CONSTRUCTION TECHNOLOGY TUTORIAL 4 PRESENTATION

BY : NA YONG YI ( 0324458 )CHAI JIA ERN ( 0324653 )TEE WAN NEE ( 0325074 )

Page 2: CT tutorial 4

WHAT IS FORMWORK ?

- Supports structure and molds to create structures out of concrete- Made by using steel, wood, aluminum and prefabricated forms- Cost of formwork is around 30-40% of the concrete cost

NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074

Page 3: CT tutorial 4

Good Formwork

Water Tight

reusablestrong

NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074

Page 4: CT tutorial 4

Consideration In

Formwork

ECONOMY

SAFETY

QUALITY

NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074

Page 5: CT tutorial 4

5

METAL FORMWORKADVANTAG

ESSTEEL ALUMINIUMStronger, durable and longer life than timberformwork

Often used in pre-fabricated formwork

Can be reused many times Strong and light in weight

Can be installed and dismantled with greater easeand speed

The lighter sections will deflect more

Quality of exposed concrete surface is good Can be recycled after smelting

Does not absorb moisture from concrete Highly precise in assembly

Does not shrink or warp Can be reused for more than 300 times

NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074

Page 6: CT tutorial 4

6

METAL FORMWORKDISADVANTAGESSTEEL ALUMINIUM

Limited size or shape Higher risk of theft

Excessive loss of heat Not field modifiable

Limited fixing Expensive

A very smooth surface will be produced which would give problems for finishing process

Lower transportation cost compared to steel formwork

NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074

Page 7: CT tutorial 4

SUITABILITYSTEEL ALUMINIUM

- Widely used in large projects or in situation where large number reuses of the shuttering is possible

- Suitable for low as well as high rise building

- For heavy concrete work - can be designed for any condition/component of building such as bay windows, stairs

- Suitable for circular or curved shaped structures - such as tanks,

columns, chimneys.

- Bridge construction / Airport construction

NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074

Page 8: CT tutorial 4

COST

$ 100 - $ 300 / square meter RM 400 – RM 1200 / square meter

$ 99 - $ 145 / square meter RM 396 – RM 580 / square meter

Aluminium formwork

Steel formwork

NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074

Page 9: CT tutorial 4

9

CONSTRUCTION TECHNOLOGY TUTORIAL 4(B) PRESENTATION

BY : NA YONG YI ( 0324458 )CHAI JIA ERN ( 0324653 )TEE WAN NEE ( 0325074 )

Page 10: CT tutorial 4

10NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074

RUBBER FLOOR FINISHES

ADVANTAGES Durability

Low maintenance

Slip-resistant

Weatherproof

Hard-wearing

DISADVANTAGES Expensive

Rubber smell

Difficult to clean

Hard to get

Page 11: CT tutorial 4

11NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074

RUBBER FLOOR FINISHES

SUITABILITY- Exercise rooms benefit from having flooring that absorbs noise

- In the kitchen, rubber flooring shrugs off most spills and drops

- Playground to prevent children from getting injured

- Bathrooms are good candidates for water-resistant sheet rubber flooring

Page 12: CT tutorial 4

12NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074

RUBBER FLOOR FINISHESBasic Best

Material Prices $320.00 – $350.00 $415.00 – $455.00

Installation Cost $105.00 – $110.00 $165.00 – $175.00

Total $425.00 – $460.00 $580.00 – $630.00

Total Average cost per foot square

$4.42 $6.05