Cryo Capture Cavity II Progress. Mike McGee April 6, 2005. DESY will Provide. 1.3 GHz cavity. Helium vessel. Magnet shielding (short). 2 VAT valves. Input coupler assembly. Status at Fermilab. Finalizing US AND DS warm-to-cold transition and VAT valve to cavity spool design. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Cryo Capture Cavity II Progress](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56813c35550346895da5b3b6/html5/thumbnails/1.jpg)
Cryo Capture Cavity II Progress
Mike McGee April 6, 2005
![Page 2: Cryo Capture Cavity II Progress](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56813c35550346895da5b3b6/html5/thumbnails/2.jpg)
DESY will Provide
•Input coupler assembly
•2 VAT valves
•Magnet shielding (short)
•Helium vessel
•1.3 GHz cavity
![Page 3: Cryo Capture Cavity II Progress](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56813c35550346895da5b3b6/html5/thumbnails/3.jpg)
Status at Fermilab
•Designing VAT valve supports, shipping/installation fixture (to be made of 316 L)
•316 LN material and tube ready to order
•316 L bellows specified and ordered (to arrive 4/24)
•Finalizing US AND DS warm-to-cold transition and VAT valve to cavity spool design
![Page 4: Cryo Capture Cavity II Progress](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56813c35550346895da5b3b6/html5/thumbnails/4.jpg)
US warm-to-cold transition
![Page 5: Cryo Capture Cavity II Progress](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56813c35550346895da5b3b6/html5/thumbnails/5.jpg)
DS warm-to-cold transition
![Page 6: Cryo Capture Cavity II Progress](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56813c35550346895da5b3b6/html5/thumbnails/6.jpg)
Fermilab will Provide•To be send to DESY
•Cleaned US and DS warm-to-cold transitions (w/isolation flanges on ends and slight positive Ar pressure)
•Drawing and procedure for assembly with fixture to be shipped
•Shipping/installation fixture
•Cleaned VAT valve supports
•Cleaned helium vessel support clamps
•Cleaned spool between cavity and VAT valve (also capped on ends)
![Page 7: Cryo Capture Cavity II Progress](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56813c35550346895da5b3b6/html5/thumbnails/7.jpg)
Fermilab will Provide•Currently at Fermilab
•Vacuum vessel and instrumentation•80 K shielding•5 K manifold•Tuner •2 Spare VAT valves
![Page 8: Cryo Capture Cavity II Progress](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56813c35550346895da5b3b6/html5/thumbnails/8.jpg)
Process•Send to DESY (May 2005)
•Cleaned US and DS warm-to-cold transitions and spool
•Under argon positive pressure
valvew/filter
blankflange
![Page 9: Cryo Capture Cavity II Progress](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56813c35550346895da5b3b6/html5/thumbnails/9.jpg)
Process cont…
•2 helium vessel support clamps
![Page 10: Cryo Capture Cavity II Progress](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56813c35550346895da5b3b6/html5/thumbnails/10.jpg)
Process cont…•VAT valve supports
![Page 11: Cryo Capture Cavity II Progress](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56813c35550346895da5b3b6/html5/thumbnails/11.jpg)
Process cont…•Shipping/installation fixture with temporary supports for bellows with crate
![Page 12: Cryo Capture Cavity II Progress](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56813c35550346895da5b3b6/html5/thumbnails/12.jpg)
Process cont…•Work at DESY (May-June 2005)
•Warm-to-cold transition•Magnet shielding
•VAT valves with supports
•Cavity and helium vessel•Assemble
•Clean US and DS warm-to-cold transitions
•Spool between VAT valve and cavity
![Page 13: Cryo Capture Cavity II Progress](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56813c35550346895da5b3b6/html5/thumbnails/13.jpg)
Process cont…•Send to Fermilab (July 2005)
•Assembled cavity with VAT valves, shielding, spool and transitions
![Page 14: Cryo Capture Cavity II Progress](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56813c35550346895da5b3b6/html5/thumbnails/14.jpg)
Process cont…•Work at Fermilab (July-August 2005)
•Modify helium return
•Install cavity assembly into vacuum vessel
•Pressure test helium vessel
•Make up cryogenic connections
•Test fit feedcan and leak check circuits
![Page 15: Cryo Capture Cavity II Progress](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56813c35550346895da5b3b6/html5/thumbnails/15.jpg)
Process cont…•Install cavity assembly into vacuum vessel
![Page 16: Cryo Capture Cavity II Progress](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56813c35550346895da5b3b6/html5/thumbnails/16.jpg)
Layout
![Page 17: Cryo Capture Cavity II Progress](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56813c35550346895da5b3b6/html5/thumbnails/17.jpg)
Layout
![Page 18: Cryo Capture Cavity II Progress](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56813c35550346895da5b3b6/html5/thumbnails/18.jpg)
Process cont…
•Make up cryogenic connections
•Test fit feedcan and leak check circuits
•Commission Cryo Capture Cavity II
![Page 19: Cryo Capture Cavity II Progress](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56813c35550346895da5b3b6/html5/thumbnails/19.jpg)
Questions and RequestsNeed DESY cleaning procedure
Need to confirm critical measurements
![Page 20: Cryo Capture Cavity II Progress](https://reader036.vdocuments.mx/reader036/viewer/2022062422/56813c35550346895da5b3b6/html5/thumbnails/20.jpg)
ScheduleMicrosoft Excel
Worksheet