critical design review - lafayette college · glv - sub-systems responsibilities of glv can be...

114
Critical Design Review LFEV-Y5-2017 Lafayette Formula Electric Vehicle Year 5 ECE 492 - Spring 2017

Upload: others

Post on 18-Mar-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Critical Design ReviewLFEV-Y5-2017

Lafayette Formula Electric VehicleYear 5

ECE 492 - Spring 2017

Page 2: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Roadmap

1. System Overview2. Schedule3. Cost Analysis4. System States5. Demo in Dynamometer Room6. Vehicle Supervisory Control and Data Acquisition (VSCADA)7. Cell App8. Tractive System Interface (TSI)9. Grounded Low Voltage (GLV)10.Controller Cooling System11.System Test Plan

2

Page 3: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

System Overview - Top

TSV Packs

TSV Packs

PedalsGLV

TSI

Motor

Controller

Cooling

Panel

Panel

3

Page 4: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

System Overview - Side

TSV Packs

GLV

TSI

MotorMC

Pedals

4

Page 5: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

System Overview - System Objectives

● TSI: Provide connection and safety for the power supply of the motor

● GLV: Provide 24V to all systems, excluding the motor

● VSCADA: Provide data acquisition capability, as well as diagnostics

● Cell App: Be able to wirelessly interface with SCADA system

● Cooling: Using 24V, provide constant feedback to SCADA while cooling the motor

● Cabling: Provide safe and consistent connections between subsystems.

5

Page 6: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

System Overview - System Objectives Cont.

● Interface Control Document: Provide documentation for both hardware and software and interfaces.

● Dyno: Build and prepare Dyno room for testing for all sub-systems

● TSV: Provide 96V to the motor, as well as diagnostic information, and update its charging algorithm

● Physics: Helping TSV team understand relevant research, as well as physical modeling of the car, and developing a cruise control algorithm

6

Page 7: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

System Overview - High Level System Block Diagram

7

Page 8: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

System Overview - High Voltage Connections

● 96V● 2/0 Cable

8

Page 9: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

System Overview - Communication Protocol

● CAN Bus● All sensors have unique ID● All stations jabber

○ Settable period

9

Page 10: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

System Overview - Safety Loop Faults

● All systems access safety loop● Driver resettable section● Non driver resettable section

Systems announce status on CAN Bus

10

Page 11: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

System Overview - Interfaces

● Hardware○ Cockpit○ Panels

● Software○ Dash○ Remote Computer○ Cell phone

11

Page 12: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Hardware Interfaces - Driver Accessible

12

Page 13: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Hardware Interfaces - Driver Inaccessible

13

Page 14: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Software Interfaces - LCD Display

14

Page 15: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Software Interfaces - Remote Displays

15

Page 16: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Software Interfaces - Cell Phone

16

Page 17: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Roadmap

1. System Overview2. Schedule3. Cost Analysis4. System States5. Demo in Dynamometer Room6. Vehicle Supervisory Control and Data Acquisition (VSCADA)7. Cell App8. Tractive System Interface (TSI)9. Grounded Low Voltage (GLV)10.Controller Cooling System11.System Test Plan

17

Page 18: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Schedule - TSI

18

Page 19: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Schedule - GLV

19

Page 20: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Schedule - TSV

20

Page 21: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Schedule - VSCADA

21

Page 22: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Schedule - Cell App

22

Page 23: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Schedule - Cooling

23

Page 24: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Schedule - DYNO

24

Page 25: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Schedule - Interconnect

25

Page 26: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Schedule - Car Physics Investigation

26

Page 27: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Schedule - Management

27

Page 28: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Roadmap

1. System Overview2. Schedule3. Cost Analysis4. System States5. Demo in Dynamometer Room6. Vehicle Supervisory Control and Data Acquisition (VSCADA)7. Cell App8. Tractive System Interface (TSI)9. Grounded Low Voltage (GLV)10.Controller Cooling System11.System Test Plan

28

Page 29: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Cost Analysis

29

TeamAllocated

Budget

Total

Spent

Budget

Remaining

Percentage

Spent

TSI $1,000 $153.61 $846.39 15.36%

GLV $1,000 $275.82 $724.18 27.58%

VSCADA $50 $0.00 $50.00 0.00%

Cell App $125 $0.00 $125.00 0.00%

Controller Cooling $600 $452.92 $147.08 75.49%

Interconnect $1,000 $1122.20 -$122.20 112.20%

Dyno $50 $0.00 $50.00 0.00%

TSV $500 $388.95 $111.05 77.79%

Shipping / Tax /

Misc$1,175 $159.94 $1,015.06 13.61%

TOTAL $5,500 $2,553.44 $2,946.56 46.43%

http://sites.lafayette.edu/ece492-sp17/cost-summary/

Page 30: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Cost Analysis - Allocated Budget

30

Team Allocated Budget

TSI $1,000

GLV $1,000

VSCADA $50

Cell App $125

Controller Cooling $600

Interconnect $1,000

Dyno $50

TSV $500

Shipping / Tax / Misc $1,175

TOTAL $5,500

Page 31: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Cost Analysis - Current Budget Status

31

TeamAllocated

Budget

Total

Spent

Budget

Remaining

TSI $1,000 $153.61 $846.39

GLV $1,000 $275.82 $724.18

VSCADA $50 $0.00 $50.00

Cell App $125 $0.00 $125.00

Controller Cooling $600 $452.92 $147.08

Interconnect $1,000 $1122.20 -$122.20

Dyno $50 $0.00 $50.00

TSV $500 $388.95 $111.05

Shipping / Tax / Misc $1,175 $159.94 $1,015.06

TOTAL $5,500 $2,553.44 $2,946.56

Page 32: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Cost Analysis - Percentage Spent per Subsystem

32

TeamPercentage

Spent

TSI 15.36%

GLV 27.58%

VSCADA 0.00%

Cell App 0.00%

Controller Cooling 75.49%

Interconnect 112.20%

Dyno 0.00%

TSV 77.79%

Shipping / Tax /

Misc13.61%

TOTAL 46.43%

Ideal 71.86%

Page 33: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Cost Analysis - Percentage Spent Overall

33

TeamPercentage

Spent

TSI 15.36%

GLV 27.58%

VSCADA 0.00%

Cell App 0.00%

Controller Cooling 75.49%

Interconnect 112.20%

Dyno 0.00%

TSV 77.79%

Shipping / Tax /

Misc13.61%

TOTAL 46.43%

Ideal 71.86%

Page 34: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Roadmap

1. System Overview2. Schedule3. Cost Analysis4. System States5. Demo in Dynamometer Room6. Vehicle Supervisory Control and Data Acquisition (VSCADA)7. Cell App8. Tractive System Interface (TSI)9. Grounded Low Voltage (GLV)10.Controller Cooling System11.System Test Plan

34

Page 35: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

System States

35

Page 36: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Roadmap

1. System Overview2. Schedule3. Cost Analysis4. System States5. Demo in Dynamometer Room6. Vehicle Supervisory Control and Data Acquisition (VSCADA)7. Cell App8. Tractive System Interface (TSI)9. Grounded Low Voltage (GLV)10.Controller Cooling System11.System Test Plan

36

Page 37: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Demo Plan

● 4 Packs● Spin motor● Safety Loop● CAN Bus communication● Cell communication● IMD Fault safety loop

37

Page 38: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Roadmap

1. System Overview2. Schedule3. Cost Analysis4. System States5. Demo in Dynamometer Room6. Vehicle Supervisory Control and Data Acquisition (VSCADA)7. Cell App8. Tractive System Interface (TSI)9. Grounded Low Voltage (GLV)10.Controller Cooling System11.System Test Plan

38

Page 39: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

VSCADACraig Lombardo & Austin Wiles

39

Page 40: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Why Do We Need VSCADA?

● VSCADA acts as the “brains” of the car● Comprehensive control and monitoring of the subsystems in the LFEV● Dynamometer control to simulate operations of an actual car

○ Physics Modeling● VSCADA displays information to both the driver and developers

○ Driver: limited information○ Developer: extensive information

40

Page 41: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

VSCADA - Installing Software

1. git clone https://github.com/LafayetteFormulaElectricVehicle/VSCADA.git2. cd VSCADA/3. make install4. ./scada or ./configuration

41

Page 42: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

VSCADA - Control Flow

42

Page 43: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

VSCADA - Web Server

● HTTP Web Server● Can query database using endpoints provided by web API● Information sent to Cell in JSON format

43

Page 44: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

VSCADA - Database Structures

44

Page 45: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

VSCADA - Database Structures cont.

Criticality Scale

45

Page 46: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

VSCADA - Database Structures cont.

46

Page 47: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

VSCADA - Maintenance View

47

Page 48: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

VSCADA - Drive View

48

Page 49: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

VSCADA - Charging View

49

Page 50: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Roadmap

1. System Overview2. Schedule3. Cost Analysis4. System States5. Demo in Dynamometer Room6. Vehicle Supervisory Control and Data Acquisition (VSCADA)7. Cell App8. Tractive System Interface (TSI)9. Grounded Low Voltage (GLV)10.Controller Cooling System11.System Test Plan

50

Page 51: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Cell AppKemal Dilsiz & Raji Birru

51

Page 52: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Cell App - In depth design - Layout

● Customizable Display● Automatically generated generic data availability● ViewPager for multiple display tabs

52

Page 53: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Cell App - Landscape Layout

53

Page 54: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Cell App - Activity Diagram

54

Page 55: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Cell App - In-Depth Design - Data Structures

Dictionary of dictionaries, provides a generic way to locally store data temporarily

Hashcodes

> “tsvcell1voltage”

> “03/03/2017 17:56:34”

newSystem.put(“03/03/2017 17:56:34”, “8.1”);

allSystems.put(“tsvcell1voltage”, newSystem);

55

Page 56: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Cell App - Content Diagram

56

Page 57: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Roadmap

1. System Overview2. Schedule3. Cost Analysis4. System States5. Demo in Dynamometer Room6. Vehicle Supervisory Control and Data Acquisition (VSCADA)7. Cell App8. Tractive System Interface (TSI)9. Grounded Low Voltage (GLV)10.Controller Cooling System11.System Test Plan

57

Page 58: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

TSIChrister Hoeflinger, Jack Plumb,

& Adam Ness

58

Page 59: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

TSI - System Overview

Safely connect tractive system voltage to motor controller

● Interface with throttle and brake pedals

● Interface with Insulation Monitoring Device (IMD)

● Send voltage, current, and IMD resistance to SCADA

● Control drive state

● Tractive System Measuring Point

59

Page 60: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

TSI - High Level Block Diagram

60

Page 61: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

TSI - System State Diagram

61

Page 62: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

TSI - Circuit Schematic - Throttle Plausibility Overview

62

Page 63: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

TSI - Circuit Schematic - Throttle Plausibility

● Two separate, linear potentiometers

● Biased 5V apart

63

Page 64: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

TSI - Circuit Schematic - Throttle Plausibility cont’d

Multiple Failure Modes1. Deviation of more than 10% pedal travel between the sensors1

12017-18 Formula SAE Rules Rev. A

64

Page 65: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

TSI - Circuit Schematic - Throttle Plausibility cont’d

Multiple Failure Modes2. Open or short circuit condition

which generates a signal outside of the normal operating range (5% - 95% travel).

12017-18 Formula SAE Rules Rev. A

65

Page 66: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

TSI - Circuit Schematic - Throttle Enable

66

Page 67: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

TSI - Circuit Schematic - Microcontroller

67

Page 68: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

TSI - Circuit Schematic - High Voltage Inputs

68

Page 69: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

TSI - Circuit Schematic - Throttle/Voltage Isolation

69

Page 70: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

TSI - Circuit Schematic - High Voltage Present Light

70

Page 71: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

TSI - Box Inventor

71

Page 72: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

TSI - Box Inventor

72

Page 73: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

TSI - Box Inventor

73

Page 74: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Roadmap

1. System Overview2. Schedule3. Cost Analysis4. System States5. Demo in Dynamometer Room6. Vehicle Supervisory Control and Data Acquisition (VSCADA)7. Cell App8. Tractive System Interface (TSI)9. Grounded Low Voltage (GLV)10.Controller Cooling System11.System Test Plan

74

Page 75: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

GLVKyle Phillips, Joe Sluke, & Chris Bennett

75

Page 76: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

GLV - Sub-Systems

Responsibilities of GLV can be divided into 4 main sub-systems.

1) GLV Power - providing 24V to all the main systems of the vehicle.

1) Safety Loop - serve as the direct means to control the Accumulator Isolation Relays in the

packs (enable/disable of high voltage systems).

1) Vehicle Computer Interface (VCI) - deliver information about GLV Power and the Safety

Loop to the VSCADA computer and route the CANBUS to the VSCADA computer

1) Vehicle User Interface (VUI) - includes physical panels, buttons, switches, screens and lights

on the car, such as the exterior panels and the cockpit panel

76

Page 77: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

GLV - GLV Power

Requirements:● Provide 24V to all subsystems for 3 hours● Rechargeable battery● Protected from overcharge, overcurrent, overdischarge and overvoltage.

Battery Choice● 24V, LiFeP04 (Lithium Iron Phosphate Battery), 10Ah. ● Internal battery management system ● Lightweight (2.63 kg)

77

Page 78: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

GLV - Safety Loop

Requirements: ● Drive the coils of the Accumulator Isolation Relays (AIRs) with 24V● Trippable by VSCADA, TSI, Cooling Controller, TSV● Trippable internally and externally by E-STOP Big Red Buttons.

78

Page 79: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

GLV - Safety Loop - Components

Switch Description Effect

Circuit Breaker A basic resettable circuit breaker

Powers Cooling

System, Dashboard,

VSCADA, and TSI

GLVMS Grounded Low Voltage Master Switch

BRBLS Big Red Button Left Side

BRBRS Big Red Button Right Side

Cooling System Fault Switch Allows Cooling System to trigger fault

24V to Accumulator

Isolation Relays

IMD Switch Insulation Monitoring Device, triggers fault if HV and GLV are galvanically

isolated

PACKMAN Fault Control Allows PACKMAN board on any pack to trigger a fault

SCADA Relay Allows SCADA computer to trigger fault

MRESET (Latching) Exterior Master Reset Button

BRB (Car Dash) Driver accessible Big Red Button

Inertia Switch Driver accessible Inertial switch, opened by a 6g+ collision.

CPR(Latching) Driver accessible Collision Protection Reset Latching Relay.

TSVMS Tractive System Voltage Master Switch

79

Page 80: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

GLV - Safety Loop

80

Page 81: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

GLV - Vehicle User Interface (VUI)

Requirements:● Design panels for dyno room● Design panels for interior and exterior of vehicle ● Provide interface for VSCASA

81

Page 82: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

GLV - Exterior Panel

82

Page 83: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

GLV - Cockpit Panel

83

Page 84: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

GLV - Vehicle Computer Interface (VCI)

Requirements: ● GLV Battery State of Charge Monitoring● CAN2USB Interface ● I²C Bus ● UART Bus ● Safety Loop Monitoring

84

Page 85: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

GLV - Safety Loop Monitoring

85

Page 86: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

GLV - High-Level System Design

86

Page 87: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

GLV - Physical Layout

87

Page 88: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

GLV - Physical Layout

88

Page 89: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

GLV - Physical Layout

89

Page 90: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

GLV - Physical Layout

90

Page 91: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

GLV - Box Design

91

Page 92: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

GLV - Break Out Board (BOB)

Last year’s BoB shortcomings:● Did not address VCI requirements (safety loop, temp, current monitoring…)● Inadequate number of relays used ● Inadequate containment of safety loop circuit

Our proposed changes:● Add opto-isolators for safety loop monitoring ● Add more relays and move more of safety loop on board ● Use I2C capable chips to relay temp and current readings to SCADA● Connect TSI and VSCADA via UART for throttle control ● Add DAC and ADC chips to connect VSCADA and Huff Box.

92

Page 93: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

GLV - BoB High Level

93

Page 94: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

GLV - BoB Layout

94

Page 95: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Roadmap

1. System Overview2. Schedule3. Cost Analysis4. System States5. Demo in Dynamometer Room6. Vehicle Supervisory Control and Data Acquisition (VSCADA)7. Cell App8. Tractive System Interface (TSI)9. Grounded Low Voltage (GLV)10.Controller Cooling System11.System Test Plan

95

Page 96: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Controller

Cooling SystemXingyuan Guo & Yi Han

96

Page 97: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Cooling System

Major Goal:

● Cool the motor controller, provide information to SCADA, shut

system down when necessary using safety loop.

Objectives:

● Automatic fan, pump speed control; as well as manual override

● CAN interface

● Safety loop interface● Mechanical design

97

Page 98: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Cooling System - Overall Electrical Connections

98

Page 99: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Cooling System - Water Cooling Layout

99

Page 100: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Cooling System - Compatibility and Independence

● 24 VDC

● Koolance products (compatible with dyno, easy to

integrate)

● Run independently

100

Page 101: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Cooling System - Automatic Speed Control w/ Manual Override

Overall Process101

Page 102: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Cooling System - CAN Bus Interface

Oscilloscope

displaying 2 types of

data frames

(Through stackable

CAN shield using

MCP2515 CAN

controller)

102

Page 103: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

● Open the safety loop when fluid temperature is too high

Cooling System - Safety Loop

103

Page 104: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

Roadmap

1. System Overview2. Schedule3. Cost Analysis4. System States5. Demo in Dynamometer Room6. Vehicle Supervisory Control and Data Acquisition (VSCADA)7. Cell App8. Tractive System Interface (TSI)9. Grounded Low Voltage (GLV)10.Controller Cooling System11.System Test Plan

104

Page 105: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

System Test

Plan Greg Flynn

105

Page 106: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

System Testing - Overview

● 7 Major tests○ Accumulator integration○ Accumulator charging○ CAN Bus link○ Safety loop○ Cruise Control○ 24h endurance test○ Shutdown

106

Page 107: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

System Testing - Accumulator Integration

107

Page 108: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

System Testing - Accumulator Charging

108

Page 109: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

System Testing - CAN Bus link

109

Page 110: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

System Testing - Safety Loop

110

Page 111: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

System Testing - Cruise Control

111

Page 112: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

System Testing - 24h Endurance Test

112

Page 113: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

System Testing - Shutdown

113

Page 114: Critical Design Review - Lafayette College · GLV - Sub-Systems Responsibilities of GLV can be divided into 4 main sub-systems. 1) GLV Power - providing 24V to all the main systems

TSV Packs

TSV Packs

PedalsGLV

TSI

Motor

Controller

Cooling

Panel

Panel

114