CSS Case Study: Jumper Creek Bridge Replacement
By John S. Fowler, P.E.
CSS National Dialog 2
March 19, 2014
![Page 2: CSS National Dialog Presentation:: Jumper Creek Bridge ... · PDF fileAccess constrained by a 14’ x 14’ box culvert ... Two 12’ travel lanes ... Jumper Creek Bridge Replacement](https://reader031.vdocuments.mx/reader031/viewer/2022022501/5aa84fd27f8b9a81188b681b/html5/thumbnails/2.jpg)
Introduction
• FDOT inspects every bridge in the State biennially (includes bridges off the State Highway System)
• Sumter CR 311W over Jumper Creek
• 2009: Sufficiency Rating = 17.7 (out of 100)
• Considered structurally deficient
• Scheduled for replacement in FY 2012
• Federally funded bridge replacement
![Page 3: CSS National Dialog Presentation:: Jumper Creek Bridge ... · PDF fileAccess constrained by a 14’ x 14’ box culvert ... Two 12’ travel lanes ... Jumper Creek Bridge Replacement](https://reader031.vdocuments.mx/reader031/viewer/2022022501/5aa84fd27f8b9a81188b681b/html5/thumbnails/3.jpg)
![Page 4: CSS National Dialog Presentation:: Jumper Creek Bridge ... · PDF fileAccess constrained by a 14’ x 14’ box culvert ... Two 12’ travel lanes ... Jumper Creek Bridge Replacement](https://reader031.vdocuments.mx/reader031/viewer/2022022501/5aa84fd27f8b9a81188b681b/html5/thumbnails/4.jpg)
![Page 5: CSS National Dialog Presentation:: Jumper Creek Bridge ... · PDF fileAccess constrained by a 14’ x 14’ box culvert ... Two 12’ travel lanes ... Jumper Creek Bridge Replacement](https://reader031.vdocuments.mx/reader031/viewer/2022022501/5aa84fd27f8b9a81188b681b/html5/thumbnails/5.jpg)
The Existing Bridge
• Built in 1962
• One lane, timber structure
• 212’ long
• 11’ clear width from face of curb to face of curb
• 12’ total width from outside of curb to outside of curb
• No existing bridge railings
![Page 6: CSS National Dialog Presentation:: Jumper Creek Bridge ... · PDF fileAccess constrained by a 14’ x 14’ box culvert ... Two 12’ travel lanes ... Jumper Creek Bridge Replacement](https://reader031.vdocuments.mx/reader031/viewer/2022022501/5aa84fd27f8b9a81188b681b/html5/thumbnails/6.jpg)
![Page 7: CSS National Dialog Presentation:: Jumper Creek Bridge ... · PDF fileAccess constrained by a 14’ x 14’ box culvert ... Two 12’ travel lanes ... Jumper Creek Bridge Replacement](https://reader031.vdocuments.mx/reader031/viewer/2022022501/5aa84fd27f8b9a81188b681b/html5/thumbnails/7.jpg)
![Page 8: CSS National Dialog Presentation:: Jumper Creek Bridge ... · PDF fileAccess constrained by a 14’ x 14’ box culvert ... Two 12’ travel lanes ... Jumper Creek Bridge Replacement](https://reader031.vdocuments.mx/reader031/viewer/2022022501/5aa84fd27f8b9a81188b681b/html5/thumbnails/8.jpg)
The Site
• One way in; one way out
• Access constrained by a 14’ x 14’ box culvert
• CR 311W: 18’ wide dirt road north of the bridge; two rutted wheelpathssouth of the bridge (ADT ≈ 10 vpd)
• Six total property owners west of I-75; three south of Jumper Creek
• Rural area mostly used for agriculture
• Several billboards within CR 311W R/W
• Overhead utility lines at R/W line
![Page 9: CSS National Dialog Presentation:: Jumper Creek Bridge ... · PDF fileAccess constrained by a 14’ x 14’ box culvert ... Two 12’ travel lanes ... Jumper Creek Bridge Replacement](https://reader031.vdocuments.mx/reader031/viewer/2022022501/5aa84fd27f8b9a81188b681b/html5/thumbnails/9.jpg)
![Page 10: CSS National Dialog Presentation:: Jumper Creek Bridge ... · PDF fileAccess constrained by a 14’ x 14’ box culvert ... Two 12’ travel lanes ... Jumper Creek Bridge Replacement](https://reader031.vdocuments.mx/reader031/viewer/2022022501/5aa84fd27f8b9a81188b681b/html5/thumbnails/10.jpg)
The Easy Answer
• Use FDOT Standards
• Two 12’ travel lanes
• 8’ paved shoulders
• Concrete and steel structure with approach slabs and barrier walls
• Maintain access during construction
![Page 11: CSS National Dialog Presentation:: Jumper Creek Bridge ... · PDF fileAccess constrained by a 14’ x 14’ box culvert ... Two 12’ travel lanes ... Jumper Creek Bridge Replacement](https://reader031.vdocuments.mx/reader031/viewer/2022022501/5aa84fd27f8b9a81188b681b/html5/thumbnails/11.jpg)
Design Options
• Replace bridge with box culvert
• Build access road from the south and eliminate the need for a bridge
• Permanent realignment of roadway at bridge
• Temporary bridge
![Page 12: CSS National Dialog Presentation:: Jumper Creek Bridge ... · PDF fileAccess constrained by a 14’ x 14’ box culvert ... Two 12’ travel lanes ... Jumper Creek Bridge Replacement](https://reader031.vdocuments.mx/reader031/viewer/2022022501/5aa84fd27f8b9a81188b681b/html5/thumbnails/12.jpg)
The Context
• Rural area, primarily agricultural use
• Very low volume dirt road with difficult access
• Three property owners affected by bridge closing, plus billboards and utilities
• Property owners:
• Do not want property opened to development
• Would prefer to maintain the rural character of the area
![Page 13: CSS National Dialog Presentation:: Jumper Creek Bridge ... · PDF fileAccess constrained by a 14’ x 14’ box culvert ... Two 12’ travel lanes ... Jumper Creek Bridge Replacement](https://reader031.vdocuments.mx/reader031/viewer/2022022501/5aa84fd27f8b9a81188b681b/html5/thumbnails/13.jpg)
The Solution
• New Bridge:
• One-lane typical section
• 14’ clear width (15’ from back of curb to back of curb)
• Steel piles and concrete pile caps
• Timber superstructure and bridge deck
• No approach slabs
• No bridge railings
![Page 14: CSS National Dialog Presentation:: Jumper Creek Bridge ... · PDF fileAccess constrained by a 14’ x 14’ box culvert ... Two 12’ travel lanes ... Jumper Creek Bridge Replacement](https://reader031.vdocuments.mx/reader031/viewer/2022022501/5aa84fd27f8b9a81188b681b/html5/thumbnails/14.jpg)
![Page 15: CSS National Dialog Presentation:: Jumper Creek Bridge ... · PDF fileAccess constrained by a 14’ x 14’ box culvert ... Two 12’ travel lanes ... Jumper Creek Bridge Replacement](https://reader031.vdocuments.mx/reader031/viewer/2022022501/5aa84fd27f8b9a81188b681b/html5/thumbnails/15.jpg)
![Page 16: CSS National Dialog Presentation:: Jumper Creek Bridge ... · PDF fileAccess constrained by a 14’ x 14’ box culvert ... Two 12’ travel lanes ... Jumper Creek Bridge Replacement](https://reader031.vdocuments.mx/reader031/viewer/2022022501/5aa84fd27f8b9a81188b681b/html5/thumbnails/16.jpg)
![Page 17: CSS National Dialog Presentation:: Jumper Creek Bridge ... · PDF fileAccess constrained by a 14’ x 14’ box culvert ... Two 12’ travel lanes ... Jumper Creek Bridge Replacement](https://reader031.vdocuments.mx/reader031/viewer/2022022501/5aa84fd27f8b9a81188b681b/html5/thumbnails/17.jpg)
Other Practical Solutions
• Bridge completely closed during construction• Negotiated settlements with affected property owners totaling about $100,000
• Saved the cost of maintaining traffic
• Shortened the project schedule
• Access from I-75• Constructed temporary access from L/A right-of-way
• Allowed access to properties in case of emergency
• Allowed delivery of oversized equipment/materials to job site
![Page 18: CSS National Dialog Presentation:: Jumper Creek Bridge ... · PDF fileAccess constrained by a 14’ x 14’ box culvert ... Two 12’ travel lanes ... Jumper Creek Bridge Replacement](https://reader031.vdocuments.mx/reader031/viewer/2022022501/5aa84fd27f8b9a81188b681b/html5/thumbnails/18.jpg)
Temporary Access Detail
![Page 19: CSS National Dialog Presentation:: Jumper Creek Bridge ... · PDF fileAccess constrained by a 14’ x 14’ box culvert ... Two 12’ travel lanes ... Jumper Creek Bridge Replacement](https://reader031.vdocuments.mx/reader031/viewer/2022022501/5aa84fd27f8b9a81188b681b/html5/thumbnails/19.jpg)
Context Sensitive Solutions
• Use of timber: Maintained rural feel
• One-lane typical section: Appropriate for very low volume, and also pleased property owners who did not want the area opened to development
• No bridge railings: Appropriate for the local users who are comfortable traversing the bridge; also allowed for better views of the bridge
• No MOT: Saved time and money; property owners were happy to accept cash payment for being denied use of their property for three months
![Page 20: CSS National Dialog Presentation:: Jumper Creek Bridge ... · PDF fileAccess constrained by a 14’ x 14’ box culvert ... Two 12’ travel lanes ... Jumper Creek Bridge Replacement](https://reader031.vdocuments.mx/reader031/viewer/2022022501/5aa84fd27f8b9a81188b681b/html5/thumbnails/20.jpg)
Questions?Contact Info:John S. Fowler, P.E.Phone: (850) 330-1450E-mail: [email protected]