csw2012 elevators

30
Elevator Construction, Maintenance + Repair Harry Vyas Alphonso Marshall Alex DeDiego April 23, 2012 – Times Square Marriott Marquis

Upload: felipe-doria-ribeiro

Post on 01-Oct-2015

222 views

Category:

Documents


0 download

DESCRIPTION

Elevators maintance guide

TRANSCRIPT

  • Elevator Construction, Maintenance + Repair

    Harry Vyas Alphonso Marshall Alex DeDiego

    April 23, 2012 Times Square Marriott Marquis

  • Elevators Unit Overview

    66,000 DevicesundertheDepartmentsjurisdiction

    500Tripsanaverageelevatormakesperday

    30Million Tripsmadecitywideeveryday

    10%PercentofallelevatorsintheU.S.inNYC

  • Elevator Safety

    Thepublic

    Elevatorpersonnel

    Authorizedpersonnel

    Emergencyresponders

  • Codes and Standards

    ASMEA17.1/2003andANSI/ASSEA10.4(PersonnelHoist)

    ASMEA17.3/2002(ExistingElevatorsandEscalatorsasmodifiedbyChapterK3)

    NYCBuildingCode2008,(AppendixK,Chapter30)

  • Device Types

    Elevators Escalators Manlifts Conveyors Personnelhoists Wheelchairlifts

  • Elevator Accidents

  • The Elevators Units Mission

    TheElevatorsUnitensurestheoperationalsafety,reliable serviceandlawfuluseofelevators,escalators,amusementridesandotherrelateddevicesthroughoutNewYorkCitybyperforminginspectionsandtesting.

    TheUnitenhancescompliantdevelopmentandsafetyawareness throughtheDepartmentsvariousoutreachprograms.TheUnitsupportsdevelopmentbypermittingnewtechnologiesunderpilotprograms.

  • Hoist Applications

    Newinstallations:

    Electricalpermitmustbefiledforelectricalwork

    Constructionapplicationmustbefiledattheboroughofficefortiestothebuildingstructureandforbackstructureinstallation

    Note:Allhoistsmustbetestedbythedepartmentafterinstallationandinspectionuponremovalofthehoist.

  • Hoist Permit Process Constructionandelectricalapplications&permits Issuedbyrespectiveborough

    Materialhandlingplan:SubmittedtoBESTSquadforapprovalonhighrisejobs.Forlowrisebuildings,EORtomaintainplanatthesiteforreview

    ElevatorsUnitapplicationprocess:

    Four(4)Elev1Forms;1original,1duplicate,and2copies AffidavitssignedsealedbyP.E./R.A. Two(2)setsofdrawingshowingthefollowing:

    Typeofhoist:(Dualhoist) Totalrise Tiestobuilding Cabandmassstructure Runbyclearance ReactionofalltiesandPit

  • Hoist Plan Review

    Foundation:

    Attachmentofslabstomast Mastandtiereactionforcescalculation Typeofties

    Type I,IIa,II,1V,V,etc. Alltiesarepositive(noepoxy)

    Tiesinscheduleshallnotexceed30feet Hoistcabstructureandsafetydevices

  • Hoist Inspection Requirements

    AcceptanceInspectionandTest DOB:

    Cathead/TowerRaise ApprovedagencyInspectors(Requiresthree(3)daysnotification)

    Ninety(90)DaysInspection ApprovedagencyInspectors(RequiresFullLoadTest)

    Inspectionsrequiredaspermanufacturesmanual

    AuditInspection DOB

    HoistRemoval DOB

  • New Technology

  • New Technology

  • New Technology

  • Power OperatedEquipment Restriction

  • Close Proximityof Equipment

  • Material HandlingPlan for Concrete Pump

  • Material HandlingPlan Needed

  • Maintenance Failure

  • Maintenance Failure

  • Power Cable/TravelingCable Trolley

  • Drop Plate Tetheredto Hoist Enclosure

  • Good Practice: IsolationBracket for Noise & Vibration

  • Elevator Maintenance & Repair

    Maintenance Control Program

    Maintenance Log

    Repair

  • Elevator Applications

    Newinstallations

    Alterations(changeinspeed,capacity,rise,structuralandlocation)

    Replacementandmodification(replacement/modificationofcontroller,machine,governor,safetyetc.)

    Elevatoruseforconstructionuse(neworamendmentonexistingapplication)

    Removal

    Dismantle

    Electricalpermitmustbefiledforelectricalworkperformedondevice

    Note:Anacceptancetestisrequiredforitems#15typesofapplications,andNYCBuildingsinspectorsshallperformthenecessarytestandinspection.

  • Types of Inspections

    AcceptanceTests PermittedApplication(newandmodernizeddevices)

    ComplaintInspections(receivedthroughNYC311callcenter)

    Incidents/AccidentsandEmergencyResponse(24/7)

    SurveyInspections

    PeriodicInspections

    ViolationReInspections

    AmusementRideInspections

    PersonnelHoistInspections(ConstructionSites)

    QualityAssuranceInspection

  • Approved Agency Inspections

    CategoryOne 1YearTest

    PerformedbetweenJanuary1st andDecember31st eachyear

    CategoryThree 3YearTest(waterhydraulic)

    CategoryFive 5YearTest

    Allaboveinspectionsandtestsshallbeperformedandwitnessedbyanapprovedagencynotaffiliatedwitheachotheronbehalfofthebuildingowner

    90daysandCathead/TowerRaisehoistinspection

  • Elevator Safety

    WorkerSafety OSHAsafetyregulation

    FallProtection PersonalFall Arrestsystem,guardrailsystem,barricades

    ElectricalSafety Personalprotectiveequipment,safetychecklist

    ProperUseofJumpers Useextremecaution,onlyuseoninspectionandensurejumpersremovedbeforeplacingequipmentbackinservice

    LockoutandTagout

    UseofCautionTapeWhenElevatorsareServiced NYCBuildingcodeSectionBC3009

  • Unsafe Work Practice

  • Questions?