WHAT IS FORMWORK ?
- Supports structure and molds to create structures out of concrete- Made by using steel, wood, aluminum and prefabricated forms- Cost of formwork is around 30-40% of the concrete cost
NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
Good Formwork
Water Tight
reusablestrong
NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
Consideration In
Formwork
ECONOMY
SAFETY
QUALITY
NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
5
METAL FORMWORKADVANTAG
ESSTEEL ALUMINIUMStronger, durable and longer life than timberformwork
Often used in pre-fabricated formwork
Can be reused many times Strong and light in weight
Can be installed and dismantled with greater easeand speed
The lighter sections will deflect more
Quality of exposed concrete surface is good Can be recycled after smelting
Does not absorb moisture from concrete Highly precise in assembly
Does not shrink or warp Can be reused for more than 300 times
NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
6
METAL FORMWORKDISADVANTAGESSTEEL ALUMINIUM
Limited size or shape Higher risk of theft
Excessive loss of heat Not field modifiable
Limited fixing Expensive
A very smooth surface will be produced which would give problems for finishing process
Lower transportation cost compared to steel formwork
NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
SUITABILITYSTEEL ALUMINIUM
- Widely used in large projects or in situation where large number reuses of the shuttering is possible
- Suitable for low as well as high rise building
- For heavy concrete work - can be designed for any condition/component of building such as bay windows, stairs
- Suitable for circular or curved shaped structures - such as tanks,
columns, chimneys.
- Bridge construction / Airport construction
NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
COST
$ 100 - $ 300 / square meter RM 400 – RM 1200 / square meter
$ 99 - $ 145 / square meter RM 396 – RM 580 / square meter
Aluminium formwork
Steel formwork
NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
9
CONSTRUCTION TECHNOLOGY TUTORIAL 4(B) PRESENTATION
BY : NA YONG YI ( 0324458 )CHAI JIA ERN ( 0324653 )TEE WAN NEE ( 0325074 )
10NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
RUBBER FLOOR FINISHES
ADVANTAGES Durability
Low maintenance
Slip-resistant
Weatherproof
Hard-wearing
DISADVANTAGES Expensive
Rubber smell
Difficult to clean
Hard to get
11NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
RUBBER FLOOR FINISHES
SUITABILITY- Exercise rooms benefit from having flooring that absorbs noise
- In the kitchen, rubber flooring shrugs off most spills and drops
- Playground to prevent children from getting injured
- Bathrooms are good candidates for water-resistant sheet rubber flooring
12NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
RUBBER FLOOR FINISHESBasic Best
Material Prices $320.00 – $350.00 $415.00 – $455.00
Installation Cost $105.00 – $110.00 $165.00 – $175.00
Total $425.00 – $460.00 $580.00 – $630.00
Total Average cost per foot square
$4.42 $6.05
13NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074