Page 1: Ct presentation 2

CONSTRUCTION TECHNOLOGY\ CHAI JIA ERN 0324653 \ NA YONG YI 0324458 \\ TEE WAN NEE 0325074 \

Page 2: Ct presentation 2

ISSUES TO BE TAKEN INTO CONSIDERATION

BEFORE CONSTRUCTION

ACCESSIBILITY TO SITE SERVICE

WATER TABLE SITE CLEARANCE

SITE INVESTIGATION

SUBSOILS

\ CHAI JIA ERN 0324653 \\ NA YONG YI 0324458 \\ TEE WAN NEE 0325074 \

TEMPORARY WORK

Page 3: Ct presentation 2

ACCESSIBILITY TO SITE- Consideration on how the

vehicles will enter and exit the site.

- Condition of road

- If no suitable accessibility, temporary road is needed.

\ CHAI JIA ERN 0324653 \\ NA YONG YI 0324458 \\ TEE WAN NEE 0325074 \

Page 4: Ct presentation 2

- Knows the building around the construction site

- To reduce disturbance to the neighbors building ( noise )

- To guarantee the safety

SITE INVESTIGATE

\ CHAI JIA ERN 0324653 \\ NA YONG YI 0324458 \\ TEE WAN NEE 0325074 \

Page 5: Ct presentation 2

SERVICES- Is there any underground

service ?- Electricity cables, water

pipes, sewers

- SOLUTION ;- Locate the pipes and

cables

\ CHAI JIA ERN 0324653 \\ NA YONG YI 0324458 \\ TEE WAN NEE 0325074 \

Page 6: Ct presentation 2

WATER TABLE- The level below which the

ground is saturated with water- Ground water pressure equals

to atmospheric pressure

- IMPACT ON CONSTRUCTION OF A HIGH WATER TABLE ;

- Extra costs to increase trench support

- Presence of chemical such as acid can lead to damage of foundation and other materials used below the ground level

\ CHAI JIA ERN 0324653 \\ NA YONG YI 0324458 \\ TEE WAN NEE 0325074 \

Page 7: Ct presentation 2

SUBSOIL- Determine whether the type of subsoil is suitable for the construction

SANDGRAVEL

HARD ROCK CLAYGravel : Ideal subsoil, strong and easily drained

Sand : Loose, subject to movement

Hard Rock : Good foundation, High excavation cost

Clay : Good bearing capacity, does not drain well

\ CHAI JIA ERN 0324653 \\ NA YONG YI 0324458 \\ TEE WAN NEE 0325074 \

Page 8: Ct presentation 2

SITE CLEARANCE- Removing existing

structure on the construction site

- Removing shrubs and trees

- Remove soil to reduce level

Bulldozer : equipped with a blade used to push large quantities of materials

[Rear] : claw-like device (ripper) to loosen densely compacted materials

Stump Grinder : power equipment attachment that remove tree stumps

Rotating cutting disk that chips away wood

\ CHAI JIA ERN 0324653 \\ NA YONG YI 0324458 \\ TEE WAN NEE 0325074 \

Page 9: Ct presentation 2

TEMPORARY WORKSPart of construction project that are needed to enable the permanent works to be built

• Site office• Site accommodation• Site toilet• Material storage• Security

\ CHAI JIA ERN 0324653 \\ NA YONG YI 0324458 \\ TEE WAN NEE 0325074 \

Page 10: Ct presentation 2

Drag picture to placeholder or click icon to add

SECURITY- FENCE AND LOCK- LIGHTING- ALARMS & SECURITY

GUARDS- CCTV

Page 11: Ct presentation 2

FENCE & LOCK- Surrounded the whole

construction site- Offer a clear indication to

any outsiders that the area within is strictly off limits.

.LIGHTING

- Large, open and outdoor- Due to these sites seldom

have sufficient lighting - To prevent criminals from

being able to operate in shadow.

.

Page 12: Ct presentation 2

ALARMS & SECURITY GUARD

- Image can be recorded or monitored live

- On site or remotely

CCTV

- Install a silent alarm- 24-hour manned guarding

Page 13: Ct presentation 2

SCAFFOLDINGA temporary structure on the outside of the building, used by workers to climb up the building to work

Putlog Scaffold

\ CHAI JIA ERN 0324653 \\ NA YONG YI 0324458 \\ TEE WAN NEE 0325074 \

Independent Scaffold Mobile Access Tower

Page 14: Ct presentation 2

TIMBERING Trenches in Firm Soil

Trenches in Bad Soil Trenches in Loose Soil - When ground is so bad that it will not stand to a

vertical surface when poling board is inserted- Should the looseness of the soil supports being

fixed at closer intervals than 6 feet. - Timbering a trench in firm ground, in which case

short deal and batten “ends”.

- Temporary supports to sides of excavations.

- Planking & Strutting

https://www.youtube.com/watch?v=cFYkeT0Yk6k

\ CHAI JIA ERN 0324653 \\ NA YONG YI 0324458 \\ TEE WAN NEE 0325074 \

Page 15: Ct presentation 2

Timbering of

trenches

STAY BRACING

VERTICAL SHEETING BOX

SHEETING

RUNNER SYSTEM

SHEET PILING

\ CHAI JIA ERN 0324653 \\ NA YONG YI 0324458 \\ TEE WAN NEE 0325074 \

Page 16: Ct presentation 2

Thank you ! (: