeline
ESCRAVOS GAS DEVELOPTUSD 500 M
Acergy's contract covers the procurement & installation of 130km of pipelines, the fabrication & installation of 15 risers and 3 subsea tie-ins and the installation of 40 crossings
OFFSHORE INSTALLATION WORK AT OSO - USD 120M
Scope : removal of existing risers, intallation of 15km of new pipelines and associated risers together with associated diving and hook-up activities
43 / 73
FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES
Award date Contractor Project Name End User Scope / SituationContractor's nationality
Final Destination
May 2010 AIR LIQUIDE FRANCE QATAR RASGAS
February 2007 ALSTOM FRANCE UK PEMBROKE POWER PLANT RWE NPOWER
June 2007 ALSTOM FRANCE FUJAIRAH FUJAIRAH II POWER PROJECT
November 2007 ALSTOM FRANCE SOUTH AFRICA ESKOM
November 2007 ALSTOM FRANCE ALGERIA SONELGAZ
January 2008 ALSTOM FRANCE NETHERLANDS ELECTRABEL NEDERLAND
February 2008 ALSTOM FRANCE SOUTH AFRICA ESKOM
April 2008 ALSTOM FRANCE TUNISIA STEG
April 2008 ALSTOM FRANCE GERMANY RWE
May 2008 ALSTOM FRANCE UK DRAX GROUP
RAS LAFFAN HELIUM PLANTUSD 200M
Project called Qatar Helium II - Turnkey contract for the construction of the Helium extraction, purification and liquefaction unit, production of 38 million m3 per year.CHIYODA AL MANA ENGINEERING will provide epc management services, responsible for construction the extraction units that will feed the Helium facility
The plant will deliver up to 2000mw, ALSTOM selected by RWE as EPC contractorThe project has received approval from the British Government in February 2009, work will start soon April 09 : contract officially signed by Alstom for a value of € 1 Billion
INTERNATIONAL POWERMARUBENI
Scope : 2000mwINTERNATIONAL POWER and MARUBENI have been selected as preferred bidder. Their nominated EPC contractor for the power plant is ALSTOM. The financial close is expected in october 2007.
MEDUPI POWER STATIONUSD 4,9 Billion
Scope 4800mw (6x800mw)ALSTOM has been selected to provide the steam turbines, turbogenerators, turbine island auxiliary equipment & associated erection services, contract value € 1,4 Billion. The steam generators will be supplied by Hitachi Power EuropeIn May 2008, Eskom has awarded the civil works subcontract (USD 383,9M) to the local MURRAY & ROBERTS, GRINAKER-LTA and CONCO
TERGA/AIN TEMOUCHENT POWER PLANT - USD 1,97 B
Scope : 1200mwALSTOM in association with ORASCOM/EGYPT has won the construction contractIn November 08, ALSTOM signed the € 317M long-term maintenance contract (20 years)
LELYSTAD FLEVOCENTRALE PROJECTUSD 592 M
Scope : 870mw Alstom will design and built the fully plant and will provide the main components including two GT26 gas turbines and associated equipment
BRAVO POWER STATIONUSD 4 Billion
Scope : 4750mw (6x790mw)ALSTOM has signed a USD 1,36 Billion (supply of steam turbines & turbo-generator package),HITACHI POWER SOUTH AFRICA has won the USD 2,5 B contract for the boilers package - Commissioning between 2013 & 2017In may 2008 BLACK&VEATCH announced that they will provide project management & engineering services for the project In december 2008 ESKOM has awarded a USD 283M contract for civil works to a consortium of local companies led by Stefanutti Stocks, including Group Five, Basil Read and WBHO Construction
GHANNOUCH POWER PLANTUSD 540 M
Scope : 400mwAlstom has been selected against Siemens
HAMM POWER PLANTUSD 750 M
capacity 1600mwALSTOM has won the contract (Euros 500M) to supply the boilers for the two units and to complete all auxiliary equipment including erection and commissioning - ALPINE/AUSTRIA will carry out foundations and civil works
DRAX BIOMASS PROCESSING FACILITYUSD 94,5M
ALSTOM will build the main processing works associated with the 1,5 million t/y biomass co-firing facility to be constructed at the 4,000mw power station in North Yorkshire. The processing works will receive, handle, store and process various biomass materials ready for direct injection into the coal-fired boiler. Work itself to start during the second half of the year
44 / 73
FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES
Award date Contractor Project Name End User Scope / SituationContractor's nationality
Final Destination
June 2008 ALSTOM FRANCE NETHERLANDS ESSENT
July 2008 ALSTOM FRANCE SAUDI ARABIA SEC
August 2008 ALSTOM FRANCE SPAIN HC ENERGIA
August 2008 ALSTOM FRANCE INDONESIA PT PLN
November 2009 ALSTOM FRANCE GERMANY GROSSKRAFTWERK MANNHEIM AG
December 2009 ALSTOM FRANCE SLOVENIA TERMOELEKTRAMA SOSTANJ
August 2008 DEGREMONT FRANCE BAHRAIN
July 2009 DEGREMONT FRANCE AUSTRALIA VICTORIA GOVERNMENT
July 2007 ENTREPOSE FRANCE NETHERLANDS GATE LNG TERMINAL
May 2008 ENTREPOSE FRANCE SOUTH AFRICA TRANSNEFT
July 2008 ENTREPOSE FRANCE ALGERIA SONATRACH
July 2008 ENTREPOSE FRANCE NIGERIA WAGPCo
CLAUS POWER PLANT EXPANSION - USD 1 BILLION
repowering of Claus B and the construction of Claus C located at Maasbracht, resulting in a 1,280 MW GT26-based combined-cycle power plant. The contract include a long-term operation support and maintenance agreementALSTOM received the Full Notice to Proceed in December 08
SHOAIBA POWER PLANT PHASE III - USD 2,85 B
Scope : 1200mwthis new phase will bring the total output to 5600mw - Like for the previous phases, ALSTOM will work with SAUDI ARCHIRODON who will carry out the civil worksAlstom will design, supply, install and commission the entire plant - contract officially signed on september 1
SOTO DE RIBERA POWER PLANTUSD 510 M
Scope : combined-cycle 400mwALSTOM and DURO FELGUERA have won the turnkey contract, additionally Alstom will provide long-term operation support and maintenance contract
MUARA TAWAR COMBINED CYCLE POWER PLANT - USD 240M
Scope : construction of a fifth unit (235mw)ALSTOM as leader of a consortium including MARUBENI/J will engineer, procure and commission a fully integrated power island while MARUBENI will supply Balance of Plant & civil works
MANNHEIM 9 POWER PJT€ 450 M
Scope : 900mwALSTOM will supply new boiler and turbine units, it will replace existing units 3 & 4
SOSTANG COAL-FIRED STEAM POWER PLANT - € 700M
Scope : 600mwAlstom will supply the complete power island including the steam turbine generator, the water-steam cycle, the boiler…
ADDUR IWPP (DESALINATION PACKAGE)
SUEZ ENERGYGULF INVESTMENT CORP
Suez Energy with Gulf Investment Corp/Kuwait have won the IWPP. DEGREMONT/F selected as EPC contractor for the desalination plant (capacity 48 million g/d)
WONTHAGGI DESALINATION PROJECT - € 1,2 B
financing, design,construction and operation, for the period to 2039, of a plant with a capacity of 450,000 m3 of drinking water per day, as well as an 85 km water distribution network. Contract to be executed by Degremont with Thiess - Work to start in October
GATE TERMINAL(Vopak/Gasunie)
the terminal will have a capacity of 8-12 billion cmGate terminal has selected a consortium including TECHINT/ITALY, SENER/SPAIN, ENTREPOSE/France and VINCI GRANDS PROJETS for the EPC contract. A final investment decision has been taken in December 2007, and the engineering construction companies have received notice to proceed in January 08. VINCI and Entrepose will be responsible for the construction of three storage tnaks (180,000cm3 each)
DURBAN-GAUTENBERG FUEL PIPELINE PROJECT - USD 315M
Scope : 544km 24" line and an additional line linking Kerdal to Waltloo and Jameson Park to Langlaagte via Alrode - contract to be carried out by Spie Capag, part of Entrepose Group. SPIE's share of the contract €105M - work to start in july 2008
SKIKDA LNG TANKS (Skikda LNG Project)
The contract has been awarded by KBR/USA, the main contractor of the Skikda LNG Project.Scope : a very large cryogenic storage tank with capacity of 150,000m3 for storing LNG, two cryogenic tanks of 65,000m3 for storing LPG and a sphere of 3000m3 for gas storage
LAGOS BEACH COMPRESSION STATION (LBCS PROJECT)
The station will compress, boost and transmit the gas through the WAGPCO pipeline from Nigeria to Benin, Togo and Ghanacontract to be executed with DELATTRE BEZONS NIGERIA
45 / 73
FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES
Award date Contractor Project Name End User Scope / SituationContractor's nationality
Final Destination
October 2008 ENTREPOSE FRANCE USA JORDAN COVE ENERGY
June 2010 FOSTER WHEELER FRANCE CAMEROON SONARA
June 2008 GE ENERGY FRANCE SPAIN BESOS 5 POWER PLANT ENDESA
June 2009 JACOBS ENGINEERING FRANCE FRANCE STORENGY
January 2010 JACOBS ENGINEERING FRANCE FRANCE STORENGY
May 2010 LAVALIN EUROPE FRANCE JORDAN JPMC / IFFCO
June 2008 LITWIN FRANCE FRANCE GDF
April 2010 LITWIN FRANCE ABU DHABI TAKREER
June 2007 SIDEM FRANCE FUJAIRAH
March 2008 SIDEM France QATAR SUEZ/MITSUI
December 2008 SPIE CAPAG FRANCE ANGOLA ANGOLA LNG
December 2009 SPIE CAPAG FRANCE EXXONMOBIL
JORDAN COVE LNG TERMINAL JORDAN COVE ENERGY has selected 4 companies to design & build the project : KIEWIT (construction of the terminal), BLACK&VEATCH (engineering design), ENTREPOSE CONTRACTING AND VINCI GRANDS PROJETS/F (LNG tanks). However the project has still to be approved before construction starts.The LNG terminal will have a capacity of 1 Billion cubic feet per day, two storage tanks (160,000cm each)
LIMBE REFINERY UPGRADING PROJECT PHASE 1
Phase One will cover revamping of the existing crude distillation unit, addition of a new vacuum distillation unit, new catalytic reformer unit, power generation and associated offsites & utilitiesEPCM contract for FW who performed the feed
Scope : 840mw tunkey contract, besides the gas turbines, generators, steam turbines, heat recovery steam generators, GE's contract includes engineering, balance of the plant equipment, civil works, erection & commissioning
ETREZ GAS STORAGE EXPANSION
Storengy is a GDF Suez CompanyJACOBS ENGINEERING has won the contract to provide engineering, procurement and construction management services to upgrade the facilitywork will cover four additional caverns to the existing 17 caverns. Jacobs will design and install gas compression, gas treatment, a control system and utilities
CERE LA RONDE UNDERDROUND GAS STORAGE FACILITY UPGRADING
The project will increase storage capacity to 1,200 million cubic metersJACOBS will design and install new gas compression, double the gas treatment facilities and upgrade the control system & utilities
FERTILIZER PLANT - JIFCO PjtUSD 650M
Scope : production of 4500t/d of sulphuric acid - 1500t/d of phosphoric acidFinancing by IFC and EIB and the developersSNC LAVALIN will provide overal project management, detailed design, proprietary equipment items and construction management. Contract to be followed by SNC LAVALIN EUROPE
BEYNES UNDERGROUND GAS STORAGE FACILITIES USD 214M
Redevelopment of the Beynes underground gas storage facility including gas compression and treatment. Contract to be executed with BOCCARD. Litwin share of the contract is € 75M
RUWAIS ISOMERATE QUALITY IMPROVEMENT PJT - USD 50M
Scope : construction of facilities to process high octane gasoline productsFEED done by TECNICAS REUNIDAS
FUJAIRAH II DESALINATION PROJECT
INTERNATIONAL POWERMARUBENI
Scope : capacity of 130 million g/dINTERNATIONAL POWER and MARUBENI have been selected as preferred bidder. Their nominated EPC contractor for the desalination plant is SIDEM. The financial close is expected in october 2007.
RAS LAFFAN C IWPP PROJECT(DESALINATION PACKAGE)
SUEZ/MITSUI has won the IWPP Project, agreement signed in March 2008.The named EPC contractor for the desalination package (286,000cm/day) is SIDEM, contract still to be confirmed by Sidem/Veolia
PIPELINE NETWORK FOR SOYO LNG - USD 550 M
ANGOLA LNG has awarded the contract to SPIE CAPAG and ACERGYSPIE CAPAG (part of ENTREPOSE Group)'s share of contract is USD 300M, it covers epcm of a pipeline system comprising 3 gas lines (18"/22"/24"), a Beach valve Station and a LNG plant tie-in station with associated facilities. Engineering & procurement to commence immediately with construction to start in the third quarter of 2009ACERGY in charge of the nearshore scope
PAPUA NEW GUINEA
PNG LNG PROJECT(Onshore pipelines) USD 430M
Scope : engineering, procurement, construction & commissioning of an onshore pipeline system of approx 450km of pipeline from 2" to 34"
46 / 73
FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES
Award date Contractor Project Name End User Scope / SituationContractor's nationality
Final Destination
TECHNIP FRANCE NIGERIA OLOKOLA LNG PROJECT
December 2007 TECHNIP FRANCE ANGOLA TOTAL
TECHNIP FRANCE RUSSIA IKRA PROJECT
July 2008 TECHNIP FRANCE TUNISIA TIFERT
July 2008 TECHNIP FRANCE ANGOLA BP ANGOLA
December 2008 TECHNIP FRANCE INDIA RELIANCE INDUSTRIES
July 2009 TECHNIP FRANCE SAUDI ARABIA
July 2009 TECHNIP FRANCE SAUDI ARABIA
TECHNIP FRANCE FRANCE TOTAL
February 2010 TECHNIP FRANCE QATAR QATARGAS
March 2007(unofficial)
OK LNG(NNPC, CHEVRON, SHELL, BG)
Scope : two LNG trains with a capacity of 5,5 Millions t/y each. TECHNIP has been selected in March 2007 with SNAMPROGETTI to carry out the contract. Contract not confirmed by Technip
PAZFLOR PROJECT (SUBSEA PACKAGE) - USD 1,8 B
Pazflor involves 4 fields : Perpetua, Hortensia, Zinia and AcaciaTECHNIP's share of the contract is USD 1,1 B, coverin 80km of production and water injection rigid flowlines, conventional flexible risers as well as engineering, procurement & fabrication of 60 km of umbilicalsTechnip/Paris will execute the contract, fabrication to take place in Angola. ACERGY's share is USD 700M
February 2008(unofficial)
RUSVINYL(Sibur / Solvin)
The plant, located at Kstovo, will produce 300,000t/y of PVC- suspension, 30,000t/y of PVC- emulsion and 225,000t/y of caustic sodaTechnip selected for the FEED and the EPCProject has been delayed, work expected to start early 2010
LA SKHIRA SULFURIC ACID PLANT
Scope : capacity of 3600 tons per day based on Monsanto processTifert is a joint-venture between Cie des Phosphates de Gafsa, Le Groupe Chimique Tunisien and the indian GSFC and Coromandel FertilizersThe unit is part of a project that will use sulfuric acid and phosphate to produce phosphoric acidContract to be executed by Technip in Paris with the local PIRECO
BLOCK 31 (PSVM PROJECT)USD 450 M
Technip signed a frame agreement contract for the engineering, procurement of equipment, construction & installation of the subea flowlines, first call-off contract signed for 45km of rigid water injection lines and 20km of rigid gas-injection lines In september 08, Technip has been awarded two new frame agreements with BP : for flexible pipes and for 34 umbilicals (total length 43km) -
MA D6 FIELD DEVELOPMENTPHASE II
Technip has been awarded a € 140 M subcontract by AKER Installation for engineering, project management, transportation & installation of 18km flexible production & gas export risers & flowlines + transport & installation of 5 umbilicals and a gas export manifold supplied by the client and installation of a 24" rigid spool - contract to be executed by Technip in Paris and Aberdeen with the support from Chennai/India
JUBAIL REFINERY(Satorp Project)Pack 2 - Conversion Unit
SAUDI ARAMCOTOTAL
Scope : epc of the hydro and catalytic cracking conversion process units. Contract to be executed by Technip in Italy and France with assistance from the group organization in the Middle East. estimated contract value USD 1,7B
JUBAIL REFINERY(Satorp Project)Pack 5A - Offsites & Utilities
SAUDI ARAMCOTOTAL
Scope : Offsites & Utilities, interconnecting network & process control for the whole refinery contract awarded to Technip with CTCI, estimated contract value : USD 1,3 Bto be executed by Technip in Roma, in Paris with the support from the organization in Middle EastCTCI confirmed the contract award in September 09, in charge of the engineering & procurement services for Flare and Cooling systems
September 2009(not confirmed)
GONFREVILLE CRACKER EXPANSION
upgrading of the vapocracker and the high density polyethylene unitscontract said to be followed by Lyon (no official confirmation)
PLATEAU MAINTENANCE PROJECT (PMP)USD 1,2 B
The project will enable Qatargas to maintain its current production level of 10 million t/y of LNGScope : a new acid gas removal unit, a new sulphur recovery unit and moridication to utility systems for handling increased feedgas rates to the existing trains.Contract won in association with CHIYODA
47 / 73
FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES
Award date Contractor Project Name End User Scope / SituationContractor's nationality
Final Destination
June 2010 TECHNIP FRANCE EGYPT BURULLUS GAS CY
July 2007 VINCI FRANCE NETHERLANDS GATE LNG TERMINAL
March 2008 GERMANY RUSSIA PERM POLYSTYRENE PLANT SIBUR KHIMPROM
May 2007 HITACHI POWER EUROPE GERMANY NETHERLANDS ELECTRABEL
May 2007 HITACHI POWER EUROPE GERMANY GERMANY ELECTRABEL
November 2007 HITACHI POWER EUROPE GERMANY SOUTH AFRICA ESKOM
December 2007 LINDE GERMANY RUSSIA TOBOLSK POLIMER
December 2008 LINDE GERMANY INDIA
July 2009 LINDE GERMANY ABU DHABI
March 2007 LURGI GERMANY IRAN ESFAHAN OIL REFINING CY
November 2007 LURGI GERMANY CANADA NORTH WEST UPGRADING
WEST DELTA DEEP MARINE PHASE VIIIaUSD 367M
Scope : Design, supply and installation of three production manifolds and three subsea distribution assemblies - Engineering, welding and installation of approximately 67 km of rigid production flowlines - Engineering, fabrication and installation of approximately 88 km of umbilicals - 12 km of flexible flowlines and three flexible jumpers - Connection of the flowlines and umbilicals to the wellheads and subsea manifolds. Contract to be executed by Paris with assistance from Genesis/UK and Technip Egypt
GATE TERMINAL(Vopak/Gasunie)
the terminal will have a capacity of 8-12 billion cmGate terminal has selected a consortium including TECHINT/ITALY, SENER/SPAIN, ENTREPOSE/France and VINCI GRANDS PROJETS for the EPC contract. A final investment decision has been taken in December 2007, and the engineering construction companies have received notice to proceed in January 08. VINCI and Entrepose will be responsible for the construction of three storage tnaks (180,000cm3 each)
CHEMIEANLAGENBAUCHEMNITZ GmbH
Scope : 50,000t/y with a potential for future expansion to 100,000t/yCHEMIEANLAGENBAU CHEMNITZ (CAC) will provide the design, equipment supply and management of construction
MAASVLAKTE COAL-BIOMASS POWER PLANT
Scope : 800mwElectrabel has signed the contract with Hitachi Power Europe
CONSTRUCTION OF 2 COAL-BIOMASS POWER PLANTS
One will be built in Stade, the other in Brunsbüttel or Wilhelmshaven. Each plant will have a capacity of 800mwElectrabel has signed the contract with Hitachi Power Europe
MEDUPI POWER STATIONUSD 4,9 Billion
Scope : 4800mw (6x800mw)HITACHI POWER EUROPE will supply six coal-fired steam generators, contract value euros 2 Billion, ALSTOM will supply the steam turbines & auxiliary equipment
TOBOLSK POLYPROPYLENE PLANT
Scope : capacity of 500,000t/y based on Ineos TechnologyLINDE will act as EPC contractor, contract to be followed by Linde KCA in DresdenTobolsk Polimer is a SIBUR's subsidiaryFinancing in place in Sept 09 (USD 154M), work to be completed mid-2012 instead of mid-2011EPC contract signed in December 09, contract value € 450M
DAHEJ PETROCHEMICAL PLANT(ETHYLENE PACKAGE)USD 1,43 BILLION
OPAL(ONGC PETRO ADDITIONS)
Scope : capacity of 1,1 Million t/y of ethylene and 340,000t/y of propylenecontract awarded to a consortium of LINDE/GERMANY and SAMSUNGLINDE's share of the contract is EUROS 350M, they will be responsible for the technology, the basic engineering and the supply of critical componentsSAMSUNG's share of the contract is USD 960M, covering the detail engineering, the supply of the remaining components, the construction and assembly
BOROUGE 3 PROJECT(ETHANE CRACKER)USD 1,07 B
BOROUGE(Adnoc/Borealis)
Scope: capacity of 1,5 Million t/ycontract to be executed on a lump sum turnkey basis, construction work to be undertaken by CCC
ESFAHAN REFINERY UPGRADINGUSD 1720 M
The production of the gasoline will be boosted from 9 million liters to 12 millions. The contract will be executed by DAELIM, UHDE, LURGI and the local companies NAMVARAN, NARGAN and CHEGALESH. Technip is the project management consultant. The upgrading involves construction of several units
NORTH WEST UPGRADER PROJECT (GASIFIER UNIT)USD 500 M
The contract covers the design, procurement and construction of a 120 MMcf/d gasification-based hydrogen plant. LURGI has appointed KBR/USA to complete pipe fabrication, module fabrication and field execution
48 / 73
FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES
Award date Contractor Project Name End User Scope / SituationContractor's nationality
Final Destination
May 2008 LURGI GERMANY RUSSIA EUROCHEM
June 2008 LURGI GERMANY NETHERLANDS AIR LIQUIDE
December 2008 LURGI GERMANY CHINA
May 2009 LURGI GERMANY RUSSIA TAIF-NK
October 2009 LURGI GERMANY RUSSIA GAZPROM KOMPLEKTATSIYA
June 2007 MAN FERROSTAAL GERMANY VENEZUELA MORON FERTILIZER PLANT PEQUIVEN
October 2008 MAN FERROSTAAL GERMANY VENEZUELA ENELVEN
February 2009 MAN FERROSTAAL GERMANY TRINIDAD GENERATION UNLIMITED
February 2005 SIEMENS GERMANY EGYPT EDEPC
April 2007 SIEMENS GERMANY NETHERLANDS DELTA ENERGY / EDF
October 2007 SIEMENS GERMANY GERMANY
February 2008 SIEMENS GERMANY NETHERLANDS INTERGEN
March 2008 SIEMENS GERMANY PORTUGAL ELECGAS
March 2008 SIEMENS GERMANY GERMANY MAINZ-WIESBADEN AG
September 2008 SIEMENS GERMANY PERU DUKE ENERGY EGENOR
MELAMINE PLANT AT NEVINNOMYSSKY AZOT - USD 139M
Scope : 50,000t/y of melamine - Urea Casale will supply the licenseThe project has an investment value of € 184M, contract value with LURGI is € 92,6M
ROTTERDAM HYDROGEN PLANTUSD 195 M
The plant will produce 130,000 cubic meters per Hour, it will supply hydrogen to the biodiesel plant planned by Neste Oil. LURGI, now part of Air Liquide, will build the plant
HUIZHOU ACRYLIC ACID PLANTEUROS 38 M
CNOOC ENERGY TECHNOLOGY & SERVICES
Scope : capacity of 140,000t/yLURGI's contract covers the license, basic engineering, certain equipment & technical support
TAIF-NK NIZHNEKAMSK REFINERY UPGRADING
the project will increase the capacity of the refiery from 7 Million t/y to 9,1 Million t/yLURGI signed an agreement in May to supply licences for parts of the technology and the complete engineering (procurement ??)
ASTRAKHAN REFINERY MODERNIZATION
Contract to supply engineering & procurement services for a naphtha hydrotreater and a c5/c6 isomerization unit to be integrated to the refinerycontract to be executed with Maveg Industrieausrüstungen GmbH
Scope : an ammonia unit (1800t/d - KBR Technology) - an urea unit (2200t/d - Toyo Technology)Contract won by a consortium including TOYO ENGINEERING, MAN FERROSTAAL and the local VEC INGENIERIA y CONSTRUCCION
TAMARE & BACHAQUERO POWER PLANTS USD 980 M
The Tamare Power plant will have a capacity of 483mw, Bachaquero 516mwMAN FERROSTAAL will provide engineering, procurement & construction in association with FERROSTAAL PROCON DE VENEZUELA and KOCH DE Portugal
TRINIDADTOBAGO
LA BREA POWER PLANTUSD 700 M
Scope : 760mwfull EPC contract for Man Ferrostaal
TALKHA POWER PLANTUSD 500 M
750MW combined cycle power plantALSTOM POWER has the steam turbine package (USD 315M), SIEMENS has the gas turbine package (USD 100M). ORASCOM and BE SIX will carry out the civil works
SLOE POWER PLANT AT VLISSINGEN - USD 750 M
Scope : 870mwSIEMENS has won the turnkey contract with a maintenance agreement during 15 years
LUNEN POWER PLANTUSD 600 M
TRIANEL POWER PROJEKTGESELLSCHAFT
KOHLEKRAFTWERK
Scope : 750mwContract signed with a consortium led by SIEMENS POWER including A-TEC INDUSTRIES/AUSTRIA subsidiary AE&E and IHI/J
RIJNMOND II POWER PLANTUSD 470 M
Scope : 430mw fired with natural gasSIEMENS has won the construction contract as well as a long-service agreement for 12 years
ABRANTES POWER PLANTSUSD 900 M
the two units to be built in Abrantes will have a combined installed capacity of 830mwSIEMENS has won the € 600 M contract and will assume responsibility of the maintenance of the plantsElecgas is a JV between International Power and Endesa/Spain
MAINZ COMBINED HEAT & POWER PLANT - USD 1,5 Billion
the coal-fired combined heat & power plant will have a capacity of 800mw SIEMENS is leading a consortium including the austrian AE&E and the japanese IHI. SIEMENS's share of the contract represents 50%.
LAS FLORES THERMO-ELECTRIC POWER STATION
Scope : capacity of 197mwSIEMENS selected as EPC contractor by Duke Energy
49 / 73
FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES
Award date Contractor Project Name End User Scope / SituationContractor's nationality
Final Destination
December 2008 SIEMENS GERMANY BELGIUM T-POWER
May 2009 SIEMENS GERMANY NETHERLANDS ENECOGEN
April 2010 SIEMENS GERMANY NETHERLANDS HEMWEG 9 POWER PLANT NUON
May 2010 SIEMENS GERMANY OMAN GDF SUEZ
July 2009 TECHNIP GERMANY GERMANY EDF / ENBW ENERGIE
August 2009 TECHNIP GERMANY GERMANY CONNECT PROJECT PHASE I SHELL DEUTSCHLAND GmbH
March 2007 UHDE GERMANY IRAN ESFAHAN OIL REFINING CY
June 2007 UHDE GERMANY ALGERIA SORFERT
April 2008 UHDE GERMANY RUSSIA IRKUSK VINYL CHLORIDE PLANT SAYANSKHIMPLAST
June 2008 UHDE GERMANY NETHERLANDS YARA
July 2008 UHDE GERMANY ROMANIA PETROM
October 2008 UHDE GERMANY IRAN NIPC
May 2009 UHDE GERMANY QATAR QAPCO
October 2009 UHDE GERMANY ABU DHABI FERTIL
TESSENDERLO POWER PLANTEUROS 320M
Scope : combined cycle power plant 420mwT POWER is a joint-venture between SIEMENS PROJECT VENTURES, TESSENDERLO CHEMIE and INTERNATIONAL POWERSIEMENS will act as EPC contractor and will maintain the gas turbine under a long-term agreement - Contract confirmed by SIEMENS in March 2009, contract to be executed with FABRICOM GTI and PAUWELS INTERNATIONAL
ROTTERDAM COMBINED CYCLE POWER PLANT - EUROS 700M
Scope : 870mwEnecogen is a partnership between Eneco and Dong Energy/DenmarkTurnkey contract for Siemens who will supply the main components of the plant including gas turbine, steam turbine, entire mechanical equipment
Scope : 435mw, it will replace an old plantTurnkey contract for Siemens + long term maintenance services
BARKA 3 / SOHAR 2 IPP PROJECTSUSD 1,7 B
In May 2010 GDF SUEZ has been awarded the contract for the construction & operation of the two gas-fired power plants, each with a capacity of 744MW. GDF has a 46% stake and is leader of a consortium including the japanese SOJITZ and SHIKOKU and local companies.Named EPC contractors are GS ENGINEERING/SOUTH KOREA and SIEMENS/GERMANY
ETZEL CRYSTAL GAS STORAGE PROJECT
Technip's contract covers engineering, procurement and construction management. The project entails gas compression and treatment facilities for the storage of gas in underground salt caverns
the first phase to be implemented in Wesseling refinery will include modifications of process units (desulphurisation and hydrogen) as well as construction of new facilities. The whole project will connect the Wesseling and Godorf refineries. Contract to be executed by Technip in Dusseldorf
ESFAHAN REFINERY UPGRADINGUSD 1720 M
The production of the gasoline will be boosted from 9 million liters to 12 millions. The contract will be executed by DAELIM, UHDE, LURGI and the local companies NAMVARAN, NARGAN and CHEGALESH. Technip is the project management consultant. The upgrading involves construction of several units
ARZEW FERTILIZER PLANTUSD 1,6 B
Scope : ammonia 4,000t/d - urea 3,250t/dSorfert is a joint-venture between Sonatrach and Orascom/EgyptContract awarded to UHDE to design, develop and construct the complex, OCI ALGERIA will perform all onshore works; The formal contract has been signed mid-april 2008
Scope : 200,000t/y based on Vinnolit TechnologyUHDE will carry out the design, manufacture & supply of equipment - Start up in October 2010
SLUISKIL UREA PLANTUSD 600 M
Scope : capacity of 1,3 Million t/yUhde selected by Yara to design and build the plant
PETROBRAZI REFINERY CLEAN FUELS PROJECT - USD 140M
the gasoline desulfurization unit, based on Axens Technology, will have a capacity of 700,000t/y of low sulfur gasoline
IMAM KHOMEINI PROPANE DEHYDROGENATION PLANT
Scope : capacity of 350,000t/y (project similar to the Egyptian one under construction by UHDE - contract still to be confirmed by UHDE
MESAIEED POLYETHYLENE PLANT (LDPE-3 Pjt)USD 550M
Scope : low density polyethylene capacity 300,000t/y (Basell technology), it will be the third unit to be built at the siteUHDE's scope of contract covers project management, detailed engineering, supply of all equipment and materials TEKFEN won the USD 165M subcontract from Uhde
RUWAIS FERTILIZER PLANT EXPANSION - USD 1,2 B
Scope : a 2,000t/d ammonia unit - a 3500t/d urea unitSAMSUNG has won the contract on a lump sum turnkey basis in partnership with UHDE/GERMANY
50 / 73
FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES
Award date Contractor Project Name End User Scope / SituationContractor's nationality
Final Destination
March 2010 UHDE GERMANY GERMANY BAYER MATERIALSCIENCE AG Scope : capacity of 20,000t/y of chlorine
May 2010 UHDE GERMANY SOUTH AFRICA OMNIA
March 2008 METKA GREECE ROMANIA PETROM
July 2009 METKA GREECE SYRIA PEEGT
November 2008 METKA GREECE GREECE
August 2009 METKA GREECE GREECE PUBLIC POWER CORP
October 2009 METKA GREECE TURKEY RWE & TURCAS
July 2009 J&P AVAX GREECE CYPRUS
January 2008 ANSALDO ITALY EGYPT
March 2008 ANSALDO ITALY FRANCE ATEL (3CB)
March 2008 ANSALDO ITALY ITALY ATEL (Progetto EnPlus)
September 2008 ANSALDO ITALY SYRIA PEEGT
July 2009 ANSALDO ITALY ITALY SORGENIA
March 2010 ANSALDO ITALY FINLAND FINGRID
April 2010 BELLELI ITALY FUJAIRAH VOPAK HORIZONS
November 2008 BONATTI ITALY ALGERIA SONATRACH
KREFELD UERDINGEN CHLORINE PLANT
SASOLBURG NITRIC ACID PLANTUSD 176M
Scope : a 1000t/d nitric acid plant and an ammonium nitrate unit + associated facilitiesUHDE selected to supply technology and licenses as well as engineering design and critical components
BRAZI POWER PLANTUSD 600 M
Scope : 860mw gas-fired combined cycleMETKA/GREECE in consortium with GE/USA has won the contract, work to start early 2009
DEIR ALI POWER PLANTUSD 910 M
Scope : 700mw - gas-fired A consortium of METKA and ANSALDO won the contract in september 2008, officially signed in July 09, commissioning within 36 months from the receipt of the LC.METKA leader with 75% share
CORINTH POWER PLANTUSD 360 M
MOTOR OIL HELLASMYTILINEOS
Scope : combined cycle natural gas power station to be built within MOH facilitiesMETKA, part of Mytilineos, will undertake the construction. Work to start in January 2009.the company created between MOH and Mytilineos will be called KORINTHOS POWER
MEGALOPOLIS V CCGT PLANT€ 500 M
Scope : 811mwPPC has decided to award the contract to Metka - Etade SA
DENIZLI POWER PLANT€ 450 M
Scope : 775mw natural gas-fired combined cycle power plantMETKA has won the epc contract, turbines to be supplied by SiemensSIEMENS confirmed the contract in February 2010, value € 110M covering steam turbine, gas turbines, generatorsFinal Investment Decision taken by RWE in May 2010, work to start in June
VASILIKOS POWER PLANT EXPANSION - € 225M
ELECTRICITY AUTHORITY OF CYPRUS
Scope : the 5th phase expansion covers 220mw, in two phases contract won in association with Hitachi Europe GmbH
SIDI KRIER & EL ATF POWER STATIONS -
WEST DELTA ELECTRICITYMIDDLE DELTA ELECTRICITY
Sidi Krier : Ansaldo will supply two 250mw steam turbines and auxiliary systems - the civil works package has gone to ORASCOM CONSTRUCTION INDUSTRIES with BE SIX/BELGIUM (contract value USD 106M)El Atf : Ansaldo will supply the two 250mw steam turbines and the civil works package has been awarded to HASSAN ALLAM & SONS/EGYPT with CCC (USD 102M)total contract value for Ansaldo : Euros 90M
BAYET POWER PLANTUSD 375 M
Scope : 400mw combined-cycleANSALDO ENERGIA has won the turnkey contract + long-term service agreement
SAN SEVERO POWER PLANTUSD 375 M
Scope : 400mw combined-cycleANSALDO ENERGIA has won the turnkey contract + long-term service agreement
DEIR ALI POWER PLANTUSD 910 M
Scope : 700mw - gas-fired A consortium of METKA and ANSALDO has son the contract, commissioning within 36 months from the official signature of the contract
APRILIA POWER PLANT€ 450M
Turnkey contract for a 800mw combined-cycle power plant + a multi-year maintenance contract for the gas turbines & the generators
FORSSA POWER PLANTUSD 101 M
ANSALDO has won the € 75M contract to supply a power-generation unit based on two gas turbines for the new reserve power plant
FUJAIRAH OIL TERMINAL EXPANSION - USD 100M
Scope : addition of 600,000 cubic metres of storage facilitiesepc contract for Belleli
ALRAR POWER PLANT EXPANSION - USD 143M
The extension will boost the capacity by 54mwThe contract has been awarded to BONATTI in association with CARLO GAVAZZI IMPIANTI
51 / 73
FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES
Award date Contractor Project Name End User Scope / SituationContractor's nationality
Final Destination
February 2009 BONATTI ITALY SAUDI ARABIA SAUDI ARAMCO
October 2009 BONATTI ITALY ALGERIA SONATRACH/ANADARKO
July 2008 FOSTER WHEELER ITALY GREECE HELLENIC PETROLEUM
July 2008 FOSTER WHEELER ITALY RUSSIA TANECO (TATNEFT)
April 2010 FOSTER WHEELER ITALY ROMANIA PETROM
February 2008 SAIPEM ITALY ITALY OLT LNG
September 2007 SAIPEM ITALY RUSSIA-GERMANY GAZPROM-NORDSTREAM
September 2007 SAIPEM ITALY SAUDI ARABIA SAUDI ARAMCO
March 2008 SAIPEM ITALY NIGERIA TOTAL/ELF PETROLEUM NIGERIA
July 2008 SAIPEM ITALY SAUDI ARABIA SAUDI ARAMCO
July 2008 SAIPEM ITALY ALGERIA SONATRACH
October 2008 SAIPEM ITALY NIGERIA TOTAL E&P NIGERIA
RAS ABU ALI PLANT UPGRADEUSD 158 M
the project includes new water injection systems, a disposal, replacement of three gas turbines
EL MERK FIELD DEVLPT(Pipelines Package) - USD 150M
The lines will run from El Merk to Haoud El Hamra and Gassi Touil : 160km 16" line (LPG) - 160km 18" (condensates) - 70km 20" (oil)
THESSALONIKI REFINERY UPGRADE - USD 170 M
The scope of the project is the production of low sulphur duels : a new 15,000b/d continuous catalytic cracker, modification of the atmospheric distillation unit and revamping of the naphtha hydrofiner and crude light ends processing unit to increase to 26,000b/d the processing capacity for the light products - Contract to be carried out by FWI and its Greek subsidiary
NIZHNEKAMSK REFINERY (FIRED HEATERS)
FWI will engineer and supply the materials for two furnaces for the hydrocracking unit and a charge heater and 3 interheaters for the continous catalytic reformer
PETROBRAZI REFINERY MODERNIZATION
FW will provide FEED and EPCM for the revamp of the atmospheric/vacuum distillation unit and will provide EPCM for a new amine unit and the FEED for the revamp of a delayed coker
LIVORNO OFFSHORE LNG TERMINAL - USD 592,5 Million
the terminal will have a capacity of 3,75 Billion cubic metersOLT LNG is a joint-venture between Iride and Endesa. Saipem has been selected in May 2007, the contract has been officially signed in February 2008, work will involve conversion of the gas tanker Golar Frost acquired recently by Olt Offshore
NORD STREAM PIPELINEUSD 2 BILLION
1200km diam 48" linking Vyborg in Russia to Greifwald on Baltic Sea Coastthe line will have an initial capacity about 27,5 Billion cm of gas per yearSAIPEM selected in september 2007 for the contract, official contract (Euros 1 Billion) announced in June 2008 by Saipem, negotiations on shore approcah, tie-ins are still underway with the client
OFFSHORE MAINTAIN POTENTIAL PROGRAM
Long-term agreement covering the construction, transport and installation of offshore facilities, a minimum workload is guaranteed over 4 years for 16 platforms and 80km of sealines. The contract will be executed with the local companies TAQA and AL RUSHAID
USAN FIELD DEVELOPMENT(URF & OLT PACKAGE)USD 1,3 BILLION
Saipem's contract involves engineering, procurement, construction, installation of the subsea umbilicals (72km), flowlines (61km) and risers connecting the 42 subsea wells to the FPSO along with the oil loading terminal
MANIFA PROJECT (CENTRAL PROCESSING FACILITIES)USD 1,8 BILLION
Scope : engineering, procurement and construction of three gas-oil separation trains with a capacity of 300,000b/d each, gas dehydration, crude inlet manifolds and the flare gas systemLump Sum Turnkey Contract for SaipemCommissioning deferred to 2013 instead of 2011
ARZEW LNG PLANT(GL3Z)USD 4,2 BILLION
Scope : capacity of 4,7 million t/y of LNGSAIPEM/SNAMPROGETTI in joint venture with CHIYODA has been awarded the lump sum turnkey contractIn February 2009, DAEWOO has been awarded a subcontract valued at USD 280,3M for the storage tanks
OML 58 UPGRADE PROJECT PHASE ONEUSD 1160 M
EPCM contract won by SAIPEM, PONTICELLI and DESICON, SAIPEM's share USD 700M - PONTICELLI's share USD 460MThe contract covers EPCM for the revamping of the Flow Station. A new gas treatment train and interconnecting pipelines & utilities to increase gas production to 15,65 MMcm/d as well as implementing condensate stabilisation and upgrading water injection. An additional 2,50MMcm/d capacity will be constructed to supply gas to domestic market
52 / 73
FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES
Award date Contractor Project Name End User Scope / SituationContractor's nationality
Final Destination
November 2008 SAIPEM ITALY ALGERIA SONATRACH
March 2009 SAIPEM ITALY ALGERIA SONATRACH/ENI
May 2009 SAIPEM ITALY KAZAKHSTAN AGIP KCO
June 2009 SAIPEM ITALY ALGERIA SONATRACH
July 2009 SAIPEM ITALY ANGOLA KIZOMBA SATELLITES PJT ESSO EXPLORATION ANGOLA
October 2009 SAIPEM ITALY QATAR QAFCO
October 2009 SAIPEM ITALY NIGERIA SHELL NIGERIA
October 2009 SAIPEM ITALY KUWAIT KOC
November 2009 SAIPEM ITALY ITALY ENI
December 2009 SAIPEM ITALY EXXONMOBIL
February 2010 SAIPEM ITALY MEXICO PEMEX
HASSI MESSAOUD LPG FACILITIES - USD 1,6 B
the lumpsum turnkey contract covers engineering, procurement and construction of 3 LPG production trains with a total capacity of 8 million cubic meters a day.the work will also include oil-separators and a pipeline to transport oil to an industrial complexIn March 2009, SHAW GROUP has been selected to provide engineering services, acting as SAIPEM's subcontractor
MLE FIELD DEVELOPMENTUSD 1,8 BILLION
the contract covers EPC on the natural gas gathering systems and processing plant and related export pipelines. The facilities will be able to process 350 million cubic feet of gas per day and 35,000b/d of liquidsENI took control of a 75% share in the field after having acquired First Calgary
KASHAGAN FIELD DEVLP PHASE ONE (HOOK UP)USD 2,6 BILLION
contract won in association with AKER SOLUTIONS for the hook-up and commissioning of the offshore facilities as well as for the inshore completion and prefabrication to be executed in the Kuryk Yard. The marine activities will be carried out using 5 barges converted into temporary living quarters & offices as well as temporary barges which Saipem refurbished under a preliminary contractSaipem's share of the contract is USD 1 Billion
GK-3 PIPELINE (pack 3)USD 580M
package 3 covers 351km between Mechtatine and El Kalathe whole GK-3 pipeline will run from Hassi R'Mel to El Kala on 784km (48")
Scope : engineering, construction, transport & installation of pipelines, umbilicals, risers and subsea systems connecting the Mavacola and Clohas fields to the existing FPSO units at Kizomba A & BIn August 09 PONTICELLI announced that they received a contract for work onshore + offshore hook-up, work will cover installation of 750 tons of piping In September AMEC informed that they will provide detailed design, procurement and logistics support services, work to be carried out by Paragon Angola with support from Amec/Houston (topsides modifications, new production flowlines with receiving, metering and pressure/surge control capabilities.....
QAFCO-IV EXPANSION PJT USD 610M
Scope : a urea unit 3850t/d + associated utilities (urea granules storage, material handling system, steam & power generation facilites and all interconnections between Qafco-6, Qafco-5 and UFC-85contract awarded to the same consortium who is presently carrying out Qafco-V. Saipem in association with HYUNDAI
BONGA NORTH-WEST FIELD SUBSEA DEVELOPMENT
Saipem's contract includes engineering, procurement, fabrication, installation of 13km of production pipe-in-pipe flowlines (10"-12"), 4km of 12" water injection flowlines + related production facilities and the instalaltion of 15km of umbilicals
GAS COMPRESSORS AT GC 7, 8 & 21 - USD 123M
The compressors will replace existing units at GC7, 8 & 21, they will process 4-8 million cubic feet a day of gasSAIPEM has won the USD 123M contract, although second-ranged bidder
AQUILA FPSO€ 1 BILLION
scope : conversion of an oil tanker into a FPSO vessel. It will have a storage capacity of 700,000 barrels and a production capacity of 12,000b/d
PAPUA NEW GUINEA
PNG LNG PROJECT(Offshore Pipeline) USD 450M
Scope : engineering, transportation & installation of 407km 34" gas sealine connecting the Omati River Landfall point to the onshore plant
SALAMANCA & TULA CLEAN FUELS PROJECT - USD 345M
Scope : gasoline desulfurization units and amine regeneration units at both refineries. The project will reduce the sulfur content of gasoline produced at those plantscontract won against Samsung and ICA Fluor. Local content to be maximized
53 / 73
FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES
Award date Contractor Project Name End User Scope / SituationContractor's nationality
Final Destination
April 2010 SAIPEM ITALY ABU DHABI ADNOC
April 2010 SAIPEM ITALY ABU DHABI ADNOC
April 2010 SAIPEM ITALY ABU DHABI ADNOC
May 2010 SAIPEM ITALY INDIA TATA CHEMICALS
May 2010 SAIPEM ITALY GABON TOTAL
June 2010 SAIPEM ITALY SURINAME STAATSOLIE
June 2010 SAIPEM ITALY KUWAIT KOC
June 2010 SAIPEM ITALY POLAND POLISH LNG
March 2009 SIIRTEC NIGI ITALY RUSSIA GAZKOMPLEKTIMPEX
SNAM PROGETTI ITALY NIGERIA OLOKOLA LNG PROJECT
November 2007 SNAM PROGETTI ITALY QATAR QAFCO
May 2008 SNAM PROGETTI ITALY KUWAIT KOC
July 2007 TECHINT ITALY NETHERLANDS MAASVLAKTE LNG TERMINAL
June 2010 TECHINT ITALY POLAND POLISH LNG
SHAH GAS PROJECT (Shah Processing Plant)USD 1,9 BILLION
The project will treat 1 billion cubic feet a day of sour gasthe package covers the engineering, procurement and construction of the gas processing plant FLUOR/VECO are the Project Management Contractors
SHAH GAS PROJECT (Shah Sulfur Recovery Units) - USD 1,45 B
The project will treat 1 billion cubic feet a day of sour gasthe package covers the engineering, procurement and construction of the sulfur recovery unitFLUOR/VECO are the Project Management Contractors
SHAH GAS PROJECT (pipelines package ) - USD 196M
The project will treat 1 Billion cubic feet a day of sour gasThe package covers engineering, procurement & construction of 250km of pipelines to transport gas, condensate and NGL from the Shah Gas Plant to Habshan and Asab tie-in pointFLUOR/VECO are the Project Management Contractors
BABRALA FERTILIZER PLANT EXPANSION (urea package)
Scope : 3900t/dSAIPEM selected as technology supplier and EPCM contractor
ANGUILLE FIELD WELLHEAD PLATFORM
The platform calls for 1,050 tonne topside, 650 tonne jacket and 1,250 tonne piles. Fabrication work subcontracted to EIFFEL
PARAMARIBO REFINERY EXPANSION PROJECTUSD 550M
The project will double the capacity of the refinery, to 15,000b/dSAIPEM selected as EPC contractor in June 2010. AKER SOLUTIONS is the Project Management Consultant, FEED don by CB&I LUMMUS
GAS BOOSTER STATION BS-171USD 900M
The station will include three high and low pressure gas trains to produce 234 million cubic feet a day of dry gas and 69,000b/d of condensates, the contract includes also a pipeline network from the gathering centers to the booster station and an intermediate slug catcher.
SWINOUJSCIE LNG TERMINALUSD 903M
Scope : initial capacity of 5 Billion cubic metres per yearSAIPEM in consortium with TECHINT/ITALY and PBG/POLAND selected as EPC contractors
PORTOVAYA GAS TREATMENT UNIT
Scope : the unit will dehydrate 170 million cubic meters of natural gas per daySIIRTEC NIGI will carry out the engineering, and will supply the required materials & equipmentthe project is part of Nord Stream Pipeline
March 2007(unofficial)
OK LNG(NNPC, CHEVRON, SHELL, BG)
Scope : two LNG trains with a capacity of 5,5 Millions t/y each. TECHNIP has been selected in March 2007 with SNAMPROGETTI to carry out the contract. Contract not confirmed by Technip nor SnamProgetti
QAFCO-V EXPANSION PROJECTUSD 3,2 Billion
Scope : two ammonia plants with a total production of 4600t/d and an urea plant with a capacity of 3850t/dwork will start in January 2008 ; the project will also include upgrade of existing facilitiesSAIPEM/SNAM leader of the consortium including HYUNDAI, contract share is € 1,4 Billion
GAS BOOSTER STATION GS 160USD 649 M
The station will consist of two identical trains delivering 250 million cf/d of sour gas. SNAMPROGETTI selected in May, official contract announced by Saipem in June 208
GATE TERMINAL(Vopak/Gasunie)
the terminal will have a capacity of 8-12 billion cmGate terminal has selected a consortium including TECHINT/ITALY, SENER/SPAIN, ENTREPOSE/France and VINCI GRANDS PROJETS for the EPC contract. A final investment decision has been taken in December 2007, and the engineering companies have received notice to proceed in January 08
SWINOUJSCIE LNG TERMINALUSD 903M
Scope : initial capacity of 5 Billion cubic metres per yearSAIPEM in consortium with TECHINT/ITALY and PBG/POLAND selected as EPC contractors
54 / 73
FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES
Award date Contractor Project Name End User Scope / SituationContractor's nationality
Final Destination
December 2007 TECNIMONT ITALY RUSSIA TOBOLSK POLIMER
January 2008 TECNIMONT ITALY VENEZUELA POLINTER
January 2008 TECNIMONT ITALY BRAZIL MPX
June 2008 TECNIMONT ITALY GERMANY WILHELMSHAVEN LNG PLANT E.ON
October 2008 TECNIMONT ITALY POLAND PGNIG
March 2009 TECNIMONT ITALY IRAN ASSALUYEH SADAF CHEMICAL CY
April 2009 TECNIMONT ITALY RUSSIA NUGCC (GAZPROM)
June 2009 TECNIMONT ITALY IRAN PETROPARS
July 2009 TECNIMONT ITALY ABU DHABI GASCO
May 2010 TECNIMONT ITALY ABU DHABI
TOBOLSK PDH PLANTUSD 1 Billion
Scope : 510,000t/y of propane dehydrogenation based on UOP TechnologyTecnimont will act as EPC contractor, FLUOR is the project managerFinancing in place in Sept 09 (USD 154M), work to be completed mid-2012 instead of mid-2011Signature of the EPC contract took place on December 3rd 2009, financing through Sace/Italy and russian banks
EL TABLAZO LOW DENSITY POLYETHYLENE PLANT
Scope : 350,000t/y based on Basell TechnologyTecnimont signed a € 90M contract to provide basic engineering services and the procurement of long lead items, contract to be later converted into an EPC contract Polinter is a Pequiven's subsidiary
ITAQI/MARANHAO & PECEM POWER PLANTS - € 1080 M
The first power station (coal-fired) to be built at Itaqi will have a capacity of 360mw, the second will be built near Pecem : 720mwMAIRE TECNIMONT has signed the two contracts, to be followed by MAIRE ENGINEERING DO BRASIL
Scope : capacity of 10,7 Billion cubic metersIn June 2008 Tecnimont selected as "preferred bidder"leader of a consortium including SOFREGAZ, VINCI GRANDS PROJETS and ENTREPOSE CONTRACTING. A final decision has still to be taken (in July/August) by the client, DFTG, a company controlled by E.ON
WIERZCHOWICE GAS STORAGE EXPANSION - USD 526 M
The storage will be increase from 500 Million cubic meters to 1,2 Billion. The contract has been awarded to a consortium including PBG/POLAND, TECNIMONT/ITALY, SOFREGAZ.F, PLYNOSTAV PARDUBICE/CZECH REPUBLIC - Tecnimont's share of the contract is 42% (Euros 161M)
ASSALUYEH ESBR PLANTUSD 340 M
Scope : capacity of 100,000t/y - Polimeri Europa Technologycontract awarded to a consortium including TECNIMONT/ITALY and NARGAN/IRAN
NOVY URENGOY POLYETHYLENE PLANT
Scope : 400,000t/y Basell TechnologyNUGCC = Novy Urengoy Gas Chemical ComplexTECNIMONT has signed in April 2009 a € 15M contract for the provision od detailed engineering services and is negotiating other agreements relevant to the completion of the complex In May 2010 MAIRE TECNIMONT signed a € 100M contract for the provision of equipment and materials with associated facilities and site assistance
SOUTH PARS PHASE 12 (EPC-3)€ 1,3 Billion
scope : a gas treatment plant at Bandar Tombak with a capacity of 3 Billion cubic feet per dayTECNIMONT has received the LOI in June, official contract to be signed in July 09, it will be executed with the local companies NARGAN, DORRIZ, GAMMA
IGD PROJECT (HABSHAN 5 GAS PROCESSING PLANT - USD 4,7 B
scope : engineering, procurement, construction and commissioning of the following core units : Gas Processing Unit (2 Billion cf/d), Sulphur Recovery Units (5000t/d), NGL Recovery unit (1,2 Billion cf/d). Contract won with JGC/JAPAN, who is the leader of the consortiumIn January 2010 KHARAFI/KUWAIT won a USD 700M subcontract and CCC a USD 300M subcontract for civil, mechanical & electrical works.
BOROUGE 3 PROJECT(POLYOLEFINS PACKAGE)USD 1,255 B
BOROUGE(Adnoc/Borealis)
Scope : two polyethylene units, each with a capacity of 540,000t/y and two polypropylene units, each with a capacity of 480,000t/y - BORSTAR technology - Contract won in association with SAMSUNG. TECNIMONT leader of the consortium, its share of the contract is USD 910M for the two packages (see hereunder)
55 / 73
FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES
Award date Contractor Project Name End User Scope / SituationContractor's nationality
Final Destination
May 2010 TECNIMONT ITALY ABU DHABI
January 2008 TECHNIP ITALY SINGAPORE NESTE OIL
June 2008 TECHNIP ITALY NETHERLANDS NESTE OIL
August 2008 TECHNIP ITALY CANADA
October 2008 TECHNIP ITALY POLAND GRUPA LOTOS
February 2009 TECHNIP ITALY EGYPT MIDOR
July 2009 TECHNIP ITALY SAUDI ARABIA
July 2009 TECHNIP ITALY SAUDI ARABIA
June 2008 TECHNIP KTI ITALY POLAND LMG PROJECT - USD 789 M PGNIG
June 2010 TECHNIP KTI ITALY SWEDEN NYNAS
November 2009 ROMINSERV KAZAKHSTAN KAZAKHSTAN KAZMUNAIGAZ
August 2009 CB&I LUMMUS NETHERLANDS NETHERLANDS SHELL
BOROUGE 3 PROJECT(LDPE Package) - USD 400M
BOROUGE(Adnoc/Borealis)
Scope : a low density polyethylene unit with a capacity of 350,000t/y - LyondellBasell technology Contract won in association with SAMSUNG. TECNIMONT leader of the consortium, its share of the contract is USD 910M for the two packages (see above)
TUAS BIODIESEL PLANTUSD 818 M
Scope : capacity of 800,000t/y based on Neste TechnologyTECHNIP has been selected as contractor for the engineering, procurement & management, work will start during the 1st half of 2008. The contract will be executed by Technip in Roma and Singaporein September 08 ROTARY ENGINEERING won the contract for the storage tanks and JACOBS ENGINEERING will provide EPCM services for the Power Scope Project (to deliver utilities to the diesel facility from the adjacent Tuas Power Plant)
ROTTERDAM BIODIESEL PLANTUSD 1 BILLION
Scope : capacity of 800,000t/y TECHNIP/ITALY has been selected as the project's main contractor. The contract covers the engineering and the management of procurement and construction activities, the project represents an investment of € 670m
HORIZON EXPANSION PROJECTUSD 195 M
CANADIAN NATURAL RESOURCES Ltd
The contract covers the engineering, procurement, supply of materials & equipment covering four new units : a gas recovery unit, a butane treating unit, sulphur recovery facilities and a carbon dioxide capture unit Contract to be executed by Technip in Roma
GDANSK REFINERY UPGRADING (deasphalting) - USD 90 M
Scope : solvent deasphalting unit with a caapcity of 180 tons per hourEngineering & procurement contract to be executed by Technip in Roma
ALEXANDRIA DELAYED COKER EXPANSION - USD 55 M
The unit, based on ConocoPhillips technology will have a capacity of 30,000b/d - Technip/Roma's scope involves engineering, procurement and supply of equipment & materials on a lumpsum basis
JUBAIL REFINERY(Satorp Project)Pack 2 - Conversion Unit
SAUDI ARAMCOTOTAL
Scope : epc of the hydro and catalytic cracking conversion process units. Contract to be executed by Technip in Italy and France with assistance from the group organization in the Middle East. estimated contract value USD 1,7B
JUBAIL REFINERY(Satorp Project)Pack 5A - Offsites & Utilities
SAUDI ARAMCOTOTAL
Scope : Offsites & Utilities, interconnecting network & process control for the whole refinery contract awarded to Technip with CTCI, estimated contract value : USD 1,3 Bto be executed by Technip in Roma, in Paris with the support from the organization in Middle East
the project involves the development of crude oil & natural gas deposits in the area of Lubitow, Miedzychod and Grotow : construction of near-borehole installations, gathering pipelines connecting the wells to the LMG central facility, construction of the LMG central facility as well as oil & gas pipelines.TECHNIP KTI won the contract in association with PBG/POLAND, THERMO DESIGN ENG/CANADA and MAVERICK ENGINEERING
NYNASHAMM SULFUR RECOVERY UNIT - USD 60 M
Scope : capacity of 24 tonnes/day + a tail gas treatment unit + offsite facilities and interconnecting piping with the units.Technip KTI is now part of Maire Tecnimont
ATYRAU REFINERY MODERNIZATION - USD 27M
Scope : the atmospheric and vacuum distillation units will be rebuilt, project is part of a complete modernization project. Rominserv is a romanian contractor
PERNIS REFINERY DIESEL HYDROTREAT - USD 60M
part of a broader investment program to cost USD 500Mthe unit will increase cleaner-burning, low-sulphur fuels production at the 400 thousand barrels per day refinery.Contract confirmed by CB&I on October 8th, contract value USD 60M
56 / 73
FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES
Award date Contractor Project Name End User Scope / SituationContractor's nationality
Final Destination
September 2009 CB&I LUMMUS NETHERLANDS SERBIA NIS
November 2009 FLUOR NETHERLANDS NETHERLANDS TAQA ENERGY
July 2008 NETHERLANDS ANGOLA BP ANGOLA HMC has been awarded the URF-1 Risers and Production Flowlines Contract
August 2008 NACAP NETHERLANDS SAUDI ARABIA SAUDI ARAMCO
April 2009 NACAP NETHERLANDS SAUDI ARABIA RAS TANURA/RIYADH PIPELINE SAUDI ARAMCO
January 2008 SBM OFFSHORE NETHERLANDS BRAZIL PETROBRAS
August 2009 SBM OFFSHORE NETHERLANDS NOBLE ENERGY
April 2008 TECHNIP NETHERLANDS ROMANIA ROMPETROL
August 2008 TECHNIP NETHERLANDS RUSSIA SIBUR NEFTEKHIM
October 2008 TECHNIP NETHERLANDS PORTUGAL REPSOL
November 2009 TECHNIP NETHERLANDS NETHERLANDS ROTTERDAM HYDROGEN PLANT AIR PRODUCTS
PANCEVO REFINERY MODERNIZATION - USD 70 M
The modernization (cost € 396M) will include construction of new units and modernization/revamping of existing unitsThe annual production of motor gasoline will increase to 638,000 tonnes while production of Euro 5 diesel fuel will inrease from 230,000 tonnes to 1,5 millionwork to start in 2010CB&I's contract (USD 70M) covers detailed engineering, procurement services, construction management & commisioning of the Hydrocracker/hydrotreater unit licensed by CHevron Lummus & associated units, auxiliary and offsites
BERGERMEER GAS STORAGE PROJECT
Fluor is responsible for the EPCM of the gas compression and treatment facilities as well as modifications to the well site. Contract followed by the Haarlem office. Commissioning during the second quarter of 2013
HEEREMA MARINE CNTRACTORS
BLOCK 31 (PSVM PROJECT)USD 1 BILLION
MANIFA PROJECT (PIPELINE PACKAGE ) - USD 195 M
Scope : 420km of oil, gas and water pipelines from 24" to 56"NACAP won the contract against korean companies
Scope : 506km 30" pipeline, 3 pump stations, metering systems, substation buildings & maintenance. The line will run from Ras Tanura refnery to Riyadh.JACOBS ENGINEERING in Reading/UK will develop the FEED, the LSTK contract will be then transfered to NACAP SUDROHRBAU who will complete project desig, material procurement, construction and commissioning activities of the projectNovember 2009 :NACAP has officially signed the € 235M contract for the engineering, procurement & construction
P-57 PLATFORMUSD 1,2 BILLION
Scope : the platform will have a capacity of 180,000b/dThe FPSO will be converted in Singapore usine one of SBM's very large carriers, topsides will be integrated in Brazil SBM signed the USD 1,25 Billion in February
EQUATORIAL GUINEA
ASENG FPSOUSD 1,2 B
SBM OFFSHORE has signed an agreement for the lease of the FPSO for the Aseng Field (ex benita). The FPSO will be based on the conversion of a VLCC hull, it will have a processing capacity of 120,000b/d of liquids and a storage capacity of 1,6 million barrels - formal contract signed in October 2009In March 2010 KEPPEL SHIPYARD won the USD 160M subcontract for conversion work : accomodation block extensions, flare tower, internal turret, topside module supports & integration of topside modules
HYDROGEN PLANT AT PETROMIDIA REFINERY - € 65M
Scope : capacity of 40,000 cubic meters per hourROMINSERV, the general contractor of Rompetrol, has awarded the contract to Technip for the supply of technology, engineering, equipment and technical assistance for the installation & commissioning
KSTOVO ETHYLENE EXPANSION PROJECT - EP-300 PJTUSD 284 M
The capacity will be expanded in two phases, the first from 260,000t/y to 360,000 and the second to 450,000t/y. - the ethylene surplus will feed the Rusvinyl project (Sibur-Solvay) - contract officially confirmed by Technip early October, contract value € 45M covering detailed engineering, procurement & supply of main equipment & materials
SINES STEAMCRACKER FURNACES - EUROS 35M
Technip will supply two new furnaces that will expand the ethylene capacity by 160,000t/y (from 410,000 to 570,000t/y). Technip in Zoetermeer will carry out the contract : basic & detailed engineering, procurement & supply of materials, construction & commissioning
Air Products has signed a long-term supply contract with ExxonMobil and will build an hydrogen production unit at Rotterdam refinery, it will be built by Technip through the alliance between Air Products & Technip
57 / 73
FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES
Award date Contractor Project Name End User Scope / SituationContractor's nationality
Final Destination
March 2010 VERWATER-AUDEX NETHERLANDS NETHERLANDS EURO TANK TERMINAL BV
September 2007 AKER KVAERNER NORWAY NORWAY BP
July 2008 AKER KVAERNER NORWAY ANGOLA BP ANGOLA
February 2009 AKER KVAERNER NORWAY NORWAY GASSCO
May 2009 AKER SOLUTIONS NORWAY KAZAKHSTAN AGIP KCO
September 2009 AKER SOLUTIONS NORWAY NORWAY ENI
March 2010 AKER SOLUTIONS NORWAY NORWAY EKOFISK 2/4L JACKET CONOCOPHILLIPS
October 2009 BW OFFSHORE NORWAY BRAZIL PETROBRAS
July 2008 SUBSEA 7 NORWAY ANGOLA BP ANGOLA
October 2009 TECHNIP NORWAY NORWAY ENI
April 2010 FOSTER WHEELER POLAND POLAND GDF SUEZ
March 2010 POLIMEX MOSTOSTAL POLAND NETHERLANDS
May 2009 SOMAGUE PORTUGAL PORTUGAL REN ATLANTICO
March 2010 ROMINSERV ROMANIA ROMANIA ROMPETROL
ROTTERDAM TANK TERMINALUSD 159 M
Verwater-Audex, a PEC Ltd/Singapore's affiliate, has won the contract to build a 465,000m3 tank terminalETT is owned by Vitol Tank Terminal International
SKARV TOPSIDESUSD 360 M
Aker Kvaerner has won the contract for detailed engineering, procurement and construction management assistance for the 16,000 topsides of the FPSO being buildby SAMSUNG
BLOCK 31 PSVM PROJECT(Umbilicals) USD 67 M
The contract is for manufacturing and delivery of 48 kilometres of steel tube umbilicals
KOLLSNES GAS PLANT UPGRADE - USD 218 M
EPC contract for AKER SOLUTIONS. engineering and procurement activities to take place at Oslo, the contract includes fabrication and installation of pre-assembly units, pipe-racks, mechanical work, piping tie-ins and installation work
KASHAGAN FIELD DEVLP PHASE ONE (HOOK UP)USD 2,6 BILLION
Contract won in association with SAIPEMScope : offshore hook-up, commissioning, assistance, onshore prefabrication, logistic support and inshore hook-up work + engineering and job carding for prefabrication and installation and vessels preparationAKER's share of the contract is USD 1,6 Billion
GOLIAT FIELD DEVELOPMENT(subsea) - USD 395M
Aker Solutions's contract covers the engineering, procurement & construction for eight four slot subsea templates with manifolds, 24 subsea trees, control systems, 20km of steel tube umbilical, a tie-in & connection system - Contract to be executed from Aker Norway, deliveries to start in 2011 until 2013
EPC contract for AKER SOLUTIONS covering a platform jacket and a bridge support jacket for the new Ekofisk accomodation platform- contract to be executed by Aker in Verdal
PAPA TERRA FPSOUSD 1,3 BILLION
BW OFFSHORE with QUIP CONSORTIUM received the Letter of Intent for the FPSO. BW Offshore will convert the ULCC BW Nisa, hull conversion to be carried out in China and topsides fabrication & integration at Quip's facility in Brazil. The FPSO will have the capacity for handling up to 180,000b/d Chevron takes the Final Investment Decision in January 2010AMEC/USA selected by QUIP to perform the basic engineering services for the topsides of the FPSO
BLOCK 31 PSVM PROJECT(Umbilicals) USD 460 M
Subsea 7's scope of supply comprises project management, engineering and installation services associated with the subsea infrastructure, including umbilicals, pipeline jumpers, flexibles and structures together with testing and pre-commissioning services.
GOLIAT FIELD DEVELOPMENT(infield pipelines) - USD 294M
Scope : supply & installation of the infield pipeline systems including flexible risers, clad production flowlines + installation of the subsea production system
POLIANEC BIOMASS POWER PLANT
Scope : 190mw, it will burn wood and agri-fuelsFW has been awarded the contract for the design, supply & erection of the plant, it will be the world largest biomass plant
ROTTERDAM TANK TERMINALUSD 70 M
DUTCH BOTLEK TANK TERMINAL BV
Scope : capacity of 185,000m3 to store mineral oils, liquid fuelsPolimex Mostostal will be responsible for design documentation, construction works, prefabrication and installation of tanks & pipelines, commissioning. Naftobudowa S.A will act as subcontractor
SINES LNG TERMINAL EXPANSIONEUROS 159 M
scope : expansion of the storage capacity from 240,000cm to 390,000cm and increase of the regasification capacity to 900,000cm/h and a minimum send-out of 1,350,000cm/hSomague has won the EPC contract, TGE GAS ENGINEERING GmbH is the consultant
NAVORADI HIGH DENSITY POLYETHYLENE PLANT EXPANSION
Capacity of HDPE will be boosted from 60,000t/y to 100,000t/yROMINSERV will carry out the contract, MITSUI CHEMICALS will supply the technology
58 / 73
FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES
Award date Contractor Project Name End User Scope / SituationContractor's nationality
Final Destination
October 2009 ATOMSTROYEXPORT RUSSIA INDIA HARIPUR NUCLEAR PLANT NULEAR POWER CORP
May 2008 E4 GROUP RUSSIA RUSSIA KRASNODAR POWER PLANT TGK-8
August 2008 E4 GROUP RUSSIA RUSSIA
June 2009 NN-AEP RUSSIA RUSSIA ENERGOATOM
February 2008 STROYTRANSGAZ RUSSIA TURKMENISTAN TURKMENGAS
October 2008 STROYTRANSGAZ RUSSIA SYRIA SYRIAN GAS COMPANY
December 2008 STROYTRANSGAZ RUSSIA GREECE DESFA
May 2010 TECHNOPROMEXPORT RUSSIA RUSSIA OGC-1
February 2009 ACCIONA AGUA SPAIN AUSTRALIA MINISTRY
February 2010 ACS SERVICIOS SPAIN MEXICO CFE
January 2008 COBRA SPAIN CHILE MEJILLONES POWER PLANT
June 2009 DRAGADOS SPAIN MEXICO PEMEX PETROCHEMICALS
June 2009 DURO FELGUERA SPAIN VENEZUELA ELECTRICIDAD DE CARACAS
February 2008 FLUOR SPAIN SPAIN REPSOL
Scope : two 1,000mw reactorsATOMSTROYEXPORT has been awarded the contract, work to start in January 2010
scope : 400mwE4 GROUP selected as general contractor, MHI/JAPAN has received the subcontract to provide the gas turbine
NYAGANSKAYA and TYUMEN TPP2 PROJECTSusd 695 m
TGK-10FORTUM
1) Nyaganskaya thermal power plant will have a capacity of 1200mw (3x400mw), to be built in 3 phases, the first two ones to be commissioned in 2011, the third in 2012 - contract value USD 567,5 M - 2) Tyumen TPP-2, construction of a fifth unit - contract value USD 128,2ME4 Group officially selected as EPC contractor for Nyagan in July 2009.
VOLGODONSK NUCLEAR UNITS 3&4USD 4,8 BILLION
Construction of a third and fourth reactor (each 1000mw)contract awarded to NIZHNIY NOVGOROD ATOMENERGOPROEKT (NN-AEP)
MALAY-BAGTYYARLIK GAS PIPELINE - USD 585 M
Part of the Turkmenistan-China Pipeline, the contract covers a 188km gas line as well as a gas purifying and dehydrating facility and a gas measuring station
ARAB GAS PIPELINE PHASE IIUSD 58 M
Scope : 62km diam 36" from the turkish-syrian border to AleppoSTROYSTRANSGAZ's contract includes also the construction of a metering station (3 million cm/d of gas), scada, control instrumentation….
NEA MESSAMBRIA COMPRESSOR STATION - € 53,4 M
The compressor station will be built along the Kulata-Athens gas pipeline. In addition to the EPC contract, Stroytransgaz will be responsible for assembling equipment, piping connections, instrumentation, cathorid protection - Work to start during the first quarter of 2009 for commissioning 26 months later - contract won in associatin with Prometheus Gas SA.
URENGOI POWER PLANTUSD 855M
capacity 450mw steam gasTECHNOPROMEXPORT selected as general contractor
ADELAIDE DESALINATION PLANTUSD 868 M
The plant will deliver 150,000 cubic meters of water per day, to be located at Port Stanvaca consortium named AdelaideAqua has been named preferred bidder, it includes ACCIONA AGUA/SPAIN and the local McCONNELL DOWELL, ABIGROUP CONTRACTORS and UNITED UTILITIES
MANZANILLO POWER STATION MODERNIZATION - USD 981M
the power plant will be converted to run on natural gascontract won in association with GRUPO COBRA and INELECTRA. Turbines to be supplied by GENERAL ELECTRIC
SUEZ ENERGYANTOFAGASTA MINERALS
Scope 150 mwSUEZ will begin soon construction of its second coal-fired power plant in Mejillones, COBRA is the EPC contractor
LA CANGREJERA AROMATICS PLANT EXPANSION -1ST PHASE
The first phase will cover construction of a platformer unit and other works necessary for the integration of new units that will double paraxylene capacitythe contract has been awarded to a consortium including DRAGADOS, ACS SERCICES and SENERMEX ENGINEERING
TERMOCENTRO COMBINED CYCLE POWER PLANTUSD 1,5 Billion
the plant will be located in Paz Castillo - Duro Felguera will execute the contract as sole contractorthe first gas turbine will come into operation early 2011, the four turbines equipping the plant will come into operation under a simple cycle basis during the second phase of 2011, then into combined cycle in december 2013
CARTAGENA REFINERY EXPANSION - OFFSITES & UTILITIES - USD 1,3B
Fluor has been awarded the project management contract and will provide enginering, management of procurement and construction of the offsites and utilities. The contract will be executed by FLUOR in Madrid and in Gliwice/Poland. TR/SPAIN is the EPC contractor for the main process units
59 / 73
FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES
Award date Contractor Project Name End User Scope / SituationContractor's nationality
Final Destination
April 2008 FLUOR SPAIN SPAIN ENAGAS
March 2008 FOSTER WHEELER SPAIN SPAIN REPSOL
November 2007 IBERDROLA INGENIERA SPAIN ALGERIA SONELGAZ
April 2009 IBERDROLA INGENIERA SPAIN LITHUANIA LIETUVOS ELEKTRINE AB
July 2009 IBERDROLA INGENIERA SPAIN VENEZUELA PDVSA
November 2009 INITEC ENERGIA SPAIN UZBEKISTAN UZBEKENERGO
December 2007 ISOLUX CORSAN SPAIN ARGENTINA YACIMIENTO CARBONIFERO
November 2009 SADYT SPAIN ISRAEL MEKOROT
February 2007 TECNICAS REUNIDAS SPAIN SPAIN REPSOL
TECNICAS REUNIDAS SPAIN PORTUGAL GALP ENERGIA
October 2007 TECNICAS REUNIDAS SPAIN RUSSIA ALLIANCE OIL COMPANY
May 2008 TECNICAS REUNIDAS SPAIN GREECE HELLENIC PETROLEUM
June 2008 TECNICAS REUNIDAS SPAIN NETHERLANDS ESSENT
EL MUSEL LNG TERMINALUSD 320 M
The facility will include two 150,000 cubic meter LNG tanks along with a regasification send-out capacity of 800,000cm per hourFLUOR's contract value : USD 320M
CARTAGENA DELAYED COKER COMPLEX
The coking complex consists of a 53,000b/d delayed coker unit, a gas concentration unit and a 90,000b/d vacuum distillation unitFW IBERIA has been awarded the contract for the detailed engineering, procurement services and construction management
KOUDIET EDRAOUCH POWER PLANT - USD 2,1 Billion
Scope : 1200mwGENERAL ELECTRICS/USA with IBERDROLA/SPAIN has won the construction contractIBERDROLA will be responsible for site development, design, equipment procurement, construction and assembly of the plant
COMBINED CYCLE POWER PLANT - USD 432 M
Scope : 444mwIBERDROLA has won the EPC contract against LAVALIN, ALSTOM and SIEMENS. The turbines will be supplied by GE
CUMANA POWER PLANTANTONIO JOSE DE SUCRE PJT
Scope : 1000mwTurnkey contract, contract won in association with Elecnor (60/40)
NAVOI THERMAL POWER PLANTUSD 505 M
Scope : 472mwINITEC ENERGIA, who is the main contractor, has awarded the power generation system to MHI/JAPAN. Construction work to be undertaken by the turkish company CALIK HOLDING
EL RIO TURBIO POWER PLANTUSD 670 M
Scope : 240mwIsolux Corsan has won the contract in association with the local TECNA
ASHDOD DESALINATION PLANT€ 330 M
the reverse osmosis plant will produce 100 million cubic meters of desalinated water per year.SADYT is part of Sacyr Vallehermoso Group
CARTAGENA REFINERY EXPANSION - USD 4,7 Billion
Scope : the capacity of the refinery will be doubled, to 220,000b/d : atmospheric distillation unit (5,5Million t/y) - Hydrocracking unit (2,5 Million t/y) - - desulphurisation unit (3 million t/y) - isomerization unit (300,000t/y), hydrogen plant + additional smaller units, cogeneration plant, storage and interconnection;;;;; REPSOL is doing engineering and will start with the EPC phase in November 2007Repsol approved the € 3,2 Billion investment in January 08
August 2007 SINES REFINERY UPGRADINGUSD 910 M
Scope : a 45,000b/d hydrocracker, a 15,000b/d vacuum distillation unit, a 22,000b/d vacuum flash unitTECNICAS REUNIDAS has received the Letter of Intent in august 2007In December 2009 TR and Galp Energia have reached a final agreement on the conversion to a lump sum turnkey contract
KHABAROVSK REFINERY EXPANSION - USD 800 M
The project will boost the capacity of the refinery from 3,2 million t/y to 3,5M : hydrocracker, hydrotreatment, hydrogen, amine regeneration, acid water, sulphur recovery unitsTecnicas Reunidas has received the Letter of Intent in October, formal contract signed in November In february 2008, FOSTER WHEELER/UK announced that they have been awarded the project management consultancy contract
ELEFSIS REFINERY UPGRADEUSD 1,56 BILLION
Scope : an hydrocracker (40,000b/d) - a flexicoker (20,000b/d) - a vacuum distillation unit (45,000b/d) - a hydrogen unit (120,000cm/h)HELPE signed the contract with TR for the execution of the project, TR has started FEED verification to be followed by engineering work, the project is listed on TR order book
MOERDIJK COMBINED CYCLE POWER PLANT
Scope : 426mwTECNICAS REUNIDAS and GE ENERGY will carry out the FEED during 8 months and will execute the EPC contract, TECNICAS REUNIDAS's share of the contract : € 150M
60 / 73
FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES
Award date Contractor Project Name End User Scope / SituationContractor's nationality
Final Destination
August 2008 TECNICAS REUNIDAS SPAIN SAUDI ARABIA SAUDI ARAMCO
August 2008 TECNICAS REUNIDAS SPAIN HUNGARY MOL HUNGARIAN OIL & GAS
October 2008 TECNICAS REUNIDAS SPAIN PORTUGAL SINES POLYETHYLENE PLANT REPSOL
November 2008 TECNICAS REUNIDAS SPAIN AUSTRALIA WATER CORPORATION
December 2008 TECNICAS REUNIDAS SPAIN SPAIN GASCAN
January 2009 TECNICAS REUNIDAS SPAIN ABU DHABI ADCO
June 2009 TECNICAS REUNIDAS SPAIN SAUDI ARABIA
November 2009 TECNICAS REUNIDAS SPAIN MOROCCO SAMIR
November 2009 TECNICAS REUNIDAS SPAIN TURKEY TUPRAS
December 2009 TECNICAS REUNIDAS SPAIN PERU PETROPERU
MANIFA PROJECT (POWER PACKAGE) - USD 500 M
Scope : 400mw combined cycle with 2 gas turbines and one steam turbineTurnkey contract for TRDec 09 : FOSTER WHEELER SPAIN has been awarded the contract to design & supply heat recovery generators and steam generators
SZAZHALOMBATTA HYDROCRACKING COMPLEX
Scope : a hydrocracking unit of high pressure of 1,5 million t/y - an unconverted oil vacuum distillation unit, a gas recovery and LPG treatment unit, amine regeneration and sour water stripping units. TR will execute the open book estimate phase with an option for EPC LSTK conversion
Part of the Sines Petrochemical Expansion Project - the polyethylene plant will have a capacity of 300,000t/y (Ineos Technology)on its website TR is listing the project in its reference list as EPCM contract
SOUTHERN SEAWATER DESALINATION PLANT - USD 620M
The plant will have a capacityy of 50 gigalitres per year, to be expandable to 100 gigalitres.TR leader of a consortium including VALORISA AGUA, a subsidiary of SACYR VALLEHERMOSO, AJ LUCAS and WORLEYPARSONS. The consortium is called Southern Seawater Alliance
GRANADILLA & ARINAGA LNG TERMINALS - € 490 M
Each terminal will cover a 150,000 cubic meters/hour regasification plant, a 150,000l3 storage and a jetty. Granadilla located in Tenerife, Arinaga in Gran Canaria
SAS PROJECT - PACKAGE BUSD 1,3 BILLION
TR's contract (60% share) wil cover oil production flowlines, primary separation through central & satellite degassing facilities, gas compression, transfer lines, oil pumping facilities, main oil pipelines (including 107km 16") and produced water handling. Contract won in association with CCC who will be involved in construction works + connecting pipelines to Asab.Once completed Sahil capacity will increase from 55,000b/d to 75,000b/d while Shah's capacity will increase from 50,000b/d to 60,000b/d
JUBAIL REFINERY(Satorp Project)Pack 1 - Distillation/Hydrotreat
SAUDI ARAMCOTOTAL
Scope : Crude/Vacuum, Naphtha Hydrotreating, High Pressure Hydrodesulphurizers, Low Pressure Hydrodesulphurizers, Hydrogen Generation Units. Units to be arranged in two trainscontract value € 1,2 Billion
MOHAMMEDIA REFINERY TOPPING 4 PROJECT
Scope : a new crude distillation unit (4 million t/y capacity), a kerosene treatment unit and revamping of a LPG Merox unitTR won the design engineering contract in July 2008, contract coverted into a lump sum turnkey contract in November 2009 - Commissioning in March 2012April 2010 : TEKFEN/TURKEY has been awarded a USD 54M subcontract for building & installation works of the topping unit
IZMIT REFINERY UPGRADING PROJECT - USD 1,5 B
Scope : an hydrocracker, vacuum unit, naphtha hydrogenation, diesel desulfurization, hydrogen, sulphur recovery, amine regeneration, sour water stripping unitThe contract has been awarded to TR under an open book model, with future conversion into a lump sum turnkey contract
TALARA REFINERY EXPANSIONUSD 1,2 B
The capacity will be boosted to 95,000b/d from 62,000b/d : modification of existing units + addition of new units such as diesel and naphtha hydrotreating, flexicoker, vacuum distillate, catalytic reformer, hydrogen, sulfuric acid, amines plant and cogenerationTR selected for the FEED cum EPC in december, feed phase until 2012. Commissioning in 2015 ABSG CONSULTING will provide project management consultancy services
61 / 73
FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES
Award date Contractor Project Name End User Scope / SituationContractor's nationality
Final Destination
April 2010 TECNICAS REUNIDAS SPAIN ABU DHABI ADNOC
June 2010 TECNICAS REUNIDAS SPAIN BOLIVIA
April 2009 NCC SWEDEN SWEDEN NYNASHAMN GASTERMINAL AB
September 2009 AKER SOLUTIONS UK UK GAIA POWER TEES VALLEY Ltd
January 2007 CBI UK IRAN NIGC
October 2008 CBI UK UK PORTLAND GAS
FLUOR UK PORTUGAL GALP ENERGIA
October 2008 FLUOR UK RUSSIA SIBUR
September 2009 FLUOR UK ITALY ISAB ENERGY
SHAH GAS PROJECT (Gas Gathering Package) - USD 463M
The project will treat 1 Billion cubic feet a day of sour gas - Scope : lump sum turnkey contract covering the design & detailed engineering, supply of all equipment & materials, construction ffor the pipelines interconnecting the wells and the central processing facilities (16" inter-pad lines and 24" transfer lines), including well pads and receIving stationTR will provide engineering, procurement & construction for the Shah Gas Gathering System in association with PUNJ LLOYD/INDIAMARGARITA GAS PROCESSING
PLANT - USD 500MREPSOL YPF / BRITISH GAS
PAN AMERICAN ENERGYthe gas plant will have a capacity of 6 million cubic meters of gas dailyTR will work with carry out the contract with local companies
NYNASHAMN LNG TERMINALUSD 33M
LNG will arrive by cargo ships to the terminal where it will be kept in stock at the terminal in a so-called full containment tank with a capacity of 20,000cm.NCC has the construction contract for the terminal, the tank itself will be built by CRYO AB. DYWIDAG INTERNATIONAL was awarded in December 08 the design & engineering contract for the storage tank
GAIA BIOMASS POWER PLANTUSD 325M
The plant will burn recycled wood chippings to generate 50mw of powerplanning permission during the last quarter of 2009, contract to be followed by Aker in Stockton on Tees
BID BOLAND GAS PROJECT (STORAGE & PIPELINE PORTION)USD 500 M
CBI JOHN BROWN selected with the local TEHRAN JONOOB for the storage and pipeline portion of the project, contract has been officially signed in january 2007. The iranian company is the leader
PORTLAND GAS PROJECTGBP 500 M
The project involve a major gas storage facility with the creation of 14 underground storage caverns totalling 35 billion cubic feet of natural gasCB&I has been awarded the first phase of the EPC contract, to be carried out by CBI in Paddington//London
August 2007 PORTO REFINERY UPGRADINGUSD 455 M
Scope : a 30,000b/d vacuum distillation unit, a 12,000b/d visbreaker, a 12,000b/d vacuum flsh unitIn October 2007 Fluor confirms that it has been awarded the FEED and early procurement services, the contract will be carried out by Fluor in Camberley and in Madrid with the support of portuguese companies.In February 2009 Fluor confirms the EPC contract with USD 400M booked in the last quarter of 2008
NOYABRSK GAS PROCESSION EXPANSION PROJECT
Fluor's project scope includes the EPCM services for the expansion and upgrade of the Vyngayakhinskaya compressor station, the compressor station 3 of the Nizhnevartovsk gas processing complex, and the Vyngapurovsky gas processing plant and associated pipelines, as well as a liquefied petroleum gas storage and loading facility in Noyabrsk.Contract to be executed by FLUOR in Camberley/UK and Manilla/Philippines, together with russian design institutesSTROYTRANSGAZ will take part in the construction
PRIOLO POWER PLANT RECONSTRUCTION - USD 150M
Fluor has won the engineering, procurement & construction contract for the reconstruction of one of its two 266mw combined cycle gas turbine power trains in Priolo/Sicily, damaged one year ago. Contract followed by Fluor in Camberley
62 / 73
FIRM PROJECTS AWARDED TO EUROPEAN COMPANIES
Award date Contractor Project Name End User Scope / SituationContractor's nationality
Final Destination
March 2009 FOSTER WHEELER UK INDIA INDIAN OIL CORP
March 2010 JACOBS ENGINEERING UK UK STORENGY
July 2007 MW KELLOGG UK NORWAY STATOIL
March 2008 PETROFAC UK SYRIA HAYAN PETROLEUM
April 2008 PETROFAC UK SYRIA PETROCANADA
August 2008 PETROFAC UK EGYPT KHALDA PETROLEUM
November 2008 PETROFAC UK KUWAIT KOC
January 2009 PETROFAC UK ABU DHABI ADCO
February 2009 PETROFAC UK SAUDI ARABIA SAUDI ARAMCO
March 2009 PETROFAC UK ALGERIA SONATRACH / ANADARKO
March 2010 PETROFAC UK QATAR QATAR PETROLEUM
May 2009 UK LIBERIA LIBERIA PETROLEUM REFINING CY
PARADIP REFINERY Capacity : 15 Million t/yFW will undertake the role of Managing Project Management Consultant for a major part of the project and will execute EPCM for 15 process units + offsites & utilitiesFW's scope includes the crude distillation, reforming, alkylatio and butane isomerisation units.FW was awarded the FEED in 2007 - Contract to be executed from Reading/UK and from India (Delhi/Kolkata)
STUBLACH STORAGE ABOVE GROUND WORKS
JACOBS will design and install new gas compression, gas treatment facilities and utilities for the storage projectcontract to be followed by Jacobs in Manchester
KARSTO GAS TREATMENT EXPANSION - USD 175 M
MW Kellogg has been awarded the detailed engineering contact, he was the main contractor on the three previous expansion stages. The project, known as KEP2010, aims to make the facilities more robust for safe and efficient operations
JIDAR GAS PROCESSING FACILITIESUSD 454 M
Petrofac has received the Letter of Intent in March 08, the contract covers EPC of the gas processing facilities + LPG recovery system, LPG Storage and loading facility, gas gathering & collection systems, satellite gathering stations, flowlines, gathering pipelines, utilities & offsites
EBLA GAS PROJECTUSD 477 M
The Ebla plant will be designed to produce 88 Million cf/d of gas, 150t/d of LPG. The project includes also pipelines, gas gathering station flow lines and well sites
KHALDA 5th GAS PROCESSING TRAIN
The new train will expand the total capacity by 100 million cf/d of gas to 810 million cf/d and 31,000b/d of condensate - PETROFAC's contract covers engineering & procurement services, to be converted into a full EPC within the next two/four months
PIPELINE BETWEEN BS 131 & MINA AL AHMADI - USD 543M
Scope : 140km diam 40" pipeline running from Booster Station 131 and Mina Al Ahmadi LPG plantPetrofac in charge of engineering design, procurement, construction and commissioning
SAS PROJECT - PACKAGE AUSD 2,3 BILLION
Petrofac's contract covers the Asab Field : upgrading of the facility's capacity to accept production from Sahil, Shah and other fields and to upgrade the associated utilities and water handling facilities. Once completed the production at Asab will increase from 280,000b/d to 310,000b/d
KARAN GAS PROJECT(cogeneration/utilities) USD 500M
Scope : cogeneration unit, utilitiesPetrofac will also upgrade the plant’s process controls, electrical systems and support facilities
EL MERK FIELD DEVLPT(CPF Package) - USD 2,2 B
Scope : the CPF capacity will be 98,000b/d of oil, 29,000 b/d of condensates, 31,000b/d of LPG with an NGL train (600 Million cf/d) + reinjection facilitiesEPC contract for PetrofacIn May 2009 ORASCOM CONSTRUCTION INDUSTRIES/EGYPT has been awarded the civil and structural steel works
MESAIEED & DUKHAN GAS SWEETENING PROJECTSUSD 650 M
Scope : Messaieed : a 750MMcf/d acid gas removal unit, upgrading of a sulphur recovery unit, an amine sweetening unit, a flare gas system - Dukhan : a 450 MMcf/d acid gas removal unitwork to commence shortly with completion within 38 months
ZAKHEM INT CONSTRUCTION
BUSHROD PRODUCT STORAGE TERMINAL EXPANSION -USD 25M
Scope : construction of 3 new tanks and piping networkEPC contract for ZAKHEM
63 / 73
FIRM PROJECTS AWARDED TO AMERICAN COMPANIES
Last Update Contractor Final Destination Project Name End User Scope / Situation
February 2009 ASTRA EVANGELISTA ARGENTINA URUGUAY ANCAP
March 2010 ALUSA BRAZIL BRAZIL PETROBRAS
July 2008 CAMARGO CORREA BRAZIL BRAZIL PETROBRAS
December 2009 CAMARGO CORREA BRAZIL BRAZIL PETROBRAS
July 2008 INTERPAR BRAZIL BRAZIL PETROBRAS
March 2008 MAIRE TECNIMONT BRAZIL BRAZIL PETROBRAS
October 2008 MAIRE TECNIMONT BRAZIL BRAZIL MPX ENERGIA
August 2009 ODEBRECHT BRAZIL ARGENTINA YPF
December 2009 ODEBRECHT BRAZIL BRAZIL PETROBRAS
September 2008 QUEIROZ GALVAO BRAZIL BRAZIL PETROBRAS
October 2009 QUIP CONSORTIUM BRAZIL BRAZIL PETROBRAS
March 2008 SKANSKA BRAZIL BRAZIL PETROBRAS
July 2009 SKANSKA BRAZIL BRAZIL PETROBRAS
March 2010 SKANSKA BRAZIL BRAZIL PETROBRAS
March 2009 SUBSEA 7 BRAZIL BRAZIL PETROBRAS
October 2009 SUBSEA 7 BRAZIL BRAZIL PETROBRAS
Contractor's nationality
LA TEJA REFINERY DESULFURIZATION PROJECTUSD 300 M
Scope : a diesel desulfurisation unit based on Haldor Topsoe technology and a gasoline desulfurisation unit based on Axens technologyASTRA EVANGELISTA has been selected against TECNICAS REUNIDAS and JANTESA/VENEZUELA. Work starting in February 09
COMPERJ REFINERY (UHC PORTION) - USD 824M
UHC = catalytic hydrocracking unitepc contract
REPAR REFINERY UPGRADING(Delayed Coker) - USD 1,5 B
the delayed coker will have a capacity of 5,000 cm/dCamargo Correa will carry out the contract in association with Promon, work will take 3 years and a half
ABREU E LIMA REFINERY(delayed coker units) USD 1,9 B
Scope : delayed coker units including substations and caustic regeneration sections. Contract won in association with CNEC ENGENHARIA (value USD 1,9B)
REPAR REFINERY UPGRADING (Interconnections) - USD 1,4 B
Scope : interconnections between the coker and the other units + storage facilities, utilitiesINTERPAR is a consortium including SETAL, MENDES Jr and MPE
VITTORIA GAS TREATMENT PLANTUSD 241 M
The plant will have a capacity of 2,5 million cubic meters per day. The contract will be carried out by Maire Tecnimont with Alusa and MPE (special purpose company)
PECEM II POWER STATIONUSD 343 M
Scope : 360mwpreliminary contract signed, formal contract to be signed by the end of the month
LA PLATA REFINERY CCR PLANTUSD 348 M
The new continuous Catalytic Reformer plant will allow an increase of premium fuel from 6 Million m3 to 8 million m3, the plant will also produce 200,000t/y of aromatic compounds and 15,000t/y of hydrogen
ABREU E LIMA REFINERY(hydrotreat & atmospheric distillation units)USD 2,6 B
Odebrecht with CONSTRUTORA OAS has won two packages : 1) diesel hydrotreating, naphtha hydrotreating, hydrogen generation for USD 1,8B2)atmospheric distillation units for USD 858MThe offsites pipelines package connecting the refinery to the seaport has been awarded to CONDUTO-EGESA, contract value USD 348M
P 55 PLATFORMUSD 845M
P-55 will be installed in Roncador field - the platform will have a production capacity of 180,000b/dThe 845M contract has been awarded to a consortium including QUEIROZ GALVANO, IESA and UTC ENGENHARIA
PAPA TERRA FPSOUSD 1,3 BILLION
BW OFFSHORE with QUIP CONSORTIUM received the Letter of Intent for the FPSO. BW Offshore will convert the ULCC BW Nisa, hull conversion to be carried out in China and topsides fabrication & integration at Quip's facility in Brazil. The FPSO will have the capacity for handling up to 180,000b/d
REFAP HDS UNITUSD 150 M
Scope : a 5,000cm/d hydrodesulfurization unit at Alberto Pasqualini refinery (Refap)SKANSKA LATIN AMERICA's contract covers detail engineering, purchasing, construction, electro-mechanical installation & start-up
REFAP REFINERY UPGRADING(interconnections) - USD 100M
Scope : partial engineering, construction, procurement, electromechanical assembly of the interconnections linking the gasoline hydrodesulfurization unit with the rest of the refinery. Work to start in August
COMPERJ REFINERY (DAV PORTION) - USD 623 M
Scope : Atmospheric Vacuum Distillation 150,000b/dcontract won in association with PROMON and ENGEVIXSKANSKA's share is USD 250M, leader of the consortium, responsible for design, detailed engineering executions and construction of the facilities, procurement of material & equipment
TAMBAU URUGUA & P-56 DEVPTUSD 200 M
The Tambau Urugua scope is to engineer, install and commission two 12” rigid steel gas flowlines (14,5km long) and associated subsea equipment.The P-56 scope is to engineer, procure, install and commission two 12” rigid steel oil export pipelines (13km long), connecting the P56 platform to the P-38 FPSO and one 10” rigid steel gas export pipeline (8,6km) from the P-56 to the P-51 platform. The pipelines and pipeline end terminations will be supplied by SUBSEA 7.
RONCADOR FIELD (SUBSEA)USD 200M
Scope : one 12" gas export line (38,7km long), one 12" oil export line (42km long) connecting the P55 platform to the PRA-1 Platform, including procurement & installation of associated subsea equipment
64 / 73
FIRM PROJECTS AWARDED TO AMERICAN COMPANIES
Last Update Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
March 2010 TECHINT BRAZIL BRAZIL PETROBRAS
November 2009 AKER SOLUTIONS CANADA CANADA TRANSCANADA
June 2010 AKER SOLUTIONS CANADA RUSSIA ILIM GROUP
June 2008 COLT WORLEYPARSONS CANADA CANADA CCRL
April 2008 HORTON CBI CANADA CANADA TERASEN GAS
August 2008 LAVALIN CANADA SOUTH AFRICA PBM
October 2008 LAVALIN CANADA MEXICO BAJA SULPHURIC ACID PLANT
June 2009 LAVALIN CANADA ALGERIA SONATRACH
September 2009 LAVALIN CANADA IRAQ MINISTRY
March 2010 LAVALIN CANADA SOUTH AFRICA SASOL NITRO
September 2009 ABENGOA MEXICO MEXICO PEMEX
August 2009 ICA FLUOR MEXICO MEXICO PEMEX
May 2009 ICA FLUOR MEXICO MEXICO PEMEX
February 2010 ICA FLUOR MEXICO MEXICO PEMEX
April 2010 ISOLUX MEXICO MEXICO PEMEX
February 2008 ACERGY USA CANADA ENCANA
February 2008 AKER KVAERNER USA USA GULF LNG ENERGY
COMPERJ REFINERY (DELAYED COKER ) - USD 1 BILLION
Techint in association with A.GUTTIEREZ selected by Petrobras for the delayed coker,
OAKVILLE POWER PLANTUSD 380M
Scope : 900mw natural gas-fired combined cycle power plantAker Solutions with HDR Corp will execute engineering, procurement and construction work, commissioning by the end of 2013
BRATSK CHLORINE DIOXIDE PLANT - USD 18M
The plant will be built at Ilim's pulp & paper mill, capacity 15t/d. Contract to be executed by Aker in Vancouver with support from the Moscow office
REGINA REFINERY EXPANSIONUSD 1,9 Billion
expansion of the refinery by 30% to 130,000b/d : addition of a fluid catalytic cracker complex, new storage facilities, revamping of several unitsCOLTWORLEYPARSONS has been awarded the contract to provide engineering, procurement and construction management services.The program manager is International Alliance Group (IAG), a subsidiary of Triten Corporation, Mustang Engineering to provide detailed design services to IAG
VANCOUVER LNG PEAK SHAVING PROJECT - USD 150 M
Horton CBI's contract covers the engineering, procurement & construction of a 1,5 Billion cubic feet LNG storage tank, the liquefaction and regasification systems and all related plan structures and systems
KOEBERG PBMR DEMONSTRATION POWER PLANTUSD 242M
Phase II of the Pebble Bed Modular Reactor Demonstration Power PlantIt will supply about 165 MweSNC LAVALIN and MURRAY & ROBERTS will carry out the engineering, procurement and construction.PBMR is owned by Eskom, the South African Industrial Develpt Corporation, the government and Westinghouse
MINERA Y METALURGICA DEL BOLEO
capacity 2400t/dpart of a mining & processing complex to produce copper & cobalt
HAMRA GAS PROCESSING FACILITIES - USD 1,09 B
Lavalin's contract calls for a gas treatment complex including infrastructure to collect raw gas at 4 fields (Rhourde Nouss Central, Rhoude Nouss South/East, Rhourde Adra and Rhourde Adra South), a natural gas processing facility and a facility to process and reinject carbon dioxide into gas fields.
HILLA & AL TAJI POWER PLANTSUSD 170M
SNC LAVALIN will install 2 gas turbines at the Hilla Power Plant (125mw each), URUK GROUP will install four turbines at the al Taji power plant (160mw) - each contract has a USD 85M value
SECUNDA CAN PLANTUSD 96M
Scope : 400,000t/y of calcium ammonium nitrateSNC LAVALIN selected to provide engineering, procurement & construction management services after having carried out the conceptual study and the basic engineering
TABASCO COGENERATION PLANT - USD 633 M
A consortium made of Abengoa Mexico and Abener has been awarded the turnkey construction of the 300mw plant + operation & maintenance for 20 years. Project value USD 633M
CADEREYTA & MADERO CLEAN FUELS PROJECT - USD 638M
ICA FLUOR will be responsible for the epc covering the installation of gasoline desulfurization plants, amone regeneration units, offsites, utilities and integration for both refineries, work to be complete in 44 months
POZA RICA CRYOGENIC PLANTUSD 268M
Contract won with Linde Process Plants. The cryogenic plant will be built at the Poza Rica Gas Processing Complex. The consortium will be responsible for the engineering, procurement, construction, testing and start-up. Work to start in august 09, when commissioned the plant will process 200 million cubic feet of natural gas per day
SALINA CRUZ & MINATITLAN CLEAN FUELS PROJECTUSD 620 M
Scope : construction of gasoline desulfurization units at both refineries. Contrat won against Dragados, Technip, saipem, ABB, Tecnimont with Samsung
SALAMANCA SULFUR RECOVERY UNIT - USD 50M
Scope : 80t/d Contract awarded to ISOLUX with TECNA and TECHNIP. Work to start immediately for commissioning in October 2011
DEEP PANUKE FIELD (SURF PACKAGE) - USD 195M
Scope : installation and tie-in of 17km infield flowlines (8") and umbilicals to four production wells, an acid gas disposal flowline connecting to a Production Field Centre
PASCAGOULA LNG TERMINALUSD 1,1 BILLION
Scope : a 1,5 Billion cf/d terminal, two 160,000cm LNG tanks and a vaporization systemAKER KVAERNER has received the full notice to proceed with the USD 680M contract won in association with IHI/USA
65 / 73
FIRM PROJECTS AWARDED TO AMERICAN COMPANIES
Last Update Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
May 2008 AKER KVAERNER USA USA DUPONT
January 2010 AMEC USA USA FLAMBEAU RIVER BIOFUELS
April 2009 BE&K CONSTRUCTION COMPANY USA USA PROGRESS ENERGY FLORIDA
May 2008 BE&K ENGINEERING COMPANY USA USA DUPONT
June 2007 BECHTEL USA NIGERIA BRASS LNG LTD
August 2006 BECHTEL USA USA MOTIVA ENTERPRISES
October 2006 BECHTEL USA USA PEABODY ENERGY
February 2007 BECHTEL USA ANGOLA
January 2008 BECHTEL USA USA DUKE ENERGY
February 2008 BECHTEL USA LIQUID NIUGINI GAS
February 2010 BECHTEL USA AUSTRALIA CURTIS LNG PLANT QGC / BG Group
COOPER RIVER FIBER PLANTUSD 500 M
the new plant will increase global Kevlar production capacity by more than 25% - BE&K Engineering in joint venture with AKER SOLUTIONS selected as EC contract, known as JBEK joint venture.
FLAMBEAU RIVER BIOFUELS PROJECT - USD 250 M
the plant will convert 1,000 dry tons per day of biomass into green electrical power, steam and heat and green diesel fuel and wax.AMEC/HOUSTON and MIRON CONSTRUCTION selected as EPC Contractors
RICHMOND COUNTY POWER PLANT - USD 600 M
Scope : 600mw natural gas-fueled power plantBE&K CONSTRUCTION, part of KBR, will provide general construction services including power generation and auxiliary equipment, piping works
COOPER RIVER FIBER PLANTUSD 500 M
the new plant will increase global Kevlar production capacity by more than 25% - BE&K Engineering in joint venture with AKER SOLUTIONS selected as EC contract, known as JBEK joint venture. Engineering to be done from Wilmington offices
BRASS LNG PROJECTUSD 3,5 BILLION
Scope : two trains, each with a capacity of 5 Million t/yIn november 2004, BECHTEL with the local NETCO has been awarded the FEED, the FEED will be rolled into EPCIn june 2007 BECHTEL has received the project management contract, the EPC contract will start when final investment decision is taken
PORT ARTHUR REFINERY EXPANSIONUSD 7 Billion
the capacity of the refinery will be boosted by 325,000b/d to 600,000b/dContract awarded to BECHTEL in association with JACOBS ENGINEERINGGo ahead given in September 2007 March 09 : Motiva is delaying the completion of the project from end of 2010 to the first quarter of 2012
PRAIRIE STATE ENERGY POWER PLANT - USD 2 BILLION
1500mw coal-fired power plantBECHTEL has signed a Letter of Intent for the EPC services, replacing FLUOR who signed a LOI in 2004, but the contract has not been finalized In June 2007 the EPCM contract has been signed with BECHTEL, contract value USD 2,9B. BABCOCK&WILCOX has the contract for the boiler systems, TOSHIBA for the turbines
SOYO LNG PROJECTUSD 4 BILLION
ANGOLA LNG Scope : a 5,2 Million t/y plantCHEVRON indicates in a press release that a contract for advance engineering & procurement has been awarded to BECHTEL. The project procurement manager is Mike Price in HoustonFebruary 2008 : Final Investment decision has been taken, the plant will use ConocoPhillips's technologyJune 2008 : SAIPEM has won a USD 252M contract from Bechtel to build 5 tanks
EDWARDSPORT POWER STATIONUSD 2 BILLION
Scope : 630mwDuke Energy has received the air permit for the coal gasification power plant, work is expected to start in spring. The plant will use integrated gasification combined cycle technology, a coal gasifiction system to convert coal into a synthesis gas. The contract will be carried out by BECHTEL and GE following an agreement signed several years ago
PAPUA NEW GUINEA
NAPA NAPA LNG PLANTUSD 4 BILLION
Scope : capacity of 5 Million t/yBECHTEL has been selected to undertake the FEED and engineering, procurement and contracting work for the plant, ConocoPhillips will provide the technologthe formal award of the contract is subject to final shareholder approval
Scope : 2 trains 8,5 million t/yBECHTEL has officially signed the EPC contract in February 2010. Full notice to proceed to be given later this yearBechtel has been issued an initial notice to proceed, as part of a US$3 billion commitments, to order long-lead items for the LNG plant such as compressors and storage tanks and to begin preparations for initial site construction
66 / 73
FIRM PROJECTS AWARDED TO AMERICAN COMPANIES
Last Update Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
June 2010 BECHTEL USA USA CHENIERE ENERGY
August 2005 BLACK&VEATCH USA USA CPS ENERGY
July 2008 BLACK&VEATCH USA THAILAND GLOW ENERGY
April 2008 CBI USA QATAR QAFCO-V STORAGE PROJECT QAFCO
January 2009 CBI USA CHINA CNOOC FUJIAN LNG Co Ltd
March 2009 CBI USA ECUADOR FLOPEC
July 2009 CBI USA ABU DHABI GASCO
September 2009 CBI USA PANAMA PETROTERMINAL DE PANAMA
October 2009 CBI USA AUSTRALIA CHEVRON/EXXONMOBIL/SHELL
October 2009 CBI USA USA UGI LNG Inc
November 2009 CBI USA COLOMBIA REFICAR
December 2009 CBI USA EXXONMOBIL
May 2010 CBI USA USA OCCIDENTAL OF ELK HILLS
June 2010 CBI USA ABU DHABI TAKREER
August 2008 CICSCO USA IRAQ MINISTRY OF OIL
October 2009 FLOATEC USA BRAZIL PETROBRAS
SABINE PASS LNG TERMINAL EXPANSION
The project will transform the terminal into a bi-directional facility capable of liquefying and exporting natural gas in addition to importing and regasifying LNG; in a first phase construction of two trains with liquefaction capacity of 1 billion cf/d. BECHTEL who built the original receiving terminal has been selected to build the liquefaction facilities. Start of construction depending on regulatory approvals and final investment decision
CALAVERAS LAKE POWER PLANT
Capacity of 750mw, project also known as Unit 2 of the J.K.Spruce Power plant. The contract has been awarded to the consortium "Calaveras Power Partners" including ZACHRY CONSTRUCTION and BLACK&VEATCH. Alstom Power will supply the boilers
COMBINED-CYCLE POWER PLANTUSD 302M
Scope : 380mw to be located at Map Ta Phut/RayongMARUBENI will be responsible for procurement of main equipment of the plant such as gas turbine generator and steam turbine generator from Siemens as well as overall civils and installation works. BLACK&VEATCH will be the technical maanger, responsible for engineering, plant equipment procurement, construction management, start-up & commissioning
Scope : two ammonia storage tanks with a capacity of 50,000 tonsCB&I has been awarded the contract by the main contractor, i.e HYUNDAI/SNAMPROGETTI
FUJIAN LNG TERMINAL EXPANSION PROJECT
CB&I's contract scope includes engineering, procurement and construction of two additional LNG storage tanks (160,000 cubic meters)
MONTEVERDE STORAGE FACILITIES - USD 50 M
Scope : engineering, procurement, fabrication and construction of several refrigerated storage tanks and spheres with a total capacity of 650,000b/d
IGD PROJECT (RUWAIS STORAGE TANKS) - USD 533 M
Scope : engineering, procurement, fabrication and contruction of 6 low temperature/cryogenic storage tanks, two ambient storage tanks and the associated piping, power distribution & civil works
PANAMA TERMINAL EXPANSIONUSD 100M
CB&i's contract includes the design & construction of 5,4million barrels of crude oil storage and the associated civil, mechanical & electrical work at PTP's terminal facilities in Chiriqui Grande and Puerto Armuelles
GORGON LNG PJt (STORAGE TANKS) - USD 550M
CB&I's contract includes engineering, procurement, fabrication & construction of two 180,000cm full containment LNG tanks, four condensate tanks & associated piping, electrical, instrumentation & civil works
TEMPLE LNG EXPANSIONUSD 100M
scope : addition of a new 50,000 cubic meters lng storage tank + related processing facilities designed to provide 150 million cubic feet of natural gas per day during peak demand periods
CARTAGENA REFINERY EXPANSION - USD 1,4 B
CB&I will provide project management and the engineering, procurement services, fabrication and construction of the new plant including crude & vacuum distillation units, fluir catalytic cracker, naphtha hydrotreater, diesel hydrotreater, hydrocracker, hydrogen plant, sulfur plant, delayed coker, HF Alkylation, C4 isomerization, power generation, offsites & utilities.CB&I carried the FEEDIn december 09, FOSTER WHEELER USA selected as PMC for the project
PAPUA NEW GUINEA
PNG LNG PROJECT(Hides Gas Plant)
Scope : Hides Gas Conditioning Plant including nearby wellheads and associated piping and infrastructure.Contract won in association with CLOUGH (CBI 65%)
ELK HILLS GAS PROCESSING PLANT - USD 280M
Scope : engineering, procurement and construction of a 200 million cf/d natural gas processing plant including fractionation, storage tanks and export pipelines
PROPYLENE TANKS AT RUWAIS REFINERY - USD 70M
DAEWOO, the main contractor for the Takreer Refinery Storage Package has subcontracted the propylene tanks to CB&I - contract value USD 70M - Commissioning in 2013
SAMAWAH REFINERY UPGRADING - USD 81 M
The contract covers a new unit that will produce 1200 cubic meters of gasoline per day - Contract to be carried out with VECO (CH2H Hill)www.cicsco.com
PAPA TERRA FLWP P-61USD 1 BILLION
Letter of Intent issued to FLOATEC (JV between Keppel Offshore & Marine Ltd and J.RAY McDermott) for the tension leg wellhead platform. Contract to be signed officially later.Final Investment Decision taken by CHEVRON in January 2010
67 / 73
FIRM PROJECTS AWARDED TO AMERICAN COMPANIES
Last Update Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
October 2006 FLUOR USA USA BP
January 2008 FLUOR USA USA MARATHON OIL
March 2008 FLUOR USA USA TOTAL
August 2008 FLUOR USA USA VALERO ENERGY
November 2008 FLUOR USA USA
December 2008 FLUOR USA USA
April 2009 FLUOR USA USA DOMINION VIRGINIA POWER
April 2010 FLUOR USA QATAR QATARGAS
September 2007 FOSTER WHEELER USA SINGAPORE EXXONMOBIL
October 2007 FOSTER WHEELER USA SINGAPORE EXXONMOBIL
August 2008 FOSTER WHEELER USA USA BP
November 2007 GENERAL ELECTRICS USA ALGERIA SONELGAZ
January 2009 J.RAY McDERMOTT USA BHP BILLITON TRINIDAD
August 2006 JACOBS ENGINEERING USA USA MOTIVA ENTERPRISES
April 2007 JACOBS ENGINEERING USA USA BP
October 2008 JACOBS ENGINEERING USA USA FLINT HILLS RESOURCES
WHITING REFINERY UPGRADINGUSD 3,8 BILLION
Fluor will provide the overall program management for the upgrade + independent engineering, procurement & fabrication of 3 major packages : revamping of the crude distillation unit, a gas-oil hydrotreater and the refinery infrastructure facilities. In august 2008 FLUOR announced that detailed engineering & construction work started in July. Fluor will book USD 3,8 Billion into its backlog
DETROIT REFINERY EXPANSIONUSD 1,9 BILLION
Scope : the project will increase the heavy oil processing capacity by 80,000b/d and the total refining capacity by 15% to 115,000b/dFLUOR has been awarded the USD 1,6 billion EPC contractIn February 2009, MARATHON plans to delay the completion of the expansion by about 18 months, i.e mid 2012. Construction will not stop byt will continue at a slower pace
PORT ARTHUR REFINERY EXPANSION - USD 2,2 BILLION
Scope : a 50,000b/d coker, a 64,000b/d desulfurisation unit, a 55,000b/d vacuum distillation unit + other related unitsFLUOR has been awarded the USD 1,9 Billion contract, it will be executed by FLUOR's offices in Aliso Viejo/alifornia, Houston and New Delhi/India
St CHARLES & PORT ARTHUR HYDROCRACKERS - USD 1,2 B
Project called HCU Program Expansion Project - Each hydrocracker to have a capacity of 50,000b/dFLUOR in Houston, Calgary and New Delhi will execute the contractValero is suspending the project in June 2009
JACK COUNTY GENERATING FACILITY UNIT 2 POWER PLANT
BRAZOS ELECTRIC POWER COOPERATIVE
620MW Gas-fired, combined cycle expansion. Contract to be executed by Fluor Irvine - Work to start on site in July 09
WOOD RIVER COKER REFINERY EXPANSION
WRB REFINING CO(CONOCOPHILLIPS/ENCANA)
FLUOR was awarded the contract for the construction & construction management of proces, utility & offistes in connection with the coker expansion. The FEED was done by FLUOR. Work will be executed by teams from Fluor/Calgary, Houston and New Delhi
BEAR GARDEN POWER STATIONUSD 619 M
Scope : 580mw gas-fired combined cycleEPC contract for FLUOR
RAS LAFFAN GAS RECOVERY PROJECT - USD 1 BILLION
project also called "jetty boil-off gas project". It will recover and collect vapors created from the production of LNG and reduce the amount of gas that has to be flared. The project design is based on collection of the LNG boil-off gas from the LNG carriers and transfer of this gas to a central compression area via large diameter stainless steel pipes. At the central compression area, the gas will be compressed and sent to the LNG trains. Contract followed by FLUOR in Texas with a support team based in Qatar
JURONG 2nd PETROCHEMICAL COMPLEX (O&U portion)
FOSTER WHEELER with WORLEYPARSONS are in charge of project coordination & services & infrastructure EPC. They did the FEED
JURONG 2nd PETROCHEMICAL COMPLEX (aromatics&oxo-alcohols)
Besides the project coordination contract, FW will carry out the EPC for modification and expansion of aromatics & oxo-alcohol facilities : a 340,000t/y benzene unit from an aromatics extraction unit, a 125,000t/y oxo-alcohol unit expansion, a 80,000t/y paraxylene expansion
WHITING REFINERY DELAYED COKER
The project is part of the major expansion aimed to increase gasoline production by 1,7 million gallons a dayFW will provide engineering, procurement and fabrication of a 102,000b/d six-drum delayed coker and gas plant facilities
KOUDIET EDRAOUCH POWER PLANT - USD 2,1 Billion
Scope : 1200mwGENERAL ELECTRICS/USA with IBERDROLA/SPAIN has won the construction contract
TRINIDAD TOBAGO
ANGOSTURA GAS EXPORT PLATFORM PROJECT
J.RAY will fabricate a 4,000 ton integrated topside platform, a 800ton four-legged jacket and 1,000 tons of piles. Construction to take place at J.RAY's Morgan City/Louisiana facility
PORT ARTHUR REFINERY EXPANSION
the capacity of the refinery will be boosted by 325,000b/d to 600,000b/dContract awarded to BECHTEL in association with JACOBS ENGINEERINGGo ahead given in September 2007
WHITING SRU & HYDROTREATER PROJECT
one package convers licensing, design and construction of sulfur recovery facilities, project carried out by the Baton Rouge center, the other package includes the revamp of several hydroprocessing units, project carried out by Jacobs in Houston
CORPUS CHRISTI DIESEL DESULFURIZATION UNIT
Part of a USD 250M investment including also a sulfur recovery unitJACOBS's contract covers a diesel desulfurization unit - work's duration : 18 months
68 / 73
FIRM PROJECTS AWARDED TO AMERICAN COMPANIES
Last Update Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
January 2009 JACOBS ENGINEERING USA USA EXXONMOBIL
July 2008 KBR USA DENMARK MAERSK OLIE
August 2009 KBR USA SAUDI ARABIA
July 2007 KBR USA ALGERIA SONATRACH
March 2010 KBR USA USA BP-HUSKY
October 2008 KIEWIT ENERGY USA USA JORDAN COVE ENERGY
August 2008 MODEC USA GHANA JUBILEE FPSO TULLOW GHANA Ltd
April 2009 PROENERGY EPC SERVICES USA PAKISTAN WALTERS POWER INT
December 2006 SHAW GROUP USA CHINA SNPTC
April 2007 SHAW GROUP USA USA ENTERGY
April 2007 SHAW GROUP USA USA DOMINION
May 2007 SHAW GROUP USA USA SWEPCO
September 2007 SHAW GROUP USA SINGAPORE EXXONMOBIL
BAYTOWN & BATON ROUGE DIESEL PROJECTS
The two projects will allow the refineries to meet rising diesel demand through the construction of new units and modification of existing facilities.JACOBS ENGINEERING selected to provide engineering, procurement & construction services
HALFDAN PHASE IV PROJECT KBR has been awarded a USD 16,5M contract to provide detailed engineering foa the platform to be built by SMOE SINGAPORE
YANBU REFINERY (UTILITIES PACKAGE)
SAUDI ARAMCOCONOCOPHILLIPS
KBR, who is the FEED and project management contractor has been awarded the contract to provide detailed engineering & procurement services for the utilities package and the interconnecting systems and pipe racks
SKIKDA LNG PLANT RECONSTRUCTION - USD 2,8B
The LNG plant will have a capacity of 4,5 Million t/yKBR selected in association with JGC in june 2005 for the contractIn January 2006, information that the engineering work has started at KBR's office in HoustonIn july 2007 SONATRACH and KBR agreed on a price of USD 2,851 Million after several months of negotiations, work will start in september and will be complete 50 months later In January 2008 AIR PRODUCTS announced that they received an order from KBR to provide process technology and main cryogenic heat exchanger In June 2008 ORASCOM has been awarded the civil works
TOLEDO REFORMER 3 PROJECTUSD 400M
scope : replacement of two existing naphtha reformers and a hydrogen plant with a single reformer. The unit will increase the refinery's gasoline yields.Contract to be followed by KBR in Houston, Monterrey/Mexico
JORDAN COVE LNG TERMINAL JORDAN COVE ENERGY has selected 4 companies to design & build the project : KIEWIT (construction of the terminal), BLACK&VEATCH (engineering design), ENTREPOSE CONTRACTING AND VINCI GRANDS PROJETS/F (LNG tanks). However the project has still to be approved before construction starts.The LNG terminal will have a capacity of 1 Billion cubic feet per day, two storage tanks (160,000cm each)
The FPSO will be able to process 120,000 barrels of oil per day and injecting more than 230,000b/d of water per day and 160 MMcf/d of produced gas
GUDDU & NAUDERO POWER PLANTS - USD 100M
Guddu : 110mw - Naudero 50mwPROENERGY EPC SERVICES has won the EPC contract, engineering work subcontracted to EDG ENGINEERS in Tulsa
CONSTRUCTION OF 4 NUCLEAR PLANTS - USD 8 BILLION
The 1,1 gigawatt plants will use Westinghouse advanced AP 1000 Design. SHAW will provide engineering, procurement and management services - the plants will be located at Sammen in Zhejiang Province and Haiyang in Shangdong provincethe definitive contract has been signed in July 2007
LITTLE GIPSY REPOWER PROJECT - USD 1 BILLION
the work will include replacing an existing natural gas-fired boiler with two new CFB boilers which will supply steam to an existing steam turbine generator. SHAW's EPC contract will also cover the fabricated piping systems and structural steel
SOUTHWEST VIRGINIA POWER PLANT
Scope : 585mw The contract will be executed in two phases, the first one will involve design, engineering, major equipment selection and finalisation of project cost. Upon the necessary regulatory approvals, SHAW will continue with EPC activities
JOHN W.TURK ELECTRIC GENERATING PLANT USD 1,3 BILLION
Scope : 600mw - it will use an ultra supercritical advanced pulverized clean coal combustion technologySHAW has been awarded the USD 700M EPC contract - BABCOCK & WILCOX has won the USD 250M contract for the pressure boiler, to be followed by B&W in Balberton
JURONG 2nd PETROCHEMICAL COMPLEX (Ethylene package)
Scope : capacity 1 million t/ySHAW GROUP has been awarded the contract to provide technology, engineering, procurement & construction services
69 / 73
FIRM PROJECTS AWARDED TO AMERICAN COMPANIES
Last Update Contractor Final Destination Project Name End User Scope / SituationContractor's nationality
September 2007 SHAW GROUP USA SINGAPORE EXXONMOBIL
April 2008 SHAW GROUP USA USA VOGTLE NUCLEAR PLANT GEORGIA POWER CY
May 2008 SHAW GROUP USA USA DUKE ENERGY CAROLINAS
May 2008 SHAW GROUP USA USA SCE&G/SANTEE COOPER
October 2008 SHAW GROUP USA USA NV ENERGY
January 2009 SHAW GROUP USA USA PROGRESS ENERGY FLORIDA
November 2009 SHAW GROUP USA TURKEY ALIAGA ETHYLENE EXPANSION PETKIM
August 2008 TECHNIP USA USA VALERO ENERGY
April 2009 TECHNIP USA USA MARATHON OIL
October 2009 TECHNIP USA GHANA JUBILEE FIELD (subsea) TULLOW GHANA Ltd
October 2009 TECHNIP USA USA LULING HYDROGEN PLANT MONSANTO
February 2010 VECO USA ABU DHABI ADCO
January 2009 WORLEYPARSONS USA SAUDI ARABIA
June 2010 ZACHRY INDUSTRIAL USA USA
JURONG 2nd PETROCHEMICAL COMPLEX (Power plant package)
Scope : capacity 220mwSHAW GROUP has been awarded the contract to provide engineering, procurement & construction
SHAW GROUP and WESTINGHOUSE have been awarded an EPC contract for two Westinghouse API 1000 nuclear units & related facilities at the existing Vogtle plant - capacity 1100mwFull notice to proceed with the EPC contract received in April 2009
CONSTRUCTION OF A GAS-FIRED POWER PLANT
SHAW has been selected to build the plant at Buck Steam Station in North Carolina - the plant will have a capacity of 620mw, in a first phase to be completed by summer 2010 it will start operation in simple cycle, one year later in combined cycle
VC SUMMER NUCLEAR UNITSUSD 9,8 BILLION
SHAW GROUP and WESTINGHOUSE have been awarded an EPC contract for two Westinghouse nuclear units at the existing V.C. Summer Sitecapacity 117mw - commissioning in 2016 and 2019
NEVADA GAS-FIRED POWER PLANT - USD 400 M
Scope : 500mw combined cycle, natural gas-fired, to be built at the existing Harry Allen Generating StationNV Energy is part of Sierra Pacific Resources - EPC contract for SHAW
LEVY COUNTY NUCLEAR PLANTUSD 7,6 BILLION
Scope : two units capacity of 1100mw eachepc contract won with WESTINGHOUSEApril 2009 : the project will be delayed by 20 months as work cannot start before NRC's approval which is expected to be given in 2011 or 2012
Scope : the 520,000t/y plant will be expanded by 10%SHAW will provide engineering & procurement services and addition study work
PORT ARTHUR REFINERY EXPANSION (2 UNITS)
TECHNIP's scope of work includes two processing units including a saturate gas recovery unit and an amine treatment unit + offsites associated with the expansion project.The contract is part of a USD 2,4 Billion expansion.
DETROIT REFINERY HYDROGEN PLANT
AIR PRODUCTS signed in April an agreement to build an hydrogen plant to supply Detroit Heavy Oil Upgrade Project. The plant will have a capacity of 50 million cf/d. It will be built by Technip through the global alliance signed between the two companies
Technip has won 2 contracts, one for flexible risers and one for 48km of production, gas & water injection rigid flowlines + installation of 26km of umbilicals, 9 flexible risers, connection of the flowlines to the wellheads and subsea manifold. The second contract will be executed by Houston
AIR PRODUCTS will build an hydrogen plant at Luling site, it will be built by Technip the the global alliance between the two companies. Production of 100 million cf/d of hydrogen
BIDA EL QEMZAN FIELD DEVELOPMENT - USD 300M
VECO (now CH2M HILL) who acted as management consultant and was working on the detailed engineering, will now order the equipment and materials for the oil gathering & pumping systems, pipeline network, water injection facilities
YANBU REFINERY CLEAN FUELS PROJECTUSD 2 B
SAMREF(Saudi Aramco / ExxonMobil)
Scope : construction of new units such as a 40,000b/d hydrotreater, a sulphur recovery unit, an hydrogenation unit, a sour water splitter and a heavy naphta hydrotreater + offsites & utilitiesWorley Parsons to execute the Front End Engineering Design (FEED) and Detailed Engineering, Procurement & Construction (EPC). Contract to be followed by Monrovia/California office - WorleyParsons's Al Khobar office will provide in-kingdom logistics support
COLETO CREEK 2 POWER PROJECT - USD 1,4 B
INTERNATIONAL POWER SOUTH TEXAS ELECTRIC COOP
Scope : 650mwZACHRY INDUSTRIAL has been selected as EPC contract part of a consortium including BURNS & McDONNELL ENGINEERING and MITSUBISHI POWER SYSTEMS AMERICA. Work to start early 2011
70 / 73
FIRM PROJECTS AWARDED TO MIDDLE EAST / AFRICAN COMPANIES + OTHERS
Last Update Contractor Contractor's nationality Final Destination Project Name End User Situation
May 2007 J.RAY McDERMOTT ABU DHABI SAUDI ARABIA MANIFA FIELD PLATFORMS SAUDI ARAMCO
June 2010 J.RAY McDERMOTT ABU DHABI ABU DHABI ADMA OPCO
May 2009 NPCC ABU DHABI ABU DHABI ADMA OPCO
September 2009 NPCC ABU DHABI INDIA ONGC
December 2009 NPCC ABU DHABI ABU DHABI ADCO
December 2009 NPCC ABU DHABI INDIA ONGC
March 2010 NPCC ABU DHABI QATAR OCCIDENTAL PETROLEUM
May 2010 NPCC ABU DHABI ABU DHABI ADMA OPCO
January 2009 PETROFAC ABU DHABI ABU DHABI ADCO
July 2009 PETROFAC ABU DHABI ABU DHABI GASCO
November 2009 TECHNIP ABU DHABI ABU DHABI GASCO
June 2008 VALENTINE MARITIME ABU DHABI SAUDI ARABIA SAUDI ARAMCO
Scope : construction of 13 new platforms and modifications to 26 existing offshore well platformsJ.RAY McDERMOTT has signed the turnkey contract : engineering, procurement, fabrication, transportation, intallation and hook-up
LOWER ZAKUM FIELD (Platform, water injection) - USD 350 M
Scope : an offshore platform and water injection facilities (2 packages)contract won against Technip
IGD PROJECT (OFFSHORE PORTION) - USD 405M
Scope : a gas processing platform at Um Shaif (8,000/9,000 tonnes), a flare system linked by a bridge to the Umm Shaif Super Complex, a 39km pipeline(42") to Das IslandNPCC selected in May 09 by Adma Opco, a formal contract will be signed soon.
B-22 FIELD DEVELOPMENTUSD 278M
NPCC's contract will cover a wellhead platform, two other wellhead platforms and 90km of pipelines. Contract won against PunjLLoyd and Larsen & Toubro
BAB & QUSAHWIRA FIELDS DEVLPT - USD 1,25 B
Bab : Infrastructure facilities for 53 wells ( Flowlines and pipelines, Water handling systems, Associated utilities)Qusahwira : Infrastructure facilities for 44 wells (GOSP facilities, Gas re-injection facilities) part of the 1,8 Million project Official contract for BAB signed in February 2010 for USD 693MOfficial contract for Qusahwira signed in March 2010 for USD 560M
RS-11 WELL PLATFORMUSD 162 M
Located in Mumbai High FieldNPCC's contract covers design, detailed engineering, procurement, fabrication, transportation, intallation & commissioning
IDD AL SHARGI PIPELINES UPGRADING PJT - USD 82M
Part of the third phase of infrastructure upgrades. Contract won against J.RAY McDermott and GLOBAL INDUSTRIESExact scope to be determined
ZAKUM CENTRAL SUPER COMPLEX DEMOTHBALLINGUSD 350M
Part of the Lower Zakum programme aimed at enhancing the oil production capacity from the Zakum field. NPCC's workscope includes detailed engineering, procurement, construction, commissioning for major complex brown field works on Zakum Central Complex and a new accomodation platform (NAP) comprising a living quarters module
SAS PROJECT - PACKAGE AUSD 2,3 BILLION
Petrofac's contract covers the Asab Field : upgrading of the facility's capacity to accept production from Sahil, Shah and other fields and to upgrade the associated utilities and water handling facilities. Once completed the production at Asab will increase from 280,000b/d to 310,000b/d
IGD PROJECT (RUWAIS 4th NGL TRAIN) - USD 2,1 BILLION
The facility will produce 4761t/d of ethane, 7657t/d of propane, 9364t/d of butane, 5546t/d of paraffinic naphtha and 6712t/d of condensate return.Contract won in association with GS ENGINEERING & CONSTRUCTION SOUTH KOREA
ASAB 3 GAS PROJECTUSD 415 M
Asab3 will be developed to process an additional 150 million cf/d of associated gas from Aab, Shah and Sahil fields. The project involve a new booster station to transport 450 MMcf/f from the Adco facilities and expansion of existing plant (new compression & treatment facilities. A 16" pipeline will also be builtcontract to be executed by Technip in ABu Dhabi
MANIFA FIELD PIPELINESUSD 450 M
Scope : Crude gathering & water injection pipelines, Power & Fibre Optic Cablesthe project will start in July 2008, project followed by VM in Abu Dhabi and in Saudi
71 / 73
FIRM PROJECTS AWARDED TO MIDDLE EAST / AFRICAN COMPANIES + OTHERS
Last Update Contractor Contractor's nationality Final Destination Project Name End User Situation
March 2009 ABB SARPI ALGERIA ALGERIA SONATRACH ANADARKO
June 2009 ABB SARPI ALGERIA ALGERIA SONATRACH
November 2008 COSIDER ALGERIA ALGERIA SONELGAZ
January 2010 DODSAL DUBAI ABU DHABI GASCO
January 2010 DODSAL DUBAI ABU DHABI ELIXIER
June 2009 PETROJET EGYPT ALGERIA SONATRACH
April 2008 ARAS CONSORTIUM IRAN IRAN SOUTH PARS PHASE 12 (EPC1) PETROPARS
December 2008 HAMPA ENGINEERING IRAN IRAN
December 2008 HAMPA ENGINEERING IRAN MALAYSIA EL-ONE RESOURCES
September 2007 IGC IRAN IRAN NIORDC
March 2009 MEHVAR SAZAN IRAN IRAN ASSALUYEH AMMONIA PLANT STAR ARIA AMMONIA CHEMICAL CY
March 2007 NAMVARAN IRAN IRAN ESFAHAN OIL REFINING CY
EL MERK FIELD DEVLPT(flowlines/gathering) - USD 673M
Scope : design & installation of pipelines, field gathering stations, gas ditribution manifolds and flowlines/trunklines as wel as water and gas-reinjection facilities. The pipeline network wil connect oil & gas wells to the processing plant via 10 gathering stations Contract won in association with PETROJET, ABB's share of the contract is USD 490M.
HADOUD BERKAOUI GAS FLARING PJT - USD 233M
The contract include new compressor trains, re-instrumentation of existing gas treatment plants at Haoud Berkaoui, Benkhala and Gellala + an integral control systemABB will be responsible for the engineering, procurement and commissioning of the project while construction activities will be carried out by SARPI
GREO GAS PIPELINE(packages 1 - 2- 3 ) USD 156M
Scope : 263km between Khenchla à M’sila Contract awarded to a consortium including COSIDER, KANAGHAZ, ENCA and ERCIYAS/TURKEY
PIPELINE BETWEEN THAMAMA C and ASAB FACILITIES - USD 85M
Scope : 36" pipeline between the Thamama C Facilities and the Asab facilities, part of the ABBR program
MIRFA/HABSHAN NITROGEN PIPELINE - USD 84M
45km 48" between Mirfa facilities and the Habshan fieldElixier is a JV between ADNOC and LINDE
GK-3 PIPELINE (pack 1 & 2)USD 800M
Scope : pack 1 = 270km between Hassi R'Mel and Chaiba - pack 2 = 163km between Chaiba and Mechtatinethe whole GK-3 pipeline will be 784km long from Hassi R'Mel to El Kala (48")
PETROPARS has awarded the USD 284M contract to the iranian ARAS (Aria Pishro Gharn, Radira, Asphalt Toos, Steam). ARAS will be responsible for constructing 4 metal storage tanks with 90,000cm capacity each, putting liquid gas reserves into operation and setting up fuel, water & fire extinguishing systems
CONSTRUCTION OF 3 AMMONIA UREA COMPLEXES
NIPCNIPC
Zanjan Petrochemical Cy Lordegan Petrochemical CyGolestan Petrochemical Cy
corresponding to the 10th, 11th and 12th Ammonia-Urea Projects to be located in Zanjan, Lordegan and Golestaneach plant will have a capacity of 2050t/d of ammonia (Casale process) and 3250t/d of urea (Stamicarbon). After having done the FEED, HAMPA is moving into the EPC phase
PUTRANA REFINERYUSD 6,8 BILLION
the refinery will have a capacity of 230,000b/d, it represents an investment of USD 6,8 Billion. HAMPA ENGINEERING selected as general contractor for the project, responsible to fulfill all pre-EPCC and EPCC works in relation with the studies, engineering, supply of equipment and materials, construction and commissioning
TEHRAN REFINERY UPGRADING PHASE II - USD 310 M
Scope : a 55,000b/d gas oil HDT, a 31,000b/d kerosene HDT, a 10,000b/d LPG recovery unit, a 112MMcf/d H2 plant - the project will modify the refining process and transform the heavy products to light productsthe EPC contract has been awarded to a consortium of local companies led by IGC, including ODCC and D&I
Scope : capacity of 720t/d on Haldor Topsoe technologyEPC contract awarded to CHINA TIANCHEN CHEMICAL ENGINEERING CORPORATION (CHINA-TCC) with the local MEHVAR SAZAN
ESFAHAN REFINERY UPGRADINGUSD 1720 M
The production of the gasoline will be boosted from 9 million liters to 12 millions. The contract will be executed by DAELIM, UHDE, LURGI and the local companies NAMVARAN, NARGAN and CHEGALESH. Technip is the project management consultant. The upgrading involves construction of several units
72 / 73
FIRM PROJECTS AWARDED TO MIDDLE EAST / AFRICAN COMPANIES + OTHERS
Last Update Contractor Contractor's nationality Final Destination Project Name End User Situation
April 2007 NARGAN IRAN IRAN
March 2009 NARGAN IRAN IRAN ASSALUYEH SADAF CHEMICAL CY
May 2009 OIEC IRAN IRAN NIOC
June 2009 PIDECO IRAN IRAN IRAN LNG
February 2009 J.RAY McDERMOTT JEBEL ALI SAUDI ARABIA SAUDI ARAMCO
March 2010 J.RAY McDERMOTT JEBEL ALI SAUDI ARABIA SAUDI ARAMCO
November 2009 ROCKSON ENG NIGERIA NIGERIA KADUNA POWER PLANT MINISTRY OF POWER
February 2010 ZAKHEM BAYWOOD JV NIGERIA NIGERIA O.U.R GAS PIPELINE TEPNG
July 2008 ARABIAN BEMCO SAUDI ARABIA SAUDI ARABIA SEC
September 2009 ARABIAN BEMCO SAUDI ARABIA SAUDI ARABIA SEC
January 2010 ARABIAN BEMCO SAUDI ARABIA SAUDI ARABIA SEC
July 2009 DAYIM PUNJ LLOYD SAUDI ARABIA SAUDI ARABIA
July 2009 PETRO STEEL SAUDI ARABIA SAUDI ARABIA
July 2009 SAUDI ARABIA SAUDI ARABIA
LORESTAN & MAHABAD POLYETHYLENE PLANTSUSD 628 M
BAKHTAR PETROCHEMICAL CY(NPC's affiliate)
Scope : a 300,000t/y LLDPE/HDPE plant on Basell Technology and a 30,000t/y butene-1 unit on Axens Technology for each siteIn October 2005 TECNIMONT has won the EPC contract in consortium with NARGAN, then it was cancelled due to lack of finance. New signature in April 2007. The contract is coming into force in february 2008, but Tecnimont will only do the engineering
ASSALUYEH ESBR PLANTUSD 340 M
Scope : capacity of 100,000t/y - Polimeri Europa Technologycontract awarded to a consortium including TECNIMONT/ITALY and NARGAN/IRAN
SOUTH PARS PHASE 20 - 21USD 5,5 B
Contract signed on May 31scope : the two phases will produce 50 million cubic meters of gas, 80,000barrels of gas condensates, 400 tons of sulfur per day in addition to 1 million ton of ethane and 1,5 million tons of liquid propane per yearwork will take 52 months
TOMBAK LIQUEFACTION PLANTUSD 1 BILLION
Scope : capacity of 10,8 Million t/y (two trains 5,4 Mmt/y)GS E&C will carry out the contract with the local PIDECO
KARAN GAS FIELD(OFFSHORE PORTIONUSD 1,2 BILLION
Scope : construction of two flare structures, bridges, 10 wellhead platforms, 3 processing platforms and a gas pipeline (36")J.RAY Mc Dermott has reduced its offer by USD 100M
SAFANIYA FIELD UPGRADINGUSD 1 BILLION
Scope : engineering, procurement & installation of a new tie-in platform (STP-20) with a 6,000 tonne topside, a electrical deck module, a 53km 42" pipeline, four in-field laterial flowlines and valve skids, 156km of subsea cable, modification of 9 wellhead platforms
Scope : 200mwROCKSON ENGINEERING in consortium with GENERAL ELECTRIC OIL & GAS (Nuovo Pignone) has won the contract.The contract covers manufacture & supply of 8 GE gas turbines to be manufactured in Florence/Italy, design/engineering/procurement of balance of the plant
45,6km pipeline 42" from Obite to Ubeta and Rumuji.Total Nigeria signed the epc contract on January 29 with ZAKHEM NIGERIA and BAYWOOD CONTINENTAL
PP10 POWER PLANTUSD 3 BILLION
1200 mwARABIAN BEMCO has been selected, financing to be put in place
AL QURAYYAH POWER PLANT CONVERSION PJT - USD 1,85 B
The power plant will be converted into combined-cycle by adding five turbines to the facility with a total capacity of 1,330mwDOOSAN HEAVY will provide the steam turbines, heat recovery steam generators and other eleements for the plant
AL QASSIM POWER PLANT EXPANSION - USD 288M
Scope : addition of four gas turbines with a total capacity of 224mwBEMCO will execute the contract on a fast-track basis, to be completed in June 2010
JUBAIL REFINERY PROJECTPACKAGE 9 - USD 247M
SAUDI ARAMCOTOTAL
Scope : tank farm and vapour recovery system, transfer pipelines, air & sewer system, emergency diesel generator, port operation buildings and loading facilities
JUBAIL REFINERY PROJECTPACKAGE 6 - USD 745 M
SAUDI ARAMCOTOTAL
The package covers the refinery tank farm covering 62 atmospheric storage tanks and 8 bullett tanks. Work outside Saudi to be managed by Rotary Engineering in Singapore (USD 384M) Petro Steel is a joint venture between Rafiq Group and Rotary Eng -
GULF CONSOLIDATED CONTRACTORS
JUBAIL REFINERY PROJECTPACKAGE 8
SAUDI ARAMCOTOTAL
the job will cover 14 pipelinesestimated contract value USD 300M
73 / 73
FIRM PROJECTS AWARDED TO MIDDLE EAST / AFRICAN COMPANIES + OTHERS
Last Update Contractor Contractor's nationality Final Destination Project Name End User Situation
April 2008 PETROFAC SHARJAH KAZAKHSTAN AGIP KCO
July 2009 PETROFAC SHARJAH OMAN PDO
December 2009 PETROFAC SHARJAH TURKMENISTAN TURKMENGAZ
September 2008 FOSTER WHEELER SOUTH AFRICA SOUTH AFRICA SASOLBURG CHEMICAL PLANT SENMIN INTERNATIONAL
March 2010 FOSTER WHEELER SOUTH AFRICA SOUTH AFRICA SASOLBURG WAX EXPANSION SASOL
May 2008 ENKA TURKEY RUSSIA OGK-4
November 2008 GUNSAYIL TURKEY ALGERIA SONELGAZ
KASHAGAN 4th GAS COMPRESSION TRAINUSD 105 M
Petrofac's additional contract is to engineer and procure a fourth sales gas compressor train within the gas and LPG plant and undertake debottlenecking modifications to tranches 1 and 2 of the gas treatment plant. The project is necessary to accommodate the additional gas associated with the processing of the production from the third oil train.
KAUTHER GAS COMPRESSION PROJECT - USD 350 M
Petrofac will undertake the engineering, procurement and construction of the gas compression system and associated facilities at the plant, in addition to undertaking the commissioning and 6 months of initial operations. Petrofac built the existing plantIn september 09 AL HASSAN ENGINEERING/OMAN has ben selected by Petrofac to execute the civil, structural, piping, electrical & instrumentation works (contract value USD 47M)
SOUTH YOLOTEN GAS PJT(gas processing) - USD 3,9 B
in a first phase Petrofac will complete a feed study (USD 100M), the second phase includes engineering, procurement of a 10 Billion cm/y gas processing facililty along with infrastructure and pipelines for the entire 20 BCm development; Total contract value announced by Turkmengaz is USD 3,9 Billion for Petrofac
The facility will produce carbon disulfide and recover sulfur from hydrogen sulfide - EPC contract for FW
the expansion project will double Fischer Tropsch Hard Wax Production.FW will supply detailed engineerin and procurement as well as project construction management. Contract to be executed by FW in South Africa with support from Singapore
YAJVINSKAYA GRES CCGT POWER PLANT - USD 508 M
Scope : 400mw ENKA selected as EPC contractor, the equipment will be supplied by SIEMENS GERMANY
GREO GAS PIPELINE(package 5 ) USD 54M
About 80km (GG1 – Boughezoul)Gunsayil is also expected to take package 4 if it can submit a price of € 43M