To:From:Date:Project:

Page 3: Critical Assumptions What are Critical Assumptions?

This budget is based on the following critical assumptions:Shoot - an estimated # Day shooting

schedule, based on the # draft of the script.

Location - where, and what is the surrounding area?

Unions - non-union, or will it be SAG, WGA, Teamster, DGA? If it is non-union, you must cite that.

Page 4: Critical Assumptions What are Critical Assumptions?

Critical Assumptions cont.

Prep - ## of days, weeks, Monday-FridayPrincipal Photography: ## days.

Scheduled start date is M/D/Y. Scheduled wrap is M/D/Y.

Page 5: Critical Assumptions What are Critical Assumptions?

Critical Assumption cont.

Post Production ## of weeks (5 day workweeks) Scheduled start date is M/D/Y at Columbia

College Chicago. The finished film is expected to be ready and

screened M/D/Y.

Page 6: Critical Assumptions What are Critical Assumptions?

Critical Assumptions Cont.

Professional Crew

List all crew that are not Columbia College students that you will have to pay.

Other crew must be accounted for, for craft service, catering, and general bodies that are going to need parking, etc.

Page 7: Critical Assumptions What are Critical Assumptions?

Assume the following ATL Costs:

Script: Est. Development Costs, WGA registration, US Copyright Office, Script Option Cost.

Cast: Actor’s name, SAG or Non-Union.Fill in the amount that this will cost.

Page 8: Critical Assumptions What are Critical Assumptions?

ATL Costs

Travel and Living: Example - 3 x nights at the Holiday Inn at $45 per night, 10 crew members and cast.

In accordance with SAG student film guidelines applicable to ?

Rehearsals: Assume rehearsal time will take place (date, time, place and attendees)

Stunts: Stunt Coordinator $$$

Page 9: Critical Assumptions What are Critical Assumptions?

Below the Line Costs:

Schedule: There are ## days of Principal Photography.

There are ## Days of Second Unit Scheduled to shoot in ?? Location.

Holidays (list all holidays and date itself)Shooting Days: Based on a ## hour day,

or more for some departments.

Page 10: Critical Assumptions What are Critical Assumptions?

BTL Continued.

Key Crew Rates : (in the event you pay any crew to work)

Example: Steadicam operator $400/day Film is ?? (super 16mm, 35mm) Food Costs: all food costs are created through

the following assumptions: how many crew, how many meals, cost per meal, names of restaurants. Also include Craft Service.

Page 11: Critical Assumptions What are Critical Assumptions?

BTL Continued….

Transportation CostsThis cost center includes the total, based

on the following assumptions: How much crew will be reimbursed for travel? By what means? Gas, Taxi, public

transportation, car rental? Are cast members going to be self drive? If so,

are you reimbursing them?

Page 12: Critical Assumptions What are Critical Assumptions?

BTL Continued…

Construction: the following sets will be built either on a stage or in a warehouse which has been converted for use as a stage. All other sets are assumed to be practical, with enhancements: Int. Print Shop… Cover Set Int. Book Store…. Cover Set

Page 13: Critical Assumptions What are Critical Assumptions?

BTL continued….

Production Design: the following will be bought….

Storyboards: there is an allowance of $$ for storyboards. Artists will be coming from ?

Special Effects: There is a budget of $ for special effects to include all labor and materials, including Second Unit. (All special effects planning was approved or will be approved by CCC faculty and staff.)

Page 14: Critical Assumptions What are Critical Assumptions?

BTL continued….

Animals: there is an allowance of $ to include all live action photography with animals, including an animal wrangler.

Picture Cars: There is an allowance of $. Tests: There is an allowance of $ for make-up

and hair tests (name the types of tests that will take place)

Facilities: Describe key locations for Principal Photography.

Page 15: Critical Assumptions What are Critical Assumptions?

Post/Visual Effects/Music

Post: It allows for a ?? Week schedule (electronic editing - 5 day work week)

Post-production Supervisor: the post-production supervisor is ___ and will work (describe work schedule: how many days per week?)

Music: An allowance of $ is included to cover all costs of score, assuming score is recorded in Chicago. There is an additional $ to cover all other music costs, such as licensed music.

Page 16: Critical Assumptions What are Critical Assumptions?

Post/Visual Effects/Music

Visual effects: There is a VFX allowance of $?.

Greenscreen: Assume greenscreen shots for the following sequences:

Production to provide all live action elements.

Post-Production sound: All ADR is explected to be done (where and by whom?)

Page 17: Critical Assumptions What are Critical Assumptions?

Post/Visual Effects/Music

Main and End Titles: The titles will be designed by ?? And will be delivered no later then ??

Dailies: Assumes viewing film (video or online) dailies (where?)

Page 18: Critical Assumptions What are Critical Assumptions?

General Expenses

Legal Costs: Includes estimates for production ,distribution, financing, music, labor relations, clearance administration, expenses, incorporation fees, copyright report and title report.

Page 19: Critical Assumptions What are Critical Assumptions?

Other

Production Insurance: An estimate of ??% of cost is assumed. (Standard coverage maybe provided through CCC. There are a number of different types of coverage that must be coordinated and confirmed with Charles Celander.

Completion Bond: An estimate of ??% of cost is assumed (for a student film, this will not be applicable)

Contingency: There is a 10% contingency included in the bottom line.