cross approx. state, p&p sh section approx. sta. approx
TRANSCRIPT
Conflict Summary Sheet.xls
Item #P&P Sh
#
Cross Section
Sht #Approx. Sta.
From Approx. Sta. To Approx. Qty Offset Location Comments Utility Type of Facility
1 State,
2 Utility Not/Reimbursable
NDT01 3 X2-X3 503+78. to 504+27. 70 1.5 ft Cut Rt In Right of way Adjust or relocate line for new ditch North Dakota Telephone Fiber Optic Line 2 Not reimbursable
NDT02 3 X4-X5 504+95. to 505+43. 50 2.75 ft Cut Rt In Right of way Conflict with existing roadway removal North Dakota Telephone Fiber Optic Line 2 Not reimbursable
NDT03 3 X4-X5 505+04. to 505+57. 50 2.75 ft Cut Rt In Right of way Conflict with existing roadway removal North Dakota Telephone Fiber Optic Line 2 Not reimbursable
NDT04 3 X4-X5 505+20. to 506+07. 50 2.75 ft Cut Rt In Right of way Conflict with existing roadway removal North Dakota Telephone Fiber Optic Line 2 Not reimbursable
NDT05 3 X6 506+77. to 506+77. NA 5.25 ft Fill Crossing New Right of way No Conflict - Under New 79th Ave Roadway North Dakota Telephone (2) Fiber Optic Lines NA NA
NDT06 3 X6 507+76. to 507+76. NA 5.25 ft Fill Crossing New Right of way No Conflict - Under New 79th Ave Roadway North Dakota Telephone Fiber Optic Line NA NA
NDT07 3 ? 508+04. to 508+04. 25 Cut Lt In Right of way Possible conflict with new culvert North Dakota Telephone Fiber Optic Line 2 Not reimbursable
NDT08 4 X9-X10 513+93. to 514+30. 60 3.25 ft Cut Lt In Right of way Adjust or relocate line for new ditch North Dakota Telephone Fiber Optic Line 2 Not reimbursable
NDT09 4 X10 514+43. to 514+70. 50 3.25 ft Cut Lt In Right of way Adjust or relocate line for new ditch North Dakota Telephone Fiber Optic Line 2 Not reimbursable
NDT10 4 X11 514+90. to 515+34. 50 2 ft Cut Lt In Right of way Adjust or relocate line for new approach elevation North Dakota Telephone Fiber Optic Line 2 Not reimbursable
NDT07 4 ? 510+40. to 510+40. ? Cut Lt In Right of way Possible conflict with new culvert North Dakota Telephone Fiber Optic Line 2 Not reimbursable
NDT07 4 ? 512+85. to 512+85. ? Cut Rt In Right of way Possible conflict with new culvert North Dakota Telephone Fiber Optic Line 2 Not reimbursable
OTP01 3 X6 & X16 507+54. to 507+54. 1 4.25' Fill crossing In Right of way Relocate Pole and Anchors Otter Tail Power Co. Overhead Power Line 2 Not reimbursable
NE01 3 X3-X4 504+60. to 504+80. 50 3 ft Cut Rt In Right of way Conflict with existing roadway removal Nodak Electric Buried Electric Line 2 Not reimbursable
NE02 3 X4 504+84. to 505+29. 50 3 ft Cut Rt In Right of way Conflict with existing roadway removal Nodak Electric Buried Electric Line 2 Not reimbursable
NE03 3 X4 505+17. to 505+17. NA 5 ft Fill Crossing New Right of way No Conflict - Under New 79th Ave Roadway Nodak Electric Buried Electric Line 2 Not reimbursable
NE03 3 X5 506+61. to 506+61. NA 5 ft Fill Crossing New Right of way No Conflict - Under New 79th Ave Roadway Nodak Electric Buried Electric Line 2 Not reimbursable
NE04 4 ? 512+77. to 512+77. ? Cut Rt In Right of way Possible conflict with new culvert Nodak Electric Buried Electric Line 2 Not reimbursable
NE05 4 ? 513+60. to 513+60. ? Cut Rt In Right of way Possible conflict with new culvert Nodak Electric Buried Electric Line 2 Not reimbursable
MDU01 3 X3-X5 504+31. to 506+02. 70 3 ft Cut Rt In Right of way Adjust or relocate line for new ditch Montana Dakota Utilities Gas Line 2 Not reimbursable
MDU02 3 X4-X5 505+13. to 505+88. 50 3 ft Cut Rt In Right of way Conflict with existing roadway removal Montana Dakota Utilities Gas Line 2 Not reimbursable
MDU03 3 X6 507+68. to 507+68. NA 5 ft Fill Crossing New Right of way No Conflict - Under New 79th Ave Roadway Montana Dakota Utilities Gas Line 2 Not reimbursable
MDU04 4 X12 515+60. to 515+80. 35 2 ft Cut Rt In Right of way Adjust or relocate line for new ditch Montana Dakota Utilities Gas Line 2 Not reimbursable
MDU05 4 ? 513+30. to 513+30. ? Cut Rt In Right of way Possible conflict with new culvert Montana Dakota Utilities Gas Line 2 Not reimbursable
RRW01 3 X5-X6 506+31. to 506+31. NA 3 ft Cut Rt In Right of way Possible Conflict with existing roadway removal Ramsey Rural Water Water Line 2 Not reimbursable
RRW01 3 ? 507+23. to 507+23. NA Fill Rt New Right of way No conflict anticipated with new culvert Ramsey Rural Water Water Line 2 Not reimbursable
Approx. Maximum
Cut/Fill
Conflict Summary Sheet.xls
Item #P&P Sh
#
Cross Section
Sht #Approx. Sta.
From Approx. Sta. To Approx. Qty Offset Location Comments Utility Type of Facility
1 State,
2 Utility Not/Reimbursable
Approx. Maximum
Cut/Fill
1 913+00. to 923+00. US 22 923+00. to 933+00. US 23 502+75. to 507+33. 79th Ave NE4 510+75. to 515+82. 79th Ave NE
Contact information for Utility Facilities with or without Conflicts. Utility Company Name and Address Contact Name Phone Number Email
North Dakota Telephone Company - 211 22nd St NW, P.O. Box 180 - Devils Lake, ND 58301 Terry Thompson (701) 662-6482Nodak Electric Coop. Inc. - P.O. Box 13000, Grand Forks, ND 58208-3000 Steven Breidenbach, (701) 746-4461MDU - Gas – Devils Lake, ND Barry Gage, (701) 351-3077MDU - Gas – Devils Lake, ND Scott Volk (701) 739-7275Otter Tail Power Company – P.O. Box 400 – Devils Lake, ND 58301 Wayne Thompson (701) 662-4021 X 702 [email protected] Ramsey Water District P.O. box 1257 Devils lake ND 58301 Nels Halgren (701) 662-5781
Plan and Profile Sheet #'s
[email protected]@[email protected]@mdu.com
2
DESIGNERS
ND DEPARTMENT OF TRANSPORTATION
__________________________________________
APPROVED DATE _________________________
GRAND
FORKS
GO
LD
EN
VA
LLE
Y
CASS
RIC
HLA
ND
RANSOM
SARGENTDICKEY
LA MOURE
BARNES
KIDDER
LOGAN
MC IN
TOSH
BU
RLEIG
H
MORTON
GRANT
SIOUXADAMS
HETTINGER
SLOPE
BOWMAN EM
MO
NS
OLIVER
MERCER
STARKBIL
LIN
GS
DUNN
MC KENZIE
MC LEAN
SHERID
AN
WELLS
EDDY
FOSTER
GRIG
GS
STEELE
TRAILL
DIVIDE
WILLIAMS
BURKE
MO
UNTR
AIL
RE
NVIL
LE
WARD
MC H
EN
RY
BOTTINEAU
ROLLE
TTE
TO
WNER
CAVALIER
RA
MSEY
WALSH
PE
MBIN
A
NELS
ONBENSONP
IER
CE
STUTSMAN
STATE COUNTY MAPOFFICE OF PROJECT DEVELOPMENT
0.38 0.38
T 154 N
R 6
4 W
R 6
5 W
79th A
ve N
E
RP 265.470 to RP 265.850
US 2 & 79th Ave NE Intersection
T 153 N
NH-3-002(146)265
STATE PROJECT NO.
ND
PCNNO.
SHEET
NO.
SECTION
DEPARTMENT OF TRANSPORTATION
NORTH DAKOTA
__________________________________________
APPROVED DATE _________________________
engineer under the laws of the state of ND.
and that I am a duly registered professional
prepared by me or under my direct supervision
I hereby certify that the attached plans were
12/2/2015 mdockter R:\project\30002265.146\design\DOTSC\Plan\001TS_001_TITLE.dgn11:44:20 AM
purposes.
implementation
construction or
and not for
is preliminary
This document
PRELIMINARY
JOB #
GROSS MILES NET MILES PROJECT NUMBER \ DESCRIPTION
effective on the date the project is advertised.
Department of Transportation and the Supplemental Specifications
2014 Standard Specifications adopted by the North Dakota
GOVERNING SPECIFICATIONS:
11
NH-3-002(146)265 20946
Design Division
Ramsey County
Intersection Realignment
NH-3-002(146)265
RP 265.470 to RP 265.850
Bridges:
Average DailyTraffic (Direction)
Design Speed: 70
Pavement Design Life 20 (years)
Minimum Sight Dist. for Stopping: 730’
Pass: 1670Current 2015 (WB) Trucks: 360 Total: 2030
Total: 3120
Current 2015 (EB)
Forecast 2035 (WB)
Forecast 2035 (EB)
Pass: 1704 Trucks: 366 Total: 2070
Total: 3185
Clear Zone Distance: 42’
Design Accumulated One-way Flexible ESALs:
Trucks: 553
Trucks: 563
Pass: 2567
Pass: 2622
DESIGN DATA
US 2 & 79th Ave NE
Proposed Roadway
Existing Roadway
Existing Railroad
2
79th A
ve N
E
Asphalt
Aggregate
US 2 W
estbound
US 2 Eastbound
NH-3-002(146)265 4 1
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
12/2/2015 mdockter R:\project\30002265.146\design\DOTSC\Plan\004SW_001_SCOPE.dgn11:44:26 AM
purposes.
implementation
construction or
and not for
is preliminary
This document
PRELIMINARY
Scope of Work
79th Ave NE Realignment
8" PCC4" Aggregate Base
6:16:1
1.6% 1.6% 4.4%4.4%
5’7’15’12’3’6’Varies25’
‘
104’ ‘ to ‘
‘
8" PCC4" Aggregate Base
6:16:1
1.6% 1.6% 4.4%4.4%
5’7’15’
‘
104’ ‘ to ‘
‘
2.1%2.1%
14’
4.0%
104’ ‘ to ‘
5" Aggregate
6.5" HBP
4" HBP4:1
8:1
4:1
Shoulder
Aggregate
Shoulder
Aggregate
Shoulder
Aggregate
12’12’
12’ 12’
HBP
HBP
4:1
2.1%2.1%
5" Aggregate
6.5" HBP
4" HBP4:1
8:1
4:1
Varies4’ 17’ 14’ Varies
Sta 919+76 - 924+71, 929+75 - 933+39
Westbound US 2
Sta 919+49 - 924+45 with Turn Lane
Eastbound US 2
Sta 913+83 - 919+49, 924+45 - 927+79
Eastbound US 2
Sta 924+71 - 929+75 with Turn Lane
Westbound US 2
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
12/2/2015 mdockter R:\project\30002265.146\design\DOTSC\Plan\030TP_001_EX TYP.dgn11:44:28 AM
purposes.
implementation
construction or
and not for
is preliminary
This document
PRELIMINARY
30
NH-3-002(146)265 1
US 2 Existing Typical Sections
79th Ave NE Realignment
3.5% 3.0%
28’
‘
Sta 503+78 - 507+16
South of US 2
Existing Typical - 79th Ave
30
NH-3-002(146)295 2
Existing Typical 79th Ave NE
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
12/2/2015 mdockter R:\project\30002265.146\design\DOTSC\Plan\030TP_002_EX TYP.dgn11:44:29 AM
purposes.
implementation
construction or
and not for
is preliminary
This document
PRELIMINARY
79th Ave NE Realignment
4:1 4:1
‘
2.1%2.1% 2.1% 2.1%
‘
2.1%2.1%
4:14:1
‘
2.1%
4’10’14’
2.1% 2.1% 2.1%
4:1 4:1
17’4’0’ - 7’Varies
4’10’14’17’7’4’
12’12’12’12’
2.1% 2.1% 2.1%
4’12’Varies 0’ - 28’14’17’7’4’
Varies 0’ - 30’12’12’12’ 12’
Right Turn Lane Left Turn LaneDriving Lane Passing Lane Lane Line
Right Turn Lane Driving Lane Passing Lane Left Turn Lane
12’ 12’ 12’ 12’
Driving Lane Passing Lane Left Turn Lane
Taper
Right Turn Lane
4:1
Sta 919+76.2 - 927+97.5
Westbound US 2
Sta 927+97.5 - 930+74.5
Westbound US 2
Sta 930+74.5 - 933+38.9
Westbound US 2
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
12/2/2015 mdockter R:\project\30002265.146\design\DOTSC\Plan\030TP_003_PR TYP.dgn11:44:30 AM
purposes.
implementation
construction or
and not for
is preliminary
This document
PRELIMINARY
30
NH-3-002(146)295 3
US 2 WB Proposed Typical Sections
79th Ave NE Realignment
‘
1.6% 1.6%
4:14:1
‘
1.6% 1.6%1.6% 1.6%
‘
1.6% 1.6%
12’12’12’12’
4’ 0’ - 9’Varies
15’12’12’4’
Driving Lane Passing LaneLeft Turn Lane
Taper
Right Turn Lane
12’12’12’12’
Driving Lane Passing LaneLeft Turn Lane Right Turn Lane
4’9’15’12’12’4’
9’15’ 4’4’
Driving Lane Passing LaneLeft Turn Lane Right Turn LaneLane Line
12’12’12’Varies 0’ - 30’12’
4:1
1.6% 1.6%
1.6% 1.6%
4:14:1
4:1
1.6%
Sta 913+83.4 - 916+81.3
Eastbound US 2
Sta 916+81.3 - 919+51.9
Eastbound US 2
Sta 919+59.1 - 927+78.9
Eastbound US 2
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
12/2/2015 mdockter R:\project\30002265.146\design\DOTSC\Plan\030TP_004_PR TYP.dgn11:44:31 AM
purposes.
implementation
construction or
and not for
is preliminary
This document
PRELIMINARY
30
NH-3-002(146)295 4
US 2 EB Proposed Typical Section
79th Ave NE Realignment
4’12’12’4’
4:1 4:1
2.1% 2.1%Topsoil Topsoil
4’12’12’4’
2.1% 2.1%Topsoil Topsoil
15" Aggregate
‘
‘
4:1 4:1
15" Aggregate
4.5" HBP
Sta 506+21.2 - 513+51.0
Proposed Typical - 79th Ave
Sta 501+62.0 - 506+21.2, 513+51.0 - 516+44.0
Proposed Typical - 79th Ave
30
NH-3-002(146)295 5
79th Ave Proposed Typical Sections
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
12/2/2015 mdockter R:\project\30002265.146\design\DOTSC\Plan\030TP_005_PR TYP.dgn11:44:32 AM
purposes.
implementation
construction or
and not for
is preliminary
This document
PRELIMINARY
79th Ave NE Realignment
18:1
15:1
12:1
20:1
24.0 RT
+96.7
69.1 RT
+17.1
80.0 RT
+81.1
72.6 LT
+70.6
80.0 LT
+19.7
24.0 RT
+57.2
80.0 RT
+21.5
38.1 RT
+83.4
R 26’
3.7 LT
+89.3
915
+00
PT 918
+04.93
920
+00
WB US 2
EB US 2
Dirt
Pr. Inv.: 1466.38
Pr. Sta.: 922+65 - 136.2’ Lt
Pr. Inv.: 1466.72
Pr. Sta.: 922+42 - 98.8’ LtPr. Inv.: 1467.36
Pr. Sta.: 920+00 - 88.5’ Lt
Pr. Inv.: 1468.68
Pr. Sta.: 920+00 - 21.2’ Lt
Pr. Inv.: 1467.28
Pr. Sta.: 923+28 - 100.6’ Rt
Pr. Inv.: 1467.50
Pr. Sta.: 923+95 - 173.8’ Rt
Pr. Inv.: 1466.24
136.2’ Lt
Pr. Sta.: 923+80
+ 0.7390 %
+ 0.7485 %
- 0.5747 %
- 1.4017 %
- 0.9706 %
- 0.3760 %
1,4
72.7
7
0’ OS from SCL US2. See the cross sections.
*The location of the proposed ditch bottom is not always
Pr. 30" Pipe Cond.
Pr. 24" Pipe Cond.
VPI 915+96.00
EL 1,472.17
VPI 917+06.00
EL 1,471.11
VPI 917+95.00
EL 1,469.86
VPI 920+00.00
EL 1,468.68
VPI 921+18.00
EL 1,469.56
PR_DS_MED
Pr. Median*
SCL US2
Ex. Median
VPI 922+89.00
EL 1,470.83
913+00 914+00 915+00 916+00 917+00 918+00 919+00 920+00 921+00 922+00 923+00
1,475.23
1,474.10
1,472.14
1,471.60
1,470.62
1,469.64
1,469.44
1,468.94
1,468.22
1,468.06
1,467.32
915+00 916+00 917+00 918+00 919+00 920+00 921+00 922+00 923+00
1,472.53
1,472.13
1,471.16
1,469.83
1,469.25
1,468.68
1,469.43
1,470.17
1,472.21
1450
1455
1460
1465
1470
1475
1480
1485
1450
1455
1460
1465
1470
1475
1480
1485
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/13/2016 mdockter R:\project\30002265.146\utilities\sheets\060PP_001_US2.dgn8:25:20 AM
purposes.
implementation
construction or
and not for
is preliminary
This document
PRELIMINARY
60
NH-3-002(146)265 1
West end of
US 2 Realignment
20430-
24RCP F
20431+24RCP F
21110T
FO
21111TF
O
21109T
FO
20433+
24RCPF FF
21107+
TF
O
NDTC
20432-
24RCP F
ND TEL
20269T
FO
21108T
FO
20434-
24RCPF FF
Brush
20068T
FO
20056G
M
20069T
FO
Brush
20024-
SG
NS
20057G
MMDU20058-
GM
Sign
20067T
FO
ND T
EL
20023
20066T
FO
20065T
FO
20064N
DTC Util Mkr
Util Mkr
20063T
FO
20456+
GY
20026-
SG
NS
20455-
GY3
20454-
GY2
20453-
GY1
20460-
GY
20060U
NK
NO
WN
VAL
VE
unknown
Valve
20458+
GY2
20459+
GY3
20457+
GY1
20461-
GY1
20462-
GY2
20450+
GY2
20449+
GY1
20451+
GY3
20270T
FO
20452-
GY
20463-
GY3
20448+
GY
20062T
FO
20059R
AMSE
Y C
OU
NT
Y R
UR
AL
WATER
Util
Mkr
20025+
SG
NS
Sign
21184-
WM
ND TEL
20028-
SG
NS
Ass
md L
oc
RA
MS
EY C
OU
NT
Y R
UR
AL
20061+TF
O
NDTC
21112T
FO
20027+
SG
NS
Sign
Util Mkr
Asp
h
locker
EL
Asph
Conc
Gr Asph
Pvt
Sign
Pvt
Sign——
Gr
Conc
GrGr
—
Dirt
Pvt
Sign
21151+SI
GNS PR
AIRIE TR
UC
K
& TR
ACT
OR REP
AIR
—21152-
SI
GNS PR
AIRIE TR
UC
K
& TR
ACT
OR REP
AIR
—
Asph
US 2 and 79US 2 and 79
20:1
15:112:1
15:1
80.0 LT
+34.5
73.7 LT
+69.0
32.5 LT
+86.1
80.0 RT
+39.0
69.2 RT
+55.3
24.0 LT
+96.1R 26’
72.0 LT
+57.2
64.0 LT
+ 64.8
3.6 RT
+66.7
at own expenserelocate or adjustutility company to Utility Poles and anchors,Conflict with 80.0 RT
+21.5
80.0 LT
+74.6
24.0 LT
+59.1
R 26’
3.7 LT
+89.3
505
+00
510+0
0
PO
T 924
+70.26
925
+00
930
+00
WB US 2
EB US 2
Dirt
Dirt
Pr. Inv.: 1467.28
Pr. Sta.: 923+28 - 100.6’ Rt
Pr. Inv.: 1467.76
Pr. Sta.: 924+81 - 139.2’ Rt
Pr. Inv.: 1467.50
Pr. Sta.: 923+95 - 173.8’ Rt
Pr. Inv.: 1466.24
136.2’ Lt
Pr. Sta.: 923+80
- 0.4512 %
- 0.8181 %
- 0.3257 %
0’ OS from SCL US2. See the cross sections.
*The location of the proposed ditch bottom is not always
Pr. 24" Pipe Cond.
VPI 922+89.00
EL 1,470.83
VPI 924+74.00
EL 1,469.17
VPI 925+96.00
EL 1,468.62
VPI 927+20.00
EL 1,467.61
PR_DS_MED
Pr. Median*
SCL_US2
Ex. Median
923+00 924+00 925+00 926+00 927+00 928+00 929+00 930+00 931+00 932+00 933+00
1,467.32
1,467.24
1,469.90
1,466.34
1,466.00
1,465.96
1,465.88
1,465.83
1,465.65
1,465.46
1,465.29
923+00 924+00 925+00 926+00 927+00 928+00 929+00 930+00 931+00 932+00 933+00
1,472.21
1,472.43
1,469.05
1,468.59
1,467.77
1,467.35
1,467.02
1,466.69
1,466.37
1,466.04
1,465.72
1450
1455
1460
1465
1470
1475
1480
1485
1450
1455
1460
1465
1470
1475
1480
1485
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/13/2016 mdockter R:\project\30002265.146\utilities\sheets\060PP_002_US2.dgn8:28:27 AM
purposes.
implementation
construction or
and not for
is preliminary
This document
PRELIMINARY
60
NH-3-002(146)265 2
East end of
US 2 Realignment
20125T
FO2
DB
20126T
FO1
20429+
24RCP F
20130T
FO2
ND TEL
20430-
24RCP F
20131T
FO2
20110W
M
20239T
FO
20431+
24RCP F
21110T
FO
21115T
FO
21111T
FO
21109T
FO
21117-
TF
O
ND T
EL
21114T
FO
20136T
FO2
ND TEL
20433+
24RCPF FF
21116T
FO
RW
RA
MS
EY
20432-
24RCP F
20238T
FO
20231U
EC
20269T
FO
21108T
FO
20242U
EC
20434-
24RCPF FF
20144T
FO2
20137T
FO2
20241U
EC
20132T
FO1
20237T
FO
20236T
FO
20127T
FO
ND TEL20129T
FO1
20224U
EC
20068T
FO
20056GM
20069T
FO
20053GM
20024-
SG
NS
MDU
20135T
FO1
20469-
GY2
20233T
FO
20054GM
20145T
FO2
20071T
FO
20070T
FO
20083-
TF
O
Sign
20138T
FO1
20107-W
M
20084-
TF
O1 LI
NES C
ONTI
NUE T
AN
GE
NT T
HR
OU
GH FL
OO
D
WATER
20055GM
ND T
EL
20100T
FO
20143T
FO1
20052M
DU C
ARS
ONITE P
OST
Util Mkr
ND TEL
20146T
FO2
20152T
FO2
20085+
UEC
NO
DA
K ELEC. C
O-
OP
20464+G
Y
20466+
GY2
20465+
GY1
20467-G
Y
20468-
GY1
20120GM
20072T
FO
20050GM
20099T
FO
20049GM
NO
DA
K R E
LEC
20051GM
20073T
FO
20023+
SG
NS
20147T
FO2
20101T
FO
20151T
FO2
RAMSEY RW
NO
DA
K R E
LEC
20225U
EC
20230U
EC
20048GM
20075T
FO
ND TEL
20223U
EC
NODAK R ELEC
20074T
FO
ND TE
L
20021SG
N
20086U
EC
20030SG
N
Dirt
20102T
FO
20047GM
20119GM
20154T
FO12
0117GM
20118GM
20077T
PC
FO Tel Ped
20078N
DTC
Util Mkr
20076-
TF
O
20022SG
N
20194+
TF
O
NDTC
20128T
FO
20228T
FO
20153-
TF
O2
20081T
FO1
20195+
TF
O1
NDTC
20082T
FO
20114G
ATE
VAL
VE C
ARS
ONITE P
OSTUtil Mkr
20098T
FO
ND TEL
20235T
FO
20202O
DD
20007SG
N
20201-
TF
O
20103T
FO
20162T
PC
FO Tel Ped
20203T
FO1
20133T
FO
ND T
EL
20155-
TF
O1
20270T
FO
20163+T
B
20214-
UEC
20029SG
N
20087U
EC
20161!
TVLT
20134T
FO
201774
"
DI
A
WO
OD B
ALL
AR
D
20160T
VLT
20148-
TF
O2
20159T
VLT
20158+
TVLT
2 FO Tel vaults
20141C
ONTEL
Util Mkr
20227+
TF
O
NDTC
20140T
PC
FO Tel Ped
20205+
UEC
NO
DA
K ELEC. C
O-
OP
20167N
DTC C
ARS
ONITE P
OST
Util Mkr
20445+
GY1
20176!E
L
20447-
GY1
20444+G
Y
20234T
FO
20222U
EC
20164T
B
20112D
O
NOT C
ONT
OUR
WMV20168N
OD
AK ELECTRIC
E Mtr
20142T
FO
20221+
UEC
NO
DA
K ELEC. C
O-
OP
20165T
B20139T
FO
20206U
EC
20215+
UEC
20079+
TF
O
NDTC
20104T
FO
20080+
TF
O1
NDTC
NODAK R ELEC
20166!T
B
20088U
EC
20157-
TF
O
20226U
EC
20219+
UEC
NO
DA
K ELEC. C
O-
OP
20046+
GM
MD
U
20220-
UEC
20207U
EC
20156T
FO
20446-G
Y
20091+
UEC
NO
DA
K ELEC. C
O-
OP
20089U
EC
20043-G
S
Gr
20171E
L
20172!E
L
20179+
TF
O
NDTC
20096O
DD IS
OL
ATE
D FL
AG
20272T
FO
201784
"
DI
A
WO
OD B
ALL
AR
D Sign Pvt
20111-W
M
20229U
EC
20208U
EC
20173+
EL
NO
DA
K R
UR
AL ELECTRIC
vaults
2 EL
20020SG
N
20175E
L
20193-
TF
O
20170E
L
20204-
TF
O1
20169+
EL
NO
DA
K R
UR
AL ELECTRIC
20115+
GM
MD
U
21112T
FO
20232U
EC
ND TEL
20174E
L
21113T
FO
20211-
UEC
20209U
EC
Gr
Dirt
Conc
20181-
TF
O
20192T
FO
20210U
EC
Asp
h
20273-
TF
O
20097+
TF
O
NDTC
20180T
FO
21190M
ET
AL T
NO F
UNCTI
ON
MDU
Asph
20109W
M
20191T
FO
20271T
FO
Conc
20106+
WM
GRE
ATER R
AMSE
Y
WATER
DISTRICT
20150T
FO2
20108+
WM
GRE
ATER R
AMSE
Y
WATER
DISTRICT
20200T
FO
20199T
FO1
20042G
S
MD
U
Gr
20116GM
20105-
TF
O
20149+
TF
O2
20190T
FO
20213U
EC
20197T
FO
20196T
FO1
20090-
UEC
20198T
FO1
20212+
UEC
NO
DA
K ELEC. C
O-
OP
20216U
EC
20217U
EC
Sign Pvt
504
503
505
506 507
508
509
10:1
10:1
31.2 LT
+72.7
16.0 RT
+21.2
21.5 RT
+73.5
31.8 RT
+10.5
R 25’
R 25’
R 75’
R 75’
R 75’
16.0 LT
+21.3
at own expenserelocate or adjustutility company to Fiber optic line,Conflict with
at own expenserelocate or adjustutility company to Gas line,Conflict with
under new 79th Ave roadwayNo anticipated Conflict under new 79th Ave roadwayNo anticipated Conflict
at own expenserelocate or adjustutility company to Fiber optic line,Possible Conflict with
at own expenserelocate or adjustutility company to Utility Poles and anchors,Conflict with
under new 79th Ave roadwayNo anticipated Conflict under new 79th Ave roadwayNo anticipated Conflict
10:1
500
+00
505+00
510
+00
925+00
79th
Ave
+ 0.2999 %
- 2.3414 %
+ 0.0000 % - 0.2500 %
+ 0.0000 %
+ 2.847
5 %
- 0.2500 %
+ 0.7500 %
EL 1,473.32
VPI 509+15.00
L = 19.93’
EL 1,472.38
VPI 507+11.71
L = 120.00’
EL 1,475.54
VPI 503+35.00
L = 140.00’
EL 1,472.38
VPI 504+70.00
EL 1,472.14
VPI 508+06.57
L = 48.41’
EL 1,472.18
VPI 508+75.00 VPI 509+75.04
EL 1,472.13
1,4
75.3
6
- 6.4000 %
1,4
73.5
0
VPI 503+02.00
EL 1,471.77 EL 1,467.50
VPI 507+10.00
EL 1,470.30
VPI 504+73.23
EL 1,469.00
VPI 505+92.49
1,4
67.4
1
- 0.1526 %
- 1.2765 %
- 1.0901 %
- 0.8597 %
SW79Ditch
Pr Ditch
OCL_79
Pr. CL
OCL_79
Ex. CL
503+00 504+00 505+00 506+00 507+00 508+00 509+00 510+001,440 1
,475.52
1,472.05
1,470.73
1,470.46
1,467.81
1,470.13
1,467.12
1,466.73
1,475.36
1,474.02
1,472.51
1,472.38
1,472.38
1,472.16
1,472.89
1,472.33
503+00 504+00 505+00 506+00 507+001,440
1450
1455
1460
1465
1470
1475
1480
1485
1450
1455
1460
1465
1470
1475
1480
1485
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/13/2016 mdockter R:\project\30002265.146\utilities\sheets\060PP_003_79th.dgn8:24:14 AM
purposes.
implementation
construction or
and not for
is preliminary
This document
PRELIMINARY
60
NH-3-002(146)265 3
North end of
79th Ave NE Realignment
1465.96
None
24" X 76’ R
CP (F
air)
923+87 - 1
20’ L
T
(chain: S
CL02)
1466.10
1466.21
E. end POSSIBLE H-WALL or BOX
(Submerged Elev. not confirmed)
12" X 46’ RCP
104+63 - 20’ LT to W end
104+47 - 25’ RT to E end
(Chain: 79TH)
1466.35
None
24" X 76’ R
CP (F
air)
923+23 - 1
4’ L
T to S
W end
(chain: S
CL02)
MD
U
ND TEL
ND T
EL
1466.65
RW
RAMSEY
1466.73
1466.74
1466.79
None
18" X 44’ CSP (Fair)
104+52 - 52’ RT to W end
104+24 - 87’ RT to E end
(Chain: 79TH)
ND T
EL
1466.84
2 R
CES (F
air)
24" X 80’ R
CP (F
air)
923+24 - 1
1’ R
T to N
E end
(chain: S
CL02)
1466.95
Brush
Brush
Util M
kr
ND TE
L
MD
U
ND TEL
Util M
kr
ND TE
L
ND T
EL
NODAK R ELEC
RA
MSEY R
W
NODAK R ELEC
ND T
EL
NO
DAK R E
LEC
ND TEL
ND T
EL
ND T
EL
Gr
FO Tel P
ed
Util M
kr
NODAK R ELEC
Dirt
1469.95
Gr
Util M
kr
Sign P
vt
FO Tel P
ed
ND TEL
Gr
Asp
h2 Sign P
vt
2 F
O Tel va
ults
Util M
kr FO Tel P
ed
Util M
kr
Util M
kr
Gr
WM
V
E Mtr
NO
DA
K R E
LE
C
Util M
kr
NO
DA
K R E
LEC
Sign P
vt
Gr
vaults
2 E
L
ND T
EL
Gr
Dirt
Conc
Gr
NODAK R ELEC
Asph
ND TEL
Gr
MD
U
ND TEL
Asph
Btry b
ox
EL box
locke
r
EL
R E
LEC
NO
DAK
E Mtr
Line E
xst
Switch R
R
Conc
Asp
h
BNSF
MD
U
MDU
Gr
Asph
Conc
Conc
Pvt
Sig
n
BNSF
X-in
g
Tim
ber
Dirt
ND TEL
WMV
Sign P
vt
511
512
510
513 514
515
516
518517
31.8 RT+10.5
at own expenserelocate or adjustutility company to Fiber optic line,Conflict with
yet to be determinedculvert placementPossible Conflict with
yet to be determinedculvert placementPossible Conflict with
at own expenserelocate or adjustutility company to Gas line,Conflict with 5
15
+00
510
+00
920+00
925+00
79th Ave
Pr. Inv.: 1466.38
36.6’ Rt
Pr. Sta.: 512+72
Pr. Inv.: 1466.38
Pr. Sta.: 513+17 - 54.3’ Lt*
+ 0.7500 %
+ 2.1170
% + 0.0000 %
- 2.5055 %
+ 0.1439 %
+ 2.0464 %
+ 1.1701 %
VPI 515+60.00
EL 1,474.10
L = 26.86’
L = 64.00’
EL 1,474.18
VPI 512+19.00VPI 511+04.00
EL 1,474.18
L = 62.18’
VPI 509+75.04
EL 1,472.13
L = 70.00’
EL 1,472.51
VPI 510+25.00
L = 130.00’
EL 1,471.75
VPI 513+16.00
L = 106.32’
EL 1,471.95
VPI 514+55.00
1,4
74.4
1
OCL_79
Pr. CL
OCL_79
Ex. CL
510+00 511+00 512+00 513+00 514+00 515+00
1,466.73
1,471.76
1,472.76
1,466.88
1,468.32
1,473.17
1,472.33
1,473.97
1,474.15
1,472.40
1,471.87
1,472.88
1450
1455
1460
1465
1470
1475
1480
1485
1450
1455
1460
1465
1470
1475
1480
1485
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/13/2016 mdockter R:\project\30002265.146\utilities\sheets\060PP_004_79th.dgn8:30:24 AM
purposes.
implementation
construction or
and not for
is preliminary
This document
PRELIMINARY
60
NH-3-002(146)265 4
North end of
79th Ave NE Realignment
MD
U
ND TEL
ND T
EL
ND T
EL
Brush
Brush
Util M
kr
ND TE
L
Sign
ND TEL
ND T
EL
NODAK R ELEC
MDU
ND T
EL
ND T
EL
Util Mkr
ND TEL
Peds2 FO Tel
R ELECNODAK
NODAK R ELEC
Dirt
El box Abn
Sign P
vt
Asph
2 Sign P
vt
Util M
kr
Sign
Util M
kr
Sign P
vt
Asph
ND TEL
NP
Btry box
EL box
locker
EL
R E
LEC
NO
DA
K
E Mtr
Line E
xst
Switc
h R
R
Asph
BNSF
WMV
Asph
Conc Bariers
BNSF
Conc
Switch RR
ND TEL
Switch RR
Peds2 FO Tel
Util Mkr
X-in
g
Tim
ber
RA
MS
EY C
OU
NT
Y R
UR
AL
MD
U
—
X-ingConc
X-ingTimber
NP
Gr piles
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1470 1470
1480 1480
502+75.00
1470 1470
1480 1480
502+78.87
1470 1470
1480 1480
503+02.27
1475.36
1475.37
1475.36
approximate
fiber optic line
location
approximate
gas line
location
approximate
fiber optic line
location
approximate
gas line
location
approximate
fiber optic line
location
approximate
gas line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:45 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 1
79th Ave NE
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1470 1470
1480 1480
503+25.00
1470 1470
1480 1480
503+75.00
1460 1460
1470 1470
1480 1480
503+91.70
1475.23
1474.56
1474.21
approximate
fiber optic line
location
approximate
gas line
location
approximate
fiber optic line
location
approximate
gas line
location
sta 503+94.23
offset 170.35
elevation 1470.76
telephone pedestal
approximate
fiber optic line
location
approximate
gas line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:46 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 2
79th Ave NE
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1470 1470
1480 1480
504+15.10
1470 1470
1480 1480
504+20.23
1460 1460
1470 1470
1480 1480
504+73.50
1473.68
1473.58
1472.75
approximate
electric line
location
approximate
fiber optic line
location approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
sta 504+22.87
offset 104.97
approximate
electric line
location
approximate
fiber optic line
locationapproximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
sta 504+47.68
offset 141.84
elevation 1470.93
water gate valve
sta 504+65.35
offset 134.88
elevation 1470.30
telephone pedestal
sta 504+70.39
offset 127.47
elevation 1470.95
meter electric or gas or water
sta 504+76.10
offset 101.99
elevation 1471.17
utility anchor
sta 504+71.62
offset 102.81
elevation 1470.81
utility anchor
approximate
electric line
location
approximate
electric line
locationapproximate
electric line
location
approximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
approximate
gas line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:47 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 3
79th Ave NE
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1460 1460
1470 1470
1480 1480
1490 1490
504+78.73
1470 1470
1480 1480
505+32.00
1470 1470
1480 1480
505+37.13
1472.69
1472.38
1472.38
sta 504+79.43
offset 124.71
elevation 1471.18
power pole
approximate
electric line
location
approximate
electric line
location approximate
electric line
location
approximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
locationapproximate
gas line
location
approximate
electric line
location approximate
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
approximate
gas line
location
approximate
electric line
location
approximate
electric line
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
approximate
gas line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:48 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 4
79th Ave NE
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1460 1460
1470 1470
1480 1480
505+64.43
1470 1470
1480 1480
505+75.00
1460 1460
1470 1470
1480 1480
506+25.00
1472.38
1472.38
1472.38
sta 505+68.61
offset 89.39
elevation 1469.82
telephone pedestal
approximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
locationapproximate
gas line
location
approximate
gas line
location
approximate
water line
location
approximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
locationapproximate
gas line
location
approximate
gas line
location
approximate
approximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
approximate
water line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:48 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 5
79th Ave NE
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1460 1460
1470 1470
1480 1480
506+75.00
1460 1460
1470 1470
1480 1480
506+88.86
1460 1460
1470 1470
1480 1480
507+33.66
1472.38
1472.38
1472.32
approximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
locationapproximate
approximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
approximate
sta 507+54.50
offset 29.09
elevation 1467.52
power pole
sta 507+66.69
offset 36.35
elevation 1468.11
utility anchor
sta 507+64.86
offset 38.03
elevation 1467.71
utility anchor
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:49 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 6
79th Ave NE
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1460 1460
1470 1470
1480 1480
510+75.00
1460 1460
1470 1470
1480 1480
511+70.57
1460 1460
1470 1470
1480 1480
512+11.47
1473.57
1474.18
1474.06
approximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
sta 511+41.41
offset -36.37
elevation 1472.67
meter electric or gas or water
approximate
electric line
location
approximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
electric line
location
approximate
electric line
locationapproximate
fiber optic line
location
approximate
fiber optic line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:50 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 7
79th Ave NE
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1460 1460
1470 1470
1480 1480
512+44.57
1460 1460
1470 1470
1480 1480
512+75.00
1460 1460
1470 1470
1480 1480
513+25.00
1473.53
1472.84
1472.08
approximate
electric line
location
approximate
electric line
locationapproximate
fiber optic line
location
approximate
fiber optic line
location approximate
fiber optic line
locationapproximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
approximate
electric line
locationapproximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location approximate
fiber optic line
location
approximate
gas line
location
approximate
electric line
location
approximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:51 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 8
79th Ave NE
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1460 1460
1470 1470
1480 1480
513+64.28
1460 1460
1470 1470
1480 1480
513+79.88
1460 1460
1470 1470
1480 1480
513+84.36
1471.85
1471.84
1471.85
approximate
electric line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
approximate
fiber optic line
location
approximate
fiber optic line
location approximate
fiber optic line
location
approximate
gas line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:52 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 9
79th Ave NE
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1460 1460
1470 1470
1480 1480
514+38.28
1460 1460
1470 1470
1480 1480
514+46.16
1460 1460
1470 1470
1480 1480
514+75.00
1472.04
1472.11
1472.46
approximate
fiber optic line
locationapproximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
fiber optic line
locationapproximate
gas line
location
sta 514+79.61
offset -43.21
elevation 1469.60
telephone pedestal
sta 514+81.83
offset -43.11
elevation 1469.85
telephone pedestal
approximate
fiber optic line
location
approximate
fiber optic line
locationapproximate
gas line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:53 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 10
79th Ave NE
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1460 1460
1470 1470
1480 1480
514+96.78
1460 1460
1470 1470
1480 1480
515+07.96
1460 1460
1470 1470
1480 1480
515+32.66
1472.82
1473.03
1473.54
approximate
fiber optic line
location
approximate
gas line
location
approximate
fiber optic line
location
approximate
gas line
location
approximate
fiber optic line
location
approximate
gas line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:54 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 11
79th Ave NE
00
00
2020
2020
4040
4040
6060
6060
8080
8080
100100
100100
120
120
140
140
160
160
1470 1470
1480 1480
515+57.52
1460 1460
1470 1470
1480 1480
515+82.22 1474.03
1474.36
approximate
fiber optic line
locationapproximate
gas line
location
sta 517+75.64
offset -31.33
elevation 1473.15
water gate valve
sta 517+26.46
offset -29.76
elevation 1474.04
sta 517+25.86
offset -27.66
elevation 1474.23
telephone fiber optic pedestal
approximate
fiber optic line
location
approximate
gas line
location
approximate
gas line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility 79th.dgn11:24:54 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 12
79th Ave NE
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150
150
1475 1475
1480 1480
914+00.00
1475 1475
1480 1480
915+00.00
1465 1465
1470 1470
1475 1475
1480 1480
916+00.00
1460 1460
1465 1465
1470 1470
1475 1475
1480 1480
1485 1485
1490 1490
917+00.00
1474.10
1472.14
1471.60
1470.62
US2_EB_LT_EDGE-B1_EOP_L
US2_EB_LT_EDGE-EX_21_L
US2_EB_LT_EDGE-EX_22_L
US2_EB_LT_EDGE-T_1_L
US2_EB_LT_EDGE-EX_11_L
US2_EB_LT_EDGE-EX_12_L
US2_EB_LT_EDGE-T_2_LUS2_EB_LT_EDGE-T_3_L
US2_EB_LT_EDGE-DG_Tie_L
US2_EB_LT_EDGE-T_SHLDR_L
US2_EB_LT_EDGE-T_4_L
US2_EB_LT_EDGE-B1_EOSP_LUS2_EB_LT_EDGE-B1_EOSB1_L
US2_EB_LT_EDGE-T_5_L
US2_EB_LT_EDGE-DG_EOL1_L
US2_EB_LT_EDGE-T_Tie_L
US2_EB_LT_EDGE-DG_EOSB2_LUS2_EB_LT_EDGE-DG_3_LUS2_EB_LT_EDGE-DG_4_LUS2_EB_LT_EDGE-DG_5_L
US2_EB_LT_EDGE-DG_EOP_L
US2_EB_LT_EDGE-B1_SHLDR_L
US2_EB_LT_EDGE-T_EOL1_LUS2_EB_LT_EDGE-T_EOP_L
US2_EB_LT_EDGE-DG_SHLDR_L
US2_EB_LT_EDGE-B1_EOL1_L
US2_EB_LT_EDGE-B1_EOP_L
US2_EB_LT_EDGE-EX_22_L
US2_EB_LT_EDGE-T_1_L
US2_EB_LT_EDGE-EX_12_L
US2_EB_LT_EDGE-T_2_LUS2_EB_LT_EDGE-T_3_L
US2_EB_LT_EDGE-DG_Tie_L
US2_EB_LT_EDGE-T_SHLDR_L
US2_EB_LT_EDGE-EX_1_L
US2_EB_LT_EDGE-T_4_L
US2_EB_LT_EDGE-B1_EOSP_LUS2_EB_LT_EDGE-B1_EOSB1_L
US2_EB_LT_EDGE-T_5_LUS2_EB_LT_EDGE-DG_EOL1_L
US2_EB_LT_EDGE-T_Tie_L
US2_EB_LT_EDGE-DG_EOSB2_LUS2_EB_LT_EDGE-DG_3_LUS2_EB_LT_EDGE-DG_4_LUS2_EB_LT_EDGE-DG_5_L
US2_EB_LT_EDGE-DG_EOP_L
US2_EB_LT_EDGE-B1_SHLDR_L
US2_EB_LT_EDGE-T_EOL1_L
US2_EB_LT_EDGE-T_EOP_L
US2_EB_LT_EDGE-DG_SHLDR_L
US2_EB_LT_EDGE-B1_EOL1_L
US2_EB_LT_EDGE-B1_EOP_L
US2_EB_LT_EDGE-EX_22_L
US2_EB_LT_EDGE-T_1_L
US2_EB_LT_EDGE-EX_12_L
US2_EB_LT_EDGE-T_2_LUS2_EB_LT_EDGE-T_3_L
US2_EB_LT_EDGE-DG_Tie_L
US2_EB_LT_EDGE-T_SHLDR_L
US2_EB_LT_EDGE-EX_1_L
US2_EB_LT_EDGE-T_4_L
US2_EB_LT_EDGE-B1_EOSP_LUS2_EB_LT_EDGE-B1_EOSB1_L
US2_EB_LT_EDGE-EX_2_L
US2_EB_LT_EDGE-T_5_LUS2_EB_LT_EDGE-DG_EOL1_L
US2_EB_LT_EDGE-T_Tie_L
US2_EB_LT_EDGE-DG_EOSB2_LUS2_EB_LT_EDGE-DG_3_LUS2_EB_LT_EDGE-DG_4_LUS2_EB_LT_EDGE-DG_5_L
US2_EB_LT_EDGE-DG_EOP_L
US2_EB_LT_EDGE-B1_SHLDR_L
US2_EB_LT_EDGE-T_EOL1_L
US2_EB_LT_EDGE-T_EOP_L
US2_EB_LT_EDGE-DG_SHLDR_L
US2_EB_LT_EDGE-B1_EOL1_L
OCL_EB2 RT-DG_EOP_R
OCL_EB2 RT-T_Tie
OCL_EB2 RT-B1_SHLDR_R
OCL_EB2 RT-DG_SHLDR_R
OCL_EB2 RT-T_EOP_ROCL_EB2 RT-T_EOL1_R
OCL_EB2 RT-T_1
OCL_EB2 RT-B1_EOL1_R
OCL_EB2 RT-DG_Tie
OCL_EB2 RT-T_2
OCL_EB2 RT-B1_EOP_R
OCL_EB2 RT-T_3OCL_EB2 RT-T_4OCL_EB2 RT-T_5
OCL_EB2 RT-EX_22_R
OCL_EB2 RT-EX_12_R
OCL_EB2 RT-DG_3
OCL_EB2 RT-T_SHLDR_R
OCL_EB2 RT-B1_EOSB1_ROCL_EB2 RT-B1_EOSP_R
OCL_EB2 RT-DG_4OCL_EB2 RT-DG_5OCL_EB2 RT-DG_EOSB2_R
OCL_EB2 RT-DG_CL_R
OCL_EB2 RT-EX_1_R
OCL_EB2 RT-EX_2_R
approximate
fiber optic line
location
US2_EB_LT_EDGE-B1_EOP_L
US2_EB_LT_EDGE-EX_22_L
US2_EB_LT_EDGE-T_1_L
US2_EB_LT_EDGE-EX_12_L
US2_EB_LT_EDGE-T_2_LUS2_EB_LT_EDGE-T_3_L
US2_EB_LT_EDGE-DG_Tie_L
US2_EB_LT_EDGE-T_SHLDR_L
US2_EB_LT_EDGE-EX_1_L
US2_EB_LT_EDGE-T_4_L
US2_EB_LT_EDGE-B1_EOSP_LUS2_EB_LT_EDGE-B1_EOSB1_L
US2_EB_LT_EDGE-EX_2_L
US2_EB_LT_EDGE-T_5_LUS2_EB_LT_EDGE-DG_EOL1_L
US2_EB_LT_EDGE-T_Tie_L
US2_EB_LT_EDGE-DG_EOSB2_LUS2_EB_LT_EDGE-DG_3_LUS2_EB_LT_EDGE-DG_4_LUS2_EB_LT_EDGE-DG_5_L
US2_EB_LT_EDGE-DG_EOP_L
US2_EB_LT_EDGE-B1_SHLDR_L
US2_EB_LT_EDGE-T_EOL1_L
US2_EB_LT_EDGE-T_EOP_L
US2_EB_LT_EDGE-DG_SHLDR_L
US2_EB_LT_EDGE-B1_EOL1_L
OCL_EB2 RT-DG_EOP_R
OCL_EB2 RT-T_Tie
OCL_EB2 RT-B1_SHLDR_R
OCL_EB2 RT-DG_SHLDR_R
OCL_EB2 RT-T_EOP_R
OCL_EB2 RT-T_EOL1_R
OCL_EB2 RT-T_1OCL_EB2 RT-B1_EOL1_R
OCL_EB2 RT-DG_Tie
OCL_EB2 RT-T_2
OCL_EB2 RT-B1_EOP_R
OCL_EB2 RT-T_3OCL_EB2 RT-T_4OCL_EB2 RT-T_5
OCL_EB2 RT-EX_22_R
OCL_EB2 RT-EX_12_R
OCL_EB2 RT-DG_3
OCL_EB2 RT-T_SHLDR_R
OCL_EB2 RT-B1_EOSB1_ROCL_EB2 RT-B1_EOSP_R
OCL_EB2 RT-DG_4OCL_EB2 RT-DG_5OCL_EB2 RT-DG_EOSB2_R
OCL_EB2 RT-DG_CL_R
approximate
fiber optic line
locationapproximate
water line
crossing
approximate
water line
crossing
approximate
water line
crossing
sta 916+92.35
water gate valve
offset 124.94
elevation 1470.1
offset 106.25
utility anchor
sta 504+79.43
offset 124.71
elevation 1471.18
power pole
(3) utility anchor
elevation 1470
offset 120.6
sta 916+97
sta 916+92
sta 916+84sta 917+31.7
elevation 1471
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility US 2.dgn11:24:56 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 13US 2 Alignment
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150
150
1460 1460
1465 1465
1470 1470
1475 1475
918+00.00
1460 1460
1465 1465
1470 1470
1475 1475
1480 1480
1485 1485
919+00.00
1460 1460
1465 1465
1470 1470
1475 1475
920+00.00
1469.64
1469.44
1468.94
US2_EB_LT_EDGE-B1_EOP_L
US2_EB_LT_EDGE-EX_22_L
US2_EB_LT_EDGE-T_1_L
US2_EB_LT_EDGE-EX_12_L
US2_EB_LT_EDGE-T_2_LUS2_EB_LT_EDGE-T_3_L
US2_EB_LT_EDGE-DG_Tie_L
US2_EB_LT_EDGE-T_SHLDR_L
US2_EB_LT_EDGE-EX_1_L
US2_EB_LT_EDGE-T_4_L
US2_EB_LT_EDGE-B1_EOSP_LUS2_EB_LT_EDGE-B1_EOSB1_L
US2_EB_LT_EDGE-EX_2_L
US2_EB_LT_EDGE-T_5_LUS2_EB_LT_EDGE-DG_EOL1_L
US2_EB_LT_EDGE-T_Tie_L
US2_EB_LT_EDGE-DG_EOSB2_LUS2_EB_LT_EDGE-DG_3_LUS2_EB_LT_EDGE-DG_4_LUS2_EB_LT_EDGE-DG_5_L
US2_EB_LT_EDGE-DG_EOP_L
US2_EB_LT_EDGE-B1_SHLDR_L
US2_EB_LT_EDGE-T_EOL1_L
US2_EB_LT_EDGE-T_EOP_L
US2_EB_LT_EDGE-DG_SHLDR_L
US2_EB_LT_EDGE-B1_EOL1_L
OCL_EB2 RT-DG_EOP_R
OCL_EB2 RT-T_Tie
OCL_EB2 RT-B1_SHLDR_R
OCL_EB2 RT-DG_SHLDR_R
OCL_EB2 RT-T_EOP_R
OCL_EB2 RT-T_EOL1_R
OCL_EB2 RT-T_1OCL_EB2 RT-B1_EOL1_R
OCL_EB2 RT-DG_Tie
OCL_EB2 RT-T_2
OCL_EB2 RT-B1_EOP_R
OCL_EB2 RT-T_3OCL_EB2 RT-T_4OCL_EB2 RT-T_5
OCL_EB2 RT-EX_22_R
OCL_EB2 RT-EX_12_R
OCL_EB2 RT-DG_3
OCL_EB2 RT-T_SHLDR_R
OCL_EB2 RT-EX_1_R
OCL_EB2 RT-B1_EOSB1_ROCL_EB2 RT-B1_EOSP_R
OCL_EB2 RT-DG_4
OCL_EB2 RT-EX_2_R
OCL_EB2 RT-DG_5OCL_EB2 RT-DG_EOSB2_R
OCL_EB2 RT-DG_CL_R
approximate
fiber optic line
location
US2_EB_LT_EDGE-B1_EOP_L
US2_EB_LT_EDGE-EX_22_L
US2_EB_LT_EDGE-T_1_L
US2_EB_LT_EDGE-EX_12_L
US2_EB_LT_EDGE-T_2_LUS2_EB_LT_EDGE-T_3_L
US2_EB_LT_EDGE-DG_Tie_L
US2_EB_LT_EDGE-T_SHLDR_L
US2_EB_LT_EDGE-EX_1_L
US2_EB_LT_EDGE-T_4_L
US2_EB_LT_EDGE-B1_EOSP_LUS2_EB_LT_EDGE-B1_EOSB1_L
US2_EB_LT_EDGE-EX_2_L
US2_EB_LT_EDGE-T_5_LUS2_EB_LT_EDGE-DG_EOL1_L
US2_EB_LT_EDGE-T_Tie_L
US2_EB_LT_EDGE-DG_EOSB2_LUS2_EB_LT_EDGE-DG_3_LUS2_EB_LT_EDGE-DG_4_LUS2_EB_LT_EDGE-DG_5_L
US2_EB_LT_EDGE-DG_EOP_L
US2_EB_LT_EDGE-B1_SHLDR_L
US2_EB_LT_EDGE-T_EOL1_L
US2_EB_LT_EDGE-T_EOP_L
US2_EB_LT_EDGE-DG_SHLDR_L
US2_EB_LT_EDGE-B1_EOL1_L
OCL_EB2 RT-DG_EOP_R
OCL_EB2 RT-T_Tie
OCL_EB2 RT-B1_SHLDR_R
OCL_EB2 RT-DG_SHLDR_R
OCL_EB2 RT-T_EOP_R
OCL_EB2 RT-T_EOL1_R
OCL_EB2 RT-T_1OCL_EB2 RT-B1_EOL1_R
OCL_EB2 RT-DG_Tie
OCL_EB2 RT-T_2
OCL_EB2 RT-B1_EOP_R
OCL_EB2 RT-T_3OCL_EB2 RT-T_4OCL_EB2 RT-T_5
OCL_EB2 RT-EX_22_R
OCL_EB2 RT-EX_12_R
OCL_EB2 RT-DG_3
OCL_EB2 RT-T_SHLDR_R
OCL_EB2 RT-EX_1_R
OCL_EB2 RT-B1_EOSB1_ROCL_EB2 RT-B1_EOSP_R
OCL_EB2 RT-DG_4
OCL_EB2 RT-EX_2_R
OCL_EB2 RT-DG_5OCL_EB2 RT-DG_EOSB2_R
OCL_EB2 RT-DG_CL_R
approximate
fiber optic line
locationsta 919+42.68
offset 120.88
elevation 1468.06
power pole
US2_EB_LT_EDGE-B1_EOP_L
US2_EB_LT_EDGE-EX_22_L
US2_EB_LT_EDGE-T_1_L
US2_EB_LT_EDGE-EX_12_L
US2_EB_LT_EDGE-T_2_LUS2_EB_LT_EDGE-T_3_L
US2_EB_LT_EDGE-DG_Tie_L
US2_EB_LT_EDGE-T_SHLDR_L
US2_EB_LT_EDGE-EX_1_L
US2_EB_LT_EDGE-T_4_L
US2_EB_LT_EDGE-B1_EOSP_LUS2_EB_LT_EDGE-B1_EOSB1_L
US2_EB_LT_EDGE-EX_2_L
US2_EB_LT_EDGE-T_5_L
US2_EB_LT_EDGE-DG_EOL1_L
US2_EB_LT_EDGE-T_Tie_L
US2_EB_LT_EDGE-DG_EOSB2_LUS2_EB_LT_EDGE-DG_3_LUS2_EB_LT_EDGE-DG_4_LUS2_EB_LT_EDGE-DG_5_L
US2_EB_LT_EDGE-DG_EOP_L
US2_EB_LT_EDGE-B1_SHLDR_L
US2_EB_LT_EDGE-T_EOL1_L
US2_EB_LT_EDGE-T_EOP_L
US2_EB_LT_EDGE-DG_SHLDR_L
US2_EB_LT_EDGE-B1_EOL1_L
OCL_EB2 RT-DG_EOP_R
OCL_EB2 RT-T_Tie
OCL_EB2 RT-B1_SHLDR_R
OCL_EB2 RT-DG_SHLDR_R
OCL_EB2 RT-T_EOP_R
OCL_EB2 RT-T_EOL1_R
OCL_EB2 RT-T_1OCL_EB2 RT-B1_EOL1_R
OCL_EB2 RT-DG_Tie
OCL_EB2 RT-T_2
OCL_EB2 RT-B1_EOP_R
OCL_EB2 RT-T_3OCL_EB2 RT-T_4OCL_EB2 RT-T_5
OCL_EB2 RT-EX_22_R
OCL_EB2 RT-EX_12_R
OCL_EB2 RT-DG_3
OCL_EB2 RT-T_SHLDR_R
OCL_EB2 RT-EX_1_R
OCL_EB2 RT-B1_EOSB1_ROCL_EB2 RT-B1_EOSP_R
OCL_EB2 RT-DG_4
OCL_EB2 RT-EX_2_R
OCL_EB2 RT-DG_5OCL_EB2 RT-DG_EOSB2_R
OCL_EB2 RT-DG_CL_R
approximate
fiber optic line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility US 2.dgn11:24:57 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 14US 2 Alignment
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150
150
1460 1460
1465 1465
1470 1470
1475 1475
921+00.00
1460 1460
1465 1465
1470 1470
1475 1475
921+50.00
1460 1460
1465 1465
1470 1470
1475 1475
1480 1480
1485 1485
922+00.00
1468.22
1468.27
1468.06
SCL_US2-DG_Tie_L
SCL_US2-T_Tie_L
US2_EB_LT_EDGE-B1_EOP_L
US2_EB_LT_EDGE-EX_22_L
US2_EB_LT_EDGE-T_1_L
US2_EB_LT_EDGE-EX_12_L
US2_EB_LT_EDGE-T_2_LUS2_EB_LT_EDGE-T_3_L
US2_EB_LT_EDGE-DG_Tie_L
US2_EB_LT_EDGE-T_SHLDR_L
US2_EB_LT_EDGE-EX_1_L
US2_EB_LT_EDGE-T_4_L
US2_EB_LT_EDGE-B1_EOSP_LUS2_EB_LT_EDGE-B1_EOSB1_L
US2_EB_LT_EDGE-EX_2_L
US2_EB_LT_EDGE-T_5_L
US2_EB_LT_EDGE-DG_EOL1_L
US2_EB_LT_EDGE-T_Tie_L
US2_EB_LT_EDGE-DG_EOSB2_LUS2_EB_LT_EDGE-DG_3_LUS2_EB_LT_EDGE-DG_4_LUS2_EB_LT_EDGE-DG_5_L
US2_EB_LT_EDGE-DG_EOP_L
US2_EB_LT_EDGE-B1_SHLDR_L
US2_EB_LT_EDGE-T_EOL1_L
US2_EB_LT_EDGE-T_EOP_L
US2_EB_LT_EDGE-DG_SHLDR_L
US2_EB_LT_EDGE-B1_EOL1_L
OCL_EB2 RT-DG_EOP_R
OCL_EB2 RT-T_Tie
OCL_EB2 RT-B1_SHLDR_R
OCL_EB2 RT-DG_SHLDR_R
OCL_EB2 RT-T_EOP_R
OCL_EB2 RT-T_EOL1_R
OCL_EB2 RT-T_1OCL_EB2 RT-B1_EOL1_R
OCL_EB2 RT-DG_Tie
OCL_EB2 RT-T_2
OCL_EB2 RT-B1_EOP_R
OCL_EB2 RT-T_3OCL_EB2 RT-T_4OCL_EB2 RT-T_5
OCL_EB2 RT-EX_22_R
OCL_EB2 RT-EX_12_R
OCL_EB2 RT-DG_3
OCL_EB2 RT-T_SHLDR_R
OCL_EB2 RT-EX_1_ROCL_EB2 RT-B1_EOSB1_ROCL_EB2 RT-B1_EOSP_R
OCL_EB2 RT-DG_4
OCL_EB2 RT-EX_2_R
OCL_EB2 RT-DG_5OCL_EB2 RT-DG_EOSB2_R
OCL_EB2 RT-DG_CL_R
OCL_WB2 RT-B1_EOP_L
OCL_WB2 RT-EX_22_L
OCL_WB2 RT-T_1_L
OCL_WB2 RT-EX_12_L
OCL_WB2 RT-T_2_LOCL_WB2 RT-T_3_L
OCL_WB2 RT-DG_Tie_L
OCL_WB2 RT-T_SHLDR_L
OCL_WB2 RT-T_4_L
OCL_WB2 RT-EX_1_L
OCL_WB2 RT-DG_EOL1_L
OCL_WB2 RT-EX_2_L
OCL_WB2 RT-T_5_L
OCL_WB2 RT-B1_EOSB11_L
OCL_WB2 RT-T_Tie_L
OCL_WB2 RT-B1_EOSP1_L
OCL_WB2 RT-DG_3_LOCL_WB2 RT-DG_4_LOCL_WB2 RT-DG_5_LOCL_WB2 RT-DG_2_Cut-1_L
OCL_WB2 RT-DG_EOP_L
OCL_WB2 RT-B1_SHLDR_L
OCL_WB2 RT-T_EOL1_LOCL_WB2 RT-T_EOP_L
OCL_WB2 RT-DG_SHLDR_L
OCL_WB2 RT-B1_EOL1_L
Label-Wetland-Exst2_L
DNC-Wetland-Exst52_L
approximate
fiber optic line
location
SCL_US2-DG_Tie_L
SCL_US2-T_Tie_L
US2_EB_LT_EDGE-B1_EOP_L
US2_EB_LT_EDGE-EX_22_L
US2_EB_LT_EDGE-T_1_L
US2_EB_LT_EDGE-EX_12_L
US2_EB_LT_EDGE-T_2_LUS2_EB_LT_EDGE-T_3_L
US2_EB_LT_EDGE-DG_Tie_L
US2_EB_LT_EDGE-T_SHLDR_L
US2_EB_LT_EDGE-EX_1_L
US2_EB_LT_EDGE-T_4_L
US2_EB_LT_EDGE-B1_EOSP_LUS2_EB_LT_EDGE-B1_EOSB1_L
US2_EB_LT_EDGE-EX_2_L
US2_EB_LT_EDGE-T_5_L
US2_EB_LT_EDGE-DG_EOL1_L
US2_EB_LT_EDGE-T_Tie_L
US2_EB_LT_EDGE-DG_EOSB2_LUS2_EB_LT_EDGE-DG_3_LUS2_EB_LT_EDGE-DG_4_LUS2_EB_LT_EDGE-DG_5_L
US2_EB_LT_EDGE-DG_EOP_L
US2_EB_LT_EDGE-B1_SHLDR_L
US2_EB_LT_EDGE-T_EOL1_L
US2_EB_LT_EDGE-T_EOP_L
US2_EB_LT_EDGE-DG_SHLDR_L
US2_EB_LT_EDGE-B1_EOL1_L
OCL_EB2 RT-DG_EOP_R
OCL_EB2 RT-T_Tie
OCL_EB2 RT-B1_SHLDR_R
OCL_EB2 RT-DG_SHLDR_R
OCL_EB2 RT-T_EOP_R
OCL_EB2 RT-T_EOL1_R
OCL_EB2 RT-T_1OCL_EB2 RT-B1_EOL1_R
OCL_EB2 RT-DG_Tie
OCL_EB2 RT-T_2
OCL_EB2 RT-B1_EOP_R
OCL_EB2 RT-T_3OCL_EB2 RT-T_4OCL_EB2 RT-T_5
OCL_EB2 RT-EX_22_R
OCL_EB2 RT-EX_12_R
OCL_EB2 RT-DG_3
OCL_EB2 RT-T_SHLDR_R
OCL_EB2 RT-EX_1_ROCL_EB2 RT-B1_EOSB1_ROCL_EB2 RT-B1_EOSP_R
OCL_EB2 RT-DG_4
OCL_EB2 RT-EX_2_R
OCL_EB2 RT-DG_5OCL_EB2 RT-DG_EOSB2_R
OCL_EB2 RT-DG_CL_R
OCL_WB2 RT-B1_EOP_L
OCL_WB2 RT-EX_22_L
OCL_WB2 RT-T_1_L
OCL_WB2 RT-EX_12_L
OCL_WB2 RT-T_2_LOCL_WB2 RT-T_3_L
OCL_WB2 RT-DG_Tie_L
OCL_WB2 RT-T_SHLDR_L
OCL_WB2 RT-T_4_L
OCL_WB2 RT-EX_1_L
OCL_WB2 RT-DG_EOL1_L
OCL_WB2 RT-EX_2_L
OCL_WB2 RT-T_5_L
OCL_WB2 RT-B1_EOSB11_L
OCL_WB2 RT-T_Tie_L
OCL_WB2 RT-B1_EOSP1_L
OCL_WB2 RT-DG_3_LOCL_WB2 RT-DG_4_LOCL_WB2 RT-DG_5_LOCL_WB2 RT-DG_2_Cut-1_L
OCL_WB2 RT-DG_EOP_L
OCL_WB2 RT-B1_SHLDR_L
OCL_WB2 RT-T_EOL1_L
OCL_WB2 RT-T_EOP_L
OCL_WB2 RT-DG_SHLDR_L
OCL_WB2 RT-B1_EOL1_L
Label-Wetland-Exst2_L
DNC-Wetland-Exst52_L
approximate
fiber optic line
location
approximate
gas line
location
SCL_US2-DG_Tie_L
SCL_US2-T_Tie_L
US2_EB_LT_EDGE-B1_EOP_L
US2_EB_LT_EDGE-EX_22_L
US2_EB_LT_EDGE-T_1_L
US2_EB_LT_EDGE-EX_12_L
US2_EB_LT_EDGE-T_2_LUS2_EB_LT_EDGE-T_3_L
US2_EB_LT_EDGE-DG_Tie_L
US2_EB_LT_EDGE-T_SHLDR_L
US2_EB_LT_EDGE-EX_1_L
US2_EB_LT_EDGE-T_4_L
US2_EB_LT_EDGE-B1_EOSP_LUS2_EB_LT_EDGE-B1_EOSB1_L
US2_EB_LT_EDGE-EX_2_L
US2_EB_LT_EDGE-T_5_L
US2_EB_LT_EDGE-DG_EOL1_L
US2_EB_LT_EDGE-T_Tie_L
US2_EB_LT_EDGE-DG_EOSB2_LUS2_EB_LT_EDGE-DG_3_LUS2_EB_LT_EDGE-DG_4_LUS2_EB_LT_EDGE-DG_5_L
US2_EB_LT_EDGE-DG_EOP_L
US2_EB_LT_EDGE-B1_SHLDR_L
US2_EB_LT_EDGE-T_EOL1_L
US2_EB_LT_EDGE-T_EOP_L
US2_EB_LT_EDGE-DG_SHLDR_L
US2_EB_LT_EDGE-B1_EOL1_L
OCL_EB2 RT-DG_EOP_R
OCL_EB2 RT-T_Tie
OCL_EB2 RT-B1_SHLDR_R
OCL_EB2 RT-DG_SHLDR_R
OCL_EB2 RT-T_EOP_R
OCL_EB2 RT-T_EOL1_R
OCL_EB2 RT-T_1OCL_EB2 RT-B1_EOL1_R
OCL_EB2 RT-DG_Tie
OCL_EB2 RT-T_2
OCL_EB2 RT-B1_EOP_R
OCL_EB2 RT-T_3OCL_EB2 RT-T_4OCL_EB2 RT-T_5
OCL_EB2 RT-EX_22_R
OCL_EB2 RT-EX_12_R
OCL_EB2 RT-DG_3
OCL_EB2 RT-T_SHLDR_R
OCL_EB2 RT-EX_1_R
OCL_EB2 RT-B1_EOSB1_ROCL_EB2 RT-B1_EOSP_R
OCL_EB2 RT-DG_4
OCL_EB2 RT-EX_2_R
OCL_EB2 RT-DG_5OCL_EB2 RT-DG_EOSB2_R
OCL_EB2 RT-DG_CL_R
OCL_WB2 RT-B1_EOP_L
OCL_WB2 RT-EX_22_L
OCL_WB2 RT-T_1_L
OCL_WB2 RT-EX_12_L
OCL_WB2 RT-T_2_LOCL_WB2 RT-T_3_L
OCL_WB2 RT-DG_Tie_L
OCL_WB2 RT-T_SHLDR_L
OCL_WB2 RT-T_4_L
OCL_WB2 RT-EX_1_L
OCL_WB2 RT-DG_EOL1_L
OCL_WB2 RT-EX_2_L
OCL_WB2 RT-T_5_L
OCL_WB2 RT-B1_EOSB11_L
OCL_WB2 RT-T_Tie_L
OCL_WB2 RT-B1_EOSP1_L
OCL_WB2 RT-DG_3_LOCL_WB2 RT-DG_4_LOCL_WB2 RT-DG_5_LOCL_WB2 RT-DG_2_Cut-1_L
OCL_WB2 RT-DG_EOP_L
OCL_WB2 RT-B1_SHLDR_L
OCL_WB2 RT-T_EOL1_L
OCL_WB2 RT-T_EOP_L
OCL_WB2 RT-DG_SHLDR_L
OCL_WB2 RT-B1_EOL1_L
Label-Wetland-Exst2_L
DNC-Wetland-Exst52_L
DNC-Wetland-Exst5_R
Label-Wetland-Exst_R
approximate
fiber optic line
location
approximate
gas line
location
sta 922+27.28
power pole
offset 120.7
elevation 1467.2
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility US 2.dgn11:24:58 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 15US 2 Alignment
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150
150
1460 1460
1465 1465
1470 1470
1475 1475
922+50.00
1460 1460
1465 1465
1470 1470
1475 1475
923+50.00
1450 1450
1455 1455
1460 1460
1465 1465
1470 1470
1475 1475
1480 1480
1485 1485
924+00.00
1467.55
1467.29
1467.24
SCL_US2-DG_Tie_L
SCL_US2-T_Tie_L
US2_EB_LT_EDGE-B1_EOP_L
US2_EB_LT_EDGE-EX_22_L
US2_EB_LT_EDGE-T_1_L
US2_EB_LT_EDGE-EX_12_L
US2_EB_LT_EDGE-T_2_LUS2_EB_LT_EDGE-T_3_L
US2_EB_LT_EDGE-DG_Tie_L
US2_EB_LT_EDGE-T_SHLDR_L
US2_EB_LT_EDGE-EX_1_L
US2_EB_LT_EDGE-T_4_L
US2_EB_LT_EDGE-B1_EOSP_LUS2_EB_LT_EDGE-B1_EOSB1_L
US2_EB_LT_EDGE-EX_2_L
US2_EB_LT_EDGE-T_5_L
US2_EB_LT_EDGE-DG_EOL1_L
US2_EB_LT_EDGE-T_Tie_L
US2_EB_LT_EDGE-DG_EOSB2_LUS2_EB_LT_EDGE-DG_3_LUS2_EB_LT_EDGE-DG_4_LUS2_EB_LT_EDGE-DG_5_L
US2_EB_LT_EDGE-DG_EOP_L
US2_EB_LT_EDGE-B1_SHLDR_L
US2_EB_LT_EDGE-T_EOL1_L
US2_EB_LT_EDGE-T_EOP_L
US2_EB_LT_EDGE-DG_SHLDR_L
US2_EB_LT_EDGE-B1_EOL1_L
OCL_EB2 RT-DG_EOP_R
OCL_EB2 RT-T_Tie
OCL_EB2 RT-B1_SHLDR_R
OCL_EB2 RT-DG_SHLDR_R
OCL_EB2 RT-T_EOP_R
OCL_EB2 RT-T_EOL1_R
OCL_EB2 RT-T_1OCL_EB2 RT-B1_EOL1_R
OCL_EB2 RT-DG_Tie
OCL_EB2 RT-T_2
OCL_EB2 RT-B1_EOP_R
OCL_EB2 RT-T_3OCL_EB2 RT-T_4OCL_EB2 RT-T_5
OCL_EB2 RT-EX_22_R
OCL_EB2 RT-EX_12_R
OCL_EB2 RT-DG_3
OCL_EB2 RT-T_SHLDR_R
OCL_EB2 RT-EX_1_R
OCL_EB2 RT-B1_EOSB1_ROCL_EB2 RT-B1_EOSP_R
OCL_EB2 RT-DG_4
OCL_EB2 RT-EX_2_R
OCL_EB2 RT-DG_5OCL_EB2 RT-DG_EOSB2_R
OCL_EB2 RT-DG_CL_R
NW79-T_1_L
NW79-B1_CL_R
NW79-T_2_LNW79-T_3_L
NW79-DG_Tie_L
NW79-T_4_L
NW79-B1_EOSP_LNW79-B1_EOSB1_L
NW79-EX_1_L
NW79-EX_2_L
NW79-T_5_L
NW79-T_CL_R
NW79-T_Tie_L
NW79-T_EOP
NW79-DG_EOSB2_LNW79-DG_3_LNW79-DG_4_L
NW79-B1_EOP
NW79-DG_5_L NW79-DG_EOP NW79-DG_CL_R
OCL_WB2 RT-B1_EOP_L
OCL_WB2 RT-EX_22_L
OCL_WB2 RT-EX_12_L
OCL_WB2 RT-T_SHLDR_L
OCL_WB2 RT-DG_EOL1_L
OCL_WB2 RT-DG_EOP_L
OCL_WB2 RT-B1_SHLDR_L
OCL_WB2 RT-T_EOL1_L
OCL_WB2 RT-T_EOP_L
OCL_WB2 RT-DG_SHLDR_L
OCL_WB2 RT-B1_EOL1_L
Label-Wetland-Exst2_L
DNC-Wetland-Exst52_L
DNC-Wetland-Exst5_R
Label-Wetland-Exst_R
fiber optic line
approximate
fiber optic line
location
approximate
gas line
location
OCL_WB2 LT-T_EOL1_R
OCL_WB2 LT-B1_EOL1_R
OCL_WB2 LT-EX_22_R
OCL_WB2 LT-EX_12_R
OCL_WB2 LT-DG_EOL1_R
US2_EB_LT_EDGE-EX_22_L
US2_EB_LT_EDGE-EX_12_L
US2_EB_LT_EDGE-DG_EOL1_L
US2_EB_LT_EDGE-T_EOL1_L
US2_EB_LT_EDGE-B1_EOL1_LNW_Median-B1_CL_R
NW_Median-B1_CL_R
NW_Median-T_CL_R
NW_Median-T_CL_R
NW_Median-DG_CL_R
NW_Median-DG_CL_R
SW79-T_CL_L
SW79-T_1_RSW79-T_EOP
SW79-T_2_R
SW79-B1_EOP
SW79-DG_Tie_R
SW79-T_3_RSW79-DG_CL_L
SW79-EX_1_R
SW79-B1_EOSB1_RSW79-B1_EOSP_R
SW79-T_4_R
SW79-EX_2_R
SW79-DG_EOP
SW79-T_5_R
SW79-T_Tie_R
SW79-DG_EOSB2_R
SW79-B1_CL_L
SW79-DG_3_RSW79-DG_4_RSW79-DG_5_R
OCL_EB2 RT-DG_EOP_R
OCL_EB2 RT-B1_SHLDR_R
OCL_EB2 RT-DG_SHLDR_R
OCL_EB2 RT-T_EOP_R
OCL_EB2 RT-T_EOL1_R
OCL_EB2 RT-B1_EOL1_R
OCL_EB2 RT-B1_EOP_R
OCL_EB2 RT-EX_22_R
OCL_EB2 RT-EX_12_R
OCL_EB2 RT-T_SHLDR_R
OCL_EB2 RT-EX_2_R
OCL_EB2 RT-DG_CL_R
NE79-DG_CL_R
OCL_WB2 RT-B1_EOP_L
OCL_WB2 RT-EX_22_L
OCL_WB2 RT-EX_12_L
OCL_WB2 RT-DG_EOL1_L
OCL_WB2 RT-DG_EOP_L
OCL_WB2 RT-T_EOL1_L
OCL_WB2 RT-T_EOP_LOCL_WB2 RT-B1_EOL1_L
NE79-B1_CL_R
NE79-T_CL_R
approximate
fiber optic line
location
approximate
fiber optic line
location
approximate
gas line
location
OCL_WB2 LT-T_EOL1_R
OCL_WB2 LT-B1_EOL1_R
OCL_WB2 LT-EX_22_R
OCL_WB2 LT-EX_12_R
OCL_WB2 LT-DG_EOL1_R
SE_Median-B1_CL_R
SE_Median-B1_CL_R
SE_Median-T_CL_R
SE_Median-T_CL_R
SE_Median-DG_CL_R
SE_Median-DG_CL_R
SW79-T_CL_L
SW79-DG_CL_L
SW79-B1_CL_L
OCL_EB2 RT-DG_EOP_R
OCL_EB2 RT-T_EOP_R
OCL_EB2 RT-T_EOL1_R
OCL_EB2 RT-B1_EOL1_R
OCL_EB2 RT-B1_EOP_R
OCL_EB2 RT-EX_22_R
OCL_EB2 RT-EX_12_R
OCL_EB2 RT-EX_2_R
OCL_EB2 RT-DG_CL_R
OCL_79 S-B1_EOP_L
OCL_79 S-T_1_LOCL_79 S-T_SHLDR_L
OCL_79 S-B1_EOSP_L OCL_79 S-B1_EOSB1_L
OCL_79 S-DG_EOP_L
OCL_79 S-B1_SHLDR_L
OCL_79 S-T_EOP_L
OCL_79 S-DG_SHLDR_L
NE79-DG_EOP
NE79-DG_Ditch2_L
NE79-DG_CL_R
OCL_WB2 RT-B1_EOP_L
OCL_WB2 RT-EX_21_L
OCL_WB2 RT-EX_11_L
OCL_WB2 RT-DG_EOL1_LOCL_WB2 RT-DG_EOP_L
OCL_WB2 RT-T_EOL1_LOCL_WB2 RT-T_EOP_L
OCL_WB2 RT-B1_EOL1_L
NE79-T_1_L NE79-B1_CL_R
NE79-DG_TIE_L
NE79-B1_EOSP_LNE79-B1_EOSB1_LNE79-EX_1_L
NE79-EX_2_L
NE79-T_CL_R
NE79-T_TIE_L
NE79-T_EOP
NE79-DG_EOSB2_L
NE79-B1_EOP
NE79-T_Ditch2_L
approximate
fiber optic line
approximate
fiber optic line
locationapproximate
fiber optic line
location
approximate
gas line
location
sta 507+67.32
offset 33.56
elevation 1468.09
utility anchor
sta 507+66.69
offset 36.35
elevation 1468.11
utility anchor
sta 507+64.86
offset 38.03
elevation 1467.71
utility anchor
sta 924+51.80
elevation 1467.52
power pole
offset 119.02
elevation 1467.71
(3) utility anchor
offset 105
sta 924+56.8
sta 924+51.7
sta 924+54.6
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility US 2.dgn11:24:59 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 16US 2 Alignment
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150
150
1460 1460
1465 1465
1470 1470
1475 1475
925+00.00
1465 1465
1470 1470
1475 1475
925+50.00
1470 1470
1475 1475
926+00.00
1455 1455
1460 1460
1465 1465
1470 1470
1475 1475
926+50.00
1469.90
1466.69
1466.34
1466.09
SCL_US2-DG_Tie_R
SCL_US2-T_Tie_R
OCL_WB2 LT-DG_EOP_R
OCL_WB2 LT-B1_SHLDR_R
OCL_WB2 LT-DG_SHLDR_R
OCL_WB2 LT-T_EOP_R
OCL_WB2 LT-T_EOL1_R
OCL_WB2 LT-B1_EOL1_R
OCL_WB2 LT-B1_EOP_R
OCL_WB2 LT-T_1_R
OCL_WB2 LT-EX_22_R
OCL_WB2 LT-T_2_R
OCL_WB2 LT-EX_12_R
OCL_WB2 LT-DG_Tie_R
OCL_WB2 LT-T_3_R
OCL_WB2 LT-T_SHLDR_R
OCL_WB2 LT-EX_1_R
OCL_WB2 LT-B1_EOSB1_ROCL_WB2 LT-B1_EOSP_R
OCL_WB2 LT-T_4_R
OCL_WB2 LT-EX_2_R
OCL_WB2 LT-DG_EOL1_R
OCL_WB2 LT-T_5_ROCL_WB2 LT-T_Tie_R
OCL_WB2 LT-DG_EOSB2_R
OCL_WB2 LT-DG_3_ROCL_WB2 LT-DG_4_ROCL_WB2 LT-DG_5_R
SE79-T_1_L
SE79-B1_CL_R
SE79-T_2_LSE79-T_3_L
SE79-DG_Tie_L
SE79-T_4_L
SE79-B1_EOSP_LSE79-B1_EOSB1_L
SE79-EX_1_L
SE79-EX_2_L
SE79-T_5_L
SE79-T_CL_R
SE79-T_Tie_L
SE79-T_EOP
SE79-DG_EOSB2_LSE79-DG_3_LSE79-DG_4_L
SE79-B1_EOP
SE79-DG_5_LSE79-DG_EOP
SE79-DG_CL_ROCL_EB2 RT-DG_EOP_R
OCL_EB2 RT-T_EOP_R
OCL_EB2 RT-T_EOL1_R
OCL_EB2 RT-B1_EOL1_R
OCL_EB2 RT-B1_EOP_R
OCL_EB2 RT-EX_22_R
OCL_EB2 RT-EX_12_R
OCL_EB2 RT-EX_2_R
OCL_EB2 RT-DG_CL_R
OCL_WB2 RT-B1_EOP_L
OCL_WB2 RT-EX_22_L
OCL_WB2 RT-T_1_L
OCL_WB2 RT-EX_12_L
OCL_WB2 RT-T_2_LOCL_WB2 RT-T_3_L
OCL_WB2 RT-DG_Tie_L
OCL_WB2 RT-T_SHLDR_L
OCL_WB2 RT-T_4_L
OCL_WB2 RT-EX_1_L
OCL_WB2 RT-DG_EOL1_L
OCL_WB2 RT-EX_2_L
OCL_WB2 RT-T_5_L
OCL_WB2 RT-B1_EOSB11_L
OCL_WB2 RT-T_Tie_L
OCL_WB2 RT-B1_EOSP1_L
OCL_WB2 RT-DG_3_LOCL_WB2 RT-DG_4_LOCL_WB2 RT-DG_5_LOCL_WB2 RT-DG_2_Cut-1_L
OCL_WB2 RT-DG_EOP_L
OCL_WB2 RT-B1_SHLDR_L
OCL_WB2 RT-T_EOL1_LOCL_WB2 RT-T_EOP_L
OCL_WB2 RT-DG_SHLDR_L
OCL_WB2 RT-B1_EOL1_L
Label-Wetland-Exst2_L
DNC-Wetland-Exst52_L
approximate
electric line
locationapproximate
fiber optic line
approximate
fiber optic line
locationapproximate
fiber optic line
location
approximate
fiber optic line
location
OCL_WB2 LT-DG_EOP_R
OCL_WB2 LT-B1_SHLDR_R
OCL_WB2 LT-DG_SHLDR_R
OCL_WB2 LT-T_EOP_R
OCL_WB2 LT-T_EOL1_R
OCL_WB2 LT-B1_EOL1_R
OCL_WB2 LT-B1_EOP_R
OCL_WB2 LT-T_1_R
OCL_WB2 LT-EX_22_R
OCL_WB2 LT-T_2_R
OCL_WB2 LT-EX_12_R
OCL_WB2 LT-DG_Tie_R
OCL_WB2 LT-T_3_R
OCL_WB2 LT-T_SHLDR_R
OCL_WB2 LT-EX_1_R
OCL_WB2 LT-B1_EOSB1_ROCL_WB2 LT-B1_EOSP_R
OCL_WB2 LT-T_4_R
OCL_WB2 LT-EX_2_R
OCL_WB2 LT-DG_EOL1_R
OCL_WB2 LT-T_5_R
OCL_WB2 LT-T_Tie_R
OCL_WB2 LT-DG_EOSB2_ROCL_WB2 LT-DG_3_ROCL_WB2 LT-DG_4_ROCL_WB2 LT-DG_5_R
OCL_WB2 RT-B1_EOP_L
OCL_WB2 RT-EX_22_L
OCL_WB2 RT-T_1_L
OCL_WB2 RT-EX_12_L
OCL_WB2 RT-T_2_LOCL_WB2 RT-T_3_L
OCL_WB2 RT-DG_Tie_L
OCL_WB2 RT-T_SHLDR_L
OCL_WB2 RT-T_4_L
OCL_WB2 RT-EX_1_L
OCL_WB2 RT-DG_EOL1_L
OCL_WB2 RT-EX_2_L
OCL_WB2 RT-T_5_L
OCL_WB2 RT-B1_EOSB11_L
OCL_WB2 RT-T_Tie_L
OCL_WB2 RT-B1_EOSP1_L
OCL_WB2 RT-DG_3_LOCL_WB2 RT-DG_4_LOCL_WB2 RT-DG_5_LOCL_WB2 RT-DG_2_Cut-1_L
OCL_WB2 RT-DG_EOP_L
OCL_WB2 RT-B1_SHLDR_L
OCL_WB2 RT-T_EOL1_LOCL_WB2 RT-T_EOP_L
OCL_WB2 RT-DG_SHLDR_L
OCL_WB2 RT-B1_EOL1_L
Label-Wetland-Exst2_L
DNC-Wetland-Exst52_L
approximate
approximate
fiber optic line
location
OCL_WB2 LT-DG_EOP_R
OCL_WB2 LT-B1_SHLDR_R
OCL_WB2 LT-DG_SHLDR_R
OCL_WB2 LT-T_EOP_R
OCL_WB2 LT-T_EOL1_R
OCL_WB2 LT-B1_EOL1_R
OCL_WB2 LT-B1_EOP_R
OCL_WB2 LT-T_1_R
OCL_WB2 LT-EX_22_R
OCL_WB2 LT-T_2_R
OCL_WB2 LT-EX_12_R
OCL_WB2 LT-DG_Tie_R
OCL_WB2 LT-T_3_R
OCL_WB2 LT-T_SHLDR_R
OCL_WB2 LT-EX_1_R
OCL_WB2 LT-B1_EOSB1_ROCL_WB2 LT-B1_EOSP_R
OCL_WB2 LT-T_4_R
OCL_WB2 LT-EX_2_R
OCL_WB2 LT-DG_EOL1_R
OCL_WB2 LT-T_5_R
OCL_WB2 LT-T_Tie_R
OCL_WB2 LT-DG_EOSB2_ROCL_WB2 LT-DG_3_ROCL_WB2 LT-DG_4_ROCL_WB2 LT-DG_5_ROCL_EB2 RT-DG_EOP_R
OCL_EB2 RT-T_Tie
OCL_EB2 RT-B1_SHLDR_R
OCL_EB2 RT-DG_SHLDR_R
OCL_EB2 RT-T_EOP_ROCL_EB2 RT-T_EOL1_R
OCL_EB2 RT-T_1
OCL_EB2 RT-B1_EOL1_R
OCL_EB2 RT-DG_Tie
OCL_EB2 RT-T_2
OCL_EB2 RT-B1_EOP_R
OCL_EB2 RT-T_3OCL_EB2 RT-T_4OCL_EB2 RT-T_5
OCL_EB2 RT-EX_22_R
OCL_EB2 RT-EX_12_R
OCL_EB2 RT-DG_3
OCL_EB2 RT-T_SHLDR_R
OCL_EB2 RT-B1_EOSB1_ROCL_EB2 RT-B1_EOSP_R
OCL_EB2 RT-DG_4
OCL_EB2 RT-EX_2_R
OCL_EB2 RT-DG_5OCL_EB2 RT-DG_EOSB2_R
OCL_EB2 RT-DG_CL_R
OCL_WB2 RT-B1_EOP_L
OCL_WB2 RT-EX_22_L
OCL_WB2 RT-T_1_L
OCL_WB2 RT-EX_12_L
OCL_WB2 RT-T_2_LOCL_WB2 RT-T_3_L
OCL_WB2 RT-DG_Tie_L
OCL_WB2 RT-T_SHLDR_L
OCL_WB2 RT-T_4_L
OCL_WB2 RT-EX_1_L
OCL_WB2 RT-DG_EOL1_L
OCL_WB2 RT-T_5_L
OCL_WB2 RT-B1_EOSB11_L
OCL_WB2 RT-T_Tie_L
OCL_WB2 RT-B1_EOSP1_L
OCL_WB2 RT-DG_3_LOCL_WB2 RT-DG_4_LOCL_WB2 RT-DG_5_LOCL_WB2 RT-DG_2_Cut-1_L
OCL_WB2 RT-DG_EOP_L
OCL_WB2 RT-B1_SHLDR_L
OCL_WB2 RT-T_EOL1_LOCL_WB2 RT-T_EOP_L
OCL_WB2 RT-DG_SHLDR_L
OCL_WB2 RT-B1_EOL1_L
Label-Wetland-Exst2_L
DNC-Wetland-Exst52_L
OCL_WB2 LT-DG_EOP_R
OCL_WB2 LT-B1_SHLDR_R
OCL_WB2 LT-DG_SHLDR_R
OCL_WB2 LT-T_EOP_R
OCL_WB2 LT-T_EOL1_R
OCL_WB2 LT-B1_EOL1_R
OCL_WB2 LT-B1_EOP_R
OCL_WB2 LT-T_1_R
OCL_WB2 LT-EX_22_R
OCL_WB2 LT-T_2_R
OCL_WB2 LT-EX_12_R
OCL_WB2 LT-DG_Tie_R
OCL_WB2 LT-T_3_R
OCL_WB2 LT-T_SHLDR_R
OCL_WB2 LT-EX_1_R
OCL_WB2 LT-B1_EOSB1_ROCL_WB2 LT-B1_EOSP_R
OCL_WB2 LT-T_4_R
OCL_WB2 LT-EX_2_R
OCL_WB2 LT-DG_EOL1_R
OCL_WB2 LT-T_5_R
OCL_WB2 LT-T_Tie_R
OCL_WB2 LT-DG_EOSB2_ROCL_WB2 LT-DG_3_ROCL_WB2 LT-DG_4_ROCL_WB2 LT-DG_5_ROCL_EB2 RT-DG_EOP_R
OCL_EB2 RT-T_Tie
OCL_EB2 RT-B1_SHLDR_R
OCL_EB2 RT-DG_SHLDR_R
OCL_EB2 RT-T_EOP_ROCL_EB2 RT-T_EOL1_R
OCL_EB2 RT-T_1
OCL_EB2 RT-B1_EOL1_R
OCL_EB2 RT-DG_Tie
OCL_EB2 RT-T_2
OCL_EB2 RT-B1_EOP_R
OCL_EB2 RT-T_3OCL_EB2 RT-T_4OCL_EB2 RT-T_5
OCL_EB2 RT-EX_22_R
OCL_EB2 RT-EX_12_R
OCL_EB2 RT-DG_3
OCL_EB2 RT-T_SHLDR_R
OCL_EB2 RT-B1_EOSB1_ROCL_EB2 RT-B1_EOSP_R
OCL_EB2 RT-DG_4OCL_EB2 RT-DG_5OCL_EB2 RT-DG_EOSB2_R
OCL_EB2 RT-DG_CL_R
OCL_WB2 RT-B1_EOP_L
OCL_WB2 RT-EX_22_L
OCL_WB2 RT-T_1_L
OCL_WB2 RT-EX_12_L
OCL_WB2 RT-T_2_LOCL_WB2 RT-T_3_L
OCL_WB2 RT-DG_Tie_L
OCL_WB2 RT-T_SHLDR_L
OCL_WB2 RT-T_4_L
OCL_WB2 RT-EX_1_L
OCL_WB2 RT-DG_EOL1_L
OCL_WB2 RT-EX_2_L
OCL_WB2 RT-T_5_L
OCL_WB2 RT-B1_EOSB11_L
OCL_WB2 RT-T_Tie_L
OCL_WB2 RT-B1_EOSP1_L
OCL_WB2 RT-DG_3_LOCL_WB2 RT-DG_4_LOCL_WB2 RT-DG_5_LOCL_WB2 RT-DG_2_Cut-1_L
OCL_WB2 RT-DG_EOP_L
OCL_WB2 RT-B1_SHLDR_L
OCL_WB2 RT-T_EOL1_LOCL_WB2 RT-T_EOP_L
OCL_WB2 RT-DG_SHLDR_L
OCL_WB2 RT-B1_EOL1_L
Label-Wetland-Exst2_L
DNC-Wetland-Exst52_L
approximate
water line
location
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility US 2.dgn11:25:00 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 17US 2 Alignment
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150
150
1470 1470
1475 1475
927+00.00
1470 1470
1475 1475
928+00.00
1470 1470
929+00.00
1465 1465
1470 1470
930+00.00
1465 1465
1470 1470
931+00.00
1466.00
1465.96
1465.88
1465.83
1465.65
OCL_WB2 LT-DG_EOP_R
OCL_WB2 LT-B1_SHLDR_R
OCL_WB2 LT-DG_SHLDR_R
OCL_WB2 LT-T_EOP_R
OCL_WB2 LT-T_EOL1_R
OCL_WB2 LT-B1_EOL1_R
OCL_WB2 LT-B1_EOP_R
OCL_WB2 LT-T_1_R
OCL_WB2 LT-EX_22_R
OCL_WB2 LT-T_2_R
OCL_WB2 LT-EX_12_R
OCL_WB2 LT-DG_Tie_R
OCL_WB2 LT-T_3_R
OCL_WB2 LT-T_SHLDR_R
OCL_WB2 LT-EX_1_R
OCL_WB2 LT-B1_EOSB1_ROCL_WB2 LT-B1_EOSP_R
OCL_WB2 LT-T_4_R
OCL_WB2 LT-EX_2_R
OCL_WB2 LT-DG_EOL1_R
OCL_WB2 LT-T_5_R
OCL_WB2 LT-T_Tie_R
OCL_WB2 LT-DG_EOSB2_ROCL_WB2 LT-DG_3_ROCL_WB2 LT-DG_4_ROCL_WB2 LT-DG_5_ROCL_EB2 RT-DG_EOP_R
OCL_EB2 RT-T_Tie
OCL_EB2 RT-B1_SHLDR_R
OCL_EB2 RT-DG_SHLDR_R
OCL_EB2 RT-T_EOP_ROCL_EB2 RT-T_EOL1_ROCL_EB2 RT-T_1
OCL_EB2 RT-B1_EOL1_R
OCL_EB2 RT-DG_Tie
OCL_EB2 RT-T_2
OCL_EB2 RT-B1_EOP_R
OCL_EB2 RT-T_3
OCL_EB2 RT-EX_21_R
OCL_EB2 RT-T_4OCL_EB2 RT-T_5
OCL_EB2 RT-EX_11_R
OCL_EB2 RT-EX_22_R
OCL_EB2 RT-EX_12_R
OCL_EB2 RT-DG_3
OCL_EB2 RT-T_SHLDR_R
OCL_EB2 RT-B1_EOSB1_ROCL_EB2 RT-B1_EOSP_R
OCL_EB2 RT-DG_4OCL_EB2 RT-DG_5OCL_EB2 RT-DG_EOSB2_R
OCL_EB2 RT-DG_CL_R
OCL_WB2 RT-B1_EOP_L
OCL_WB2 RT-EX_22_L
OCL_WB2 RT-T_1_L
OCL_WB2 RT-EX_12_L
OCL_WB2 RT-T_2_LOCL_WB2 RT-T_3_L
OCL_WB2 RT-DG_Tie_L
OCL_WB2 RT-T_SHLDR_L
OCL_WB2 RT-T_4_L
OCL_WB2 RT-EX_1_L
OCL_WB2 RT-DG_EOL1_L
OCL_WB2 RT-T_5_L
OCL_WB2 RT-B1_EOSB11_L
OCL_WB2 RT-T_Tie_L
OCL_WB2 RT-B1_EOSP1_L
OCL_WB2 RT-DG_3_LOCL_WB2 RT-DG_4_LOCL_WB2 RT-DG_5_LOCL_WB2 RT-DG_2_Cut-1_L
OCL_WB2 RT-DG_EOP_L
OCL_WB2 RT-B1_SHLDR_L
OCL_WB2 RT-T_EOL1_LOCL_WB2 RT-T_EOP_L
OCL_WB2 RT-DG_SHLDR_L
OCL_WB2 RT-B1_EOL1_LLabel-Wetland-Exst2_L
DNC-Wetland-Exst52_L
OCL_WB2 LT-DG_EOP_R
OCL_WB2 LT-B1_SHLDR_R
OCL_WB2 LT-DG_SHLDR_R
OCL_WB2 LT-T_EOP_R
OCL_WB2 LT-T_EOL1_R
OCL_WB2 LT-B1_EOL1_R
OCL_WB2 LT-B1_EOP_R
OCL_WB2 LT-T_1_R
OCL_WB2 LT-EX_22_R
OCL_WB2 LT-T_2_R
OCL_WB2 LT-EX_12_R
OCL_WB2 LT-DG_Tie_R
OCL_WB2 LT-T_3_R
OCL_WB2 LT-T_SHLDR_R
OCL_WB2 LT-EX_1_R
OCL_WB2 LT-B1_EOSB1_ROCL_WB2 LT-B1_EOSP_R
OCL_WB2 LT-T_4_ROCL_WB2 LT-DG_EOL1_R OCL_WB2 LT-T_5_R
OCL_WB2 LT-T_Tie_R
OCL_WB2 LT-DG_EOSB2_ROCL_WB2 LT-DG_3_ROCL_WB2 LT-DG_4_ROCL_WB2 LT-DG_5_R
OCL_WB2 RT-B1_EOP_L
OCL_WB2 RT-EX_22_L
OCL_WB2 RT-T_1_L
OCL_WB2 RT-EX_12_L
OCL_WB2 RT-T_2_LOCL_WB2 RT-T_3_L
OCL_WB2 RT-DG_Tie_L
OCL_WB2 RT-T_SHLDR_L
OCL_WB2 RT-T_4_L
OCL_WB2 RT-EX_1_L
OCL_WB2 RT-DG_EOL1_L
OCL_WB2 RT-T_5_L
OCL_WB2 RT-B1_EOSB11_L
OCL_WB2 RT-T_Tie_L
OCL_WB2 RT-B1_EOSP1_L
OCL_WB2 RT-DG_3_LOCL_WB2 RT-DG_4_LOCL_WB2 RT-DG_5_LOCL_WB2 RT-DG_2_Cut-1_L
OCL_WB2 RT-DG_EOP_L
OCL_WB2 RT-B1_SHLDR_L
OCL_WB2 RT-T_EOL1_LOCL_WB2 RT-T_EOP_L
OCL_WB2 RT-DG_SHLDR_L
OCL_WB2 RT-B1_EOL1_LLabel-Wetland-Exst2_L
DNC-Wetland-Exst52_L
OCL_WB2 LT-DG_EOP_R
OCL_WB2 LT-B1_SHLDR_R
OCL_WB2 LT-DG_SHLDR_R
OCL_WB2 LT-T_EOP_R
OCL_WB2 LT-T_EOL1_R
OCL_WB2 LT-B1_EOL1_R
OCL_WB2 LT-B1_EOP_R
OCL_WB2 LT-T_1_R
OCL_WB2 LT-EX_22_R
OCL_WB2 LT-T_2_R
OCL_WB2 LT-EX_12_R
OCL_WB2 LT-DG_Tie_R
OCL_WB2 LT-T_3_R
OCL_WB2 LT-T_SHLDR_R
OCL_WB2 LT-EX_1_R
OCL_WB2 LT-B1_EOSB1_ROCL_WB2 LT-B1_EOSP_R
OCL_WB2 LT-T_4_ROCL_WB2 LT-DG_EOL1_R OCL_WB2 LT-T_5_R
OCL_WB2 LT-T_Tie_R
OCL_WB2 LT-DG_EOSB2_ROCL_WB2 LT-DG_3_ROCL_WB2 LT-DG_4_ROCL_WB2 LT-DG_5_R
OCL_WB2 RT-B1_EOP_L
OCL_WB2 RT-EX_22_L
OCL_WB2 RT-T_1_L
OCL_WB2 RT-EX_12_L
OCL_WB2 RT-T_2_LOCL_WB2 RT-T_3_L
OCL_WB2 RT-DG_Tie_L
OCL_WB2 RT-T_SHLDR_L
OCL_WB2 RT-T_4_L
OCL_WB2 RT-EX_1_L
OCL_WB2 RT-DG_EOL1_L
OCL_WB2 RT-T_5_L
OCL_WB2 RT-B1_EOSB11_L
OCL_WB2 RT-T_Tie_L
OCL_WB2 RT-B1_EOSP1_L
OCL_WB2 RT-DG_3_LOCL_WB2 RT-DG_4_LOCL_WB2 RT-DG_5_LOCL_WB2 RT-DG_2_Cut-1_L
OCL_WB2 RT-DG_EOP_L
OCL_WB2 RT-B1_SHLDR_L
OCL_WB2 RT-T_EOL1_L
OCL_WB2 RT-T_EOP_L
OCL_WB2 RT-DG_SHLDR_L
OCL_WB2 RT-B1_EOL1_LLabel-Wetland-Exst2_L
DNC-Wetland-Exst52_L
OCL_WB2 LT-DG_EOP_R
OCL_WB2 LT-B1_SHLDR_R
OCL_WB2 LT-DG_SHLDR_R
OCL_WB2 LT-T_EOP_R
OCL_WB2 LT-T_EOL1_R
OCL_WB2 LT-B1_EOL1_R
OCL_WB2 LT-B1_EOP_R
OCL_WB2 LT-T_1_R
OCL_WB2 LT-EX_22_R
OCL_WB2 LT-T_2_R
OCL_WB2 LT-EX_12_R
OCL_WB2 LT-DG_Tie_R
OCL_WB2 LT-T_3_R
OCL_WB2 LT-T_SHLDR_R
OCL_WB2 LT-EX_1_R
OCL_WB2 LT-B1_EOSB1_ROCL_WB2 LT-B1_EOSP_R
OCL_WB2 LT-T_4_ROCL_WB2 LT-DG_EOL1_R OCL_WB2 LT-T_5_R
OCL_WB2 LT-T_Tie_R
OCL_WB2 LT-DG_EOSB2_ROCL_WB2 LT-DG_3_ROCL_WB2 LT-DG_4_ROCL_WB2 LT-DG_5_R
OCL_WB2 RT-B1_EOP_L
OCL_WB2 RT-EX_22_L
OCL_WB2 RT-T_1_L
OCL_WB2 RT-EX_12_L
OCL_WB2 RT-T_2_LOCL_WB2 RT-T_3_L
OCL_WB2 RT-DG_Tie_L
OCL_WB2 RT-T_SHLDR_L
OCL_WB2 RT-T_4_L
OCL_WB2 RT-EX_1_L
OCL_WB2 RT-DG_EOL1_L
OCL_WB2 RT-T_5_L
OCL_WB2 RT-B1_EOSB11_L
OCL_WB2 RT-T_Tie_L
OCL_WB2 RT-B1_EOSP1_L
OCL_WB2 RT-DG_3_LOCL_WB2 RT-DG_4_LOCL_WB2 RT-DG_5_LOCL_WB2 RT-DG_2_Cut-1_L
OCL_WB2 RT-DG_EOP_L
OCL_WB2 RT-B1_SHLDR_L
OCL_WB2 RT-T_EOL1_L
OCL_WB2 RT-T_EOP_L
OCL_WB2 RT-DG_SHLDR_L
OCL_WB2 RT-B1_EOL1_LLabel-Wetland-Exst2_L
DNC-Wetland-Exst52_L
OCL_WB2 LT-DG_EOP_R
OCL_WB2 LT-B1_SHLDR_R
OCL_WB2 LT-DG_SHLDR_R
OCL_WB2 LT-T_EOP_R
OCL_WB2 LT-T_EOL1_R
OCL_WB2 LT-B1_EOL1_R
OCL_WB2 LT-B1_EOP_R
OCL_WB2 LT-T_1_R
OCL_WB2 LT-EX_22_R
OCL_WB2 LT-T_2_R
OCL_WB2 LT-EX_12_R
OCL_WB2 LT-DG_Tie_R
OCL_WB2 LT-T_3_R
OCL_WB2 LT-T_SHLDR_R
OCL_WB2 LT-EX_1_R
OCL_WB2 LT-B1_EOSB1_ROCL_WB2 LT-B1_EOSP_R
OCL_WB2 LT-T_4_ROCL_WB2 LT-DG_EOL1_R OCL_WB2 LT-T_5_R
OCL_WB2 LT-T_Tie_R
OCL_WB2 LT-DG_EOSB2_ROCL_WB2 LT-DG_3_ROCL_WB2 LT-DG_4_ROCL_WB2 LT-DG_5_R
OCL_WB2 RT-B1_EOP_L
OCL_WB2 RT-EX_22_L
OCL_WB2 RT-T_1_L
OCL_WB2 RT-EX_12_L
OCL_WB2 RT-T_2_LOCL_WB2 RT-T_3_L
OCL_WB2 RT-DG_Tie_L
OCL_WB2 RT-T_SHLDR_L
OCL_WB2 RT-T_4_L
OCL_WB2 RT-EX_1_L
OCL_WB2 RT-DG_EOL1_LOCL_WB2 RT-T_5_L
OCL_WB2 RT-B1_EOSB11_L
OCL_WB2 RT-T_Tie_L
OCL_WB2 RT-B1_EOSP1_L
OCL_WB2 RT-DG_3_LOCL_WB2 RT-DG_4_LOCL_WB2 RT-DG_5_LOCL_WB2 RT-DG_2_Cut-1_L
OCL_WB2 RT-DG_EOP_L
OCL_WB2 RT-B1_SHLDR_L
OCL_WB2 RT-T_EOL1_L
OCL_WB2 RT-T_EOP_L
OCL_WB2 RT-DG_SHLDR_L
OCL_WB2 RT-B1_EOL1_L
Label-Wetland-Exst2_L
DNC-Wetland-Exst52_L
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility US 2.dgn11:25:00 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 18US 2 Alignment
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150
150
1465 1465
1470 1470
932+00.00
1465 1465
1470 1470
932+85.98
1465.46
1465.39
OCL_WB2 LT-DG_EOP_R
OCL_WB2 LT-B1_SHLDR_R
OCL_WB2 LT-DG_SHLDR_R
OCL_WB2 LT-T_EOP_R
OCL_WB2 LT-T_EOL1_R
OCL_WB2 LT-B1_EOL1_R
OCL_WB2 LT-B1_EOP_R
OCL_WB2 LT-T_1_R
OCL_WB2 LT-EX_22_R
OCL_WB2 LT-T_2_R
OCL_WB2 LT-EX_12_R
OCL_WB2 LT-DG_Tie_R
OCL_WB2 LT-T_3_R
OCL_WB2 LT-T_SHLDR_R
OCL_WB2 LT-EX_1_R
OCL_WB2 LT-B1_EOSB1_ROCL_WB2 LT-B1_EOSP_R
OCL_WB2 LT-T_4_ROCL_WB2 LT-DG_EOL1_R OCL_WB2 LT-T_5_R
OCL_WB2 LT-T_Tie_R
OCL_WB2 LT-DG_EOSB2_ROCL_WB2 LT-DG_3_ROCL_WB2 LT-DG_4_ROCL_WB2 LT-DG_5_R
Label-Wetland-Exst2_L
DNC-Wetland-Exst52_L
OCL_WB2 LT-DG_EOP_R
OCL_WB2 LT-B1_SHLDR_R
OCL_WB2 LT-DG_SHLDR_R
OCL_WB2 LT-T_EOP_ROCL_WB2 LT-T_EOL1_R
OCL_WB2 LT-B1_EOL1_R OCL_WB2 LT-B1_EOP_R
OCL_WB2 LT-T_1_R
OCL_WB2 LT-EX_22_R
OCL_WB2 LT-T_2_R
OCL_WB2 LT-EX_12_R
OCL_WB2 LT-DG_Tie_R
OCL_WB2 LT-T_3_R
OCL_WB2 LT-T_SHLDR_R
OCL_WB2 LT-EX_1_R
OCL_WB2 LT-B1_EOSB1_ROCL_WB2 LT-B1_EOSP_R
OCL_WB2 LT-T_4_ROCL_WB2 LT-DG_EOL1_R
OCL_WB2 LT-T_5_R
OCL_WB2 LT-T_Tie_R
OCL_WB2 LT-DG_EOSB2_ROCL_WB2 LT-DG_3_ROCL_WB2 LT-DG_4_ROCL_WB2 LT-DG_5_R
Label-Wetland-Exst2_L
DNC-Wetland-Exst52_L
200
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
1/14/2016 mdockter R:\project\30002265.146\utilities\lxsec utility US 2.dgn11:25:01 AM
PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES
All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. NH-3-002(146)265 XS 19US 2 Alignment