Current Damage Assessment and Bridge Replacement

Bella Vista Property Owner’s Association

Bella Vista Flood Study Project No. 102594

Revision B 2/26/2018

Current Damage Assessment and Bridge Replacement

prepared for

Bella Vista Property Owner’s Association Bella Vista Flood Study Bella Vista, Arkansas

Project No. 102594

Revision B 2/26/2018

prepared by

Burns & McDonnell Engineering Company, Inc. Springdale, Arkansas

COPYRIGHT © 2018 BURNS & McDONNELL ENGINEERING COMPANY, INC.

Current Damage Assessment and Bridge Replacement Streambank Damage Assessment

Bella Vista Property Owner’s Association 1 Burns & McDonnell

INDEX AND CERTIFICATION

Bella Vista Property Owner’s Association Current Damage Assessment and Bridge Replacement

Project No. 102594

Report Index

Chapter

Number Chapter Title

Number

of Pages

1.0 Streambank Damage Assessment 2

2.0 Bridge Replacement 3

Appendix A Streambank Repair Cost 8

Appendix B Bridge Repair Cost 6

Appendix C Bridge Site Pictures 5

Attachment 1 Big R 1

Attachment 2 Contech 3

Attachment 3 Kingswood 18 Construction Cost 1

Current Damage Assessment and Bridge Replacement Streambank Damage Assessment

Bella Vista Property Owner’s Association 2 Burns & McDonnell

TABLE OF CONTENTS

EXECUTIVE SUMMARY Page No.

1.0 STREAMBANK DAMAGE ASSESSMENT ......................................................... 3

1.1 Task Description ......................................................................................................3

1.2 Cost Estimates ..........................................................................................................3

1.2.1 Summary of Streambank Repair Cost Estimate........................................4

2.0 BRIDGE REPLACEMENT ................................................................................... 5

2.1 Task Description ......................................................................................................5

2.2 Cost Estimates ..........................................................................................................5

2.2.1 Summary of Bridge Replacement Costs ...................................................7

APPENDIX A – STREAMBANK REPAIR COST

APPENDIX B – BRIDGE REPAIR COST

APPENDIX C – BRIDGE SITE PICTURES

ATTACHMENT 1 – BIG R

ATTACHMENT 2 – CONTECH

ATTACHMENT 3 – KINGSWOOD 18 CONSTRUCTION COSTS

.

Current Damage Assessment and Bridge Replacement Streambank Damage Assessment

Bella Vista Property Owner’s Association 3 Burns & McDonnell

1.0 STREAMBANK DAMAGE ASSESSMENT

1.1 Task Description

The Bella Vista Property Owners Association (POA) hired Burns & McDonnell to prepare a report with cost estimates to repair damage caused to the three golf courses by the recent flood events. The seven sites that were investigated and considered for repair are:

1. Site 1: Berksdale, East of Hwy. 71 Bridge

2. Site 2: Berksdale, Under Hwy. 71 Bridge

3. Site 3: Berksdale, West of Hwy. 71 Bridge

4. Site 4: Berksdale, East of the 18th Green

5. Site 5: Kingswood, Between the back tee of #18 and bridge from #17 green to the forward tee at #18

6. Site 6: Kingswood, West of the 4th Green

7. Site 7: Kingswood, Confluence with Lake Ann Tributary

These seven sites are shown on the maps to the right.

1.2 Cost Estimates

Burns and McDonnell performed a site visit at each location on October 9, 2017. During this visit, Burns & McDonnell staff met with a client representative. The client representative indicated that their preferred method of streambank protection is riprap due to its affordability and ease of construction Therefore, the estimates reflect riprap as the preferred alternative. An additional alternative is also included for the use of gabion baskets in locations where aesthetics is a concern. The cost estimates provided herein are based on previous streambank stabilization project information provided for use by the POA, Streambank and Shoreline Protection Manual, the Arkansas Department of Transportation (ArDOT) bid tabulations, and general knowledge and experience. The development of the cost estimates assumes that one site will be repaired at a time. Cost savings may be achieved if sites are repaired in groups. Additionally, the estimates do not include permitting costs for the Federal Emergency Management Agency (FEMA). FEMA approvals may not be necessary depending on the final approach taken to re-establish a stable streambank. The following page provides summary costs for the stabilization of each site. The detailed cost breakdown for each site is included in Appendix A.

Current Damage Assessment and Bridge Replacement Streambank Damage Assessment

Bella Vista Property Owner’s Association 4 Burns & McDonnell

1.2.1 Summary of Streambank Repair Cost Estimate

STREAMBANK REPAIR COST ESTIMATE

LOCATION

Site 1

Site 2

Site 3

Site 4

Site 5

Site 6

Site 7

ENGINEERING CONSTRUCTION TOTAL SITE COST

$43,200

$43,200

$52,000

$57,000

$43,200

$43,200

$33,540

$52,279

$139,274

$216,522

$267,786

$63,836

$43,200

$1,162,798

$64,560

$76,740

$95,479

$182,474

$268,522

$324,786

$107,036

$107,760

TOTAL STREAMBANK REPAIR COST

Current Damage Assessment and Bridge Replacement Bridge Replacement

Bella Vista Property Owner’s Association 5 Burns & McDonnell

2.0 BRIDGE REPLACEMENT

2.1 Task Description

Burns and McDonnell was also tasked with preparing cost estimates to replace five precast concrete beam bridges with steel arch truss bridges similar to the structure installed near Kingswood Hole #18. The five structures included in this analysis are listed and shown below. The approximate locations are shown in the figures below.

1. Berksdale Golf Course, Bridge Site 1 2. Berksdale Golf Course, Bridge Site 2 3. Berksdale Golf Course, Bridge Site 3 4. Berksdale Golf Course, Bridge Site 4 5. Kingswood Golf Course, Bridge Site 5

2.2 Cost Estimates

Burns and McDonnell performed a site visit at each location on October 9, 2017. At that time, bridges at Site 1 and Site 2 were both closed. Each of the five structures were multiple spans comprised of precast concrete beams supported on steel H-pile intermediate bents. Replacement structures are recommended to be single span weathering steel prefabricated arch truss bridges with concrete decks supported on steel H-pile concrete abutments with straight turnback wings. Each bridge should be designed to carry emergency vehicles and have a 12-foot minimum roadway width. The replacement structures should be designed to minimize maintenance requirements. Single span bridges will eliminate the build-up of drift debris against the bridge piers and weathering steel will avoid the need for regular painting. Using abutments with turnback wings will provide a high degree of bridge end protection during flood events.

Current Damage Assessment and Bridge Replacement Bridge Replacement

Bella Vista Property Owner’s Association 6 Burns & McDonnell

Cost estimates to remove and replace the above listed bridge structures are provided herein. These estimates are based on costs associated with previous bridge replacements by the POA, prefabricated truss manufactures cost estimate to fabricate and deliver the new truss, ArDOT bid tabs and general knowledge and experience. Similar to the stream bank stabilization estimates, these cost estimates assume that one bridge will be replaced at a time. Cost savings may be achieved if bridges are replaced in groups. Additionally, the estimates do not include permitting costs with state or federal agencies such as the U.S. Army Corps of Engineers or Federal Emergency Management Agency (FEMA). The Site 5 estimate is the only location that includes costs for a CLOMR/LOMR approval from FEMA. This is because a new alignment is likely, and that process would be required for the work to be done. The new alignment will eliminate the sharp curve in the trail on the west end to allow the passage of emergency vehicles. The CLOMR/LOMR permitting process can increase costs of up to $35,000 to remap the floodplain. Options for avoiding the need for a CLOMR/LOMR can be explored for the other locations during the design and planning for construction. These options could include showing a “no-rise” during the floodplain modeling or closing the existing bridge and placing the new bridge in the same location as the existing. Specific to Site 2, the team was asked to consider the removal and abandonment of this bridge. This cost is estimated to be roughly $45,000. A summary of the bridge replacement costs is provided on the following page, and the detailed cost breakdown can be found in Appendix B.

Kingswood 18

Constructed in 2010 for a cost of $206,000.

Current Damage Assessment and Bridge Replacement Bridge Replacement

Bella Vista Property Owner’s Association 7 Burns & McDonnell

2.2.1 Summary of Bridge Replacement Costs

BRIDGE REPLACEMENT ESTIMATE

BRIDGE

Bridge Site 1

Bridge Site 2

Bridge Site 3

Bridge Site 4

Bridge Site 5

$285,024

$242,472

$406,176

$406,176

$377,016

$425,664

$425,112

TOTAL BRIDGE REPLACMENT COST

ENGINEERING CONSTRUCTION TOTAL BRIDGE COST

$2,040,144

$140,640

$140,640

$140,640

$140,640

$182,640

$265,536

$265,536

$236,376

APPENDIX A – STREAMBANK REPAIR COST

Client:

Project:

Made By: RWC Date: 10.23.2017

Checked By: Date:

SITE 1: BERKSDALE, EAST OF HWY. 71 BRIDGE

Average Height = 8 Ft.

Length = 135 Ft.

Side Slope = 2:1

ENGINEERING

ITEM COST

Survey $ 4,200

Environmental Permitting $ 7,000

Roadway Design $ 20,000

Bidding Phase Services $ 2,000

Construction Administration $ 10,000

SUBTOTAL $ 43,200

CONTINGENCY 0% 0

TOTAL ENGINEERING $ 43,200

CONSTRUCTION

UNIT

ITEM QUANTITY UNIT PRICE COST

Compacted Embankment 160 Cu. Yd. $13 $ 2,080

Unclassified Excavation 160 Cu. Yd. $11 $ 1,760

Mobilization 1 LS $4000 $ 4,000

Erosion Control 1 LS $1160 $ 1,160

Filter Blanket 336 Sq. Yd. $5 $ 1,680

Riprap - Majority greater than 90 lbs 157 Cu. Yd. $110 $ 17,270

SUBTOTAL $ 27,950

CONTINGENCY 20% 5,590

TOTAL CONSTRUCTION $ 33,540

TOTAL STREAMBANK REPAIR SITE COST $ 76,740

Gabions - Cost Increase if Used 120 Cu. Yd. $325 $ 20,050

Estimated protection cost does not include hydraulic permitting if a CLOMR/LOMR process is required.

If the local floodplain administrator requires a submittal it would increase cost up to $35,000.

Bella Vista POA

102594

Streambank Repair Cost Estimate

Page 1 of 8

Client:

Project:

Made By: RWC Date: 10.24.2017

Checked By: Date:

SITE 2: BERKSDALE, UNDER HWY. 71 BRIDGE

Average Height = 10 Ft.

Length = 175 Ft.

Side Slope = 2:1

ENGINEERING

ITEM COST

Survey $ 4,200

Environmental Permitting $ 7,000

Roadway Design $ 20,000

Bidding Phase Services $ 2,000

Construction Administration $ 10,000

SUBTOTAL $ 43,200

CONTINGENCY 0% 0

TOTAL ENGINEERING $ 43,200

CONSTRUCTION

UNIT

ITEM QUANTITY UNIT PRICE COST

Compacted Embankment 324 Cu. Yd. $13 $ 4,212

Unclassified Excavation 324 Cu. Yd. $11 $ 3,564

Mobilization 1 LS $4000 $ 4,000

Erosion Control 1 LS $2010 $ 2,010

Filter Blanket 522 Sq. Yd. $5 $ 2,610

Riprap - Majority greater than 90 lbs 247 Cu. Yd. $110 $ 27,170

SUBTOTAL $ 43,566

CONTINGENCY 20% 8,713

TOTAL CONSTRUCTION $ 52,279

TOTAL STREAMBANK REPAIR SITE COST $ 95,479

Gabions - Cost Increase if Used 195 Cu. Yd. $325 $ 33,595

Estimated protection cost does not include hydraulic permitting if a CLOMR/LOMR process is required.

If the local floodplain administrator requires a submittal it would increase cost up to $35,000.

Bella Vista POA

102594

Streambank Repair Cost Estimate

Page 2 of 8

Client:

Project:

Made By: RWC Date: 10.24.2017

Checked By: Date:

SITE 3: BERKSDALE, WEST OF HWY. 71 BRIDGE

Site is split into two sections by an existing riprap section of streambank.

East: Average Height = 15 Ft. West: Average Height = 8 Ft.

Length = 195 Ft. Length = 205 Ft.

Side Slope = 2:1 Side Slope = 2:1

ENGINEERING

ITEM COST

Survey $ 4,200

Environmental Permitting $ 7,000

Roadway Design $ 20,000

Bidding Phase Services $ 2,000

Construction Administration $ 10,000

SUBTOTAL $ 43,200

CONTINGENCY 0% 0

TOTAL ENGINEERING $ 43,200

CONSTRUCTION

UNIT

ITEM QUANTITY UNIT PRICE COST

Compacted Embankment 1085.5 Cu. Yd. $13 $ 14,112

Unclassified Excavation 1085.5 Cu. Yd. $11 $ 11,941

Mobilization 1 LS $4000 $ 4,000

Erosion Control 1 LS $5970 $ 5,970

Filter Blanket 1334 Sq. Yd. $5 $ 6,670

Riprap - Majority greater than 90 lbs 667 Cu. Yd. $110 $ 73,370

SUBTOTAL $ 116,062

CONTINGENCY 20% 23,212

TOTAL CONSTRUCTION $ 139,274

TOTAL STREAMBANK REPAIR SITE COST $ 182,474

Gabions - Cost Increase if Used 325 Cu. Yd. $325 $ 25,585

Estimated protection cost does not include hydraulic permitting if a CLOMR/LOMR process is required.

If the local floodplain administrator requires a submittal it would increase cost up to $35,000.

Bella Vista POA

102594

Streambank Repair Cost Estimate

Page 3 of 8

Client:

Project:

Made By: RWC Date: 10.24.2017

Checked By: Date:

SITE 4: BERKSDALE, EAST OF THE 18th

GREEN

Average Height = 14 Ft.

Length = 500 Ft.

Side Slope = 2:1

ENGINEERING

ITEM COST

Survey $ 6,000

Environmental Permitting $ 7,000

Roadway Design $ 27,000

Bidding Phase Services $ 2,000

Construction Administration $ 10,000

SUBTOTAL $ 52,000

CONTINGENCY 0% 0

TOTAL ENGINEERING $ 52,000

CONSTRUCTION

UNIT

ITEM QUANTITY UNIT PRICE COST

Compacted Embankment 1815 Cu. Yd. $13 $ 23,595

Unclassified Excavation 1815 Cu. Yd. $11 $ 19,965

Mobilization 1 LS $12500 $ 12,500

Erosion Control 1 LS $9600 $ 9,600

Filter Blanket 1989 Sq. Yd. $5 $ 9,945

Riprap - Majority greater than 90 lbs 953 Cu. Yd. $110 $ 104,830

SUBTOTAL $ 180,435

CONTINGENCY 20% 36,087

TOTAL CONSTRUCTION $ 216,522

TOTAL STREAMBANK REPAIR SITE COST $ 268,522

Gabions - Cost Increase if Used 778 Cu. Yd. $325 $ 138,075

Estimated protection cost does not include hydraulic permitting if a CLOMR/LOMR process is required.

If the local floodplain administrator requires a submittal it would increase cost up to $35,000.

Bella Vista POA

102594

Streambank Repair Cost Estimate

Page 4 of 8

Client:

Project:

Made By: RWC Date: 10.24.2017

Checked By: Date:

Average Height = 18 Ft.

Length = 450 Ft.

Side Slope = 2:1

ENGINEERING

ITEM COST

Survey $ 6,000

Environmental Permitting and ArDOT Permitting $ 9,000

Roadway Design $ 30,000

Bidding Phase Services $ 2,000

Construction Administration $ 10,000

SUBTOTAL $ 57,000

CONTINGENCY 0% 0

TOTAL ENGINEERING $ 57,000

CONSTRUCTION

UNIT

ITEM QUANTITY UNIT PRICE COST

Compacted Embankment 2700 Cu. Yd. $13 $ 35,100

Unclassified Excavation 2700 Cu. Yd. $11 $ 29,700

Mobilization 1 LS $15000 $ 15,000

Erosion Control 1 LS $13260 $ 13,260

Filter Blanket 2237 Sq. Yd. $5 $ 11,185

Riprap - Majority greater than 90 lbs 1081 Cu. Yd. $110 $ 118,910

SUBTOTAL $ 223,155

CONTINGENCY 20% 44,631

TOTAL CONSTRUCTION $ 267,786

TOTAL STREAMBANK REPAIR SITE COST $ 324,786

Gabions - Cost Increase if Used 900 Cu. Yd. $325 $ 162,405

Estimated protection cost does not include hydraulic permitting if a CLOMR/LOMR process is required.

If the local floodplain administrator requires a submittal it would increase cost up to $35,000.

Bella Vista POA

102594

Streambank Repair Cost Estimate

This site is located along ArDOT's right of way. If the streambank continues to erode it would be a hazard for motorists on Highway 71 prompting a response/repair from ArDOT.

SITE 5: KINGSWOOD, KINGSWOOD, BETWEEN THE BACK TEE OF #18 AND BRIDGE FROM #17 GREEN TO THE

FORWARD TEE AT #18

Page 5 of 8

Client:

Project:

Made By: RWC Date: 10.24.2017

Checked By: Date:

SITE 6: KINGSWOOD, WEST OF THE 4th

GREEN

Average Height = 10 Ft.

Length = 200 Ft.

Side Slope = 2:1

ENGINEERING

ITEM COST

Survey $ 4,200

Environmental Permitting $ 7,000

Roadway Design $ 20,000

Bidding Phase Services $ 2,000

Construction Administration $ 10,000

SUBTOTAL $ 43,200

CONTINGENCY 0% 0

TOTAL ENGINEERING $ 43,200

CONSTRUCTION

UNIT

ITEM QUANTITY UNIT PRICE COST

Compacted Embankment 370.5 Cu. Yd. $13 $ 4,817

Unclassified Excavation 370.5 Cu. Yd. $11 $ 4,076

Mobilization 1 LS $8000 $ 8,000

Erosion Control 1 LS $2300 $ 2,300

Filter Blanket 597 Sq. Yd. $5 $ 2,985

Riprap - Majority greater than 90 lbs 282 Cu. Yd. $110 $ 31,020

SUBTOTAL $ 53,197

CONTINGENCY 20% 10,639

TOTAL CONSTRUCTION $ 63,836

TOTAL STREAMBANK REPAIR SITE COST $ 107,036

Gabions - Cost Increase if Used 223 Cu. Yd. $325 $ 38,470

Estimated protection cost does not include hydraulic permitting if a CLOMR/LOMR process is required.

If the local floodplain administrator requires a submittal it would increase cost up to $35,000.

Bella Vista POA

102594

Streambank Repair Cost Estimate

Page 6 of 8

Client:

Project:

Made By: RWC Date: 10.24.2017

Checked By: Date:

SITE 7: KINGSWOOD, CONFLUENCE WITH LAKE ANN TRIBUTARY

Average Height = 8 Ft.

Length = 270 Ft.

Side Slope = 2:1

ENGINEERING

ITEM COST

Survey $ 4,200

Environmental Permitting $ 7,000

Roadway Design $ 20,000

Bidding Phase Services $ 2,000

Construction Administration $ 10,000

SUBTOTAL $ 43,200

CONTINGENCY 0% 0

TOTAL ENGINEERING $ 43,200

CONSTRUCTION

UNIT

ITEM QUANTITY UNIT PRICE COST

Compacted Embankment 320 Cu. Yd. $13 $ 4,160

Unclassified Excavation 320 Cu. Yd. $11 $ 3,520

Mobilization 1 LS $6000 $ 6,000

Erosion Control 1 LS $2330 $ 2,330

Filter Blanket 672 Sq. Yd. $5 $ 3,360

Riprap - Majority greater than 90 lbs 313 Cu. Yd. $110 $ 34,430

SUBTOTAL $ 53,800

CONTINGENCY 20% 10,760

TOTAL CONSTRUCTION $ 64,560

TOTAL STREAMBANK REPAIR SITE COST $ 107,760

Gabions - Cost Increase if Used 240 Cu. Yd. $325 $ 40,210

Estimated protection cost does not include hydraulic permitting if a CLOMR/LOMR process is required.

If the local floodplain administrator requires a submittal it would increase cost up to $35,000.

Bella Vista POA

102594

Streambank Repair Cost Estimate

Page 7 of 8

Client:

Project:

Made By: RWC Date: 10.24.2017

Checked By: Date:

STREAMBANK REPAIR COST ESTIMATE

LOCATION

Site 1: Berksdale, East of Hwy. 71 Bridge

Site 2: Berksdale, Under Hwy. 71 Bridge

Site 3: Berksdale, West of Hwy. 71 Bridge

Site 4: Berksdale, East of the 18th

Green

Site 6: Kingswood, West of the 4th

Green

TOTAL STREAMBANK REPAIR COST

$268,522

$1,162,798

$43,200 $64,560 $107,760

$63,836 $107,036

Site 7: Kingswood, Confluence with Lake Ann Tributary

ENGINEERING CONSTRUCTION TOTAL SITE COST

$43,200

$43,200

$43,200

$52,000

$43,200

$33,540

$52,279

$139,274

$216,522

$76,740

$95,479

$182,474

Bella Vista POA

102594

Streambank Repair Cost Estimate

Site 5: Kingswood, Kingswood, Between the back tee of #18 and bridge from #17 green to the forward tee at #18

$57,000 $267,786 $324,786

Page 8 of 8

APPENDIX B – BRIDGE REPAIR COST

Client:

Project:

Made By: TMR Date: 10.24.2017

Checked By: Date:

BRIDGE SITE 1

ENGINEERING

ITEM COST

Survey $ 4,200

Environmental Permitting $ 7,000

Geotechnical Investigations $ 5,000

Bridge Design $ 35,000

Roadway Design $ 35,000

Bidding Phase Services $ 6,000

Construction Administration $ 25,000

SUBTOTAL $ 117,200

CONTINGENCY 20% 23,440

TOTAL ENGINEERING $ 140,640

CONSTRUCTION

UNIT

ITEM QUANTITY UNIT PRICE COST

Removal of Existing Bridge 1269 sq. ft. $20 $ 25,380

Prefabricated Steel Truss (120' x 12.5') $ 100,900

Construction $ 95,000

SUBTOTAL $ 221,280

CONTINGENCY 20% 44,256

TOTAL CONSTRUCTION $ 265,536

TOTAL BRIDGE REPLACEMENT COST $ 406,176

Estimated replacements costs do not include hydraulic permitting if a CLOMR/LOMR process is required.

A CLOMR/LOMR can increase costs of up to $35,000.

Bella Vista POA

102594

Bridge Replacement Cost Estimate

Page 1 of 6

Client:

Project:

Made By: TMR Date: 10.24.2017

Checked By: Date:

BRIDGE SITE 2

ENGINEERING

ITEM COST

Survey $ 4,200

Environmental Permitting $ 7,000

Geotechnical Investigations $ 5,000

Bridge Design $ 35,000

Roadway Design $ 35,000

Bidding Phase Services $ 6,000

Construction Administration $ 25,000

SUBTOTAL $ 117,200

CONTINGENCY 20% 23,440

TOTAL ENGINEERING $ 140,640

CONSTRUCTION

UNIT

ITEM QUANTITY UNIT PRICE COST

Removal of Existing Bridge 1269 sq. ft. $20 $ 25,380

Prefabricated Steel Truss (120' x 12.5') $ 100,900

Construction $ 95,000

SUBTOTAL $ 221,280

CONTINGENCY 20% 44,256

TOTAL CONSTRUCTION $ 265,536

TOTAL BRIDGE REPLACEMENT COST $ 406,176

Estimated replacements costs do not include hydraulic permitting if a CLOMR/LOMR process is required.

A CLOMR/LOMR can increase costs of up to $35,000.

Bella Vista POA

102594

Bridge Replacement Cost Estimate

Page 2 of 6

Client:

Project:

Made By: TMR Date: 10.24.2017

Checked By: Date:

BRIDGE SITE 3

ENGINEERING

ITEM COST

Survey $ 4,200

Environmental Permitting $ 7,000

Geotechnical Investigations $ 5,000

Bridge Design $ 35,000

Roadway Design $ 35,000

Bidding Phase Services $ 6,000

Construction Administration $ 25,000

SUBTOTAL $ 117,200

CONTINGENCY 20% 23,440

TOTAL ENGINEERING $ 140,640

CONSTRUCTION

UNIT

ITEM QUANTITY UNIT PRICE COST

Removal of Existing Bridge 1054 sq. ft. $20 $ 21,080

Prefabricated Steel Truss (100' x 12.5') $ 80,900

Construction $ 95,000

SUBTOTAL $ 196,980

CONTINGENCY 20% 39,396

TOTAL CONSTRUCTION $ 236,376

TOTAL BRIDGE REPLACEMENT COST $ 377,016

Estimated replacements costs do not include hydraulic permitting if a CLOMR/LOMR process is required.

A CLOMR/LOMR can increase costs of up to $35,000.

Bella Vista POA

102594

Bridge Replacement Cost Estimate

Page 3 of 6

Client:

Project:

Made By: TMR Date: 10.24.2017

Checked By: Date:

BRIDGE SITE 4

ENGINEERING

ITEM COST

Survey $ 4,200

Environmental Permitting $ 7,000

Geotechnical Investigations $ 5,000

Bridge Design $ 35,000

Roadway Design $ 35,000

Bidding Phase Services $ 6,000

Construction Administration $ 25,000

SUBTOTAL $ 117,200

CONTINGENCY 20% 23,440

TOTAL ENGINEERING $ 140,640

CONSTRUCTION

UNIT

ITEM QUANTITY UNIT PRICE COST

Removal of Existing Bridge 2081 sq. ft. $20 $ 41,620

Prefabricated Steel Truss (120' x 12.5') $ 100,900

Construction $ 95,000

SUBTOTAL $ 237,520

CONTINGENCY 20% 47,504

TOTAL CONSTRUCTION $ 285,024

TOTAL BRIDGE REPLACEMENT COST $ 425,664

Estimated replacements costs do not include hydraulic permitting if a CLOMR/LOMR process is required.

A CLOMR/LOMR can increase costs of up to $35,000.

Bella Vista POA

102594

Bridge Replacement Cost Estimate

Page 4 of 6

Client:

Project:

Made By: TMR Date: 10.24.2017

Checked By: Date:

BRIDGE SITE 5

ENGINEERING

ITEM COST

Survey $ 4,200

Environmental Permitting $ 7,000

CLOMR/LOMR $ 35,000

Geotechnical Investigations $ 5,000

Bridge Design $ 35,000

Roadway Design $ 35,000

Bidding Phase Services $ 6,000

Construction Administration $ 25,000

SUBTOTAL $ 152,200

CONTINGENCY 20% 30,440

TOTAL ENGINEERING $ 182,640

CONSTRUCTION

UNIT

ITEM QUANTITY UNIT PRICE COST

Removal of Existing Bridge 1708 sq. ft. $20 $ 34,160

Prefabricated Steel Truss (120' x 12.5') $ 100,900

Construction $ 67,000

SUBTOTAL $ 202,060

CONTINGENCY 20% 40,412

TOTAL CONSTRUCTION $ 242,472

TOTAL BRIDGE REPLACEMENT COST $ 425,112

Bella Vista POA

102594

Bridge Replacement Cost Estimate

Page 5 of 6

Client:

Project:

Made By: TMR Date: 10.24.2017

Checked By: Date:

BRIDGE REPLACEMENT ESTIMATE

BRIDGE

Bridge Site 1

Bridge Site 2

Bridge Site 3

Bridge Site 4

Bridge Site 5

Bella Vista POA

102594

Bridge Replacement Cost Estimate

ENGINEERING

$140,640

CONSTRUCTION TOTAL BRIDGE COST

$140,640

$140,640

$182,640

$406,176

$425,664

$425,112

$265,536

$265,536

$285,024

$242,472

$406,176

$140,640 $236,376 $377,016

$2,040,144TOTAL BRIDGE REPLACEMENT COST

Page 6 of 6

APPENDIX C – BRIDGE SITE PICTURES

Bridge: Bridge Site 1 Site Visit Date: 10/9/2017

Elevation Looking North Path Looking West

Elevation Looking North Typical Superstructure

Bridge: Bridge Site 2 Site Visit Date: 10/9/2017

Path Looking North Erosion Damage at North Span

Elevation Looking West

Bridge: Bridge Site 3 Site Visit Date: 10/9/2017

Path Looking West Elevation Looking North

Typical Superstructure

Bridge: Bridge Site 4 Site Visit Date: 10/9/2017

Path Looking North Elevation Looking East

Damaged Pier Due to Flooding

Typical Superstructure

Bridge: Bridge Site 5 Site Visit Date: 10/9/2017

Path Looking East Elevation Looking South

Typical Superstructure

ATTACHMENT 1 – BIG R

Aaron Clauson | Sr. Business Development Manager: Phone (817) 788 9118, Email: [email protected] Page 1 of 1�

650 JUSTICE LANCEMANSFIELD, TEXAS76063Phone. 817 788 9118Toll Free. 800 234 0734www.bigrbridge.com

9/18/2017

________

1/15/2018

2017 02676

PROJECT: Bella Vista Golf Course # 17 02676

Item Description Quantity Unit Price Total Price

1 Prefabricated steel truss pedestrian bridge superstructure with featuresas described below:

Bridge Model: Ped Truss Parallel Chord H Section FBLength: AS NOTEDWidth: 12ftDesign Code: AASHTODesign Vehicle: HS20 44Live Load: 95 psfNumber of Pieces: 2 / bridge (field bolting by others)Finish: Weathering SP7 CleanBridge Decking: Concrete (shop installed deck forms)Railing Type: Horizontal Rails 4" Max OpeningRailing Height: 54 INCHESBearings: Bearing assemblies included.

Berksdale 4: 120’ span $117,900Berksdale 11: 100’ span $94,900Berksdale 12: 120’ span $117,900Berksdale 18: 120’ span $117,900Kingswood 8: 120’ span $117,900

Deck forms are shop installed ready to receive a field poured reinforced concrete deck byothers.

Estimated Design fee for foundations $7,500 per Span.

1 ea. Lump SumIncludes Freight

$566,500.00

To ensure quality standards are followed, Big R Bridge holds the following certifications:

In the United States we are certified under the AISC Quality Certification Program for Simple and Major Steel Bridges with Fracture Critical and SophisticatedPaint endorsements.In Canada we are certified under the Canadian Welding Bureau (CWB) as being qualified under CSA Standard W47.1, Division 2.

The following items are not included with this proposal:

third party inspection of bridge during fabrication,design, excavation and construction of bridge abutments,anchor bolt design, supply and installation,unloading and assembly of bridge at the project site,supply and placement of reinforced concrete deck (if applicable),site surveys, permitting or geotechnical evaluations,any federal, state, county or local sales tax.

Lead times for drawing submittals and final product delivery to be mutually agreed based on Customer requirements and Big R Bridge production capabilities atthe time of order.

Prices are FOB: Big R Greeley, CO with freight allowed to Bella Vista, AR. Delivery will be to a common stockpile accessible by standard highway tractor trailer,buyer to unload and assemble.

Budget Date:

Bid Date:

Expiration Date:

Opportunity No.:

BUDGET ESTIMATE

rwcastor
Text Box
*
rwcastor
Text Box
*Per email conversation on February 20, 2018, The IBC code is what all building and parking garages are built to, and it allows for a more cost efficient design on pedestrian truss bridges. The IBC code could save an owner 10% to 15% on a bridge. The prices in the report were reduced from the above statement by roughly 15%.

ATTACHMENT 2 – CONTECH

ATTACHMENT 3 – KINGSWOOD 18 CONSTRUCTION COSTS

tmrapp
Text Box
$10,120.00
tmrapp
Text Box
$1,292.00
tmrapp
Text Box
$6,515.00
tmrapp
Text Box
$1,073.00
tmrapp
Text Box
$4,050.00
tmrapp
Text Box
$728.00
tmrapp
Text Box
$532.00
tmrapp
Text Box
$1,540.00
tmrapp
Text Box
$828.00
tmrapp
Text Box
$10,829.00
tmrapp
Text Box
$8,840.00
tmrapp
Text Box
$769.50
tmrapp
Text Box
$2,692.50
tmrapp
Text Box
$7,800.00
tmrapp
Text Box
$10,905.30
tmrapp
Text Box
$500.00
tmrapp
Text Box
$7,781.25
tmrapp
Text Box
$129,395.00
tmrapp
Text Box
$206,190.55
tmrapp
Pen

Burns & McDonnell 6815 Isaac’s Orchard Road, Suite B3

Springdale, AR 72762 O 479-725-5460 F 479-725-5470

www.burnsmcd.com