Page 1: Crude Unit Overhead Automated Corrosion Control · “Corrosion Window” ... Monitoring on Corrosion • In manual mode: with more ... Targets pH 6.5 Chloride 25 ppm Iron 0.5 ppm

DETECT

DETERMINE

DELIVER

©Copyright 2010 Nalco Company. All rights reserved

Crude Unit OverheadAutomated Corrosion Control

Page 2: Crude Unit Overhead Automated Corrosion Control · “Corrosion Window” ... Monitoring on Corrosion • In manual mode: with more ... Targets pH 6.5 Chloride 25 ppm Iron 0.5 ppm

DETECTDETERMINEDELIVER

Opportunity Crude Processing

Refinery Tank Farm

Wharf

Terminals

Atmospheric Tower

Desalter

Brine

WWTP

Page 3: Crude Unit Overhead Automated Corrosion Control · “Corrosion Window” ... Monitoring on Corrosion • In manual mode: with more ... Targets pH 6.5 Chloride 25 ppm Iron 0.5 ppm

DETECTDETERMINEDELIVER

Automating Crude Overhead Monitoring

• Start with ovhd water analysis

Page 4: Crude Unit Overhead Automated Corrosion Control · “Corrosion Window” ... Monitoring on Corrosion • In manual mode: with more ... Targets pH 6.5 Chloride 25 ppm Iron 0.5 ppm

DETECTDETERMINEDELIVER

Its all about

90/10““Corrosion WindowCorrosion Window””

90% of the corrosion in a 90% of the corrosion in a crude overhead circuit crude overhead circuit

occurs in 10% of the timeoccurs in 10% of the time

Page 5: Crude Unit Overhead Automated Corrosion Control · “Corrosion Window” ... Monitoring on Corrosion • In manual mode: with more ... Targets pH 6.5 Chloride 25 ppm Iron 0.5 ppm

DETECTDETERMINEDELIVER

Overhead Corrosion Automation

Undetected excursions resulting in annual exchanger failuresUndetected excursions resulting in annual exchanger failures

KPI in spec 100% of time ?

KPI Cl 25ppm

Page 6: Crude Unit Overhead Automated Corrosion Control · “Corrosion Window” ... Monitoring on Corrosion • In manual mode: with more ... Targets pH 6.5 Chloride 25 ppm Iron 0.5 ppm

DETECTDETERMINEDELIVER

Overhead Corrosion Automation

Undetected excursions resulting in annual exchanger failuresUndetected excursions resulting in annual exchanger failures

KPI Cl 25ppm

Page 7: Crude Unit Overhead Automated Corrosion Control · “Corrosion Window” ... Monitoring on Corrosion • In manual mode: with more ... Targets pH 6.5 Chloride 25 ppm Iron 0.5 ppm

DETECTDETERMINEDELIVER

Alpha analyzer data5-Months

Page 8: Crude Unit Overhead Automated Corrosion Control · “Corrosion Window” ... Monitoring on Corrosion • In manual mode: with more ... Targets pH 6.5 Chloride 25 ppm Iron 0.5 ppm

DETECTDETERMINEDELIVER

Weekend Upset

Saturday evenings upset takes until

Monday midnight to correct

•Data not captured in operators log

Sat Sun Mon

Estimated 2Estimated 2--6 mils lost over 2 days6 mils lost over 2 days

Page 9: Crude Unit Overhead Automated Corrosion Control · “Corrosion Window” ... Monitoring on Corrosion • In manual mode: with more ... Targets pH 6.5 Chloride 25 ppm Iron 0.5 ppm

DETECTDETERMINEDELIVER

Data allows troubleshooting … 90/10

Crude RelatedTransient Corrosion Excursion Identified

Chloride SpikepH Drop

Fe (corrosion ) increase

Page 10: Crude Unit Overhead Automated Corrosion Control · “Corrosion Window” ... Monitoring on Corrosion • In manual mode: with more ... Targets pH 6.5 Chloride 25 ppm Iron 0.5 ppm

DETECTDETERMINEDELIVER

Impact of Continuous Monitoring on Corrosion

• In manual mode: with more frequent data corrosion was reduced by 60%60%

5.7 mpy during initial 3 months

3.5 mpy during last 6 months

Page 11: Crude Unit Overhead Automated Corrosion Control · “Corrosion Window” ... Monitoring on Corrosion • In manual mode: with more ... Targets pH 6.5 Chloride 25 ppm Iron 0.5 ppm

DETECTDETERMINEDELIVER

Use Analyzer for continuous monitoring and REAL TIME process chemical control

TargetspH 6.5

Chloride 25 ppm

Iron 0.5 ppm

Nalco On-LineAnalyzer

Neutralizer based on pH

Control caustic in crude based on chloride, or customer-set limit

Automation Project Objectives

Filmer based on iron

Page 12: Crude Unit Overhead Automated Corrosion Control · “Corrosion Window” ... Monitoring on Corrosion • In manual mode: with more ... Targets pH 6.5 Chloride 25 ppm Iron 0.5 ppm

DETECTDETERMINEDELIVER

Anticipated Value

• Improved Reliability• Reduce Total Cost Operation• Improved corrosion performance• True picture of actual unit performance • In-depth interrogation of upset conditions• Real time caustic/chloride control

Page 13: Crude Unit Overhead Automated Corrosion Control · “Corrosion Window” ... Monitoring on Corrosion • In manual mode: with more ... Targets pH 6.5 Chloride 25 ppm Iron 0.5 ppm

DETECTDETERMINEDELIVER

Anticipated Value

• Predictive analysis of chloride based of crude diet and rates

• Improved control (tighter control of KPI’s)• Better understanding of system limits• Improved control and safer operation at

the limits• 24/7/365 reporting thru real time

Dashboard