CSR PROJECT Infrastructure up gradation work M/s. Mahatma PhuleApang School, Maan under the activity of CSR of M/s. Renishaw Metrology Systems Ltd, Hinjewadi. Pune. Subject A) Upgradation of flooring of Canteen area, Dining area and Physio equipment room with Matt finish Vitrified tiles. B) Furniture preparation and Installation for Science lab along with Centre table for students. Scope of Work (BOQ) Earlier detail photographs

Upload: others

Post on 27-Apr-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CSR PROJECT - img1.wsimg.com

CSR PROJECT

Infrastructure up gradation work M/s. Mahatma PhuleApang School, Maan under the activity of CSR of

M/s. Renishaw Metrology Systems Ltd, Hinjewadi. Pune.

Subject –

A) Upgradation of flooring of Canteen area, Dining area and Physio equipment room with Matt finish Vitrified

tiles.

B) Furniture preparation and Installation for Science lab along with Centre table for students.

Scope of Work (BOQ) –

Earlier detail photographs –

Page 2: CSR PROJECT - img1.wsimg.com

Progress report –

01) Compacting and Murrum filling activity – We have done compacting at various location in specified area

of Dining/Kitchen and Physio room. After that high quality murrum was filled and compacting has been

done on it before going for PCC work activity.

02) P.C.C work activity – We have done P.C.C at various location in specified area of Dining, Kitchen and

Physio room before going for Vitrified tiling work activity.

Page 3: CSR PROJECT - img1.wsimg.com

03) Vitrified Tiling work activity – We have done Tiling at Dining, Kitchen and Physio room along with Skirting

at required height. For this we have used Kajaria make Vitrified tile of Desert series which are Matt finish

and having good resistance against slippage.

Page 4: CSR PROJECT - img1.wsimg.com

04) Furniture work activity – We have done prepared and installed work benches for Science lab along with

Centre table. For this MS support is prepared and commercial plywood of 18mm along with Laminate has

used to get good quality of furniture.

Page 5: CSR PROJECT - img1.wsimg.com

Summary –

a) P.C.C. and Tiling work of Dining area.

b) P.C.C. and Tiling work of Kitchen area.

c) Vitrified Tiling work of Physio room.

d) Furniture work of Science room.

In addition to this, We (M/s. Shree Ganesh Enterprises) has done below additional work as below –(This is

only for your information)

1. Additional Murrum filling of 2” in Dining area and Kitchen area.

2. Additional P.C.C. work done of approximate 2” in Dining area and Kitchen area.

3. Additional 125 sq. fts. Vitrified tiling done in Kitchen and other area.

4. Additional - Ramp, Civil slope PCC, Civil touchup, Kitchen plumbing, Fabrication work done.

1) 3)

2) 4)