Page 1
March 28, 2012
Vermelding onderdeel organisatie
1
Chapter 2: Positioning the subject
ct5308 Breakwaters and Closure Dams
H.J. Verhagen
Faculty of Civil Engineering and GeosciencesSection Hydraulic Engineering
Page 2
March 28, 2012 2
Focus on:• Technical aspects• Technical impacts only
Page 3
March 28, 2012 3
Breakwaters and Closure dams
• Comparable items:• similar materials• similar execution methods
• Differences:• load difference (wave action vs. currents)• life time
Page 4
March 28, 2012 4
Characteristic values
Type of structure H/Δdn
Sandy beachGravel beachRock slopeBerm breakwater(Stable) rubble mound breakwatercaisson
>50020-5006-203-61-4<1
Page 5
March 28, 2012 5
mound breakwater types
Page 6
March 28, 2012 6
Monolithic breakwater type
Page 7
March 28, 2012 7
Sometimes vertical wall is only option
Cardiff Barrage14 m tidal range(situation at high water
Page 8
March 28, 2012 8
Composite breakwater types
Page 9
March 28, 2012 9
Special breakwater types
Page 10
March 28, 2012 10
Floating breakwater in Italy(Marina di Verbania, Lago Maggiore)
Page 11
March 28, 2012 11
Floating breakwater in Italy
Page 12
March 28, 2012 12
Floating breakwater in Italy
Page 13
March 28, 2012 13
Vertical screens(Royal Prince Alfred Yacht Club, Sydney, Australia)
Page 14
March 28, 2012 14
Basic methods of closure
Page 15
March 28, 2012 15
Closure named after topography
Page 16
March 28, 2012 16
Closures named after hydrologic conditions
Page 17
March 28, 2012 17
closures named after materials used
• stacking up willow mattresses (opzinken)
• sand closure• clay or boulder clay closure• stone dam closure (rock closure)• caisson closure
Page 18
March 28, 2012 18
Pluimpot, Tholen
Page 19
March 28, 2012 19
sand closure
Page 20
March 28, 2012 20
Afsluitdijk
Page 21
March 28, 2012 21
rock closure
Page 22
March 28, 2012 22
caisson closure
Page 23
March 28, 2012 23
Rubble mound breakwater at Cittavecchia
Page 24
March 28, 2012 24
Breakwater at Cherbourg
Page 25
March 28, 2012 25
Breakwater at Plymouth
Page 26
March 28, 2012 26
Monolithic breakwater at Dover
Page 27
March 28, 2012 27
Breakwater at Marseilles
Page 28
March 28, 2012 28
Typical breakwater along the Mediterranean coast
Page 29
March 28, 2012 29
Historical closures
• Rhine damming (Wijk bij Duurstede)• Sloe closure (pakwerk)• Hindeburgdam
Page 30
March 28, 2012 30
Walcheren, four gaps on one island
Page 31
March 28, 2012 31
Development of erosion gullies