ctb london drawing template · 2018-07-05 · lp gg rs 21.72 gg 20.01 gg 18.54 gg 18.54 rs nb bo rs...

1
Project Management Initials: Author: Designer: Checked: Approved: BA NA NA JML REV. M 0 25 50 75 100 125m SCALE 1:1250 1. 2. 3. 4. DO NOT SCALE FROM THIS DRAWING. ALL DIMENSIONS, CO-ORDINATES AND LEVELS ARE GIVEN IN METRES UNLESS SHOWN OTHERWISE. EARTHWORKS CREATED AT 1 IN 2 WHERE POSSIBLE, IN AREAS LIMITED BY LAND OR ENVIRONMENTAL RESTICTIONS, STEEPER SLOPES HAVE BEEN GENERATED. ALL SLOPE ANGLES ARE TO BE CONFIRMED FOLLOWING SITE INVESTIGATION. EXACT LOCATION AND FORM OF HEADWALLS AND ASSOCIATED CULVERTS TO BE CONFIRMED FOLLOWING SITE INVESTIGATION. Last saved by: NEIL.ASHFORD(2018-04-26) Last Plotted: 2018-04-26 Filename: C:\USERS\NEIL.ASHFORD\DESKTOP\FVLR PLANNING APPLICATION DRAWINGS - LOWER ROAD LEVEL\HIGHWAY ENGINEER\FVLR-ACM-00-01-DR-CE-0004 L OUTLINE DESIGN GA\FVLR-ACM-00-01-DR-CE-0004 M OUTLINE DESIGN GA.DWG FOR PLANNING I/R DATE DESCRIPTION ISSUE/REVISION A 18/08/17 INITIAL ISSUE NOTES ADDED B 25/08/17 EARTHWORKS AMENDED ROAD MARKINGS AMENDED C 07/09/17 CULVERT HEAD WALLS AND BRIDGE AMENDED FACILITY TO NORTH SIDE OF LINK ROAD AMENDED, CYCLE D 13/09/17 EARTHWORKS TO SW SIDE OF SLOPES AMENDED TO 1 IN 2 LINK ROAD EMBANKMENT TRAFFIC SIGNAL LAYBY ADDED E 03/10/17 ATTENUATION POND AMENDED FVLR DEVELOPMENT SHOWN F 16/10/17 DRAFT TIE IN DETAILS WITH REQUESTED AMENDMENTS G 10/11/17 LINK ROAD RAISED & CLIENT SITE ACCESS INDICATED ROAD ADDED, BLUNTS LANE H 06/12/17 BUS LANE MERGE ON LINK SHEET NUMBER FVLR-ACM-00-01-DR-CE-0004 GENERAL NOTES CLIENT BALFOUR BEATTY PROJECT FORDER VALLEY LINK ROAD ISO A0 841mm x 1189mm This drawing has been prepared for the use of AECOM's client. It may not be used, modified, reproduced or relied upon by third parties, except as agreed by AECOM or as required by law. AECOM accepts no responsibility, and denies any liability whatsoever, to any party that uses or relies on this drawing without AECOM's express written consent. Do not scale this document. All measurements must be obtained from the stated dimensions. DRAWING STATUS LEGEND PROPOSED HB2 / BN KERBS PROPOSED EDGING KERBS PROPOSED CYCLE BLOCK CARRIAGEWAY VERGE PROPOSED ROAD MARKINGS PROPOSED CUT SLOPE PROPOSED FILL SLOPE © Crown copyright and database rights 2013 Ordnance Survey 100018633 SHEET TITLE FORDER VALLEY LINK ROAD OUTLINE DESIGN GENERAL ARRANGMENT CLIENT BALFOUR BEATTY PROJECT FORDER VALLEY LINK ROAD PROJECT NUMBER 60535194 PROPOSED ATTENUATION / INFILTRATION POND (POND SIZE AND LAYOUT TO BE CONFIRMED FOLLOWING INFILTRATION TESTING AND SITE INVESTIGATION) CARRIAGEWAY FOOTWAY CYCLEWAY SHARED USE FOOTWAY/CYCLEWAY TRAFFIC ISLANDS SOFT LANDSCAPING CONSULTANT AECOM Plumer House, East Wing, Third Floor, Tailyour Road, Plymouth, PL6 5DH +44(0)1752 676700 tel +44(0)870 238 6023 fax www.aecom.com EXTRACT OF PLANNING BOUNDARY (12/02027/OUT, SEE DRAWING 07710L01.02) AREA OF PCC LAND TO BECOME HMPE APPROXIMATE EXTENT OF PERSIMMON DEVELOPMENT I/R DATE DESCRIPTION ISSUE/REVISION A 18/08/17 INITIAL ISSUE NOTES ADDED B 25/08/17 EARTHWORKS AMENDED ROAD MARKINGS AMENDED C 07/09/17 CULVERT HEAD WALLS AND BRIDGE AMENDED FACILITY TO NORTH SIDE OF LINK ROAD AMENDED, CYCLE D 13/09/17 EARTHWORKS TO SW SIDE OF SLOPES AMENDED TO 1 IN 2 LINK ROAD EMBANKMENT TRAFFIC SIGNAL LAYBY ADDED E 03/10/17 ATTENUATION POND AMENDED FVLR DEVELOPMENT SHOWN F 16/10/17 DRAFT TIE IN DETAILS WITH REQUESTED AMENDMENTS G 10/11/17 LINK ROAD RAISED & CLIENT SITE ACCESS INDICATED ROAD ADDED, BLUNTS LANE H 06/12/17 BUS LANE MERGE ON LINK J 11/12/17 FOOTWAY ACCESS TO ECO POND ADDED, HMPE EXTENSION ADDED K 14/12/17 TOPO ADDED TO DRAWING L 31/01/18 BLUNTS LANE SHARED USE ROUTE AMENDED. VARIOUS NOTES AMENDED. M 26/04/18 CHAINAGE LINE (CARRIAGEWAY CENTRELINE) AMENDED. 95.29 GG CL 95.23 MH CL 95.02 MH 93.96 GG CL 92.84 MH GG 92.99 GG SV MP H MP LP SI SI TC SV MP IC IC IC DP SI SV TC CL 93.30 IC SV SV TC LP SV CL 88.93 IC 87.01 GG 88.25 GG CL 89.01 MH CL 89.06 MH GG 91.59 GG 92.59 CL 92.61 MH RL 105.06 RL 102.84 RL 101.41 RL 101.11 RL 99.99 EL 97.19 RL 99.72 CL 87.25 MH CL 87.30 MH 87.29 GG LP 86.28 GG 85.82 CL 86.52 MH CL 86.70 MH 96.68 80.13 GG 83.77 GG CL 88.39 IC CL 87.90 MH 87.82 MH BX GG PO PO CL 81.43 MH PO PO PO PO PO 35.16 GG DR EP PO DP CL 34.61 MH CL 34.68 MH DR DP DR UC EL 38.68 EL 39.61 EL 39.61 RL 42.14 UC DP EP RL 40.70 UC CL 35.27 MH DP PO EL 39.52 EL 40.12 EL 41.62 EL 38.04 RL 39.97 EL 37.99 RL 40.05 PO PO PO PO PO PO PO EL 36.88 RL 41.96 EL 41.56 RL 43.42 DP CL 36.79 MH CL 32.64 MH RL 42.09 PO PO PO BH CL 27.93 MH CL 23.40 MH EP SY SY CL 25.02 MH EP SY SY BH BH CL 25.73 MH EL 31.92 RL 32.77 PO BH PO OHL OHL OHL OHL OHL OHL OHL OHL OHL OHL OHL SY EP OHL OHL OHL OHL OHL OHL OHL CL 32.72 CL 34.13 OHL CL 35.23 BO TS TL BO TL LP GG RS 21.72 GG 20.01 GG 18.54 GG 18.54 RS NB BO RS TS TL TS RS BO TS PO TL TSs CL 19.04 MH 18.92 GG 18.85 GG LP LP LP CL 19.13 MH NB LP LP TS TS TS TS TL CL 18.55 MH CL 19.03 MH LP EC EC 23.10 GG 22.90 GG LP LP RS EC LP LP LP TP TC NB RS SY GVs BO x5 BO TV 23.55 GG 26.29 GG RS CL 26.64 MH CL 25.68 MH NB 36.93 GG LP CL 40.97 MH LP TC 38.84 MH 31.37 GG CL 33.02 MH 36.87 GG GVs RS PO TP RS BOs LP BO PO PO PO LP TS LP TC TL TS TC BOs BOs BO MH CL 18.46 MH CL 18.41 BO TC GG 18.09 MH CL 18.23 GG 17.95 TL GG 18.12 LP LP LP GG LP 17.12 BO GG 17.03 BO GG 16.75 GG LP TC 16.54 MH CL 16.60 LP MH 16.04 GG 15.97 GG CL 16.00 BO LP RS LP GG GG 17.47 17.39 RS RS RS MH CL 17.43 LP TS PO GG 19.22 PO MH CL 18.81 BO RS PO TS TS TC PO TS ECs GG 18.83 TC PO PO NB GG LP CL 65.24 MH LP CL 68.41 MH CL 68.47 MH TC CL 68.69 MH CL 68.71 MH CL 59.41 MH RS CL 58.18 IC 56.55 GG 54.94 GG TC 53.32 GG RS CL 60.07 MH CL 60.35 MH LP LP LP LP RS LP SI LP TC LP 59.61 GG LP CL 60.81 MH LP TLIC 60.93 GG CL 60.87 MH 60.75 GG 60.87 GG LP 57.90 GG 57.00 GG LP 68.46 GG 68.43 GG LP 54.43 GG CL 51.88 MH LP 51.90 GG 51.17 GG 49.40 GG LP 48.26 GG 47.42 GG CL 48.99 MH LP CL 46.02 MH 45.96 MH 45.66 GG 44.91 44.18 GG CL 43.65 TC MH LP 43.35 GG 42.67 GG 41.99 GG LP CL 41.34 MH 40.78 GG CL 40.59 MH 40.23 GG LP 39.61 GG LP TC CL 43.47 MH LP SI 51.94 GG CL 51.39 MH LP 50.38 GG LP SI CL 47.16 MH TC LP 48.52 GG 47.14 GG LP 45.71 GG 44.16 GG LP 42.56 GG VP 51.46 GG LP EP TC CL 52.96 MH RS TC EP RS BO BO BO BO RS LP RS LP LP CL 40.14 MH SI 41.07 GG LP TC 39.46 GG TC TC 37.75 GG SI TC LP LP 35.36 GG RS 32.11 GG LP NB OHL NB TC 25.10 GG LP TC TC TLIC LP 26.73 GG CL 26.40 MH SI CL 24.99 MH TLIC TC LP TLIC TLIC TL TL TL TLIC TL TLIC 21.11 GG LP EP CL 19.98 MH 35.83 GG 36.94 GG LP 37.35 GG 37.70 GG 38.05 GG LP 38.61 GG 38.72 GG 38.80 GG LP CL 38.89 MH 38.99 GG 39.29 GG 37.45 33.42 GG LP 34.04 GG 34.80 GG CL 36.61 MH CL 35.86 MH CL 34.33 MH CL 32.87 MH CL 33.19 MH EP 37.33 GG 37.09 GG BO 37.75 GG WM TC LP LP Y TLIC TLIC TLIC OHL OHL 42.04 GG SC WM TV FH LP WM WM TC WM CL 43.17 MH CL 43.16 MH CL 41.85 MH CL 41.85 MH TV 41.84 GG 41.00 TV 40.42 40.18 GG SC 41.26 40.55 36.59 GG 37.27 GG 38.05 GG RL 48.23 RL 47.80 RL 43.95 TP EP ET SY SY WM LP 36.83 37.11 37.13 PO PO Wall 1.0h Block Wall 1.0h Block Ret. Wall 1.2h Block Ret. Wall Conc. Ret.Wall I/R 1.0h Block Ret. Wall 1.5h OHL OHL OHL Block Wall 2.0h C/B 2.0h Footway (Asphalt) C/B 2.0h Block Wall 1.1h Concrete Ret. Wall 1.3h Wall 0.8h Stone 28 29 30 31 32 33 33 34 34 35 35 35 36 36 36 37 37 38 C/B 2.0h Wall 1.0h Block Wall 1.3h Conc. 27.72 28.05 28.17 28.33 30.46 30.56 30.32 30.30 30.80 31.99 30.70 30.65 CL 31.13 MH CL 34.13 IC 30.77 B/W 1.0h Stone Ret. Wall B/W 1.0h Stone Ret. Wall ET SI CL 18.36 MH SY SY SY ET ET EP EP PO EP SI SI EP OHL OHL P/R Conc. P/R 1.1h Conc. Drainage Channel 0.5h 16 16 17 17 18 18 19 20 20 21 21 22 22 23 23 24 24 25 25 25 26 26 26 27 27 27 27 28 28 28 29 29 30 31 32 OHL OHL OHL OHL OHL OHL OHL 1.0h Conc. Drainage Channel 0.5h Monitoring well IL 16.13 17.43 IL 0.6Ø PO CL 26.03 MH EP CL 19.26 MH IL 20.74 300Ø MP 24.96 GG 24.82 GG TC CL 29.57 MH SC LP TC SC SC SC SC TC SC SC WO LP LP TC 0.5Ø IL 27.02 0.5Ø CL 28.20 MH OHL OHL OHL OHL OHL OHL 0.9mØ Conc Stone Ret. Wall Block 25 25 25 25 25 25 25 25 25 25 30 30 30 30 30 30 30 30 30 30 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 40 40 40 40 40 40 40 40 40 45 45 45 45 45 45 45 45 45 45 45 50 50 50 50 50 50 50 50 55 55 55 55 55 55 60 60 60 60 60 65 65 65 65 65 70 70 70 70 70 70 75 75 75 75 75 75 80 80 80 80 80 80 85 85 85 85 85 85 85 90 90 90 95 95 95 50 25 26 27 27 29 31 30 30 31 31 32 32 32 35 34 33 35 34 35 36 37 36 37 37 38 34 34 34 34 34 35 35 35 36 36 36 37 37 37 38 38 39 39 39 40 40 40 41 41 41 42 42 42 43 43 43 44 44 44 45 45 45 46 46 46 47 47 47 48 48 48 49 49 49 50 50 51 51 52 52 53 53 28 28 29 29 30 30 31 31 31 32 32 32 33 33 33 34 34 34 34 34 35 35 35 36 36 36 36 37 37 37 37 38 38 38 38 39 39 39 40 40 40 41 41 41 42 42 42 43 43 43 44 44 44 45 45 45 46 46 46 47 47 47 48 48 48 49 49 49 50 IC CL 41.45 50 51 51 51 52 52 53 53 54 54 24 24 25 25 26 26 27 28 28 28 29 29 30 36 33 33 38 34 IC CL 31.64 MH CL 18.36 EP EP SY Well OHL OHL TC RS 16.26 16.23 CL 16.18 MH Monitoring Well SI BOs CL 16.33 MH CL 16.36 MH CL 16.39 MH CL 16.30 MH LP BOs 16.21 CL 16.20 MH CL 16.22 MH 16.26 16.25 SI SI VP 16.05 GG CL 16.22 MH LP CL 16.14 MH BO BO VP 16.14 Bollards 16.12 CL 16.10 MH 15.95 GG CL 16.17 MH CL 16.15 MH CL 16.13 MH LP 16.24 16.24 CL 16.23 MH 16.12 GG CL 16.18 MH SY SY CL 16.05 MH LP BO BO CL 15.94 MH BO 16.05 CL 15.90 MH CL 15.86 MH CL 15.88 MH CL 15.84 MH LP CL 16.16 MH LP CL 16.21 MH DR CL 16.01 MH 15.95 GG CL 15.98 MH CL 16.02 MH CL 16.11 MH 15.96 GG BOs 16.22 16.23 Disabled RL 20.01 CL 16.07 MH CL 16.04 MH 16.11 BO CL 16.06 MH CL 16.04 MH CL 16.05 MH CL 16.04 MH SI LP LP LP LP BO 15.97 GG BOs 15.97 GG CL 16.03 MH CL 16.09 MH DP DR BO DP DR CL 16.06 MH 16.25 P/R 1.0h Conc. Gravel C/B 1.8h Concrete Brick Wall 1.0h C/B 1.8h OHL P/R 0.8h Conc. I/R 2.0h Gravel SI HGV FUEL DR DR DC BOs BOs EXIT Monitoring Well AIR VAC ENTRANCE CAR WASH BOs Bollards Monitoring Well Store Monitoring Wells TC FP 1 IN 2 FILL SLOPE 1 IN 2 FILL SLOPE 1 IN 2 FILL SLOPE 1 IN 2 FILL SLOPE 1 IN 1.5 FILL SLOPE 1 IN 1 CUT SLOPE 1 IN 1.5 CUT SLOPE 1 IN 40 CUT SLOPE 1 IN 0.36 FILL SLOPE 1 IN 40 FILL SLOPE 1 IN 1.5 FILL SLOPE 1 IN 2 FILL SLOPE 1 IN 2 CUT SLOPE 1 IN 2 CUT SLOPE 1 IN 2 FILL SLOPE 1 IN 2 FILL SLOPE FORDER VALLEY LINK ROAD FORDER VALLEY ROAD (WEST) NOVOROSSIYSK ROAD FORDER VALLEY ROAD (SOUTH) PROPOSED EXTENT OF BRIDGE STRUCTURE (APPROX 140m LONG) PROPOSED TOUCAN CROSSING POINTS PROPOSED STAGGERED TOUCAN CROSSING POINT ACCOMMODATING EXISTING NON MOTORISED USER FACILITY LINKED TO ERLSTOKE CLOSE. PROPOSED DIVERGING TAPER (TD 42/9 7.51) PROPOSED RIGHT TURNING TRAFFIC LANES (2 x 3.25m ON TO NOVOROSSIYSK ROAD) WITH 169m OF QUEUING CAPACITY PROPOSED NORTHBOUND TRAFFIC LANES (ON TO FORDER VALLEY LINK ROAD) WITH 110m OF QUEUING CAPACITY 3.25m LANE WIDTHS USED TO MINIMISE IMPACT ON ADJACENT NATURE RESERVE. PROPOSED CULVERT AND HEADWALL POSITIONS TO ACCOMMODATE JUNCTION ARRANGEMENT AND POTENTIAL OFFLINE CONSTRUCTION METHOD. PROPOSED SEGREGATED FOOTWAY / CYCLEWAY (3m AND 2m EFFECTIVE WIDTHS ADJACENT TO A 0.5m VERGE) PROPOSED SHARED USE FOOTWAY / CYCLEWAY (3.5m EFFECTIVE WIDTH ADJACENT TO A 0.5m VERGE) PROPOSED SHARED USE FOOTWAY / CYCLEWAY (3.5m EFFECTIVE WIDTH ADJACENT TO A 0.5m VERGE) PROPOSED SEGREGATED FOOTWAY / CYCLEWAY (3m AND 2m EFFECTIVE WIDTHS ADJACENT TO A 0.5m VERGE) PROPOSED SHARED USE FOOTWAY / CYCLEWAY (3.5m EFFECTIVE WIDTH ADJACENT TO A 0.5m VERGE) PROPOSED 1 IN 1 GRADED CUT SLOPE (ASSUMED ROCK FACE, TO BE CONFIRMED DURING SITE INVESTIGATION) PROPOSED 1 IN 1.5 GRADED CUT SLOPE TO MAXIMISE LAND BETWEEN PROPOSED HIGHWAY AND EXISTING PROPERTY BOUNDARIES, (SITE INVESTIGATION TO DETERMINE FEASIBILITY) PROPOSED 1 IN 6 GRADED CUT SLOPE. FOLLOWING COMPLETION OF SITE INVESTIGATION, GRADING TO BE DETERMINED IN CONJUNCTION WITH CUT SLOPES OF ADJACENT ATTENUATION POND (1 IN 2). PROPOSED SHARED USE FOOTWAY / CYCLEWAY (5m EFFECTIVE WIDTH ADJACENT TO A 0.5m VERGE) PROPOSED 1 IN 1.5 FILL SLOPE (WITH EROSION / SCOUR PROTECTION) TO AVOID CONFLICT WITH EXISTING WATER COURSE PROPOSED REINFORCED EARTH STRUCTURE (APPROX 70° SLOPE) PROPOSED BRIDGE STRUCTURE AND ASSOCIATED ABUTMENTS PROPOSED REINFORCED EARTH STRUCTURE (APPROX 70° SLOPE) PROPOSED FORM AND EXTENTS OF ATTENUATION / INFILTRATION POND TO BE CONFIRMED FOLLOWING SITE INVESTIGATION PROPOSED TRAFFIC SIGNAL MAINTENANCE LAYBY FOLLOWING SITE INVESTIGATION TO DETERMINE GROUND CONDITIONS AND ACTUAL TREE ROOT POSITIONS, IT MAY BE POSSIBLE TO INCORPORATE A STRENGTHENED EMBANKMENT OR RETAINING STRUCTURE TO AVOID LOSS OF TREE LINE AND ASSOCIATED HEDGE. THIS WILL BE IMPLEMENTED IF POSSIBLE AS PART OF THE DETAILED DESIGN. DEMARCATION LINE BETWEEN 30/40mph SPEED LIMITS (DETERMINED BY HORIZONTAL GEOMETRY) TIE IN POINT WITH DEVELOPMENT TO BE CONFIRMED EXTENT OF EARTHWORKS TO BE DETERMINED UPON COMPLETION OF NEGOTIATIONS WITH DEVELOPER EXTENT OF PERSIMMON DEVELOPMENT EXTENT OF PLYMOUTH CITY COUNCIL DEVELOPMENT NOVOROSSIYSK ROAD TREES WITH BAT POTENTIAL. POND EARTHWORKS TO BE UNDERTAKEN WITHOUT IMPACT ON ROOTS ASSOCIATED WITH THESE TREES. PROPOSED LINK TO COMMUNITY PARK (SCHEME CURRENTLY SUBJECT TO PUBLIC CONSULTATION) 00 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 913 00 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000 1050 1100 1134 300 350 400 450 500 550 600 650 700 750 800 850 900 350 00 50 100 150 200 250 00 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000 1050 1100

Upload: others

Post on 22-Jan-2020

24 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CTB London drawing template · 2018-07-05 · lp gg rs 21.72 gg 20.01 gg 18.54 gg 18.54 rs nb bo rs ts tl ts rs bo ts po tl tss cl 19.04 18.92mh gg 18.85 gg lp lp lp cl 19.13mh nb

Pro

je

ct M

an

ag

em

en

t In

itia

ls: A

uth

or:

D

esig

ne

r:

C

he

cke

d:

A

pp

ro

ve

d:

BA

NA

NA

JM

L

REV.

M

0 25 50 75 100 125m

SCALE 1:1250

1.

2.

3.

4.

DO NOT SCALE FROM THIS DRAWING.

ALL DIMENSIONS, CO-ORDINATES AND LEVELS ARE GIVENIN METRES UNLESS SHOWN OTHERWISE.

EARTHWORKS CREATED AT 1 IN 2 WHERE POSSIBLE, INAREAS LIMITED BY LAND OR ENVIRONMENTALRESTICTIONS, STEEPER SLOPES HAVE BEENGENERATED. ALL SLOPE ANGLES ARE TO BE CONFIRMEDFOLLOWING SITE INVESTIGATION.

EXACT LOCATION AND FORM OF HEADWALLS ANDASSOCIATED CULVERTS TO BE CONFIRMED FOLLOWINGSITE INVESTIGATION.

La

st sa

ve

d b

y: N

EIL

.A

SH

FO

RD

(2

01

8-0

4-2

6) L

ast P

lo

tte

d: 2

01

8-0

4-2

6

File

na

me

: C

:\U

SE

RS

\N

EIL

.A

SH

FO

RD

\D

ES

KT

OP

\F

VL

R P

LA

NN

IN

G A

PP

LIC

AT

IO

N D

RA

WIN

GS

- L

OW

ER

R

OA

D L

EV

EL

\H

IG

HW

AY

E

NG

IN

EE

R\F

VL

R-A

CM

-0

0-0

1-D

R-C

E-0

00

4 L

O

UT

LIN

E D

ES

IG

N G

A\F

VL

R-A

CM

-0

0-0

1-D

R-C

E-0

00

4 M

O

UT

LIN

E D

ES

IG

N G

A.D

WG

FOR PLANNING

I/R DATE DESCRIPTION

ISSUE/REVISION

A 18/08/17 INITIAL ISSUE

NOTES ADDED

B 25/08/17 EARTHWORKS AMENDED

ROAD MARKINGS AMENDED

C 07/09/17 CULVERT HEAD WALLS AND

BRIDGE AMENDED

FACILITY TO NORTH SIDE OF

LINK ROAD AMENDED, CYCLE

D 13/09/17 EARTHWORKS TO SW SIDE OF

SLOPES AMENDED TO 1 IN 2

LINK ROAD EMBANKMENT

TRAFFIC SIGNAL LAYBY ADDED

E 03/10/17 ATTENUATION POND AMENDED

FVLR DEVELOPMENT SHOWN

F 16/10/17 DRAFT TIE IN DETAILS WITH

REQUESTED AMENDMENTS

G 10/11/17 LINK ROAD RAISED & CLIENT

SITE ACCESS INDICATED

ROAD ADDED, BLUNTS LANE

H 06/12/17 BUS LANE MERGE ON LINK

SHEET NUMBER

FVLR-ACM-00-01-DR-CE-0004

GENERAL NOTES

CLIENT

BALFOUR BEATTY

PROJECT

FORDER VALLEY LINK

ROAD

IS

O A

0 8

41

mm

x 1

18

9m

m

Th

is d

ra

win

g h

as b

ee

n p

re

pa

re

d fo

r th

e u

se

o

f A

EC

OM

's clie

nt. It m

ay n

ot b

e u

se

d, m

od

ifie

d, re

pro

du

ce

d o

r re

lie

d u

po

n b

y th

ird

p

artie

s, e

xce

pt a

s a

gre

ed

b

y A

EC

OM

o

r a

s re

qu

ire

d b

y la

w. A

EC

OM

a

cce

pts n

o re

sp

on

sib

ility, a

nd

d

en

ie

s a

ny lia

bility w

ha

tso

eve

r, to

a

ny p

arty th

at u

se

s o

r re

lie

s o

n th

is d

ra

win

g w

ith

ou

t A

EC

OM

's e

xp

re

ss w

ritte

n co

nse

nt. D

o n

ot sca

le

th

is d

ocu

me

nt. A

ll m

ea

su

re

me

nts m

ust b

e o

bta

in

ed

fro

m th

e sta

te

d d

im

en

sio

ns.

DRAWING STATUS

LEGEND

PROPOSED HB2 / BN KERBSPROPOSED EDGING KERBSPROPOSED CYCLE BLOCK

CARRIAGEWAY VERGE

PROPOSED ROAD MARKINGSPROPOSED CUT SLOPEPROPOSED FILL SLOPE

© Crown copyright and database rights 2013Ordnance Survey 100018633

SHEET TITLE

FORDER VALLEY LINK ROAD

OUTLINE DESIGN

GENERAL ARRANGMENT

CLIENT

BALFOUR BEATTY

PROJECT

FORDER VALLEY LINK

ROAD

PROJECT NUMBER

60535194

PROPOSED ATTENUATION / INFILTRATION POND(POND SIZE AND LAYOUT TO BE CONFIRMEDFOLLOWING INFILTRATION TESTING AND SITEINVESTIGATION)

CARRIAGEWAY

FOOTWAY

CYCLEWAY

SHARED USE FOOTWAY/CYCLEWAY

TRAFFIC ISLANDS

SOFT LANDSCAPING

CONSULTANT

AECOM

Plumer House, East Wing, Third Floor,

Tailyour Road,

Plymouth, PL6 5DH

+44(0)1752 676700 tel +44(0)870 238 6023 fax

www.aecom.com

EXTRACT OF PLANNING BOUNDARY(12/02027/OUT, SEE DRAWING 07710L01.02)

AREA OF PCC LAND TO BECOME HMPE

APPROXIMATE EXTENT OF PERSIMMONDEVELOPMENT

I/R DATE DESCRIPTION

ISSUE/REVISION

A 18/08/17 INITIAL ISSUE

NOTES ADDED

B 25/08/17 EARTHWORKS AMENDED

ROAD MARKINGS AMENDED

C 07/09/17 CULVERT HEAD WALLS AND

BRIDGE AMENDED

FACILITY TO NORTH SIDE OF

LINK ROAD AMENDED, CYCLE

D 13/09/17 EARTHWORKS TO SW SIDE OF

SLOPES AMENDED TO 1 IN 2

LINK ROAD EMBANKMENT

TRAFFIC SIGNAL LAYBY ADDED

E 03/10/17 ATTENUATION POND AMENDED

FVLR DEVELOPMENT SHOWN

F 16/10/17 DRAFT TIE IN DETAILS WITH

REQUESTED AMENDMENTS

G 10/11/17 LINK ROAD RAISED & CLIENT

SITE ACCESS INDICATED

ROAD ADDED, BLUNTS LANE

H 06/12/17 BUS LANE MERGE ON LINK

J 11/12/17 FOOTWAY ACCESS TO ECO

POND ADDED, HMPE

EXTENSION ADDED

K 14/12/17 TOPO ADDED TO DRAWING

L 31/01/18 BLUNTS LANE SHARED USE

ROUTE AMENDED. VARIOUS

NOTES AMENDED.

M 26/04/18 CHAINAGE LINE (CARRIAGEWAY

CENTRELINE) AMENDED.

95.29

GG

CL 95.23

MH

CL 95.02

MH

93.96

GG

CL 92.84

MH

GG

92.99

GG

SV

MP

FH

MP

LP

SI

SI

TC

SV

MP

I

C

I

C

IC

DP

SI SV

TC

C

L

9

3

.

3

0

I

C

SV

SV

TC

LP

SV

C

L

8

8

.

9

3

I

C

87.01

GG

88.25

GG

CL 89.01

MH

CL 89.06

MH

GG

91.59

GG

92.59

CL 92.61

MH

R

L

1

0

5

.

0

6

R

L

1

0

2

.

8

4

R

L

1

0

1

.

4

1

R

L

1

0

1

.

1

1

R

L

9

9

.

9

9

E

L

9

7

.

1

9

R

L

9

9

.

7

2

CL 87.25

MH

CL 87.30

MH

87.29

GG

LP

8

6

.2

8

GG

85.82

CL 86.52

MH

CL 86.70

MH

96.68

80.13

GG

83.77

GG

CL 88.39

IC

CL 87.90

MH

87.82

MH

BX

GG

PO

PO

CL 81.43

MH

PO

PO

PO

PO

PO

35.16

GG

DR

EP

PO

DP

CL 34.61

MH

CL 34.68

MH

DR

DP

DR

UC

E

L

3

8

.6

8

E

L

3

9

.6

1

E

L

3

9

.6

1

R

L

4

2

.1

4

UC

DP

EP

R

L

4

0

.7

0

UC

CL 35.27

MH

DP

PO

E

L

3

9

.5

2

E

L

4

0

.1

2

E

L

4

1

.6

2

E

L

3

8

.0

4

R

L

3

9

.9

7

E

L

3

7

.9

9

R

L

4

0

.0

5

PO

PO

PO

PO

PO

PO

PO

E

L

3

6

.8

8

R

L

4

1

.9

6

E

L

4

1

.5

6

R

L

4

3

.4

2

DP

CL 36.79

MH

CL 32.64

MH

R

L

4

2

.0

9

PO

PO

PO

BH

CL 27.93

MH

CL 23.40

MH

EP

SY

SY

CL 25.02

MH

EP

SY

SY

BH

BH

CL 25.73

MH

E

L

3

1

.9

2

R

L

3

2

.7

7

PO

BH

PO

OHL

O

H

L

OHL

O

H

L

O

H

L

O

H

L

O

H

L

OHL

O

H

L

O

H

L

O

H

L

SY

EP

OH

L

O

H

L

O

H

L

OHL

O

H

L

O

H

L

O

H

L

CL 32.72

CL 34.13

O

H

L

CL 35.23

B

O

TS

T

L

BO

TL

LP

GG

RS

21.72

GG

20.01

GG

18.54

GG

18.54

RS

NB

BO

R

S

TS

TL

T

S

RS

B

O

TS

P

O

TL

TSs

CL 19.04

MH18.92

GG

18.85

GG

LP

LP

LP

C

L

1

9

.1

3

M

H

NB

LP

LP

TS

TS

TS

T

S

TL

CL 18.55

MH

CL 19.03

MH

L

P

EC

EC

23.10

GG

22.90

GG

LP

LP

RS

EC

LP

LP

LP

TP

TC

NB

RS

SY

GVs

BO x5

BO

TV

23.55

GG

26.29

GG

RS

CL 26.64

MH

CL 25.68

MH

N

B

36.93

GG

LP

CL 4

0.9

7

M

H

LP

TC

38.84

MH

31.37

GG

CL 33.02

MH

36.87

GG

GVs RS

PO

TP

RS

BOs

LP

BO

PO

PO

PO

LP

TS

LP

TC

TL

TS

TC

BOs

B

O

s

BO

MH

CL 18.46

M

H

C

L

1

8

.

4

1

BO

TC

GG

18.09

MH

CL 18.23

GG

17.95

TL

GG

18.12

LP

LP

LP

GG

LP

17.12

BO

GG

17.03

BO

GG

16.75

GG

LP

TC

16.54

MH

CL 16.60

LP

MH

16.04

GG

15.97

GG

CL 16.00

BO

LP

RS

LP

GG

GG

17.47

17.39

RS

RS

RS

M

H

C

L

1

7

.

4

3

LP

TS

PO

GG

19.22

PO

MH

CL 18.81

BO

RS

PO

TS

TS

TC

PO

T

S

ECs

GG

18.83

TC

P

O

P

O

NB

GG

LP

CL 65.24

MH

LP

CL 68.41

MH

CL 68.47

MH

TC

CL 68.69

MH

CL 68.71

MH

C

L

5

9

.

4

1

M

H

RS

CL 58.18

IC

56.55

GG

54.94

GG

TC

53.32

GG

RS

CL 60.07

MH

CL 60.35

MH

LP

LP

LP

LP

RS

LP

SI

LP

TC

LP

59.61

GG

LP

CL 60.81

MH

LP

TLIC

60.93

GG

CL 60.87

MH

60.75

GG

60.87

GG

LP

57.90

GG

57.00

GG

LP

68.46

GG

68.43

GG

LP

54.43

GG

CL 51.88

MH

LP

51.90

GG

51.17

GG

49.40

GG

LP

48.26

GG

47.42

GG

CL 48.99

MH

LP

CL 46.02

MH

45.96

MH

45.66

GG

44.9144.18

GG

CL 43.65

TC

MH

LP

43.35

GG

42.67

GG

41.99

GG

LP

CL 41.34

MH

40.78

GG

CL 40.59

MH

40.23

GG

LP

39.61

GG

LP

TC

CL 43.47

MH

LP

SI

51.94

GG

CL 51.39

MH

LP

50.38

GG

LP

SI

CL 47.16

MH

TC

LP

48.52

GG

47.14

GG

LP

45.71

GG

44.16

GG

LP

42.56

GG

VP

51.46

GG

LP

EP

TC

CL 52.96

MH

RS

TC

EP

RS

B

O

B

O

B

O

B

O

RS

LP

RS

LP

LP

CL 40.14

MH

SI

41.07

GG

LP

TC

39.46

GG

TC

TC

37.75

GG

SI

TC

LP

LP

35.36

GG

RS

32.11

GG

LP

N

B

O

H

L

N

B

TC

25.10

GG

LP

TC

TC

T

L

I

C

LP

26.73

GG

CL 26.40

MH

SI

CL 24.99

MH

TLIC

TC

LP

T

L

I

C

T

L

I

C

T

L

TL

T

L

T

L

I

C

TL

T

L

I

C

21.11

GG

LP

EP

CL 19.98

MH

35.83

GG

36.94

GG

LP

37.35

GG

37.70

GG

38.05

GG

LP

38.61

GG

38.72

GG

38.80

GG

LP

CL 38.89

MH

38.99

GG

39.29

GG

37.45

33.42

GG

LP

34.04

GG

34.80

GG

CL 36.61

MH

CL 35.86

MH

CL 34.33

MH

CL 32.87

MH

CL 33.19

MH

EP

37.33

GG

37.09

GG

BO

37.75

GG

WM

TC

LP

LP

N

O

E

N

T

R

Y

T

L

I

C

T

L

I

C

T

L

I

C

O

H

L

O

H

L

42.04

GG

SC

WM

TV

FH

LP

WM

WM

TC

WM

CL 43.17

MH

CL 43.16

MH

CL 41.85

MH

CL 41.85

MH

TV

41.84

GG

41.00

TV

40.42

40.18

GG

SC

41.26

40.55

36.59

GG

37.27

GG

38.05

GG

RL 48.23

RL 47.80

R

L

4

3

.

9

5

TP

EP

ET

SY

SY

WM

LP

3

6

.

8

3

3

7

.

1

1

3

7

.

1

3

PO

PO

W

a

l

l

1

.

0

h

B

l

o

c

k

W

a

l

l

1

.

0

h

B

l

o

c

k

R

e

t

.

W

a

l

l

1

.

2

h

B

l

o

c

k

R

e

t

.

W

a

l

l

C

o

n

c

.

R

e

t

.

W

a

l

l

I

/

R

1

.

0

h

B

l

o

c

k

R

e

t

.

W

a

l

l

1

.

5

h

O

H

L

O

H

L

OHL

B

l

o

c

k

W

a

l

l

2

.

0

h

C

/

B

2

.

0

h

F

o

o

t

w

a

y

(

A

s

p

h

a

l

t

)

C

/

B

2

.

0

h

B

l

o

c

k

W

a

l

l

1

.

1

h

C

o

n

c

r

e

t

e

R

e

t

.

W

a

ll

1

.

3

h

Wall 0.8h

Stone

2

8

2

9

3

0

3

1

3

2

3

3

3

3

3

4

3

4

3

5

3

5

3

5

3

6

3

6

3

6

3

7

3

7

3

8

C

/

B

2

.

0

h

Wall 1.0h

Block

Wall 1.3h

Conc.

27.72

28.05

28.17

28.33

30.46 30.5

6

30.32

30.30

30.80

31.99

30.70

30.65

CL 31.13

MH

CL 34.13

IC

30.77

B/W

1.0

h

Stone R

et. W

all

B

/

W

1

.

0

h

Stone R

et. W

all

ET

SI

CL 18.36

MH

SY

SY

SY

ET

ET

EP

EP

PO

EP

SI

SI

EP

O

H

L

O

H

L

P/R

C

o

n

c

.

P/R

1

.1

h

Conc. D

rain

age Channel 0

.5h

1

6

1

6

1

7

1

7

1

8

1

8

1

9

2

0

2

0

2

1

2

1

22

2

2

2

3

2

3

2

4

2

4

2

5

25

2

5

26

26

2

6

27

27

2

7

2

7

2

8

2

8

28

2

9

29

30

31

3

2

O

H

L

O

H

L

O

H

L

O

H

L

O

H

L

O

H

L

O

H

L

1.0h

C

o

n

c

.

D

r

a

in

a

g

e

C

h

a

n

n

e

l

0

.

5

h

Monitoring well

I

L

1

6

.

1

3

1

7

.

4

3

I

L

0

.

6

Ø

PO

CL 26.03

MH

EP

CL 19.26

MH

IL 20.74

300Ø

MP

24.96

GG

24.82

GG

TC

CL 29.57

MH

SC LP

TC

SC

SC

SC

SC

TC

SC

SC

WO

LP

LP

TC

0

.

5

Ø

IL

2

7

.0

2

0

.5

Ø

CL 28.20

MH

O

H

L

O

H

L

O

H

L

O

H

L

O

H

L

O

H

L

0

.

9

m

Ø

C

o

n

c

Stone Ret.

Wall

B

l

o

c

k

2

5

2

5

2

5

2

5

25

2

5

2

5

2

5

25

2

5

3

0

3

0

3

0

3

0

3

0

3

0

3

0

30

3

0

3

0

35

3

5

3

5

3

5

3

5

3

5

3

5

3

5

3

5

35

35

35

3

5

3

5

3

5

3

5

4

0

40

4

0

4

0

4

0

4

0

4

0

4

0

4

0

45

4

5

4

5

45

4

5

45

4

5

45

45

45

45

5

0

5

0

5

0

50

5

0

50

50

50

5

5

5

5

55

5

5

55

5

5

6

0

6

0

60

60

6

0

65

6

5

6

5

65

6

5

70

7

0

70

70

70

7

0

7

5

7

5

75

7

5

75

7

5

8

0

8

0

8

0

8

0

80

8

0

8

5

8

5

85

8

5

85

85

85

9

0

9

0

90

95

9

5

95

5

0

2

5

2

6

2

7

2

7

2

9

31

3

0

30

3

1

3

1

3

2

32

3

2

3

5

3

4

3

3

3

5

34

3

5

3

6

37

3

6

3

7

3

7

38

3

4

3

4

3

4

34

3

4

3

5

3

5

35

3

6

3

6

3

6

3

7

3

7

3

7

3

8

3

8

3

9

3

9

3

9

4

0

4

0

4

0

4

1

4

1

4

1

4

2

4

2

4

2

4

3

4

3

4

3

4

4

4

4

4

4

4

5

4

5

4

5

4

6

4

6

4

6

4

7

4

7

4

7

4

8

4

8

4

8

49

49

4

9

5

0

5

0

51

5

1

5

2

5

2

5

3

5

3

2

8

2

8

29

2

9

30

3

0

3

1

31

31

3

2

32

3

2

3

3

33

3

3

3

4

34

3

4

34

34

3

5

3

5

35

3

6

3

6

3

6

36

3

7

3

7

3

7

3

7

3

8

3

8

3

8

3

8

3

9

39

39

40

4

0

40

41

4

1

41

42

4

2

42

43

4

3

43

44

4

4

4

4

45

4

5

4

5

4

6

46

4

6

4

7

47

47

4

8

48

48

4

9

4

9

49

5

0

IC

CL 41.45

50

51

5

1

51

52

5

2

53

53

54

54

2

4

24

2

5

2

5

2

6

2

6

2

7

2

8

2

8

2

8

2

9

2

9

3

0

36

3

3

33

3

8

34

IC

CL 31.64

MH

CL 18.36

EP

EP

SY

Well

OH

L

O

H

L

TC RS

16.26

1

6

.2

3

CL 16.18

MH

Monitoring Well

SI

BOs

CL 16.33

MH

CL 16.36

MH

CL 16.39

MH

CL 16.30

MH

LP

BOs

16.21

C

L

1

6

.2

0

M

H

CL 16.22

MH

1

6

.

2

6

16.25

SI

SI

VP

16.05

GG

CL 16.22

MH

LP

C

L

1

6

.

1

4

M

H

BO

BO

VP

1

6

.1

4

B

o

lla

rd

s

16.12

CL 16.10

MH

15.95

GG

CL 16.17

MH

CL 16.15

MH

C

L

1

6

.1

3

M

H

LP

16.24

16.24

CL 16.23

MH

16.12

GG

CL 16.18

MH

SY

SY

CL 16.05

MH

LP

BO

BO

CL 15.94

MH

BO

1

6

.

0

5

CL 15.90

MH

C

L

1

5

.8

6M

H

CL 15.88

MH

CL 15.84

MH

LP

CL 16.16

MH

LP

C

L

1

6

.2

1

M

H

DR

C

L

1

6

.0

1

M

H

15.95

GG

CL 15.98

MH

CL 16.02

MH

C

L

1

6

.1

1

M

H

15.96

GG

BOs

1

6

.2

2

16.23

Disabled

R

L

2

0

.0

1

C

L

1

6

.0

7

M

H

C

L

1

6

.0

4

M

H

1

6

.1

1

BO

CL 16.06

MH

CL 16.04

MH

CL 16.05

MH

CL 16.04

MH

SI

LP

LP

LP

LP

B

O

15.97

GG

B

O

s

15.97

GG

CL 16.03

MH

CL 16.09

MH

DP

DR

BO

DP

DR

CL 16.06

MH

16.25

P

/

R

1

.

0

h

C

o

n

c

.

G

ra

v

e

l

C

/

B

1

.

8

h

C

o

n

c

re

te

B

ric

k

W

a

ll 1

.0

h

C

/

B

1

.

8

h

OH

L

P

/

R

0

.

8

h

C

o

n

c

.

I

/

R

2

.

0

h

G

r

a

v

e

l

SI

HG

V

FU

EL

DR

DR

D

C

BOs

BOs

E

X

IT

Monitoring Well

A

IR

V

A

C

E

N

T

R

A

N

C

E

C

A

R

W

A

S

H

BOs

B

o

lla

rd

s

Monitoring

Well

S

t

o

r

e

Monitoring

Wells

TC

F

P

1 IN 2 FILL SLOPE

1 IN 2 FILL SLOPE

1 IN 2 FILL SLOPE

1 IN 2 FILL SLOPE

1 IN 1.5 FILL SLOPE

1 IN 1 CUT SLOPE

1 IN 1.5 CUT SLOPE

1 IN 40 CUT SLOPE

1 IN 0.36 FILL SLOPE

1 IN 40 FILL SLOPE

1 IN 1.5 FILL SLOPE

1 IN 2

FILL S

LOPE

1 IN 2 CUT SLOPE

1 IN 2 CUT SLOPE

1 IN 2 FILL SLOPE

1 IN 2 FILL SLOPE

FORDER VALLEY LINK ROAD

FORDER VALLEY ROAD (WEST)

NOVOROSSIYSK ROAD

FORDER VALLEY ROAD (SOUTH)

PROPOSED EXTENT OF BRIDGE STRUCTURE (APPROX 140m LONG)

PROPOSED TOUCAN CROSSING POINTS

PROPOSED STAGGERED TOUCAN CROSSING POINTACCOMMODATING EXISTING NON MOTORISED USER

FACILITY LINKED TO ERLSTOKE CLOSE.

PROPOSED DIVERGING TAPER (TD 42/9 7.51)

PROPOSED RIGHT TURNING TRAFFIC LANES (2 x 3.25m ON TONOVOROSSIYSK ROAD) WITH 169m OF QUEUING CAPACITY

PROPOSED NORTHBOUND TRAFFIC LANES (ON TO FORDERVALLEY LINK ROAD) WITH 110m OF QUEUING CAPACITY

3.25m LANE WIDTHS USED TO MINIMISEIMPACT ON ADJACENT NATURE RESERVE.

PROPOSED CULVERT AND HEADWALL POSITIONS TO ACCOMMODATE JUNCTIONARRANGEMENT AND POTENTIAL OFFLINE CONSTRUCTION METHOD.

PROPOSED SEGREGATED FOOTWAY / CYCLEWAY (3mAND 2m EFFECTIVE WIDTHS ADJACENT TO A 0.5m VERGE)

PROPOSED SHARED USE FOOTWAY / CYCLEWAY (3.5mEFFECTIVE WIDTH ADJACENT TO A 0.5m VERGE)

PROPOSED SHARED USE FOOTWAY / CYCLEWAY (3.5mEFFECTIVE WIDTH ADJACENT TO A 0.5m VERGE)

PROPOSED SEGREGATED FOOTWAY / CYCLEWAY (3m AND 2m EFFECTIVEWIDTHS ADJACENT TO A 0.5m VERGE)

PROPOSED SHARED USE FOOTWAY / CYCLEWAY (3.5mEFFECTIVE WIDTH ADJACENT TO A 0.5m VERGE)

PROPOSED 1 IN 1 GRADED CUT SLOPE (ASSUMED ROCKFACE, TO BE CONFIRMED DURING SITE INVESTIGATION)

PROPOSED 1 IN 1.5 GRADED CUT SLOPE TO MAXIMISE LAND BETWEENPROPOSED HIGHWAY AND EXISTING PROPERTY BOUNDARIES, (SITE

INVESTIGATION TO DETERMINE FEASIBILITY)

PROPOSED 1 IN 6 GRADED CUT SLOPE. FOLLOWINGCOMPLETION OF SITE INVESTIGATION, GRADING TOBE DETERMINED IN CONJUNCTION WITH CUT SLOPESOF ADJACENT ATTENUATION POND (1 IN 2).

PROPOSED SHARED USE FOOTWAY / CYCLEWAY (5mEFFECTIVE WIDTH ADJACENT TO A 0.5m VERGE)

PROPOSED 1 IN 1.5 FILL SLOPE (WITH EROSION / SCOUR PROTECTION) TOAVOID CONFLICT WITH EXISTING WATER COURSE

PROPOSED REINFORCED EARTHSTRUCTURE (APPROX 70° SLOPE)

PROPOSED BRIDGE STRUCTUREAND ASSOCIATED ABUTMENTS

PROPOSED REINFORCED EARTHSTRUCTURE (APPROX 70° SLOPE)

PROPOSED FORM AND EXTENTS OF ATTENUATION /INFILTRATION POND TO BE CONFIRMED FOLLOWINGSITE INVESTIGATION

PROPOSED TRAFFIC SIGNAL MAINTENANCE LAYBYFOLLOWING SITE INVESTIGATION TO DETERMINE GROUND CONDITIONS AND ACTUAL TREEROOT POSITIONS, IT MAY BE POSSIBLE TO INCORPORATE A STRENGTHENED EMBANKMENT ORRETAINING STRUCTURE TO AVOID LOSS OF TREE LINE AND ASSOCIATED HEDGE. THIS WILL BEIMPLEMENTED IF POSSIBLE AS PART OF THE DETAILED DESIGN.

DEMARCATION LINE BETWEEN 30/40mph SPEED LIMITS(DETERMINED BY HORIZONTAL GEOMETRY)

TIE IN POINT WITH DEVELOPMENT TO BE CONFIRMED

EXTENT OF EARTHWORKS TO BE DETERMINED UPONCOMPLETION OF NEGOTIATIONS WITH DEVELOPER

EXTENT O

F

PERSIMMON

DEVELOPMENT

EXTENT O

F

PLYMOUTH

CITYCOUNCIL

DEVELOPMENT

NOVOROSSIYSK ROAD

TREES WITH BAT POTENTIAL. PONDEARTHWORKS TO BE UNDERTAKENWITHOUT IMPACT ON ROOTSASSOCIATED WITH THESE TREES.

PROPOSED LINK TO COMMUNITY PARK (SCHEME CURRENTLYSUBJECT TO PUBLIC CONSULTATION)

00

50

100

150

200

250

300

350

400

450 50

0 550 600 650 700 750

800

850

900

913

00

50

100

150

200

250

300

350

400

450

500

550

600

650

700

750

800

850

900

950

1000

1050

1100

1134

300

350

400

450 500

550

600

650

700

750 80

0

850

900

350

00

50 100

150

200

250

00

50

100

150

200

250

300

350

400

450

500

550

600

650

700

750

800

850

900

950

1000

1050

1100

1050

AutoCAD SHX Text
350.000
AutoCAD SHX Text
360.000
AutoCAD SHX Text
370.000
AutoCAD SHX Text
380.000
AutoCAD SHX Text
390.000
AutoCAD SHX Text
410.000
AutoCAD SHX Text
420.000
AutoCAD SHX Text
430.000
AutoCAD SHX Text
440.000
AutoCAD SHX Text
450.000
AutoCAD SHX Text
460.000
AutoCAD SHX Text
470.000
AutoCAD SHX Text
480.000
AutoCAD SHX Text
490.000
AutoCAD SHX Text
500.000
AutoCAD SHX Text
510.000
AutoCAD SHX Text
530.000
AutoCAD SHX Text
540.000
AutoCAD SHX Text
550.000
AutoCAD SHX Text
560.000
AutoCAD SHX Text
400.000
AutoCAD SHX Text
520.000
AutoCAD SHX Text
81.00
AutoCAD SHX Text
82.00
AutoCAD SHX Text
83.00
AutoCAD SHX Text
84.00
AutoCAD SHX Text
85.00
AutoCAD SHX Text
86.00
AutoCAD SHX Text
87.00
AutoCAD SHX Text
88.00
AutoCAD SHX Text
89.00
AutoCAD SHX Text
90.00
AutoCAD SHX Text
91.00
AutoCAD SHX Text
92.00
AutoCAD SHX Text
93.00
AutoCAD SHX Text
94.00
AutoCAD SHX Text
95.00
AutoCAD SHX Text
96.00
AutoCAD SHX Text
INDICATIVE LOCATION OF ACCESS TO ONE PLANET CENTRES IN ACCORDANCE WITH PLANNING REF 17/01339/FUL
AutoCAD SHX Text
INDICATIVE LOCATION OF ACCESS TO BLUNTS LANE DEVELOPMENT
AutoCAD SHX Text
530.000
AutoCAD SHX Text
83.00
AutoCAD SHX Text
84.00
AutoCAD SHX Text
85.00