TSS Report (3G) Cover A.Site Location Details B1.BBU Equipment Implementation B2.RRU Equipment Implementation B3.Power Implementation B4.Existing Transmission B5.Tower & Ant Implementation C1.Radio Frequency Part Sector#1 C2.Radio Frequency Part Sector#2 C3.Radio Frequency Part Sector#3 C4.Radio Frequency Part Sector#4 C5. Obstacle Diagram. C6. Sketch plan of Rooftop site or Greenfield site (Top Vie C7. Sketch Equipment Room Floor Plan Layout D1. PHOTOS LIST (Indoor) D2. PHOTOS LIST (Outdoor) D3. PHOTOS LIST (RF) Site Acquisition Reports

Upload: subpoa-limsaihua

Post on 11-Sep-2014

172 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Cri0002 3g Bfkt Tssr Ok

TSS Report (3G)

Cover

A.Site Location Details

B1.BBU Equipment Implementation

B2.RRU Equipment Implementation

B3.Power Implementation

B4.Existing Transmission

B5.Tower & Ant Implementation

C1.Radio Frequency Part Sector#1

C2.Radio Frequency Part Sector#2

C3.Radio Frequency Part Sector#3

C4.Radio Frequency Part Sector#4

C5. Obstacle Diagram.

C6. Sketch plan of Rooftop site or Greenfield site (Top View,)

C7. Sketch Equipment Room Floor Plan Layout

D1. PHOTOS LIST (Indoor)

D2. PHOTOS LIST (Outdoor)

D3. PHOTOS LIST (RF)

Site Acquisition Reports

Page 2: Cri0002 3g Bfkt Tssr Ok

ข้�อมู�ลตำ�แหน่ งที่��ตำ� �งสถน่ที่��

รยละเอ�ยดเกี่��ยวกี่�บกี่รตำ�ดตำ��งอ�ปกี่รณ์"ไฟฟ%รยละเอ�ยดเกี่��ยวกี่�บกี่รตำ�ดตำ��งอ�ปกี่รณ์"ส&�อส�ญญณ์เด�มู

แบบหล�งคหร&อแบบบน่ที่��ด�น่ที่��ตำ�ดตำ��งเสอกี่ศ

รยละเอ�ยดเกี่��ยวกี่�บกี่รตำ�ดตำ��งอ�ปกี่รณ์" BBU รยละเอ�ยดเกี่��ยวกี่�บกี่รตำ�ดตำ��งอ�ปกี่รณ์" RRU

รยละเอ�ยดเกี่��ยวกี่�บกี่รตำ�ดตำ��งอ�ปกี่รณ์"บน่tower

Page 3: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

HSPA BFKT TSS Report

Site Id: CRI0002

Site Name: GRF /Ban Rong Suaten

Page 4: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

HSPA BFKT TSS Report

Page 5: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

A1.Site Location Details ข้�อมู�ลตำ�แหน่ งที่��ตำ��งสถน่ที่��

Site ID CRI0002 Candidate A Region North

Site Name GRF /Ban Rong Suaten Building Name N/A Status N/A

Phase (2G) N/A Phase (3G) Ph.3

AddressN/A

Moo BanN/A

Trok/SoiN/Aบ้�น่เลข้ที่�� หมู� บ้�น่

RoadN/A

Tumbon/SubdistrictN/A

Amphur/Districtเมู&องถน่น่

ProvinceChiang rai

Postal Code57100

Telephone-

จั�งหวั�ด รห�สไปรษณี�ย์! โที่รศั�พที่!

19.9272 99.8416

Site Type

ประเภที่ข้องสถน่ที่�� อครส�ง พื้&�น่ที่��ว งเปล

Area Type

ล�กี่ษณ์ะชุ�มูชุน่ หน่แน่ น่ ปน่กี่ลง ชุน่เมู&อง ชุน่บที่Equipment Location Lease space Width (M)

8Length (M)

6Height (M)

N/Aตำ�แหน่ งที่��ตำ��งอ�ปกี่รณ์" พื้&�น่ที่��เชุ Antenna height AGL (M)

40Ground height ASL (M)

N/A

Survey Information:

Survey Date: 26-Aug-11

Function Name TMV Name

SA: (Site Acquisition) TMV

C&I: (Construction & Implementation) TMV

RF: (RF Engineer) TMV

TRSP: (Transmission Planning) TMV

Landlord Representative: TMV

Comments:

ตำรอก/ซอย์

ตำ�บ้ล/แข้วัง อ�เภอ/เข้ตำ

Coordinates Latitude(E): (WGS 84, FROM GPS WITH 3 SATELLITES, 5 DIGITS AFTER DECIMAL FOR DECIMAL FORMAT)

Coordinates Longitude(N): (WGS 84, FROM GPS WITH 3 SATELLITES, 5 DIGITS AFTER DECIMAL FOR DECIMAL FORMAT)

อครพื้ณ์�ชุย"/ตำ.กี่แถว

กี่ว�ง (เมูตำร ยว (เมูตำร) ส�ง (เมูตำร)

ควมูส�งข้องเสอกี่ศ เหน่&อระด�บพื้&�น่ด�น่ (เมูตำร) ควมูส�งข้องพื้&�น่ด�น่เหน่&อระด�บน่��ที่ะเล (เมูตำร)

Vendor /Subcon

ShopHouse Highrise Building Greenfield

Urban Suburban Rural

Indoor Outdoor

Dense Urban

Page 6: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

A2.Site Accessกรเข้�ออกสถน่ที่��

Accesstime

ระยะเวลเข้�ออกี่สถน่ที่��Contract Detail for Access Name

TMVTelephone

-บ�คคลตำ�ดตำ อเพื้&�อเข้�ออกี่สถน่ที่�� โที่รศ�พื้ที่"Parking

ที่��จอดรถ มู� ไมู มู�Access Route

เส�น่ที่งกี่รเข้�ออกี่ ใชุ�ที่งเข้�ออกี่สธรณ์ะ ใชุ�ที่งเข้�ออกี่ส วน่ตำ�ว สร�งที่งเข้�ออกี่แยกี่ตำ งหกี่Road Type

ชุน่�ดถน่น่ คอน่กี่ร�ตำ 5 เมูตำร ด�น่ เมูตำร ยงมูะตำอย เมูตำร อ&�น่ ๆ

ให� ไมู ให�

ให� ไมู ให�

Any Specific comments relating to access

ตำลอดเวล 24 ชุ��วโมูง 7 ว�น่ กี่�หน่ดเวลกี่รเข้�-ออกี่

ชุ&�อ - น่มูสกี่�ล

Is the site provider give the key to access the building/sites

เจ�ข้องสถน่ที่��ให�กี่�ญแจเข้�ออกี่อครหร&อไมู Is access to the site from the piblic road solely owned by the site provider

ที่งเข้�ออกี่จกี่ถน่น่สธรณ์ะไปย�งสถน่�เป4น่พื้&�น่ที่��ข้องเจ�ข้องสถน่ที่��คน่เด�ยวหร&อไมู

เข้�ออกี่ตำ�ดตำ อ TMV (GRF)ค�แน่ะน่�เพื้��มูเตำ�มูที่��เกี่��ยวข้�องกี่�บกี่รเข้�ออกี่สถน่ที่��

Concrete Soil Asphalt Other

24 hours, 7 days Limited Access

Yes No

Public Access Private Access Build Separate Access

Yes No

Yes No

Page 7: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

A2.Site Accessกรเข้�ออกสถน่ที่��

-

ไมู มู�

สร�งที่งเข้�ออกี่แยกี่ตำ งหกี่

เมูตำร

ไมู ให�

ไมู ให�

Other

Build Separate Access

Page 8: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

A3.Construction Detailsรย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��ง

Staircase DimensionWidth (m.) 1 Height (m.) 1

ข้น่ดข้องบ�น่ไดElevator Dimension

Width (m.) N/A Length (m.) N/A Height (m.) N/Aข้น่ดข้องล�ฟที่"Elevator Load Capacity(Kg.)

N/Aน่��หน่�กี่บรรที่�กี่ข้องล�ฟที่"Access Door Dimension

Width (m.) 2.4 Length (m.) N/A Height (m.) N/Aข้น่ดข้องประตำ�ที่งเข้�Road Type

คอน่กี่ร�ตำ 5 เมูตำร ด�น่ เมูตำร ยงมูะตำอย เมูตำร อ&�น่ ๆ

ชุน่�ดข้องพื้&�น่ถน่น่Is parking available for construction vehicles?

มู� ไมู มู�Building Type

ประเภที่ข้องอคร คอน่กี่ร�ตำ ไมู� คอน่กี่ร�ตำ และ ไมู� อ&�น่ ๆ

Condition of building and rooftop

สภพื้ข้องอครและดดฟ% ด� พื้อใชุ� ไมู ค อยด� อ&�น่ ๆNumber of Floors

Floor(s) N/Aจ�น่วน่ชุ��น่Building Age

Year(s) N/Aอย�ข้องอครGeneral Comments relating to construction

รยละเอ�ยดที่��วๆไปเกี่��ยวกี่�บกี่รตำ�ดตำ��ง

ที่��จอดรถเพื้�ยงพื้อส�หร�บรถข้น่อ�ปกี่รณ์"ตำ�ดตำ��ง

Yes No

Concrete and timber OtherConcrete Timber

FairGood Poor Other

Page 9: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

A3.Construction Detailsรย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��ง

1

N/A

N/A

N/A

เมูตำร

ไมู มู�

อ&�น่ ๆ

อ&�น่ ๆ

N/A

N/A

Other

Other

Page 10: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

NodeB Site type (Marco or IBC)

NodeB configuration

Site type

Floor Type

พื้&�น่ห�น่กี่รวด

Room dimension (LxWxH) meter. L (m) : 2.1 W (m) : 3.2 H (m) : 3

There’s space for BBU

BBU DC power cable length / PGND Length BBU DC power cable (m) : 2 BBU PGND power cable (m) : 5

Trunk cable with the Iub interface Trunk cable length (m) :

LAN cable with the Iub interface LAN cable length (m) : 2

Optic cable with the Iub interface Optic cable length (m) : 15 Peer end connector type : LC/FC

Type of DDF (to connect with)

How many available port :

Alarm Cable Cable Length (m) : 2 Capacity of existing DDF :

Comments of Implementation Team :

B1.BBU Equipment Implementation รย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี! BBU

How to install BBU(H86mm x W442mm x D310mm, 12kg/BBU)

กี่รตำ�ดตำ��ง BBU

Peer end connector type(If any) :

Peer end connector type(If any) :

Location of New DDF(In case of new DDF)

Tie E1 cable(In case of Tie from New to Existing DDF)

Macro IBC (Pico)

S1 S1/1/1S1/1 S1/1/1/1

Existing Room Building Roof top Container Building Container Greenfield

Sun Shelter RoofTop Sun Shelter Greenfield Other :

Container FL Cement FL Raised FL Wooden FL

Other:

Yes No

Existing DDF Panel Existing DDF Box

New DDF panel New DDF Box (Wall) Other :

Need Length (m) :No Need

19' Rack

APM30

Eltek Outdoor

Emerson Outdoor Emerson Indoor Other :

No Need (Use Existing) DDF panel in 19' rackDDF panel in APM30 DDF panel in EltekDDF panel in Emerson DDF Box on wall

Other

Eltek Indoor

Page 11: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

Sector S1 S2 S3 S4

Space for RRU 850 MHz

How to install HW RRU

Installation kit for RRU 3804 model

Structure Modification for RRU Needed

There's space for New Antenna (at least 2.6m height)

Structure modification for New Antenna needed

60 60 60

Ground Bar for RRU

Length of Ground Cable RRU 15 m. 15 m. 15 m. m.

Length of Ground Cable Filter m. m. m. m.

2 2 2

N/A N/A N/A

Comments of Implementation Team

B2.RRU Equipment Implementationรย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี! RRU

Space Available for RRU on existing structure (RRU 3804: 485mm x 285mm x 170mm, 20kg/RRU)

Length of power cable RRU (RRU-DC ) ( m)

Length of Optic Cable(BBU to RRU) ( m)

Jumper Length between RRU and Ant (m)(Not over 14m)

Feeder 7/8' Length (m)In case, lower jumper > 14m

Jumper Length between RRU and Ant / combiner (Not over 14m) ควมูยวข้องสย Jumper

Space available for 2.1GHz in future (in case need modification of structure, take final result)

Space available for MIMO additional 3G RRU (in case need modification of structure, take final result)

Yes No Yes Yes YesNo NoNo

Yes No Yes Yes YesNo NoNo

Yes No Yes Yes YesNo NoNo

Yes No Yes Yes YesNo NoNo

Yes No Yes Yes YesNo NoNo

Yes No Yes Yes YesNo NoNo

Yes No Yes Yes YesNo NoNo

Yes No Yes Yes YesNo NoNo

2 5

10 20

30 40

50 60

70120

Other :

100150

2 5

10 20

30 40

50 60

70120

Other :

100150

2 5

10 20

30 40

50 60

70120

Other :

100150

2 5

10 20

30 40

50 60

70120

Other :

100150

Distribution Centralized

PoleTowerWall

Ladder

Open Rack

Other :

PoleTowerWall

Ladder

Open Rack

Other :

PoleTowerWall

Ladder

Open Rack

Other :

PoleTowerWall

Ladder

Open Rack

Other :

10 2030 40

50 70

100

Other:

10 20

30 40

50 70

100

Other:

10 20

30 40

50 70

100

Other:

10 20

30 40

50 70

100

Other:

No need

2m. 3 เส�น่2m. 2 เส�น่

No need

2m. 3เส�น่2m. 2 เส�น่

No need

2m., 3 เส�น่2m. 2 เส�น่

No need

2m. 3 เส�น่2m. 2 เส�น่

Page 12: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

รย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี!ไฟฟ,

A

Sector S1 S2 S3

A A

Additional Rectifier needed for long BBU-RRU distance?N/A N/A N/A

Power Mode DC available? (Y/N)

How many independence DC power

Total Power Supply Capacity (A) A

Remaining Power Current (A) A

Capacity of existing battery (AH) AH

Add New AC Breaker (pcs) 1 pcs

Power input for AC Power Cabinent

AC power cable length 15 meter

PGND cable length 15 meter

รย์ละเอ�ย์ดกรป-กเสไฟฟ,

เจ�ข้องที่��ด�น่เจ�ข้องที่��ด�น่เจ�ข้องที่��ด�น่

ที่งรถไฟ รยละเอ�ยดเพื้��มูเจ�ข้องที่��ด�น่เจ�ข้องที่��ด�น่

Comments of Implementation Team

B3.Power Implementation

Power Consumption of BBU (Max. 250W, Typical</=100W)

Power Consumption per RRU (20W/40W): 210W/240W

Existing DC Circuit breakers available If yes how many slot leave

1. เสไฟฟ%ป5กี่ใน่โฉน่ดที่��ด�น่แปลกี่ที่��เชุ เที่ น่��น่ 1.1 เสไฟฟ%ป5กี่ใน่โฉน่ด/น่.ส. 3. กี่/ ส.ค. เลข้ที่��

1.2 เสไฟฟ%ป5กี่ใน่โฉน่ด/น่.ส. 3. กี่/ ส.ค. เลข้ที่��1.3 เสไฟฟ%ป5กี่ใน่โฉน่ด/น่.ส. 3. กี่/ ส.ค. เลข้ที่��

2. กี่รเด�น่สยไฟฟ%มู�กี่รข้�มู/ พื้ด ผ่ น่อะไรบ�ง

2.1 เสไฟฟ%ป5กี่ใน่โฉน่ด/น่.ส. 3. กี่/ ส.ค. เลข้ที่��2.2 เสไฟฟ%ป5กี่ใน่โฉน่ด/น่.ส. 3. กี่/ ส.ค. เลข้ที่��

Yes No

1 2

Y (>/= 4 slot) Y (>8 slot)

Container FL Cement FL Raised FL Wooden FL

Single Phase Three Phase

ใชุ / ไมู ใชุ โปรดกี่รอกี่รยละเอ�ยดเพื้��มู

ถน่น่ คลอง /ที่��ด�น่ผ่��อ&�น่ โปรดกี่รอกี่

Page 13: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

Page 14: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

รย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี!ไฟฟ,

A

S3 S4

A A

N/A

A

A

AH

pcs

meter

meter

*

*

*

*

รยละเอ�ยดเพื้��มู *

*

*

No

2

No (<4 slot)

Raised FL Wooden FL Other

Other

/ ไมู ใชุ โปรดกี่รอกี่รยละเอ�ยดเพื้��มู

/ที่��ด�น่ผ่��อ&�น่ โปรดกี่รอกี่ อ&�น่

Page 15: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

Page 16: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

B4.IPRAN Transmission

Transmission Implementation

Infrastructure of Transmission (LL, MW, Optic)

IPRAN equipment DC power cable length / PGND Length DC Power Cable (m.) PGND power cable (m.)

2 2

Patch Cord Cable (m.) Peer End Connector type ______

10 LC/FCLAN cable for Downlink interface, length (m)

LAN Cable (m.) Peer End Connector type ______ (if any)

2 RJ45How many available port

Location of New DDF

Tie E1 cable

Length(m.)

Location of New ODF

DDF or ODF PGND length PGND power cable (m.)

5Comments of Transmission Team

รย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี!ส.�อส�ญญณี IPRAN

There're space for IPRAN equipment มู�ที่&�น่ที่��ตำ�ดตำ��งอ�ปกี่รณ์" IPRAN

How to install IPRAN equipment (PTN910) กี่รตำ�ดตำ��งอ�ปกี่รณ์" IPRAN

PTN910: 442 (W) x 220 (D) x 1 U(H)

ควมูยวสยไฟ และ สยกี่รวด"ข้องอ�ปกี่รณ์" IPRAN (PTN910)

Optic cable for Uplink interface, length (m)

ควมูยวข้องสย LAN และประเภที่ห�วตำ อ

Type of DDF (to connect with) ประเภที่ข้อง DDF

Type of DDF ประเภที่ข้อง DDF

ถ�ตำ�องกี่ร DDF ใหมู ตำ�องกี่รแบบ

ตำ�องมู� สย Tie E1 ระหว ง DDF เด�มูกี่�บข้องใหมู หร&อไมู

ถ�ตำ�องกี่ร ODF ใหมู ตำ�องกี่รแบบ

LL MW Optic

Yes

No

19” Rack

21” Rack

23” Rack

APM30

Emerson

Eltek

Existing DDF Panel

Existing DDF Box

New DDF Panel

New DDF Box (Wall)

75 Ohm 120 Ohm

No Need (Use Existing) DDF panel in 19' rack

DDF panel in APM30

DDF panel in 23' rackDDF panel in 21' rack

Other

Need No Need

No Need (Use Existing) ODF panel in 19' rack

ODF panel in APM30

ODF panel in 23' rackODF panel in 21' rack

Other

Etc.

Wall Mount

Page 17: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

B4.IPRAN Transmission

Transmission Implementation

2

LC/FC

Peer End Connector type ______ (if any)

RJ45

5

รย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี!ส.�อส�ญญณี IPRAN

DDF panel in 19' rack

DDF panel in 23' rack

Other

No Need

ODF panel in 19' rack

ODF panel in 23' rack

Other

Etc.

Wall Mount

Page 18: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

Building height (m) from earth

Tower type

Tower height (m.)

40 m From tower ground to top of tower

Existing Antenna height (m 40 m From tower ground (Not include building)

New Antenna height (m) 40 m From tower ground (Not include building)

Height from floor level to bottom of antenna 39 m From tower ground to bottom of antenna (Not include building)

Total New Antenna height (m) 40 m Ant to Earth

RRU height (m) from tower ground 39 m RRU to ground

Existing 2G Antenna height (m

New 3G Antenna mounting Type

New Structure Type (if applicable)

Comments of Implementation Team

B5.Tower & Ant Implementation

รย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี!บ้น่ TOWER

Can existing structure support new configuration (Yes/No)

Pole Guyed Mast Self Support Wall Mout OtherElectrical Pole

A B C D Special Modify

Type 1.1

Type 2.1

Type 3 (2G/3G Single RAN that can reduce antenna)

Special Modify (Remark) ______________________

Yes No

Pole Guyed Mast Self Support Wall Mout

Other

Electrical Pole

Type 1.2 (Need Retrofit) Type 1.3 (Additional New Pole)

Type 2.2 Type 2.3

togetherwe can makeit convergence Type 1 (Add)

Before

After

2G

3G(850)

2G 2G

3G (850)

2G 2G

Vertical position preferred

togetherwe can makeit convergence

Type 2.1, 2.2, 2.3 (Swapped)

Type 2.2

Before

2G 3G (850)

2G 2G

3G (850)

Type 2.1(Swap and add)

2G 2G

2G

2G 2G3G (850)

Vertical Horizontal

3G

Type 2.3

3G 3G

Page 19: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

STUB23

m From tower ground to top of tower

m From tower ground (Not include building)

m From tower ground (Not include building)

m From tower ground to bottom of antenna (Not include building)

m Ant to Earth

m RRU to ground

B5.Tower & Ant Implementation

รย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี!บ้น่ TOWER

Special Modify

Electrical Pole

Type 1.3 (Additional New Pole)

Page 20: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

C1.Radio Frequency Part Sector#1

RF Sector1Antenna And Feeder System Implementation – Sector 1

Existing 2G New 3G

Antenna Type: UMWD 06516 2D 5473_800_ET02

Coverage Objective: 65 80

Number of Antennae: 1 1

Antenna Orientation: 10 10

Mechanical Tilt: 0 2

Electrical Tilt: 2 2

RET Installed

Height to Middle of Antenna: (Antenna Height) 40 40

Antenna Distance from Edge of Bldg (see picture below) N/A H: N/A m

Antenna Support Type: (Rooftop Pole/Wall Pole/Guyed Mast/Tower) TOWER TOWER

Antenna Support Height: 40 40

Isolation from 2G

N/AIsolation requirement for 3G Antenna installation:

Option 1: Vertical 0.5 meter

Option 2: Horizontal 1 Meter (at least 0.4m )

Feeder Type (if applicable) 15 8 N/A

Feeder Length: (m) N/A N/A

Space Available for antenna of 3G 2.1GHz N/A

Filter N/A N/A

TMA N/A N/A

Diplexer N/A N/A

Comment of Sector1:

H

D

Antenna

Yes No Yes

Vertical (m)

Horizontal (m)

Yes

Page 21: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

C1.Radio Frequency Part Sector#1

RF Sector1Antenna And Feeder System Implementation – Sector 1

New 3G

5473_800_ET02

80

1

10

2

2

40

D: N/A m

TOWER

40

1

N/A

N/A

*

N/A

N/A

N/A

No

No

Page 22: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

C2.Radio Frequency Part Sector#2

RF Sector2Antenna And Feeder System Implementation – Sector 2

Existing 2G New 3G

Antenna Type: UMWD 06516 2D 5473_800_ET02

Coverage Objective: 65 80

Number of Antennae: 1 1

Antenna Orientation: 120 100

Mechanical Tilt: 0 2

Electrical Tilt: 2 2

RET Installed

Height to Middle of Antenna: (Antenna Height) 40 40

Antenna Distance from Edge of Bldg (see picture below) N/A H: N/A m

Antenna Support Type: (Rooftop Pole/Wall Pole/Guyed Mast/Tower) TOWER TOWER

Antenna Support Height: 40 40

Isolation from 2G

N/AIsolation requirement for 3G Antenna installation:

Option 1: Vertical 0.5 meter

Option 2: Horizontal 1 Meter (at least 0.4m )

Feeder Type (if applicable) 15 8 N/A

Feeder Length: (m) N/A N/A

Space Available for antenna of 3G 2.1GHz N/A

Filter N/A N/A

TMA N/A N/A

Diplexer N/A N/A

Comment of Sector2 :

H

D

Antenna

Yes No Yes

Vertical (m)

Horizontal (m)

Yes

Page 23: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

C2.Radio Frequency Part Sector#2

RF Sector2Antenna And Feeder System Implementation – Sector 2

New 3G

5473_800_ET02

80

1

100

2

2

*

40

D: N/A m

TOWER

40

1

N/A

N/A

*

N/A

N/A

N/A

No

No

Page 24: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

C3.Radio Frequency Part Sector#3

RF Sector3Antenna And Feeder System Implementation – Sector 3

Existing 2G New 3G

Antenna Type: PCSD18 09015 2D 5473_800_ET02

Coverage Objective: 65 90

Number of Antennae: 2 1

Antenna Orientation: 240 240

Mechanical Tilt: 0 2

Electrical Tilt: 2 4

RET Installed

Height to Middle of Antenna: (Antenna Height) 40 40

Antenna Distance from Edge of Bldg (see picture below) N/A H: N/A m

Antenna Support Type: (Rooftop Pole/Wall Pole/Guyed Mast/Tower) TOWER TOWER

Antenna Support Height: 40 40

Isolation from 2G

N/AIsolation requirement for 3G Antenna installation:

Option 1: Vertical 0.5 meter

Option 2: Horizontal 1 Meter (at least 0.4m )

Feeder Type (if applicable) 15 8 N/A

Feeder Length: (m) N/A N/A

Space Available for antenna of 3G 2.1GHz N/A

Filter N/A N/A

TMA N/A N/A

Diplexer N/A N/A

Comment of Sector3 :

H

D

Antenna

Yes No Yes

Vertical (m)

Horizontal (m)

Yes

Page 25: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

C3.Radio Frequency Part Sector#3

RF Sector3Antenna And Feeder System Implementation – Sector 3

New 3G

5473_800_ET02

90

1

240

2

4

*

40

D: N/A m

TOWER

40

1

N/A

N/A

*

N/A

N/A

N/A

No

No

Page 26: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

C4.Radio Frequency Part Sector#4

RF Sector4Antenna And Feeder System Implementation – Sector 4

Existing 2G New 3G

Antenna Type:

Coverage Objective:

Number of Antennae:

Antenna Orientation:

Mechanical Tilt:

Electrical Tilt:

RET Installed

Height to Middle of Antenna: (Antenna Height)

Antenna Distance from Edge of Bldg (see picture below) H:

Antenna Support Type: (Rooftop Pole/Wall Pole/Guyed Mast/Tower)

Antenna Support Height:

Isolation from 2G

N/AIsolation requirement for 3G Antenna installation:

Option 1: Vertical 0.5 meter

Option 2: Horizontal 1 Meter (at least 0.4m )

Feeder Type (if applicable)

Feeder Length: (m)

Space Available for antenna of 3G 2.1GHz

Filter

TMA

Diplexer

Comment of Sector4 :

H

D

Antenna

Yes No Yes

Vertical (m)

Horizontal (m)

Yes

Page 27: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

C4.Radio Frequency Part Sector#4

RF Sector4Antenna And Feeder System Implementation – Sector 4

New 3G

*

m D: m

*

Yes No

Vertical (m)

Horizontal (m)

Yes No

Page 28: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

C5. Obstacle Diagram.

#

1 N/A

2 N/A

3 N/A

4

5

ถ�ไมู มู�ส��งกี่�ดข้วงกี่ร�ณ์ ใส X ใน่กี่ล องที่งซ้�ยมู&อObstacles: describe all obstructing obstacles within 500 meters,

which are of a height equal to or higher than the siteส��งกี่�ดข้วง: อธ�บยถ.งส��งกี่�ดข้วงภยใน่ร�ศมู� 500 เมูตำร ซ้.�งมู�ควมูส�งเที่ หร&อ ส�งกี่ว สถน่�

Azimuthที่�ศที่ง

Distanceระยะที่ง

Height AGLควมูส�งเหน่&อพื้&�น่ด�น่

200m

100m

0

30

60

90

120

150

240

210

180

300

330

270

N

300m

400m

500m

(If there are no obstacles mark here with a "X"

Page 29: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

6

Page 30: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

ถ�ไมู มู�ส��งกี่�ดข้วงกี่ร�ณ์ ใส X ใน่กี่ล องที่งซ้�ยมู&อObstacles: describe all obstructing obstacles within 500 meters,

which are of a height equal to or higher than the site อธ�บยถ.งส��งกี่�ดข้วงภยใน่ร�ศมู� 500 เมูตำร ซ้.�งมู�ควมูส�งเที่ หร&อ ส�งกี่ว สถน่�

Descriptionรยละเอ�ยด

200m

100m

0

30

60

90

120

150

240

210

180

300

330

270

N

300m

400m

500m

(If there are no obstacles mark here with a "X"

Page 31: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

Page 32: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

C6. Sketch plan of Rooftop site or Greenfield site (Top View,)

แบ้บ้หล�งคหร.อแบ้บ้บ้น่ที่��ด)น่ที่��ตำ)ดตำ��งเสอกศั(Remember to indicate North direction on the sketch)

โปรดระบ้*ที่)ศัเหน่.อบ้น่แบ้บ้1. Please identify proposed location of guy anchor and antennas

โปรดระบ้*ตำ�แหน่ งคร วัๆ ข้องกรตำ)ดตำ��งเสอกศั2. Please include location of any other antennas

โปรดระบ้*ตำ�แหน่ งข้องเสอกศัอ.�น่ที่��ตำ)ดตำ��งอย์�

Before

After

Page 33: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

C6. Sketch plan of Rooftop site or Greenfield site (Top View,)

แบ้บ้หล�งคหร.อแบ้บ้บ้น่ที่��ด)น่ที่��ตำ)ดตำ��งเสอกศั(Remember to indicate North direction on the sketch)

โปรดระบ้*ที่)ศัเหน่.อบ้น่แบ้บ้

Page 34: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

C7. Sketch Equipment Room Floor Plan Layout

1. Please identify proposed location of all new Equipment2. Please include location of existing Equipment

Page 35: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

C7. Sketch Equipment Room Floor Plan Layout

Page 36: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

D1. PHOTOS LIST (Indoor)

Access Road

Front site/building view

Page 37: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

Site Drawing View

Check AC main breaker and DC PDB slot

Addto new CB 50 A

Page 38: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

N/A

DC power supply

N/A

DC Equipment Ground BAR

Page 39: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

N/A

Feeder window hole

N/A

Transmission, DDF and connector type

Page 40: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

N/A

Room Free Space - 1

N/A

Room Free Space - 2

Page 41: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

N/A

APM30 or 19’ New Rack location (if any)

BBU Equipment location

NEW Eltex

Page 42: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

Indoor Cable ladder

Page 43: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

D2. PHOTOS LIST (Outdoor)

RRU Location Sector1

RRU Location Sector2

2G

3G

3G

2G

Page 44: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

RRU Location Sector3

RRU Location Sector4 (If any)

3G

2G

Page 45: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

Outdoor Cable ladder

Outdoor groung bar

Page 46: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

Tower ground bar

Outdoor feeder tray

Page 47: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

Feeder installation standard

Feeder Clamp installation standard

Page 48: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

Rooftop Front site view

Rooftop Back site view

Page 49: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

Rooftop Right site view

Equipment mounted (if any)

Page 50: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

D3. PHOTOS LIST (RF)

Panoramic 0 Degree

Panoramic 30 degree

Page 51: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

Page 52: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

Panoramic 60 degree

Panoramic 90 degree

Panoramic 120 degree

Page 53: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

Panoramic 150 degree

Panoramic 180 degree

Page 54: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

Panoramic 210 degree

Panoramic 240 degree

Page 55: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

Panoramic 270 degree

Panoramic 300 degree

Page 56: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

Panoramic 330 degree

Antenna Location Sector1

Page 57: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

Antenna Location Sector2

Antenna Location Sector3

Page 58: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

N/A

Antenna Location Sector4 (If any)

Sector1 10 Degree view

Page 59: Cri0002 3g Bfkt Tssr Ok

Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011

Sector2 100 Degree view

Sector3 240 Degree view

Page 60: Cri0002 3g Bfkt Tssr Ok

Site ID ______ Site Name ________ Candidate___ Phase3G ___ ___ Date ______

Site Acquisition Reports

Please remember to check the following on first visit.

No Description Check

1 Equipment Type & Location

2 Antenna Height and Type

3

4 Power to run equipment (MDB, AC breaker Brand, Spare slots)

5 Height of structure (use 50m tapes to get accurate measurement)

6 Description of how to get to site written from major point of town or road junction.

7 Space available indoor or on the roof or mast.

8 Owners name and address and if we have 24 hour access (if not who has the keys)

and correct in all the information you write into this SAR).

Photos and more photos included access, danger points, power out let, 360 degree photos from roof every 30 degrees. Photo everything!!!!

IMPORTANT – take your time, do not leave the site before you have collected all the information !!

REMEMBER – the information you collect must be understood by other people as well (be short, precise

Page 61: Cri0002 3g Bfkt Tssr Ok

Annex 9-1.5 TSSR form (excel)

1 Site info2 Equipment3 RF

Page 62: Cri0002 3g Bfkt Tssr Ok

Site ID A1. Site Location Details Site ID Candidate RegionBKAxxx1 CRI0002A NorthBKAxxx2BKAxxx3BKAxxx4

Page 63: Cri0002 3g Bfkt Tssr Ok

Site Name Building Name Status Phase (2G) Phase (3G) Address Moo Ban Trok/SoiGRF /Ban RoN/A N/A N/A Ph.3 N/A N/A N/A

Page 64: Cri0002 3g Bfkt Tssr Ok

Road Tumbon/Subdistrict Amphur/District Province Postal Code Telephone Lattiude(E)N/A N/A เมู&อง Chiang rai 57100 - 19.9272

Page 65: Cri0002 3g Bfkt Tssr Ok

Longitude(N) Site Type Area Type Equipment Location Antenna Height AGL99.8416 ShopHouse Urban 40

Page 66: Cri0002 3g Bfkt Tssr Ok

Ground Height ASL Survey Date SA Name C&I Name RF Name TRSP NameN/A 26/8/54

Page 67: Cri0002 3g Bfkt Tssr Ok

Landlord Representation Comment A2. Site Access Access Time

Page 68: Cri0002 3g Bfkt Tssr Ok

Contact Detail for access Parking Access route Road Type Key to access the buildingTMV : -

Page 69: Cri0002 3g Bfkt Tssr Ok

Public road to site Site access comment A3. Site Provider Details Name Address

Page 70: Cri0002 3g Bfkt Tssr Ok

Moo Ban Trok/Soi Road Tumbon/Subdistrict Amphur/District Province Postal Code

Page 71: Cri0002 3g Bfkt Tssr Ok

Telephone Mobile Fax Type of Ownership Site Provider's Interest General Comments

Page 72: Cri0002 3g Bfkt Tssr Ok

A4. Agent Contact Details Name Company Name Telephone Mobile Fax

Page 73: Cri0002 3g Bfkt Tssr Ok

General Comments A5. Acquisition Details Estamate Rent

Page 74: Cri0002 3g Bfkt Tssr Ok

Estimate acquistion timescale Under Mortgage Standard Lease

Page 75: Cri0002 3g Bfkt Tssr Ok

Any acquisition requirements General Comments relating to Acquisition

Page 76: Cri0002 3g Bfkt Tssr Ok

A6. Existing Infrastruction & Co-location Operator/Owner Antenna Type

Page 77: Cri0002 3g Bfkt Tssr Ok

Distance from site Height A7. Site Hazard Details Underground cables

Page 78: Cri0002 3g Bfkt Tssr Ok

Underground pipes Tripping hazards Slippery Surfaces Unprotected Staircase Animal

Page 79: Cri0002 3g Bfkt Tssr Ok

Dangerous fumes Unprotected skylights Unprotected Edges

Page 80: Cri0002 3g Bfkt Tssr Ok

A8. Construction Details Staircase dimension Elevator demension1 : 1 N/A : N/A : N/A

Page 81: Cri0002 3g Bfkt Tssr Ok

Elevator Load Capacity Access Dorr Dimension Space available for craneN/A 2.4 : N/A : N/A 5

Page 82: Cri0002 3g Bfkt Tssr Ok

Parking available for vehicles Building Type Condition of Building and rooftop

Page 83: Cri0002 3g Bfkt Tssr Ok

General Comments relating to Construction A9. Power Authorities Company Name

Page 84: Cri0002 3g Bfkt Tssr Ok

Contact Person Address Moo Ban Trok/Soi Road Tumbon/Subdistrict Amphur/District

Page 85: Cri0002 3g Bfkt Tssr Ok

Province Postal Code Telephone Mobile Fax Existing Power Supply Supply Tye

Page 86: Cri0002 3g Bfkt Tssr Ok

Power Detail Distance to Power Supply The Power Supply has to cross

Page 87: Cri0002 3g Bfkt Tssr Ok

Describe ground conditions General Comments relating to Power

Page 88: Cri0002 3g Bfkt Tssr Ok

Site ID B1. BBU Equipment Implementation NodeB Site TypeBKAxxx1BKAxxx2BKAxxx3

Page 89: Cri0002 3g Bfkt Tssr Ok

NodeB Configuration Site Type Site Type (other) Floor Type Floor Type (other)

Page 90: Cri0002 3g Bfkt Tssr Ok

Room Dimension Space for BBU How to install BBU2.1x3.2x3

Page 91: Cri0002 3g Bfkt Tssr Ok

BBU DC Power Cable Length BBU PGND Power Cable Length2 5

Page 92: Cri0002 3g Bfkt Tssr Ok

Trunk cable with the lub interface_Length

Trunk cable with the lub interface_Peer end connector type

Page 93: Cri0002 3g Bfkt Tssr Ok

2

LAN cable with the lub interface_Length

LAN cable with the lub interface_Peer end connector type

Page 94: Cri0002 3g Bfkt Tssr Ok

Type of DDF15 LC/FC

Optic cable with the lub interface_Length

Optic cable with the lub interface_Peer end connector type

Page 95: Cri0002 3g Bfkt Tssr Ok

Type of DDF (other) Location of new DDF Tie E1 CableHow many available port of existing DDF

Page 96: Cri0002 3g Bfkt Tssr Ok

Tie E1 Cable_Length Alarm Cable Length2

Alarm Cable_Capacity of existing DDF

Page 97: Cri0002 3g Bfkt Tssr Ok

Comments of Implemntation Team B2. RRU Equipment Implementation SectorS1S2S3S4

Page 98: Cri0002 3g Bfkt Tssr Ok

Space for RRU 2100 MHz Space available for RRU on existing structure

Page 99: Cri0002 3g Bfkt Tssr Ok

How to install HW RRU Installation kit for RRU xxx model

Page 100: Cri0002 3g Bfkt Tssr Ok

Structure Modification for RRU Needed Space for New Antenna

Page 101: Cri0002 3g Bfkt Tssr Ok

Structure Modification for new Antenna Needed Length of Power Cable RRU

Page 102: Cri0002 3g Bfkt Tssr Ok

Ground Bar for RRU Length of Optic Cable Jumper Length between RRU and Ant222

Page 103: Cri0002 3g Bfkt Tssr Ok

Feeder 7/8" Fix-Length Top Jumper Length of Power Cable RRUN/AN/AN/A

Page 104: Cri0002 3g Bfkt Tssr Ok

Space available for MIMO additonal 3G RRU Comments of Implementation Team

Page 105: Cri0002 3g Bfkt Tssr Ok

B3. Power Implementation Power Consumption of BBU xxxx SectorS1S2S3S4

Page 106: Cri0002 3g Bfkt Tssr Ok

Power Consumption RRU Additional Rectifier needed for long BBU-RRU distance0 N/A0 N/A0 N/A0

Page 107: Cri0002 3g Bfkt Tssr Ok

Power Mode DC available Independence DC Power Total Power Supply Capacity

Page 108: Cri0002 3g Bfkt Tssr Ok

Remaining Power Current Capacity of existing battery Existing DC Circuit Breakers available

Page 109: Cri0002 3g Bfkt Tssr Ok

Add New Breaker Cabinet Basement Power input for Power Cabinet AC Power Cable Length1 15

Page 110: Cri0002 3g Bfkt Tssr Ok

Comments of Implemntation Team B4. Existing Transmission

Page 111: Cri0002 3g Bfkt Tssr Ok

Infrastructure of Transmission Transmission Connection with Leased Line

Page 112: Cri0002 3g Bfkt Tssr Ok

Using Optic Fiber Solution Internal Copper Wire Space for ODF

Page 113: Cri0002 3g Bfkt Tssr Ok

Space for ADM/Switch Node Existing Transmission Interface Type of Existing Transmission

Page 114: Cri0002 3g Bfkt Tssr Ok

Communication Sites Surrounding Comments of Implemntation Team#REF!

Page 115: Cri0002 3g Bfkt Tssr Ok

B5. Tower & Antenna Implementation Building Height from Earth Tower Type#REF!

Page 116: Cri0002 3g Bfkt Tssr Ok

Tower Height Existing Antenna Height New Antenna Hegith#REF! #REF! #REF!

Page 117: Cri0002 3g Bfkt Tssr Ok

Height from floor level to bottom of antenna Total New Antenna Height#REF! #REF!

Page 118: Cri0002 3g Bfkt Tssr Ok

RRU Height from Tower Ground Existing 2G Antenna Mounting Type#REF!

Page 119: Cri0002 3g Bfkt Tssr Ok

New 3G Antenna Mounting Type Existing Structure Support New Configuration

Page 120: Cri0002 3g Bfkt Tssr Ok

New Structure Type Comments of Implemntation Team#REF!

Page 121: Cri0002 3g Bfkt Tssr Ok

Site C1. Radio Frequency Part Sector1 Antenna TypeCRI0002 Existing 2G UMWD 06516 2

New 3G 5473_800_ET02

Page 122: Cri0002 3g Bfkt Tssr Ok

Coverage Objective Number of Antenna Antenna Orientation Mechanical Tilt Electrical Tilt65 1 10 0 280 1 10 2 2

Page 123: Cri0002 3g Bfkt Tssr Ok

RET Installed Height to Middle of Antenna Antenna Distance from Edge of Building40 N/A40 N/A;N/A

Page 124: Cri0002 3g Bfkt Tssr Ok

Antenna Support Type Antenna Support Height Isolation requirement for 3G AntennaTOWER 40TOWER 40

Page 125: Cri0002 3g Bfkt Tssr Ok

Feeder Type Feeder Length Filter TMA Dipixer Comment of Sector115 8 N/A N/A N/A N/AN/A N/A N/A N/A N/A

Page 126: Cri0002 3g Bfkt Tssr Ok

C2. Radio Frequency Part Sector2 Antenna Type Coverage ObjectiveUMWD 06516 2 655473_800_ET02 80

Page 127: Cri0002 3g Bfkt Tssr Ok

Number of Antenna Antenna Orientation Mechanical Tilt Electrical Tilt1 120 0 21 100 2 2

Page 128: Cri0002 3g Bfkt Tssr Ok

Height to Middle of Antenna Antenna Distance from Edge of Building Antenna Support Type40 N/A TOWER40 N/A;N/A TOWER

Page 129: Cri0002 3g Bfkt Tssr Ok

Antenna Support Height Isolation requirement for 3G Antenna Feeder Type Feeder Length40 15 8 N/A40 N/A N/A

Page 130: Cri0002 3g Bfkt Tssr Ok

Filter TMA Dipixer Comment of Sector2N/A N/A N/AN/A N/A N/A

Page 131: Cri0002 3g Bfkt Tssr Ok

C3. Radio Frequency Part Sector3 Antenna Type Coverage ObjectivePCSD18 09015 655473_800_ET02 90

Page 132: Cri0002 3g Bfkt Tssr Ok

Number of Antenna Antenna Orientation Mechanical Tilt Electrical Tilt2 240 0 21 240 2 4

Page 133: Cri0002 3g Bfkt Tssr Ok

Height to Middle of Antenna Antenna Distance from Edge of Building Antenna Support Type40 N/A TOWER40 N/A;N/A TOWER

Page 134: Cri0002 3g Bfkt Tssr Ok

Antenna Support Height Isolation requirement for 3G Antenna Feeder Type Feeder Length40 15 8 N/A40 N/A N/A

Page 135: Cri0002 3g Bfkt Tssr Ok

Comment of Sector3 Filter TMA DipixerN/A N/A N/AN/A N/A N/A

Page 136: Cri0002 3g Bfkt Tssr Ok

C4. Radio Frequency Part Sector4 Antenna Type Coverage Objective

Page 137: Cri0002 3g Bfkt Tssr Ok

Number of Antenna Antenna Orientation Mechanical Tilt Electrical Tilt

Page 138: Cri0002 3g Bfkt Tssr Ok

Height to Middle of Antenna Antenna Distance from Edge of Building Antenna Support Type

;

Page 139: Cri0002 3g Bfkt Tssr Ok

Antenna Support Height Isolation requirement for 3G Antenna Feeder Type Feeder Length

Page 140: Cri0002 3g Bfkt Tssr Ok

Comment of Sector4 Filter TMA Dipixer C5. Obstacle Diagram

Page 141: Cri0002 3g Bfkt Tssr Ok

Obstacle surrounding Azimuth Distance Geight AGL DescriptionYes N/A 0 0 0

N/A 0 0 0N/A 0 0 0

0 0 0 00 0 0 00 0 0 0

Page 142: Cri0002 3g Bfkt Tssr Ok

TSSR Summary CRI0002

Err:508 Site Name GPS Data Lat-Long Site Type Area Type

CRI0002 GRF /Ban Ro 19.9272 99.8416

Page 143: Cri0002 3g Bfkt Tssr Ok

Equipment Location Lease space (WxLxH) m.

outdoor 8 6 N/A Macro Other

NodeB Site type (Marco or IBC)

NodeB configuration

Page 144: Cri0002 3g Bfkt Tssr Ok

Cabinet for install BBU

0 2 5 0

NodeB configuration

BBU DC power cable length (m.)

BBU PGND Cablelength (m.)

Trunk Cablelength (m.)

Page 145: Cri0002 3g Bfkt Tssr Ok

Type of DDF

0 15 0 0 2

LAN Cable length(m.)

Patch CordSingle ModeFC-LC (m.)

Tie E1 cablelength (m.)

AlarmCable (m.)

Page 146: Cri0002 3g Bfkt Tssr Ok

40 60 40 60 40 60 0 300

RRU DC Power cable Sector1 (m.)

RRU DC Power cable Sector2 (m.)

RRU DC Power cable Sector3 (m.)

RRU DC Power cable Sector4 (m.)

Over All RRUDC Power cable (m.)

Page 147: Cri0002 3g Bfkt Tssr Ok

7 7 7

RRUGround Cable LengthSector1 (m.)

RRUGround Cable LengthSector2 (m.)

RRUGround Cable LengthSector3 (m.)

Page 148: Cri0002 3g Bfkt Tssr Ok

0 21 0

RRUGround Cable LengthSector4 (m.)

Over All RRUGround Cable Length (m.)

Filter Ground Cable Sector1 Length (m.)

Page 149: Cri0002 3g Bfkt Tssr Ok

0 0 0

Filter Ground Cable Sector2 Length (m.)

Filter Ground Cable Sector3 Length (m.)

Filter Ground Cable Sector4 Length (m.)

Page 150: Cri0002 3g Bfkt Tssr Ok

0 40 40 40

OverallFilter Ground CableLength (m.)

CPRI MM LC-LCCable Length (m.)Sector 1

CPRI MM LC-LCCable Length (m.)Sector 2

CPRI MM LC-LCCable Length (m.)Sector 3

Page 151: Cri0002 3g Bfkt Tssr Ok

CPRI MM LC-LCCable Length (m.)Sector 4

Jumper lengthRRU to Ant Sector 1 (m.)

Jumper lengthRRU to Ant Sector 2 (m.)

Jumper lengthRRU to Ant Sector 3 (m.)

2m. 2 เส�น่ 2m. 2 เส�น่ 2m. 2 เส�น่

Page 152: Cri0002 3g Bfkt Tssr Ok

Yes 1 15 15

Jumper lengthRRU to Ant Sector 4 (m.)

Power Mode AC available? (Y/N)

Add New Breaker

AC Power Cable Length (m.)

PGND Cable length (m.)

Page 153: Cri0002 3g Bfkt Tssr Ok

Sector 1

RET Filter

Kathrein 800 10305 Type 1.1 No 40

Antenna Type

Antenna Scenario

AntennaHeightfrom ground (m.)

Page 154: Cri0002 3g Bfkt Tssr Ok

Sector 1 Sector 2

RET

0 1 Kathrein 800 10305 Type 1.1 No

Isolation from2G Ant. requirement for 3G Antenna installation:

Vertical (m.)At least 0.5 meter

Hoizontal (m.)At least 0.4 meter

Antenna Type

Antenna Scenario

Page 155: Cri0002 3g Bfkt Tssr Ok

Sector 2

Filter

No 40 0 1

Isolation from2G Ant. requirement for 3G Antenna installation:

AntennaHeightfrom ground (m.)

Vertical (m.)At least 0.5 meter

Hoizontal (m.)At least 0.4 meter

Page 156: Cri0002 3g Bfkt Tssr Ok

Sector 3

RET Filter

Kathrein 800 10305 Type 1.1 No No 40 0

Isolation from2G Ant. requirement for 3G Antenna installation:

Antenna Type

Antenna Scenario

AntennaHeightfrom ground (m.)

Vertical (m.)At least 0.5 meter

Page 157: Cri0002 3g Bfkt Tssr Ok

Sector 3 Sector 4

RET Filter

1 0 0

Isolation from2G Ant. requirement for 3G Antenna installation:

Isolation from2G Ant. requirement for 3G Antenna installation:

Hoizontal (m.)At least 0.4 meter

Antenna Type

Antenna Scenario

AntennaHeightfrom ground (m.)

Vertical (m.)At least 0.5 meter

Page 158: Cri0002 3g Bfkt Tssr Ok

Sector 4

0

Isolation from2G Ant. requirement for 3G Antenna installation:

Hoizontal (m.)At least 0.4 meter