    3/23/15 PEO Aircraft Carriers 2

    First of Class Comments

    “Procurement nightmare”

    “The Navy’s billion-dollar hole in the water”

    “Another example of the Navy driving itself to

    the poor house in a Cadillac.” 

    60 ships later !..DDG 51 is doing pretty well!!

  • 8/9/2019 Credit Suisse Brief - PAO Chop R1-2.pdf

    3/10

    3/23/15 PEO Aircraft Carriers 3

    GERALD R. FORD (CVN 78)Ship Construction

    March 2013 May 2013Hull structure

    complete.

    January 2013Island landing.

     August 2013Hull painting

    complete.

    October 2013Dry dock flooding complete.

     Aug 2011Construction

    status

  • 8/9/2019 Credit Suisse Brief - PAO Chop R1-2.pdf

    4/10

    3/23/15 PEO Aircraft Carriers 43/23/15

    PEO Aircraft Carriers 4

    My Favorite Headline

  • 8/9/2019 Credit Suisse Brief - PAO Chop R1-2.pdf

    5/10

    3/23/15 PEO Aircraft Carriers 53/23/15

    PEO Aircraft Carriers 5

    GERALD R. FORD ClassThe Future is Now

    The Future is Now

    The GERALD R. FORD Class brings new

    improvements over the Nimitz class, including:

    ! Increased flexibility

    • Nearly 3 times the electric plant capacity

    • 

    Restored weight and stability service lifeallowances

    !  Increased capability

    • 33% increase in Sortie Generation Rates

    • Increased space for flight deck operationsand aircraft maintenance

    ! Increased affordability

    • Reduced manning and 20% reduction inmaintenance costs

    • Designed for 43-month maintenance cycleand 12-year docking intervals 

  • 8/9/2019 Credit Suisse Brief - PAO Chop R1-2.pdf

    6/10

    3/23/15 PEO Aircraft Carriers 6

    GERALD R. FORD (CVN 78)Current State

    Status !  99% design complete

    !  98% material procured

    !  87% ship construction complete

    !  957 of 2608 compartments turned over to crew (37%)

    !  9.4 million of 9.8 million feet of cable installed

    !  37% overall shipboard testing complete

    !  Current EAC = $12,887M (at cost cap)

    Construction supports March 2016 Delivery. Closely managing remaining test risks.

    Accomplishments !  9 of 9 new design air conditioning plants operational

    !  4 of 11 Advanced Weapons Elevators (AWEs) in test

    !  Catapult installation on track (2 of 4 complete)

    !   Advanced Arresting Gear (AAG)

    "  Major components received

    "  Installation behind schedule

    !  Electromagnetic Aircraft Launch System (EMALS)

    "  Shipboard testing started on schedule, Aug 2014

    8 of 12 motor generators energized

    "  Catapult testing started 16 Dec 2014, testing on schedule

    !   All Dual Band Radar (DBR) components received and installed

    !  Propulsion Plant

    "  Power units loaded

    "  Electric plant energized and operational

    Upcoming Key Events!   Apr 2015: EMALS shuttle movement (no load testing) begins

    Jun 2015: EMALS deadload Testing begins!   Aug 2015: Crew move aboard

    !  Nov 2015: Combat Systems Trial Rehearsal

  • 8/9/2019 Credit Suisse Brief - PAO Chop R1-2.pdf

    7/10

    3/23/15 PEO Aircraft Carriers 7

    Historical CVN ConstructionMan-Hours

    CVN 79 TO-GO (UNEXPENDED)

    + COST CHALLENGES CARRIER CONSTRUCTION RETURNING TO HISTORICAL LEVELS – FOR MORE CAPABLE SHIP 

    CVN 78 ClassCapabilities

    •  33% greater SortieGeneration Rate

    •  Survivability andDamage Control

    improvements

    •  Increased magazineand JP-5 storage

    •  Greater Operational Availability

    •  Nearly 3X electricplant capacity

    • 

    Restoration of ServiceLife Allowances

    •  $4B Reduced TotalOwnership Cost

  • 8/9/2019 Credit Suisse Brief - PAO Chop R1-2.pdf

    8/10

    3/23/15 PEO Aircraft Carriers 8

    John F. Kennedy (CVN 79) Status

    Description!  Modified repeat of CVN 78, and second ship of the Gerald R. Ford class

    !  Force structure replacement for USS NIMITZ (CVN 68)

    Construction Preparation (CP)

    !  Long lead material procurement since FY07

    !  Engineering / cost savings analyses; build strategy changes

    !   Advance construction since FY11

    "  662 units under contract; 570 units started; 405 complete

    "  100% Product Model roll-over complete

    !  ~95% of direct-buy material under contract

    Detail Design & Construction (DD&C))

    !   All Remaining construction units (1,109 Total)

    !   All Remaining erectables (452 Total)

     All Remaining construction material!  Manhours for integration and testing

    Key Construction Milestones

    !  Keel: Sep 2015; Launch: Feb 2020; Delivery: Jun 2022

  • 8/9/2019 Credit Suisse Brief - PAO Chop R1-2.pdf

    9/10

    PEO Aircraft CarriersNAVSEA: Statement A: Approved for Release. Distribution is unlimited.

  • 8/9/2019 Credit Suisse Brief - PAO Chop R1-2.pdf

    10/10

    3/23/15 PEO Aircraft Carriers 10

    -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0

    RCOH+)%#* ,-

    .)#/"$)

    0"-)

    •  1232456(7%**8 9:: ;,;%7 $%##")#6?M

    •  NIOP6(7%**8 C: $%##")#*= *)#/">? H:CL F>G7 HCC:

    !"#$% '"()*% +,"-% %.* #/0/%1 23+44

     

    (Q1 @:

    (Q1 ED

    (Q1 E@