Project Background

-- Expo Line scheduled to open in 2011

-- Opportunities exist for transportation projects to improve access to the Crenshaw Blvd.

--There is a focus on making the corridor amenity-rich while respecting the history and character of the neighborhood

-- CD 10 (Herb Wesson) has begun analyzing this corridor for potential TOD*

*(Draft Mid-City Crenshaw Visioning Plan)

Source: ArcGIS Online Map

Page 3: CRENSHAW CORRIDOR FINAL ANALYSIS By: Ivan Gonzalez March 14 th, 2011
Page 4: CRENSHAW CORRIDOR FINAL ANALYSIS By: Ivan Gonzalez March 14 th, 2011

Crenshaw Corridor Analysis

-Median Income is lower at areas with higher densities-This map indicates that large share of the communities along the corridor fall within a low to mid income group.-These groups will serve as the basis for my spatial analysis

-This map displays transit dependent groups (under 18 and over 64) over actual ridership-It confirms that there a need for a convenient shuttle

Page 5: CRENSHAW CORRIDOR FINAL ANALYSIS By: Ivan Gonzalez March 14 th, 2011

• Density Exists at the beginning and end of the corridor

• There exists opportunity for density increases near the Expo Line Stop.

Page 6: CRENSHAW CORRIDOR FINAL ANALYSIS By: Ivan Gonzalez March 14 th, 2011
Page 7: CRENSHAW CORRIDOR FINAL ANALYSIS By: Ivan Gonzalez March 14 th, 2011
Page 8: CRENSHAW CORRIDOR FINAL ANALYSIS By: Ivan Gonzalez March 14 th, 2011

-Hotspot Analysis shows the areas in which a TOD site would be most desirable

- -I placed a greater weight on proximity to local high schools, followed by transit dependence, population density and median income

- -The two ideal sites resulting from the analysis would be at Slauson Ave and Exposition Blvd

- -1/8th mile buffer chosen to show the approximate lot setback for a potential TOD

- -- The Shuttle will run at 15 minute headways on weekdays and 30 minutes on weekends

- - Fares of $.25 will be equitable to transit dependent target group

Crenshaw Corridor Analysis

Page 9: CRENSHAW CORRIDOR FINAL ANALYSIS By: Ivan Gonzalez March 14 th, 2011
Page 10: CRENSHAW CORRIDOR FINAL ANALYSIS By: Ivan Gonzalez March 14 th, 2011

Appendix

Page 11: CRENSHAW CORRIDOR FINAL ANALYSIS By: Ivan Gonzalez March 14 th, 2011

Appendix

Page 12: CRENSHAW CORRIDOR FINAL ANALYSIS By: Ivan Gonzalez March 14 th, 2011

1. MetaData

2. Model

3. Buffering

4. Measurement

5. Creating Indices

6. Geocoding

7. Original Data

8. Network Analysis

9. Spatial Analysis

10. Hotspot Analysis

11. And several others (Select by Attributes, Select by Location

Skills Learned

Page 13: CRENSHAW CORRIDOR FINAL ANALYSIS By: Ivan Gonzalez March 14 th, 2011

Questions?

Thank you!

CRENSHAW CORRIDOR ANALYSIS