cs-ee 481 spring 2006 1january, 2006 university of portland school of engineering project santiam...
TRANSCRIPT
CS-EE 481 Spring 2006
January, 2006 1University of Portland School of Engineering
Project SantiamWhenever Messenger
TeamLisa Eberle
Jason Favors
Ben Foran
AdvisorDr. Vegdahl, Dr. VanDeGrift
Industry RepresentativeMr. Gentry
Harland Financial Solutions
CS-EE 481 Spring 2006
January, 2006 2University of Portland School of Engineering
Overview
• Introduction
• Scorecard
• Additional Accomplishments
• Plans
• Issues/Concerns
• Conclusions
CS-EE 481 Spring 2006
January, 2006 3University of Portland School of Engineering
Introduction
• Whenever Messenger allows users to send messages to offline contacts
• Project Santiam is a web-based application that works with AOL instant messenger
CS-EE 481 Spring 2006
January, 2006 4University of Portland School of Engineering
Scorecard• [Complete upcoming milestones]
– Send content from database to online user –done
– Identify when a user comes online – done– Identify when a user is already online – done
• [Anticipate and prepare to encounter difficulties with integrating the project]– Researched calling php script from Java – done
CS-EE 481 Spring 2006
January, 2006 5University of Portland School of Engineering
Additional Accomplishments
• Continued work on basic website
• Major portion of upcoming milestone complete– Successfully store a message from
website that is sent once a user comes online (as long as already in the list of Whenever Messenger’s buddies)
CS-EE 481 Spring 2006
January, 2006 6University of Portland School of Engineering
Additional AccomplishmentsScreenshot of sending messages
CS-EE 481 Spring 2006
January, 2006 7University of Portland School of Engineering
Plans
• Complete website -> DB -> user sending
• Confirmation message
• Additional website pages
• Secure login for users
• Alpha Release
CS-EE 481 Spring 2006
January, 2006 9University of Portland School of Engineering
Concerns/Issues
• Difficulties adding contacts from website
• Load for ‘whenever msngr’ over AIM
• Ongoing: AOL modifying its protocol
• May want more time scheduled for debugging
CS-EE 481 Spring 2006
January, 2006 10University of Portland School of Engineering
Conclusions
• Hit February milestones
• Outlook good to complete March milestones, and to have basic functionality complete before Spring Break
• Leave room for error