CROSS-COUNTRY PIPELINE ROUTE SELECTION By: Geoff Price MGIS CAPSTONE PROPOSAL Mitigating “Costs” for Early Concept Development June 22, 2009 Advisor: Dr. Todd Bacastow

Upload: asher-gerard-goodman

Post on 30-Dec-2015

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CROSS-COUNTRY PIPELINE ROUTE SELECTION By: Geoff Price MGIS CAPSTONE PROPOSAL Mitigating “Costs” for Early Concept Development June 22, 2009 Advisor: Dr

CROSS-COUNTRY PIPELINE ROUTE SELECTION

By: Geoff Price

MGIS CAPSTONE PROPOSAL

Mitigating “Costs” for Early Concept Development

June 22, 2009Advisor: Dr. Todd Bacastow

Page 2: CROSS-COUNTRY PIPELINE ROUTE SELECTION By: Geoff Price MGIS CAPSTONE PROPOSAL Mitigating “Costs” for Early Concept Development June 22, 2009 Advisor: Dr

Overview2

• Problem Statement• Old Way, New Way• Route Influences• Least-Cost Path• Model Builder• Inserting Real Cost• Research• Q & A

Page 3: CROSS-COUNTRY PIPELINE ROUTE SELECTION By: Geoff Price MGIS CAPSTONE PROPOSAL Mitigating “Costs” for Early Concept Development June 22, 2009 Advisor: Dr

Problem 3

Select alignment alternatives for optimal cross-country pipeline construction that meet project requirements.

Summarize alignment alternatives to facilitate real dollar cost estimation for early concept development (+/- 50%)

How Much?

Where?&

Page 4: CROSS-COUNTRY PIPELINE ROUTE SELECTION By: Geoff Price MGIS CAPSTONE PROPOSAL Mitigating “Costs” for Early Concept Development June 22, 2009 Advisor: Dr

Old Problem, Old Solution4

The Manual Method Small Scale Paper Maps (USGS, DOE, State

Regulatory Dept, etc…) Hand Delineation Terrain Evaluation from Aerial Photographs

Page 5: CROSS-COUNTRY PIPELINE ROUTE SELECTION By: Geoff Price MGIS CAPSTONE PROPOSAL Mitigating “Costs” for Early Concept Development June 22, 2009 Advisor: Dr

Old Problem, New Solution5

The GIS Method Digital Maps Spatial Database (retrieval & storage) Data Manipulation Data Conversion Raster Analysis (Map Algebra, LCP, etc.)

Used properly, GIS methods are faster, more efficient, more

comprehensive, and less expensive than traditional methods.

Page 6: CROSS-COUNTRY PIPELINE ROUTE SELECTION By: Geoff Price MGIS CAPSTONE PROPOSAL Mitigating “Costs” for Early Concept Development June 22, 2009 Advisor: Dr

Route Influences6

Page 7: CROSS-COUNTRY PIPELINE ROUTE SELECTION By: Geoff Price MGIS CAPSTONE PROPOSAL Mitigating “Costs” for Early Concept Development June 22, 2009 Advisor: Dr

What is Least-Cost Path?7

LEAST-COST PATHCOST SURFACE LEAST-COST SURFACE(VECTOR)

LEAST-COST PATH(VECTOR)

Land Cover

+ =

COST SURFACE COST SURFACE LEAST-COST Surface

Land Cover Terrain-Slope

Page 8: CROSS-COUNTRY PIPELINE ROUTE SELECTION By: Geoff Price MGIS CAPSTONE PROPOSAL Mitigating “Costs” for Early Concept Development June 22, 2009 Advisor: Dr

Cost-Weighted Surface8

LEAST-COST/WEIGHTED

Terrain-Slope

* .60 =

* .40 =

Land Cover

+ =

Influence

Page 9: CROSS-COUNTRY PIPELINE ROUTE SELECTION By: Geoff Price MGIS CAPSTONE PROPOSAL Mitigating “Costs” for Early Concept Development June 22, 2009 Advisor: Dr

LCP & Model Builder9

LEAST COST PATH

Page 10: CROSS-COUNTRY PIPELINE ROUTE SELECTION By: Geoff Price MGIS CAPSTONE PROPOSAL Mitigating “Costs” for Early Concept Development June 22, 2009 Advisor: Dr

LCP Results10

Page 11: CROSS-COUNTRY PIPELINE ROUTE SELECTION By: Geoff Price MGIS CAPSTONE PROPOSAL Mitigating “Costs” for Early Concept Development June 22, 2009 Advisor: Dr

Inserting Dollar Costs11

GIS Cost Estimating Manual

Page 12: CROSS-COUNTRY PIPELINE ROUTE SELECTION By: Geoff Price MGIS CAPSTONE PROPOSAL Mitigating “Costs” for Early Concept Development June 22, 2009 Advisor: Dr

Cost Estimating Manual

Productivity Factors General Economy Project Supervision Labor Conditions Equipment Weather

Terrain Factor Terrain-Slope

Geology Factor Rock Type

12

GF

Page 13: CROSS-COUNTRY PIPELINE ROUTE SELECTION By: Geoff Price MGIS CAPSTONE PROPOSAL Mitigating “Costs” for Early Concept Development June 22, 2009 Advisor: Dr

Cost Estimating Manual cont…

13

Summarize Construction Activities

Page 14: CROSS-COUNTRY PIPELINE ROUTE SELECTION By: Geoff Price MGIS CAPSTONE PROPOSAL Mitigating “Costs” for Early Concept Development June 22, 2009 Advisor: Dr

Research14

What are pipeline route selection rules of thumb? (i.e., Engineering, Biophysical, & Socioeconomic).

Is there a favorable standard to apply relative “costs” to individual layers? (i.e.., 1,2,3,4 -OR- 1,3,6,9 -OR- other).

Identify a process for determining costs & weights. (i.e., Delphi Method, Analytical Hierarchy Process, etc…)

Identify benchmark candidate(s) for calibrating LCP and inserting real cost.

Using Cost Estimating Manual For Pipelines to quantify labor/equipment estimates and develop a +/-50% cost estimate for route alternatives.

Page 15: CROSS-COUNTRY PIPELINE ROUTE SELECTION By: Geoff Price MGIS CAPSTONE PROPOSAL Mitigating “Costs” for Early Concept Development June 22, 2009 Advisor: Dr

Research Time Line15

Aug/Sept

Page 16: CROSS-COUNTRY PIPELINE ROUTE SELECTION By: Geoff Price MGIS CAPSTONE PROPOSAL Mitigating “Costs” for Early Concept Development June 22, 2009 Advisor: Dr

QUESTIONS?

Page 17: CROSS-COUNTRY PIPELINE ROUTE SELECTION By: Geoff Price MGIS CAPSTONE PROPOSAL Mitigating “Costs” for Early Concept Development June 22, 2009 Advisor: Dr

References:17

Delavar, M.R., 2003, Pipeline Routing Using Geospatial Information System Analysis,

ScanGIS'2003 - The 9th Scandinavian Research Conference on Geographical Information Science,

4-6 June 2003, Espoo, Finland – Proceedings, pp. 203-213.

Mollard, J.D., Penner, Lyncen., Zimmer, Troy., 2008, Pipeline Geo-Environmental Design and Geohazard Management. Chapter 2 Pipeline Route Selection pp. 5-69

Page, S. John, Cost Estimating Manual for Pipelines and Marine Structures, 3rd Ed. 2000. Section 1, pp 1-65.