1. Action Items Review2. Concept Revision Summary3. Concept Book Review4. Functional Resources (Joint CSA, CSTS,
CSSM)5. CSSM Information Entities 6. Schedule of Services Review7. Schedule of Services Prototype/Test Plan8. Roadmap9. Extensibility Model for Configuration Profile10.Representational State Transfer (REST)11.Situational Awareness12.Planning
Action Items Review
• (See Spreadsheet on CWE)• General action to remind WG about is to review
event compendium created by C. Haddow
Concept Revision Summary: Pre-Bordeaux
Concept (GB)
Schedule Content/Format
(BB)
Planning Information
Content/Format (BB)
Framework (BB)
Lifecycle
Functional Resources
Mgmt Information Entities
Extensibility Model
Management Service Recommendations (BBs)
FWD RTN TRK
Concept Revision Summary: Post-Bordeaux
Concept Book (GB)
Data Format BBs
Schedule Format Planning Data
Service Request, Service Package
Service Catalog, Service
Agreement, Service
Configuration Profile
Event Sequence
Trajectory Prediction
Framework(Internal to WG)
Lifecycle
Functional Resources
Mgmt Information Entities
Extensibility Model
eb- 6
Concept Book Review
• Updates• Figure 3-1: (1st) to be revised to show only functions at
an abstract high level• Figure 3-2: Terrestrial WAN Node moves to be inside the
Provider Domain• Figure 3-2: Add a connection between Control Node +
ESLT• Figure 3-3: All block definitions should be stereotyped• SSI Diagrams – Need same treatment as Fig 3-1, 3-2 (ie
abstract functions vs node definitions)• Open question: Does enterprise model need to show 3-
way configurations (e.g, NASA/DSN uplink, ESA/ESTRACK downlink)?
Functional Resources Review(Joint Mtg w/CSA, CSTS WGs)
• Agreed that FRs are on the right track• Mapping from CSA (Cross Support Architecture) to
FR seems quite feasible• An annex and/or reference to the FR techincal note is to
be added to the CSA• Question of granularity still to be sorted out (functional
resources vs. functional group defintions – later more useful for the CSA)
• Question of reference model refresh• (Subsequent discussion is that this is on hold as
resources are not available to do examine the existing SLE Reference Model)
• ESLT is where DDOR correlator “lives”
CSSM Information Entities (1/3) • Extensibility considerations now more focused on per information
entity basis• Extensibility concerns discussed noted on following slides
CSSM Information Entities (2/3)
• Extensibility Considerations for Service Catalog• New Services Definitions• Additional service capabilities• Agency Specific Offerings
• Extensibility Consideration for Service Agreement• New Service Definitions, e.g. ranging• Additional service capabilities• Agency Specific Offering• Separation of (existing) operational (management service)
constraints from functional resource constraints• Lifecycle phase refinement, e.g., compatibility testing/validation • Financial Information/Data• Functional Resources
- Examples- RF/Modulation Schemes- Terrestrial Data Transfer protocol configuration
CSSM Information Entities (3/3)
• Extensibility Considerations for Configuration Profile• New Services Definitions• Additional service capabilities• Agency Specific Offerings• Functional Resources• Examples• RF/Modulation Schemes• Terrestrial Data Transfer protocol configuration
• Extensibility Considerations for Service Package• Temporal constraints, e.g. Rules for scheduling a series of service packages
Schedule of Services WB Review
• Use Case definitions Generally Okay
• Activity Type This becomes service(s), and become part of schedule item
• Antenna ID becomes AntennaRef
• Frequency Band Added to the Service Type data class- Action to M. Gnat; C. Circolan: provide some frequency band parameter
definitions (apparently there are not standard frequency band definitions)
Schedule of Service Prototyping/Test Plan
• Prototyping Activity So Far:• NASA Rep (C. Audain) has produced examples schedules for SN
and one NOAA• DLR Rep (M. Gnat) has received schedules
- Examined via XML SPY- Conclusion: Makes sense, okay so far
• Some Findings:• Set up time: NASA NEN appears to selectively include set-up/tear-
down times; ie not used routinely• Agreed to make optional as it appear that some networks do not use
this/need it.• Agreed to allow additional parameters for Service Type class (bi-
lateral) (in addition to those for Scheduled Activity class)• Agreed to add Orbit number to Scheduled Activity class
• Test Plan Review:• Agreed to remove test case 3• Agreed to add round-trip test case• Agreed that Test case 4 can be done a rather lightly -- no need to set
up the implied infrastructure
Road Map
A preliminary road map for revised concept was produced; subject tofurther revision, refinement, updates based on project definitions, subsequent extensibility analysis, etc.
Extensibility Model, Configuration Profile
Ext. Model, Configuration Profile -- Notes
• Framework meta data• Common across all information entity definitions • Allows for referential framework much like current Blue-1
• Functional resources • Forms the (abstract) basis for identifying the functions that are
being managed
• Functional group• Collection of functional resources with well defined affinities
sufficient that the grouped functional resources can be treated as unit
• Services • Identifies the cross support services in terms of functional groups
• “Wiring”• Composition of the configuration profile information entity with
respect to the above
REST
• May potentially replace or allow for a “slim”/”lightweight” service definition if and when agencies are ready for management services
• See A. Crowson’s presentation darft analysis -- RESTful CSSM
Situational Awareness
Inputs, comments were solicited from WG members in attendance re agency development related to service management…
• ESA• Desire to have something fairly quickly• Recognize that BLUE-1 is not really it
• DLR• Similar concerns to ESA
• UKSA• No plans to implement SM currently• May be some private tracking operations that could consider using
• JAXA• Looking at Blue-1 implementation
• NASA• SN ground sustainment task is taking a conceptually similar approach to
Blue-1 but is not really Blue-1• TTC networks integration project has been initiated is looking to adopt
post-BLUE-1 SM standards
CSSM Planning for Next 6 months
8 Telecons and associated milestones planned – see below
Longer Term Planning
• Planning information project drafted and in the CCSDS CWE Framework -- please do not edit, for reference only
(http://cwe.ccsds.org/fm/Lists/Projects/DispForm.aspx?ID=359&Source=http%3A%2F%2Fcwe.ccsds.org%2Fcss%2FLists%2FFramework%2FAllItems.aspx)
• Resource estimates for blue books identified in the roadmap were developed
L1 -- Deliverable L2 Work Items L3 Work ItemsEstimated Effort (Work Months)
Subtotal per
deliverable
Schedule of ServicesBook Updates 0.25XML Schema 0.25
Test Plan 0.5Prototype 1 0.5Prototype 2 2Test Report 0.25
3.75Concept Book
Book UpdatesEnterprise Model 0.25
Implication Assessment 0.25Updates Based on
Concept Adjustment3
Roadmap Section 0.25Emergency Section 0.25
4Service Request,
Service Package BBDraft 1 3Draft 2 2
XML Schema 0.5Prototype 3
8.5Planning Information
BB (Request and Plan)
Draft 1 6Draft 2 3
Prototype 6XML Schema 1
16
Sevice Catalog, Service Agreement,
Configuration Profile
Draft 1 3Draft 2 2
XML Schema 1Prototype 3
9
Trajectory Prediction
Draft 1 0.5Draft 2 0.25
Prototype 0.25XML Schema 0.25
1.25Event Sequence
Draft 1 1.5Draft 2 1
Prototype 2XML Schema 0.5
5
Management Svcs (Blue Book)
Draft 1 6Draft 2 3
Prototype 1221
Miscellaneous Notes
• MagicDraw• Agreed to use MD V 17.0.2 as for modeling
Thank You