TSS Report (3G)
Cover
A.Site Location Details
B1.BBU Equipment Implementation
B2.RRU Equipment Implementation
B3.Power Implementation
B4.Existing Transmission
B5.Tower & Ant Implementation
C1.Radio Frequency Part Sector#1
C2.Radio Frequency Part Sector#2
C3.Radio Frequency Part Sector#3
C4.Radio Frequency Part Sector#4
C5. Obstacle Diagram.
C6. Sketch plan of Rooftop site or Greenfield site (Top View,)
C7. Sketch Equipment Room Floor Plan Layout
D1. PHOTOS LIST (Indoor)
D2. PHOTOS LIST (Outdoor)
D3. PHOTOS LIST (RF)
Site Acquisition Reports
ข้�อมู�ลตำ�แหน่ งที่��ตำ� �งสถน่ที่��
รยละเอ�ยดเกี่��ยวกี่�บกี่รตำ�ดตำ��งอ�ปกี่รณ์"ไฟฟ%รยละเอ�ยดเกี่��ยวกี่�บกี่รตำ�ดตำ��งอ�ปกี่รณ์"ส&�อส�ญญณ์เด�มู
แบบหล�งคหร&อแบบบน่ที่��ด�น่ที่��ตำ�ดตำ��งเสอกี่ศ
รยละเอ�ยดเกี่��ยวกี่�บกี่รตำ�ดตำ��งอ�ปกี่รณ์" BBU รยละเอ�ยดเกี่��ยวกี่�บกี่รตำ�ดตำ��งอ�ปกี่รณ์" RRU
รยละเอ�ยดเกี่��ยวกี่�บกี่รตำ�ดตำ��งอ�ปกี่รณ์"บน่tower
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
HSPA BFKT TSS Report
Site Id: CRI0002
Site Name: GRF /Ban Rong Suaten
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
HSPA BFKT TSS Report
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
A1.Site Location Details ข้�อมู�ลตำ�แหน่ งที่��ตำ��งสถน่ที่��
Site ID CRI0002 Candidate A Region North
Site Name GRF /Ban Rong Suaten Building Name N/A Status N/A
Phase (2G) N/A Phase (3G) Ph.3
AddressN/A
Moo BanN/A
Trok/SoiN/Aบ้�น่เลข้ที่�� หมู� บ้�น่
RoadN/A
Tumbon/SubdistrictN/A
Amphur/Districtเมู&องถน่น่
ProvinceChiang rai
Postal Code57100
Telephone-
จั�งหวั�ด รห�สไปรษณี�ย์! โที่รศั�พที่!
19.9272 99.8416
Site Type
ประเภที่ข้องสถน่ที่�� อครส�ง พื้&�น่ที่��ว งเปล
Area Type
ล�กี่ษณ์ะชุ�มูชุน่ หน่แน่ น่ ปน่กี่ลง ชุน่เมู&อง ชุน่บที่Equipment Location Lease space Width (M)
8Length (M)
6Height (M)
N/Aตำ�แหน่ งที่��ตำ��งอ�ปกี่รณ์" พื้&�น่ที่��เชุ Antenna height AGL (M)
40Ground height ASL (M)
N/A
Survey Information:
Survey Date: 26-Aug-11
Function Name TMV Name
SA: (Site Acquisition) TMV
C&I: (Construction & Implementation) TMV
RF: (RF Engineer) TMV
TRSP: (Transmission Planning) TMV
Landlord Representative: TMV
Comments:
ตำรอก/ซอย์
ตำ�บ้ล/แข้วัง อ�เภอ/เข้ตำ
Coordinates Latitude(E): (WGS 84, FROM GPS WITH 3 SATELLITES, 5 DIGITS AFTER DECIMAL FOR DECIMAL FORMAT)
Coordinates Longitude(N): (WGS 84, FROM GPS WITH 3 SATELLITES, 5 DIGITS AFTER DECIMAL FOR DECIMAL FORMAT)
อครพื้ณ์�ชุย"/ตำ.กี่แถว
กี่ว�ง (เมูตำร ยว (เมูตำร) ส�ง (เมูตำร)
ควมูส�งข้องเสอกี่ศ เหน่&อระด�บพื้&�น่ด�น่ (เมูตำร) ควมูส�งข้องพื้&�น่ด�น่เหน่&อระด�บน่��ที่ะเล (เมูตำร)
Vendor /Subcon
ShopHouse Highrise Building Greenfield
Urban Suburban Rural
Indoor Outdoor
Dense Urban
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
A2.Site Accessกรเข้�ออกสถน่ที่��
Accesstime
ระยะเวลเข้�ออกี่สถน่ที่��Contract Detail for Access Name
TMVTelephone
-บ�คคลตำ�ดตำ อเพื้&�อเข้�ออกี่สถน่ที่�� โที่รศ�พื้ที่"Parking
ที่��จอดรถ มู� ไมู มู�Access Route
เส�น่ที่งกี่รเข้�ออกี่ ใชุ�ที่งเข้�ออกี่สธรณ์ะ ใชุ�ที่งเข้�ออกี่ส วน่ตำ�ว สร�งที่งเข้�ออกี่แยกี่ตำ งหกี่Road Type
ชุน่�ดถน่น่ คอน่กี่ร�ตำ 5 เมูตำร ด�น่ เมูตำร ยงมูะตำอย เมูตำร อ&�น่ ๆ
ให� ไมู ให�
ให� ไมู ให�
Any Specific comments relating to access
ตำลอดเวล 24 ชุ��วโมูง 7 ว�น่ กี่�หน่ดเวลกี่รเข้�-ออกี่
ชุ&�อ - น่มูสกี่�ล
Is the site provider give the key to access the building/sites
เจ�ข้องสถน่ที่��ให�กี่�ญแจเข้�ออกี่อครหร&อไมู Is access to the site from the piblic road solely owned by the site provider
ที่งเข้�ออกี่จกี่ถน่น่สธรณ์ะไปย�งสถน่�เป4น่พื้&�น่ที่��ข้องเจ�ข้องสถน่ที่��คน่เด�ยวหร&อไมู
เข้�ออกี่ตำ�ดตำ อ TMV (GRF)ค�แน่ะน่�เพื้��มูเตำ�มูที่��เกี่��ยวข้�องกี่�บกี่รเข้�ออกี่สถน่ที่��
Concrete Soil Asphalt Other
24 hours, 7 days Limited Access
Yes No
Public Access Private Access Build Separate Access
Yes No
Yes No
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
A2.Site Accessกรเข้�ออกสถน่ที่��
-
ไมู มู�
สร�งที่งเข้�ออกี่แยกี่ตำ งหกี่
เมูตำร
ไมู ให�
ไมู ให�
Other
Build Separate Access
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
A3.Construction Detailsรย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��ง
Staircase DimensionWidth (m.) 1 Height (m.) 1
ข้น่ดข้องบ�น่ไดElevator Dimension
Width (m.) N/A Length (m.) N/A Height (m.) N/Aข้น่ดข้องล�ฟที่"Elevator Load Capacity(Kg.)
N/Aน่��หน่�กี่บรรที่�กี่ข้องล�ฟที่"Access Door Dimension
Width (m.) 2.4 Length (m.) N/A Height (m.) N/Aข้น่ดข้องประตำ�ที่งเข้�Road Type
คอน่กี่ร�ตำ 5 เมูตำร ด�น่ เมูตำร ยงมูะตำอย เมูตำร อ&�น่ ๆ
ชุน่�ดข้องพื้&�น่ถน่น่Is parking available for construction vehicles?
มู� ไมู มู�Building Type
ประเภที่ข้องอคร คอน่กี่ร�ตำ ไมู� คอน่กี่ร�ตำ และ ไมู� อ&�น่ ๆ
Condition of building and rooftop
สภพื้ข้องอครและดดฟ% ด� พื้อใชุ� ไมู ค อยด� อ&�น่ ๆNumber of Floors
Floor(s) N/Aจ�น่วน่ชุ��น่Building Age
Year(s) N/Aอย�ข้องอครGeneral Comments relating to construction
รยละเอ�ยดที่��วๆไปเกี่��ยวกี่�บกี่รตำ�ดตำ��ง
ที่��จอดรถเพื้�ยงพื้อส�หร�บรถข้น่อ�ปกี่รณ์"ตำ�ดตำ��ง
Yes No
Concrete and timber OtherConcrete Timber
FairGood Poor Other
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
A3.Construction Detailsรย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��ง
1
N/A
N/A
N/A
เมูตำร
ไมู มู�
อ&�น่ ๆ
อ&�น่ ๆ
N/A
N/A
Other
Other
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
NodeB Site type (Marco or IBC)
NodeB configuration
Site type
Floor Type
พื้&�น่ห�น่กี่รวด
Room dimension (LxWxH) meter. L (m) : 2.1 W (m) : 3.2 H (m) : 3
There’s space for BBU
BBU DC power cable length / PGND Length BBU DC power cable (m) : 2 BBU PGND power cable (m) : 5
Trunk cable with the Iub interface Trunk cable length (m) :
LAN cable with the Iub interface LAN cable length (m) : 2
Optic cable with the Iub interface Optic cable length (m) : 15 Peer end connector type : LC/FC
Type of DDF (to connect with)
How many available port :
Alarm Cable Cable Length (m) : 2 Capacity of existing DDF :
Comments of Implementation Team :
B1.BBU Equipment Implementation รย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี! BBU
How to install BBU(H86mm x W442mm x D310mm, 12kg/BBU)
กี่รตำ�ดตำ��ง BBU
Peer end connector type(If any) :
Peer end connector type(If any) :
Location of New DDF(In case of new DDF)
Tie E1 cable(In case of Tie from New to Existing DDF)
Macro IBC (Pico)
S1 S1/1/1S1/1 S1/1/1/1
Existing Room Building Roof top Container Building Container Greenfield
Sun Shelter RoofTop Sun Shelter Greenfield Other :
Container FL Cement FL Raised FL Wooden FL
Other:
Yes No
Existing DDF Panel Existing DDF Box
New DDF panel New DDF Box (Wall) Other :
Need Length (m) :No Need
19' Rack
APM30
Eltek Outdoor
Emerson Outdoor Emerson Indoor Other :
No Need (Use Existing) DDF panel in 19' rackDDF panel in APM30 DDF panel in EltekDDF panel in Emerson DDF Box on wall
Other
Eltek Indoor
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Sector S1 S2 S3 S4
Space for RRU 850 MHz
How to install HW RRU
Installation kit for RRU 3804 model
Structure Modification for RRU Needed
There's space for New Antenna (at least 2.6m height)
Structure modification for New Antenna needed
60 60 60
Ground Bar for RRU
Length of Ground Cable RRU 15 m. 15 m. 15 m. m.
Length of Ground Cable Filter m. m. m. m.
2 2 2
N/A N/A N/A
Comments of Implementation Team
B2.RRU Equipment Implementationรย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี! RRU
Space Available for RRU on existing structure (RRU 3804: 485mm x 285mm x 170mm, 20kg/RRU)
Length of power cable RRU (RRU-DC ) ( m)
Length of Optic Cable(BBU to RRU) ( m)
Jumper Length between RRU and Ant (m)(Not over 14m)
Feeder 7/8' Length (m)In case, lower jumper > 14m
Jumper Length between RRU and Ant / combiner (Not over 14m) ควมูยวข้องสย Jumper
Space available for 2.1GHz in future (in case need modification of structure, take final result)
Space available for MIMO additional 3G RRU (in case need modification of structure, take final result)
Yes No Yes Yes YesNo NoNo
Yes No Yes Yes YesNo NoNo
Yes No Yes Yes YesNo NoNo
Yes No Yes Yes YesNo NoNo
Yes No Yes Yes YesNo NoNo
Yes No Yes Yes YesNo NoNo
Yes No Yes Yes YesNo NoNo
Yes No Yes Yes YesNo NoNo
2 5
10 20
30 40
50 60
70120
Other :
100150
2 5
10 20
30 40
50 60
70120
Other :
100150
2 5
10 20
30 40
50 60
70120
Other :
100150
2 5
10 20
30 40
50 60
70120
Other :
100150
Distribution Centralized
PoleTowerWall
Ladder
Open Rack
Other :
PoleTowerWall
Ladder
Open Rack
Other :
PoleTowerWall
Ladder
Open Rack
Other :
PoleTowerWall
Ladder
Open Rack
Other :
10 2030 40
50 70
100
Other:
10 20
30 40
50 70
100
Other:
10 20
30 40
50 70
100
Other:
10 20
30 40
50 70
100
Other:
No need
2m. 3 เส�น่2m. 2 เส�น่
No need
2m. 3เส�น่2m. 2 เส�น่
No need
2m., 3 เส�น่2m. 2 เส�น่
No need
2m. 3 เส�น่2m. 2 เส�น่
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
รย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี!ไฟฟ,
A
Sector S1 S2 S3
A A
Additional Rectifier needed for long BBU-RRU distance?N/A N/A N/A
Power Mode DC available? (Y/N)
How many independence DC power
Total Power Supply Capacity (A) A
Remaining Power Current (A) A
Capacity of existing battery (AH) AH
Add New AC Breaker (pcs) 1 pcs
Power input for AC Power Cabinent
AC power cable length 15 meter
PGND cable length 15 meter
รย์ละเอ�ย์ดกรป-กเสไฟฟ,
เจ�ข้องที่��ด�น่เจ�ข้องที่��ด�น่เจ�ข้องที่��ด�น่
ที่งรถไฟ รยละเอ�ยดเพื้��มูเจ�ข้องที่��ด�น่เจ�ข้องที่��ด�น่
Comments of Implementation Team
B3.Power Implementation
Power Consumption of BBU (Max. 250W, Typical</=100W)
Power Consumption per RRU (20W/40W): 210W/240W
Existing DC Circuit breakers available If yes how many slot leave
1. เสไฟฟ%ป5กี่ใน่โฉน่ดที่��ด�น่แปลกี่ที่��เชุ เที่ น่��น่ 1.1 เสไฟฟ%ป5กี่ใน่โฉน่ด/น่.ส. 3. กี่/ ส.ค. เลข้ที่��
1.2 เสไฟฟ%ป5กี่ใน่โฉน่ด/น่.ส. 3. กี่/ ส.ค. เลข้ที่��1.3 เสไฟฟ%ป5กี่ใน่โฉน่ด/น่.ส. 3. กี่/ ส.ค. เลข้ที่��
2. กี่รเด�น่สยไฟฟ%มู�กี่รข้�มู/ พื้ด ผ่ น่อะไรบ�ง
2.1 เสไฟฟ%ป5กี่ใน่โฉน่ด/น่.ส. 3. กี่/ ส.ค. เลข้ที่��2.2 เสไฟฟ%ป5กี่ใน่โฉน่ด/น่.ส. 3. กี่/ ส.ค. เลข้ที่��
Yes No
1 2
Y (>/= 4 slot) Y (>8 slot)
Container FL Cement FL Raised FL Wooden FL
Single Phase Three Phase
ใชุ / ไมู ใชุ โปรดกี่รอกี่รยละเอ�ยดเพื้��มู
ถน่น่ คลอง /ที่��ด�น่ผ่��อ&�น่ โปรดกี่รอกี่
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
รย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี!ไฟฟ,
A
S3 S4
A A
N/A
A
A
AH
pcs
meter
meter
*
*
*
*
รยละเอ�ยดเพื้��มู *
*
*
No
2
No (<4 slot)
Raised FL Wooden FL Other
Other
/ ไมู ใชุ โปรดกี่รอกี่รยละเอ�ยดเพื้��มู
/ที่��ด�น่ผ่��อ&�น่ โปรดกี่รอกี่ อ&�น่
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
B4.IPRAN Transmission
Transmission Implementation
Infrastructure of Transmission (LL, MW, Optic)
IPRAN equipment DC power cable length / PGND Length DC Power Cable (m.) PGND power cable (m.)
2 2
Patch Cord Cable (m.) Peer End Connector type ______
10 LC/FCLAN cable for Downlink interface, length (m)
LAN Cable (m.) Peer End Connector type ______ (if any)
2 RJ45How many available port
Location of New DDF
Tie E1 cable
Length(m.)
Location of New ODF
DDF or ODF PGND length PGND power cable (m.)
5Comments of Transmission Team
รย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี!ส.�อส�ญญณี IPRAN
There're space for IPRAN equipment มู�ที่&�น่ที่��ตำ�ดตำ��งอ�ปกี่รณ์" IPRAN
How to install IPRAN equipment (PTN910) กี่รตำ�ดตำ��งอ�ปกี่รณ์" IPRAN
PTN910: 442 (W) x 220 (D) x 1 U(H)
ควมูยวสยไฟ และ สยกี่รวด"ข้องอ�ปกี่รณ์" IPRAN (PTN910)
Optic cable for Uplink interface, length (m)
ควมูยวข้องสย LAN และประเภที่ห�วตำ อ
Type of DDF (to connect with) ประเภที่ข้อง DDF
Type of DDF ประเภที่ข้อง DDF
ถ�ตำ�องกี่ร DDF ใหมู ตำ�องกี่รแบบ
ตำ�องมู� สย Tie E1 ระหว ง DDF เด�มูกี่�บข้องใหมู หร&อไมู
ถ�ตำ�องกี่ร ODF ใหมู ตำ�องกี่รแบบ
LL MW Optic
Yes
No
19” Rack
21” Rack
23” Rack
APM30
Emerson
Eltek
Existing DDF Panel
Existing DDF Box
New DDF Panel
New DDF Box (Wall)
75 Ohm 120 Ohm
No Need (Use Existing) DDF panel in 19' rack
DDF panel in APM30
DDF panel in 23' rackDDF panel in 21' rack
Other
Need No Need
No Need (Use Existing) ODF panel in 19' rack
ODF panel in APM30
ODF panel in 23' rackODF panel in 21' rack
Other
Etc.
Wall Mount
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
B4.IPRAN Transmission
Transmission Implementation
2
LC/FC
Peer End Connector type ______ (if any)
RJ45
5
รย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี!ส.�อส�ญญณี IPRAN
DDF panel in 19' rack
DDF panel in 23' rack
Other
No Need
ODF panel in 19' rack
ODF panel in 23' rack
Other
Etc.
Wall Mount
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Building height (m) from earth
Tower type
Tower height (m.)
40 m From tower ground to top of tower
Existing Antenna height (m 40 m From tower ground (Not include building)
New Antenna height (m) 40 m From tower ground (Not include building)
Height from floor level to bottom of antenna 39 m From tower ground to bottom of antenna (Not include building)
Total New Antenna height (m) 40 m Ant to Earth
RRU height (m) from tower ground 39 m RRU to ground
Existing 2G Antenna height (m
New 3G Antenna mounting Type
New Structure Type (if applicable)
Comments of Implementation Team
B5.Tower & Ant Implementation
รย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี!บ้น่ TOWER
Can existing structure support new configuration (Yes/No)
Pole Guyed Mast Self Support Wall Mout OtherElectrical Pole
A B C D Special Modify
Type 1.1
Type 2.1
Type 3 (2G/3G Single RAN that can reduce antenna)
Special Modify (Remark) ______________________
Yes No
Pole Guyed Mast Self Support Wall Mout
Other
Electrical Pole
Type 1.2 (Need Retrofit) Type 1.3 (Additional New Pole)
Type 2.2 Type 2.3
togetherwe can makeit convergence Type 1 (Add)
Before
After
2G
3G(850)
2G 2G
3G (850)
2G 2G
Vertical position preferred
togetherwe can makeit convergence
Type 2.1, 2.2, 2.3 (Swapped)
Type 2.2
Before
2G 3G (850)
2G 2G
3G (850)
Type 2.1(Swap and add)
2G 2G
2G
2G 2G3G (850)
Vertical Horizontal
3G
Type 2.3
3G 3G
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
STUB23
m From tower ground to top of tower
m From tower ground (Not include building)
m From tower ground (Not include building)
m From tower ground to bottom of antenna (Not include building)
m Ant to Earth
m RRU to ground
B5.Tower & Ant Implementation
รย์ละเอ�ย์ดเก��ย์วัก�บ้กรตำ)ดตำ��งอ*ปกรณี!บ้น่ TOWER
Special Modify
Electrical Pole
Type 1.3 (Additional New Pole)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C1.Radio Frequency Part Sector#1
RF Sector1Antenna And Feeder System Implementation – Sector 1
Existing 2G New 3G
Antenna Type: UMWD 06516 2D 5473_800_ET02
Coverage Objective: 65 80
Number of Antennae: 1 1
Antenna Orientation: 10 10
Mechanical Tilt: 0 2
Electrical Tilt: 2 2
RET Installed
Height to Middle of Antenna: (Antenna Height) 40 40
Antenna Distance from Edge of Bldg (see picture below) N/A H: N/A m
Antenna Support Type: (Rooftop Pole/Wall Pole/Guyed Mast/Tower) TOWER TOWER
Antenna Support Height: 40 40
Isolation from 2G
N/AIsolation requirement for 3G Antenna installation:
Option 1: Vertical 0.5 meter
Option 2: Horizontal 1 Meter (at least 0.4m )
Feeder Type (if applicable) 15 8 N/A
Feeder Length: (m) N/A N/A
Space Available for antenna of 3G 2.1GHz N/A
Filter N/A N/A
TMA N/A N/A
Diplexer N/A N/A
Comment of Sector1:
H
D
Antenna
Yes No Yes
Vertical (m)
Horizontal (m)
Yes
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C1.Radio Frequency Part Sector#1
RF Sector1Antenna And Feeder System Implementation – Sector 1
New 3G
5473_800_ET02
80
1
10
2
2
40
D: N/A m
TOWER
40
1
N/A
N/A
*
N/A
N/A
N/A
No
No
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C2.Radio Frequency Part Sector#2
RF Sector2Antenna And Feeder System Implementation – Sector 2
Existing 2G New 3G
Antenna Type: UMWD 06516 2D 5473_800_ET02
Coverage Objective: 65 80
Number of Antennae: 1 1
Antenna Orientation: 120 100
Mechanical Tilt: 0 2
Electrical Tilt: 2 2
RET Installed
Height to Middle of Antenna: (Antenna Height) 40 40
Antenna Distance from Edge of Bldg (see picture below) N/A H: N/A m
Antenna Support Type: (Rooftop Pole/Wall Pole/Guyed Mast/Tower) TOWER TOWER
Antenna Support Height: 40 40
Isolation from 2G
N/AIsolation requirement for 3G Antenna installation:
Option 1: Vertical 0.5 meter
Option 2: Horizontal 1 Meter (at least 0.4m )
Feeder Type (if applicable) 15 8 N/A
Feeder Length: (m) N/A N/A
Space Available for antenna of 3G 2.1GHz N/A
Filter N/A N/A
TMA N/A N/A
Diplexer N/A N/A
Comment of Sector2 :
H
D
Antenna
Yes No Yes
Vertical (m)
Horizontal (m)
Yes
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C2.Radio Frequency Part Sector#2
RF Sector2Antenna And Feeder System Implementation – Sector 2
New 3G
5473_800_ET02
80
1
100
2
2
*
40
D: N/A m
TOWER
40
1
N/A
N/A
*
N/A
N/A
N/A
No
No
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C3.Radio Frequency Part Sector#3
RF Sector3Antenna And Feeder System Implementation – Sector 3
Existing 2G New 3G
Antenna Type: PCSD18 09015 2D 5473_800_ET02
Coverage Objective: 65 90
Number of Antennae: 2 1
Antenna Orientation: 240 240
Mechanical Tilt: 0 2
Electrical Tilt: 2 4
RET Installed
Height to Middle of Antenna: (Antenna Height) 40 40
Antenna Distance from Edge of Bldg (see picture below) N/A H: N/A m
Antenna Support Type: (Rooftop Pole/Wall Pole/Guyed Mast/Tower) TOWER TOWER
Antenna Support Height: 40 40
Isolation from 2G
N/AIsolation requirement for 3G Antenna installation:
Option 1: Vertical 0.5 meter
Option 2: Horizontal 1 Meter (at least 0.4m )
Feeder Type (if applicable) 15 8 N/A
Feeder Length: (m) N/A N/A
Space Available for antenna of 3G 2.1GHz N/A
Filter N/A N/A
TMA N/A N/A
Diplexer N/A N/A
Comment of Sector3 :
H
D
Antenna
Yes No Yes
Vertical (m)
Horizontal (m)
Yes
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C3.Radio Frequency Part Sector#3
RF Sector3Antenna And Feeder System Implementation – Sector 3
New 3G
5473_800_ET02
90
1
240
2
4
*
40
D: N/A m
TOWER
40
1
N/A
N/A
*
N/A
N/A
N/A
No
No
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C4.Radio Frequency Part Sector#4
RF Sector4Antenna And Feeder System Implementation – Sector 4
Existing 2G New 3G
Antenna Type:
Coverage Objective:
Number of Antennae:
Antenna Orientation:
Mechanical Tilt:
Electrical Tilt:
RET Installed
Height to Middle of Antenna: (Antenna Height)
Antenna Distance from Edge of Bldg (see picture below) H:
Antenna Support Type: (Rooftop Pole/Wall Pole/Guyed Mast/Tower)
Antenna Support Height:
Isolation from 2G
N/AIsolation requirement for 3G Antenna installation:
Option 1: Vertical 0.5 meter
Option 2: Horizontal 1 Meter (at least 0.4m )
Feeder Type (if applicable)
Feeder Length: (m)
Space Available for antenna of 3G 2.1GHz
Filter
TMA
Diplexer
Comment of Sector4 :
H
D
Antenna
Yes No Yes
Vertical (m)
Horizontal (m)
Yes
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C4.Radio Frequency Part Sector#4
RF Sector4Antenna And Feeder System Implementation – Sector 4
New 3G
*
m D: m
*
Yes No
Vertical (m)
Horizontal (m)
Yes No
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C5. Obstacle Diagram.
#
1 N/A
2 N/A
3 N/A
4
5
ถ�ไมู มู�ส��งกี่�ดข้วงกี่ร�ณ์ ใส X ใน่กี่ล องที่งซ้�ยมู&อObstacles: describe all obstructing obstacles within 500 meters,
which are of a height equal to or higher than the siteส��งกี่�ดข้วง: อธ�บยถ.งส��งกี่�ดข้วงภยใน่ร�ศมู� 500 เมูตำร ซ้.�งมู�ควมูส�งเที่ หร&อ ส�งกี่ว สถน่�
Azimuthที่�ศที่ง
Distanceระยะที่ง
Height AGLควมูส�งเหน่&อพื้&�น่ด�น่
200m
100m
0
30
60
90
120
150
240
210
180
300
330
270
N
300m
400m
500m
(If there are no obstacles mark here with a "X"
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
6
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
ถ�ไมู มู�ส��งกี่�ดข้วงกี่ร�ณ์ ใส X ใน่กี่ล องที่งซ้�ยมู&อObstacles: describe all obstructing obstacles within 500 meters,
which are of a height equal to or higher than the site อธ�บยถ.งส��งกี่�ดข้วงภยใน่ร�ศมู� 500 เมูตำร ซ้.�งมู�ควมูส�งเที่ หร&อ ส�งกี่ว สถน่�
Descriptionรยละเอ�ยด
200m
100m
0
30
60
90
120
150
240
210
180
300
330
270
N
300m
400m
500m
(If there are no obstacles mark here with a "X"
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C6. Sketch plan of Rooftop site or Greenfield site (Top View,)
แบ้บ้หล�งคหร.อแบ้บ้บ้น่ที่��ด)น่ที่��ตำ)ดตำ��งเสอกศั(Remember to indicate North direction on the sketch)
โปรดระบ้*ที่)ศัเหน่.อบ้น่แบ้บ้1. Please identify proposed location of guy anchor and antennas
โปรดระบ้*ตำ�แหน่ งคร วัๆ ข้องกรตำ)ดตำ��งเสอกศั2. Please include location of any other antennas
โปรดระบ้*ตำ�แหน่ งข้องเสอกศัอ.�น่ที่��ตำ)ดตำ��งอย์�
Before
After
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C6. Sketch plan of Rooftop site or Greenfield site (Top View,)
แบ้บ้หล�งคหร.อแบ้บ้บ้น่ที่��ด)น่ที่��ตำ)ดตำ��งเสอกศั(Remember to indicate North direction on the sketch)
โปรดระบ้*ที่)ศัเหน่.อบ้น่แบ้บ้
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C7. Sketch Equipment Room Floor Plan Layout
1. Please identify proposed location of all new Equipment2. Please include location of existing Equipment
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
C7. Sketch Equipment Room Floor Plan Layout
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
D1. PHOTOS LIST (Indoor)
Access Road
Front site/building view
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Site Drawing View
Check AC main breaker and DC PDB slot
Addto new CB 50 A
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
N/A
DC power supply
N/A
DC Equipment Ground BAR
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
N/A
Feeder window hole
N/A
Transmission, DDF and connector type
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
N/A
Room Free Space - 1
N/A
Room Free Space - 2
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
N/A
APM30 or 19’ New Rack location (if any)
BBU Equipment location
NEW Eltex
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Indoor Cable ladder
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
D2. PHOTOS LIST (Outdoor)
RRU Location Sector1
RRU Location Sector2
2G
3G
3G
2G
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
RRU Location Sector3
RRU Location Sector4 (If any)
3G
2G
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Outdoor Cable ladder
Outdoor groung bar
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Tower ground bar
Outdoor feeder tray
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Feeder installation standard
Feeder Clamp installation standard
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Rooftop Front site view
Rooftop Back site view
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Rooftop Right site view
Equipment mounted (if any)
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
D3. PHOTOS LIST (RF)
Panoramic 0 Degree
Panoramic 30 degree
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Panoramic 60 degree
Panoramic 90 degree
Panoramic 120 degree
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Panoramic 150 degree
Panoramic 180 degree
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Panoramic 210 degree
Panoramic 240 degree
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Panoramic 270 degree
Panoramic 300 degree
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Panoramic 330 degree
Antenna Location Sector1
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Antenna Location Sector2
Antenna Location Sector3
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
N/A
Antenna Location Sector4 (If any)
Sector1 10 Degree view
Site ID CMI1776 Site Name GRF / Hang Dong market Candidate A Phase3G 1 Date 19/05/2011
Sector2 100 Degree view
Sector3 240 Degree view
Site ID ______ Site Name ________ Candidate___ Phase3G ___ ___ Date ______
Site Acquisition Reports
Please remember to check the following on first visit.
No Description Check
1 Equipment Type & Location
2 Antenna Height and Type
3
4 Power to run equipment (MDB, AC breaker Brand, Spare slots)
5 Height of structure (use 50m tapes to get accurate measurement)
6 Description of how to get to site written from major point of town or road junction.
7 Space available indoor or on the roof or mast.
8 Owners name and address and if we have 24 hour access (if not who has the keys)
and correct in all the information you write into this SAR).
Photos and more photos included access, danger points, power out let, 360 degree photos from roof every 30 degrees. Photo everything!!!!
IMPORTANT – take your time, do not leave the site before you have collected all the information !!
REMEMBER – the information you collect must be understood by other people as well (be short, precise
Annex 9-1.5 TSSR form (excel)
1 Site info2 Equipment3 RF
Site ID A1. Site Location Details Site ID Candidate RegionBKAxxx1 CRI0002A NorthBKAxxx2BKAxxx3BKAxxx4
Site Name Building Name Status Phase (2G) Phase (3G) Address Moo Ban Trok/SoiGRF /Ban RoN/A N/A N/A Ph.3 N/A N/A N/A
Road Tumbon/Subdistrict Amphur/District Province Postal Code Telephone Lattiude(E)N/A N/A เมู&อง Chiang rai 57100 - 19.9272
Longitude(N) Site Type Area Type Equipment Location Antenna Height AGL99.8416 ShopHouse Urban 40
Ground Height ASL Survey Date SA Name C&I Name RF Name TRSP NameN/A 26/8/54
Landlord Representation Comment A2. Site Access Access Time
Contact Detail for access Parking Access route Road Type Key to access the buildingTMV : -
Public road to site Site access comment A3. Site Provider Details Name Address
Moo Ban Trok/Soi Road Tumbon/Subdistrict Amphur/District Province Postal Code
Telephone Mobile Fax Type of Ownership Site Provider's Interest General Comments
A4. Agent Contact Details Name Company Name Telephone Mobile Fax
General Comments A5. Acquisition Details Estamate Rent
Estimate acquistion timescale Under Mortgage Standard Lease
Any acquisition requirements General Comments relating to Acquisition
A6. Existing Infrastruction & Co-location Operator/Owner Antenna Type
Distance from site Height A7. Site Hazard Details Underground cables
Underground pipes Tripping hazards Slippery Surfaces Unprotected Staircase Animal
Dangerous fumes Unprotected skylights Unprotected Edges
A8. Construction Details Staircase dimension Elevator demension1 : 1 N/A : N/A : N/A
Elevator Load Capacity Access Dorr Dimension Space available for craneN/A 2.4 : N/A : N/A 5
Parking available for vehicles Building Type Condition of Building and rooftop
General Comments relating to Construction A9. Power Authorities Company Name
Contact Person Address Moo Ban Trok/Soi Road Tumbon/Subdistrict Amphur/District
Province Postal Code Telephone Mobile Fax Existing Power Supply Supply Tye
Power Detail Distance to Power Supply The Power Supply has to cross
Describe ground conditions General Comments relating to Power
Site ID B1. BBU Equipment Implementation NodeB Site TypeBKAxxx1BKAxxx2BKAxxx3
NodeB Configuration Site Type Site Type (other) Floor Type Floor Type (other)
Room Dimension Space for BBU How to install BBU2.1x3.2x3
BBU DC Power Cable Length BBU PGND Power Cable Length2 5
Trunk cable with the lub interface_Length
Trunk cable with the lub interface_Peer end connector type
2
LAN cable with the lub interface_Length
LAN cable with the lub interface_Peer end connector type
Type of DDF15 LC/FC
Optic cable with the lub interface_Length
Optic cable with the lub interface_Peer end connector type
Type of DDF (other) Location of new DDF Tie E1 CableHow many available port of existing DDF
Tie E1 Cable_Length Alarm Cable Length2
Alarm Cable_Capacity of existing DDF
Comments of Implemntation Team B2. RRU Equipment Implementation SectorS1S2S3S4
Space for RRU 2100 MHz Space available for RRU on existing structure
How to install HW RRU Installation kit for RRU xxx model
Structure Modification for RRU Needed Space for New Antenna
Structure Modification for new Antenna Needed Length of Power Cable RRU
Ground Bar for RRU Length of Optic Cable Jumper Length between RRU and Ant222
Feeder 7/8" Fix-Length Top Jumper Length of Power Cable RRUN/AN/AN/A
Space available for MIMO additonal 3G RRU Comments of Implementation Team
B3. Power Implementation Power Consumption of BBU xxxx SectorS1S2S3S4
Power Consumption RRU Additional Rectifier needed for long BBU-RRU distance0 N/A0 N/A0 N/A0
Power Mode DC available Independence DC Power Total Power Supply Capacity
Remaining Power Current Capacity of existing battery Existing DC Circuit Breakers available
Add New Breaker Cabinet Basement Power input for Power Cabinet AC Power Cable Length1 15
Comments of Implemntation Team B4. Existing Transmission
Infrastructure of Transmission Transmission Connection with Leased Line
Using Optic Fiber Solution Internal Copper Wire Space for ODF
Space for ADM/Switch Node Existing Transmission Interface Type of Existing Transmission
Communication Sites Surrounding Comments of Implemntation Team#REF!
B5. Tower & Antenna Implementation Building Height from Earth Tower Type#REF!
Tower Height Existing Antenna Height New Antenna Hegith#REF! #REF! #REF!
Height from floor level to bottom of antenna Total New Antenna Height#REF! #REF!
RRU Height from Tower Ground Existing 2G Antenna Mounting Type#REF!
New 3G Antenna Mounting Type Existing Structure Support New Configuration
New Structure Type Comments of Implemntation Team#REF!
Site C1. Radio Frequency Part Sector1 Antenna TypeCRI0002 Existing 2G UMWD 06516 2
New 3G 5473_800_ET02
Coverage Objective Number of Antenna Antenna Orientation Mechanical Tilt Electrical Tilt65 1 10 0 280 1 10 2 2
RET Installed Height to Middle of Antenna Antenna Distance from Edge of Building40 N/A40 N/A;N/A
Antenna Support Type Antenna Support Height Isolation requirement for 3G AntennaTOWER 40TOWER 40
Feeder Type Feeder Length Filter TMA Dipixer Comment of Sector115 8 N/A N/A N/A N/AN/A N/A N/A N/A N/A
C2. Radio Frequency Part Sector2 Antenna Type Coverage ObjectiveUMWD 06516 2 655473_800_ET02 80
Number of Antenna Antenna Orientation Mechanical Tilt Electrical Tilt1 120 0 21 100 2 2
Height to Middle of Antenna Antenna Distance from Edge of Building Antenna Support Type40 N/A TOWER40 N/A;N/A TOWER
Antenna Support Height Isolation requirement for 3G Antenna Feeder Type Feeder Length40 15 8 N/A40 N/A N/A
Filter TMA Dipixer Comment of Sector2N/A N/A N/AN/A N/A N/A
C3. Radio Frequency Part Sector3 Antenna Type Coverage ObjectivePCSD18 09015 655473_800_ET02 90
Number of Antenna Antenna Orientation Mechanical Tilt Electrical Tilt2 240 0 21 240 2 4
Height to Middle of Antenna Antenna Distance from Edge of Building Antenna Support Type40 N/A TOWER40 N/A;N/A TOWER
Antenna Support Height Isolation requirement for 3G Antenna Feeder Type Feeder Length40 15 8 N/A40 N/A N/A
Comment of Sector3 Filter TMA DipixerN/A N/A N/AN/A N/A N/A
C4. Radio Frequency Part Sector4 Antenna Type Coverage Objective
Number of Antenna Antenna Orientation Mechanical Tilt Electrical Tilt
Height to Middle of Antenna Antenna Distance from Edge of Building Antenna Support Type
;
Antenna Support Height Isolation requirement for 3G Antenna Feeder Type Feeder Length
Comment of Sector4 Filter TMA Dipixer C5. Obstacle Diagram
Obstacle surrounding Azimuth Distance Geight AGL DescriptionYes N/A 0 0 0
N/A 0 0 0N/A 0 0 0
0 0 0 00 0 0 00 0 0 0
TSSR Summary CRI0002
Err:508 Site Name GPS Data Lat-Long Site Type Area Type
CRI0002 GRF /Ban Ro 19.9272 99.8416
Equipment Location Lease space (WxLxH) m.
outdoor 8 6 N/A Macro Other
NodeB Site type (Marco or IBC)
NodeB configuration
Cabinet for install BBU
0 2 5 0
NodeB configuration
BBU DC power cable length (m.)
BBU PGND Cablelength (m.)
Trunk Cablelength (m.)
Type of DDF
0 15 0 0 2
LAN Cable length(m.)
Patch CordSingle ModeFC-LC (m.)
Tie E1 cablelength (m.)
AlarmCable (m.)
40 60 40 60 40 60 0 300
RRU DC Power cable Sector1 (m.)
RRU DC Power cable Sector2 (m.)
RRU DC Power cable Sector3 (m.)
RRU DC Power cable Sector4 (m.)
Over All RRUDC Power cable (m.)
7 7 7
RRUGround Cable LengthSector1 (m.)
RRUGround Cable LengthSector2 (m.)
RRUGround Cable LengthSector3 (m.)
0 21 0
RRUGround Cable LengthSector4 (m.)
Over All RRUGround Cable Length (m.)
Filter Ground Cable Sector1 Length (m.)
0 0 0
Filter Ground Cable Sector2 Length (m.)
Filter Ground Cable Sector3 Length (m.)
Filter Ground Cable Sector4 Length (m.)
0 40 40 40
OverallFilter Ground CableLength (m.)
CPRI MM LC-LCCable Length (m.)Sector 1
CPRI MM LC-LCCable Length (m.)Sector 2
CPRI MM LC-LCCable Length (m.)Sector 3
CPRI MM LC-LCCable Length (m.)Sector 4
Jumper lengthRRU to Ant Sector 1 (m.)
Jumper lengthRRU to Ant Sector 2 (m.)
Jumper lengthRRU to Ant Sector 3 (m.)
2m. 2 เส�น่ 2m. 2 เส�น่ 2m. 2 เส�น่
Yes 1 15 15
Jumper lengthRRU to Ant Sector 4 (m.)
Power Mode AC available? (Y/N)
Add New Breaker
AC Power Cable Length (m.)
PGND Cable length (m.)
Sector 1
RET Filter
Kathrein 800 10305 Type 1.1 No 40
Antenna Type
Antenna Scenario
AntennaHeightfrom ground (m.)
Sector 1 Sector 2
RET
0 1 Kathrein 800 10305 Type 1.1 No
Isolation from2G Ant. requirement for 3G Antenna installation:
Vertical (m.)At least 0.5 meter
Hoizontal (m.)At least 0.4 meter
Antenna Type
Antenna Scenario
Sector 2
Filter
No 40 0 1
Isolation from2G Ant. requirement for 3G Antenna installation:
AntennaHeightfrom ground (m.)
Vertical (m.)At least 0.5 meter
Hoizontal (m.)At least 0.4 meter
Sector 3
RET Filter
Kathrein 800 10305 Type 1.1 No No 40 0
Isolation from2G Ant. requirement for 3G Antenna installation:
Antenna Type
Antenna Scenario
AntennaHeightfrom ground (m.)
Vertical (m.)At least 0.5 meter
Sector 3 Sector 4
RET Filter
1 0 0
Isolation from2G Ant. requirement for 3G Antenna installation:
Isolation from2G Ant. requirement for 3G Antenna installation:
Hoizontal (m.)At least 0.4 meter
Antenna Type
Antenna Scenario
AntennaHeightfrom ground (m.)
Vertical (m.)At least 0.5 meter
Sector 4
0
Isolation from2G Ant. requirement for 3G Antenna installation:
Hoizontal (m.)At least 0.4 meter