CSU Master Plan Committee (MPC) Meeting June 13, 2018

Upload: danganh

Post on 29-Aug-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

CSU Master Plan Committee (MPC) Meeting

June 13, 2018

Page 2: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

Agenda1. Science Quad Sub-area Master Plan – Informational

(Fred Haberecht, Assistant Director of Facilities Management and University Planner)

2. Diversity House Addition – Informational Update (Fred Haberecht and Mike Rush, Associate Director, Capital Design and Construction)

Page 3: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

Informational

Science Quad Sub-area Master Plan

Page 4: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

Science Quad Redevelopment: Opportunities and Constraints - Context

Maintain Building SetbacksCampusGateway

EvolvingScience

Quad

CenterAvenue

Mall

Anatomy-Zoology

Physiology Environmental Health

Chemistry Research

Microbiology

Biology

Painter

Pathology

Yates Hall

MRB

LAKE STREET

PITKIN STREET

EAST

DR

IVE

June

201

8

Page 5: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

Science Quad Redevelopment: Opportunities and Constraints - CVMBS Sites

Anatomy-Zoology

PhysiologyEnviron-mental Health

Chemistry Research

Microbiology

Biology

Painter

Pathology

Yates Hall

MRB

LAKE STREET

PITKIN STREET

EAST

DR

IVE

June

201

8

Page 6: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

Science Quad Redevelopment: Opportunities and Constraints - Bicycle and Pedestrian Connections

Anatomy-Zoology

Physiology Environmental Health

Chemistry Research

Microbiology

Biology

Painter

Pathology

Yates Hall

MRB

Campus Loop:

“Prairie Side”

Bike / Ped. Connection

Campus Bike/

Pedestrian Route

Bike / Ped. Connection

HORN Turn-

around

HORN Stop

Campus Loop:

“Mountain Side”

LAKE STREET

PITKIN STREET

EAST

DR

IVE

June

201

8

Page 7: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

Science Quad Redevelopment: Opportunities and Constraints - Parking and Transit

Anatomy-Zoology

Physiology

Environmental Health

Chemistry Research

Microbiology

Biology

Painter

Pathology

Yates Hall

MRB

HORN Turnaround

Lake St. Parking Garage

S. College Ave.

Parking Garage

20 parking spaces 1/4

mile: 5 - 7 minute walk

27 parking spaces

864 parking spaces

663 parking spaces

HORN Stop

138 parking spaces

Lot 575

Lot 455

+/-230 parking spaces

LAKE STREET

PITKIN STREET

EAST

DR

IVE

June

201

8

Page 8: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

Science Quad Redevelopment: Opportunities and Constraints - Utilities, Drainage and Emergency Access

Anatomy-Zoology

Physiology Environmental Health

Chemistry Research

Microbiology

Biology

Painter

Pathology

Yates Hall

MRB

Fire Lane Access

Arthur’s Ditch

Major Utility Corridor

Major Utility Corridor

LAKE STREET

PITKIN STREET

EAST

DR

IVE

June

201

8

Page 9: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

Science Quad Redevelopment: Opportunities and Constraints - Floodplain

Anatomy-Zoology

Physiology Environmental Health

Chemistry Research

Microbiology

Biology

Painter

Pathology

Yates Hall

MRB

LAKE STREET

PITKIN STREET

EAST

DR

IVE

June

201

8

Page 10: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

Informational Update

Diversity House Addition

Page 11: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

CONSTRUCTION IN PROGRESSCONSTRUCTION IN PROGRESS

CONSTRUCTION IN PROGRESS

ROOFOVERHANG

ROOF

OVERHANG

FF= 5004. 6

Swale

2nd Floor B

alcony

OCCU

PATI

ONAL

65

0125

INGERSOLL HALL

17

EDWARDS HALL18

28

172

18

NEWSOM HALL20

AYLESWORTH HALL21

25

MOBY ARENA

STUDENT RECREATION CENTER

MOBY ARENAB WING

27

C WINGMOBY ARENA

ENVIRONMENTAL

OBSERVATORY

GIFFORD BLDG152

COMPLEXVISUAL ARTS

151

151

155

CHEMISTRY

150

PHYSIOLOGY & BIOPHYSICS

142

143ANATOMY/ZOOLOGY

141

BUILDING

ENVIRONMENTALHEALTH

PATHOLOGY140

PAINTER CENTER144

22BRAIDEN HALL

150

114EDUCATION

EDDY HALL

EDDY HALL

113

90

120

INSECTARY107

105

93

134RECEIVINGCENTRAL

CENTRAL RECEIVING

131

STORAGE132

124MAINT.

LG. VEHICLE

130

GARAGE

126

EASTF.S.C.

931

930127

125

FACILITIES SERVICES SOUTH

FACILITIES SERVICES NORTH

104

99

101

LABSTORAGE

SEED

95

55

41

NATURAL

TELECOM

88GLOVER

83

FORESTRY81

RESEARCH LABNAT. RESOURCES

WAGARJ.V.K.

84

80ADMINISTRATION

41

WEBER BUILDING

45

STATISTICS44

46

50 51CHAPELDANFORTH

94

SERVICESSTUDENT

76

HALL

JOHNSON HALL

CENTENNIAL

79

77

75EDUCATIONVOCATIONAL

FIELD HOUSE

73

68

PLANTHEATING

L.L.

67

66

ALDER HALL

73

CENTERPRECONSTRUCTION

GUGGENHEM

58

LAB

60

63

HALLSPRUCE

SAGE HALL

(CHARNEY LAB)POTTING SHED

64

61

30

62 ROUTTHALL

69

29

FUM McGRAWATHLETIC

71

LAURELHALL

33

34

145123

YATES HALL

SUMMIT HALL

35

36

UNIVERSITY SQUARE

100TRACKPRESSBOX

ElectricalShop

MotorpoolStorage

VEHICLEWASH

82

59

CHILLPLANT

CENTER

SUNDECKSTORAGE

174GASMETERHOUSE

SERVICESOUTSIDE

133

MICROBIOLOGY

160161

HONORS

119

PLANTCHILL

#2

162

ENGINEERING

37

COMPUTER86

SCIENCE

163

ASPENBLDG

48

170THERMAL

PLANT

INDOORPRACTICEFACILITY

49ACADEMICTRAININGCENTER

BUILDINGSERVICESGENERAL

102

COMMONS

STUDENTHEALTHCENTER

218W. LAUREL

MORGANLIBRARY

ENGINEERINGCENTER

GLENN MORRISGYM

2727

WEEDRESEARCHLAB

HALL

RESOURCES

91

PLANT

ANIMAL SCIENCE

CLARK C-WING

110

CLARK A-WING91

108

ENVIRONMENTAL SERVICESNATURAL AND

SCIENCE

NATURAL AND

SERVICES

SHEPARDSON

106

92

109

UNIVERSITYGREENHOUSES

112

BEHAVIORALSCIENCES

BLDG.

OT A

NNEX

THER

APY

SCIENCESINDUSTRIAL

187

185

183

MOLECULAR AND

BIOSCIENCESRADIOLOGICAL

WES

TFAL

L HA

LL

5

CENTERDURRELL

6

PALMER CENTER4

DURWARD HALL7

10CORBETT

HALL

11 13GREEN

32

ALLISON

14

ROCKWELL HALL15

WEATHERSTATION

PARMELEE

47ROCKWELL WEST

MINOR IN BUSINESSENGINEERING II

HALLHALLHALL

43

158PAVILION

157

156

ALPINE HALL

PINON HALL

GIBBONS

40

LORYSTUDENTCENTER

ACADEMIC VILLAGECOMPLEX

VISITOR'SCENTER

Stadium GardenSupport Building

171

HorticultureStorage Shed

MILITARY SCIENCE MILITARY ANNEX

STATIONSUB

138

AMMONSHALL

THE INSTITUTE FOR LEARNING AND TEACHING

BIOLOGY BLDGCHEMISTRY BLDG

STADIUM SITECONSTRUCTION IN PROGRESS

PARKING GARAGE

SD-8"

SIGN

BS1

BS2

BS5

BS6

BS7

BS8

R A M

CNTRLINE OF BOULDER

WALL

South Drive

Mason Street

Pitkin Street

Braiden Drive

A Street

East Drive South College Avenue

University Ave.University Ave.

South Drive

West Plum Street

Shields Street

Laurel Street

West Plum St.

Meridian Avenue

Amy Va

n Dyken Way

East Drive

Mason Street

Old Main Drive

Laurel Street

Shields Street

Ellis Drive

Pitkin Street

Rembrant

Oval Dr

Oval Dr

Oval Dr

Isotope Drive

Isotope Drive

Meridian

Avenu

e

West Lake Street

Music D

r

Whitcomb

Street

Centre Ave.

Laurel Street

Plum Street

Locust Street

East Elizabeth Street

Garfield Street

Edwards Street

East Pitkin Street

South College Ave.

East Drive

Edison Dr.Meridian Avenue

James Court

Bennet Court

Springfield Drive

Westward Drive

University Avenue

West Elizabeth Street

West Plum Street

Del Norte

Monte Vist a

Arm

strong

Washington

South Gra

alley

South Loom

alley

South Whitc

South Sherw

South Meldr

alley

South Howe

alley

South Maso

alley

South College Avenue

Pitkin St

Laurel Street

Meridian Avenue

University Ave.

West Lake Street

Old Main Drive

West Lake Street

JERSE

YBA

RRIE

R

JERSE

YBA

RRIE

R

JERSE

YBA

RRIE

RJERSE

YBA

RRIE

R

JERSE

YBA

RRIE

R

JERSE

YBA

RRIE

R

JERSE

YBA

RRIE

R

JERSE

YBA

RRIE

R

JERSE

YBA

RRIE

R

JERSE

YBA

RRIE

R

JERSE

YBA

RRIE

R

JERSE

YBA

RRIE

R

JERSE

YBA

RRIE

R

JERS E

YBA

RRIE

R

BOLLARD

BOLLARD

DIVERSITY HOUSE ADDITION CONCEPT

1" = 400'-0"1 PROJECT SITE LOCATION

Page 12: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

SHIELDS

LAU

REL

DIVERSITY HOUSE ADDITION CONCEPT

1" = 50'-0"1 SITE PLAN

Page 13: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

-

-

AA41

AA4

2

3

A AB

C

D

3

1447 SFTRAINING

1 2

1' - 0"

25' - 3 1/2" 5' - 8"

32' -

7 1

/2"

2' -

0 1/

2"21

' - 1

1"

DIVERSITY HOUSE ADDITION SCHEMATIC

1/8" = 1'-0"1 LEVEL ONE WORKING

Page 14: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

-

AA41

AA4

2

3

AB

C

D

31 2

149 SFoffice

176 SFoffice

125 SFoffice

124 SFoffice

46 SFfurn.

13' -

2 1

/2"

13' -

3"

10' - 7 1/2" 14' - 8"

10' -

4"

11' -

2"

5' -

9 1/

2"

30' - 11 1/2"

21' -

11"

2' -

0 1/

2"

DIVERSITY HOUSE ADDITION SCHEMATIC

1/8" = 1'-0"1 LEVEL TWO WORKING

Page 15: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

DIVERSITY HOUSE ADDITION SCHEMATIC

1/8" = 1'-0"1 East

1/8" = 1'-0"2 North

1/8" = 1'-0"3 West

Page 16: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

DIVERSITY HOUSE ADDITION SCHEMATIC

Page 17: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

DIVERSITY HOUSE ADDITION SCHEMATIC1 {3D} Copy 4 Copy 1

Page 18: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

DIVERSITY HOUSE ADDITION SCHEMATIC2 3D View 4 Copy 1

Page 19: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

-

-

AA41

AA4

AA4

2

3

1 2

A A

B

C

D

3

26' - 4"

existing stair - no modificationsthis option

1170 gsf addition - first level

1' - 3 1/2"

30' -

8 1

/2"

remove (e) ductwork with (n) MEP distributionas required for sightlines

anticipate - b.o. steel or lvl beam at t.o. plate elevation w/ (e) and (n) floor joists in hanger condition

offset addition geometry to accommmodate potential constructability issues around existing wall and roof geometries.

storage

lift to second level

fv run

DIVERSITY HOUSE ADDITION CONCEPT

1/8" = 1'-0"1 LEVEL ONE WORKING

Page 20: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

-

-

AA41

AA4

AA4

2

3

1 2

A

B

C

D

3

870 gsf addition - second level

stg

132 SFoffice

132 SFoffice

139 SFoffice

139 SFoffice

open office

lift

DIVERSITY HOUSE ADDITION CONCEPT

(n) wall offsetto accommodate (e)roof geometry and conductor head this location - anticipate partial (e) roof shingle removal to deck w/ adjacent siding removal wrap entire are with Grace ice and water shield and reshingle/ flash to conductor head.

1/8" = 1'-0"1 LEVEL TWO WORKING

Page 21: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

DIVERSITY HOUSE ADDITION CONCEPT

1/8" = 1'-0"1 East

1/8" = 1'-0"2 North

1/8" = 1'-0"3 West

Page 22: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

DIVERSITY HOUSE ADDITION CONCEPT

Page 23: CSU Master Plan Committee (MPC) Meeting · Turnaround Lake St. Parking Garage S. College Ave. Parking Garage 20 parking spaces 1/4 mile: 5 - 7 minute walk 27 parking spaces 864 parking

DIVERSITY HOUSE ADDITION CONCEPT3D View 4 Copy 1