crane operations cummins southern plains, ltd.. crane operations inspection rigging wire rope...

33
CRANE CRANE OPERATIONS OPERATIONS Cummins Southern Plains, Ltd.

Upload: brycen-hannah

Post on 16-Dec-2015

232 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

CRANE CRANE OPERATIONSOPERATIONS

Cummins Southern Plains, Ltd.

Page 2: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

Crane Operations

Inspection Rigging

Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

Overhead Crane Operation Field Service Trucks

Page 3: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

HOISTS / CRANES Inspection Checklist

Hoist operators must inspect equipment daily before use.

Check for any loose or missing parts.

Check end stops. End stops prevent the trolley from running off the beam.

Know the location of disconnect switch that will cut the power off only to the hoist or crane. Be sure it is readily accessible and not blocked.

Page 4: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

HOISTS / CRANES Inspection Checklist

• Make sure all control buttons are labeled to indicate their function. Operate each button to make sure it functions properly, releases immediately, and does not stick.

• Make sure wire rope is properly seated in its drum and sheave grooves without any slack or overlapping.

• Operate the crane or hoist several feet in each direction that it travels. Listen for any unusual noises. Look for any jerky movements.

NN

WW

SS

EE

Page 5: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

HOISTS / CRANES Inspection Checklist

Check upper hoist limit switch by slowly raising the block to trip the switch.

Lower the hoist block to activate the lower limit switch if the hoist is so equipped, leaving at least one turn of rope on the take-up drum.

Page 6: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

HOISTS / CRANES Inspection Checklist

Check all hooks. Hooks should not be cracked, stretched, bent, or twisted.

Each hook must have a safety latch that automatically closes the throat of the hook. If the latch is bent, spring is broken, or is otherwise damaged the latch must be repaired before use.

Hooks should rotate freely in block assembly without any “grinding” felt or heard.

Page 7: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

HOISTS / CRANES Inspection Checklist

• Check the block assembly for structural damage or cracks in any components. Sheaves should rotate freely without any grinding felt or heard coming from the bearings. The sheave guard must be unbroken and intact. No part of the sheave guard should be in contact with the wire rope or sheave.

Page 8: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

Rigging Inspection Checklist

• Wire rope shall be taken out of service when any of the following conditions exist:1. In running ropes, six randomly distributed broken wires in one lay or

three broken wires in one strand in one lay;

2. In standing ropes, more than two broken wires in one lay in sections beyond end connections or more than one broken wire at an end connection.

3. Wear of one-third the original diameter of outside individual wires. Kinking, crushing, bird caging, or any other damage resulting in distortion of the rope structure;

4. Evidence of any heat damage from any cause;

Page 9: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

Immediately remove damaged or defective slings from service

Rigging Inspection Checklist

Page 10: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

Broken Strands

Damaged wire rope must be taken out of service

Crushed Rope

Rigging Inspection Checklist

Page 11: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

Wire Rope Construction

Page 12: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

• A cutting edge cuts the life of the sling.

• Use blocking, padding, or a corner saddle when the cable must go around sharp corners

Rigging Inspection Checklist

Page 13: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches
Page 14: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

1. Take up slack, then start to load slowly. A chain has no elasticity and does not react well to shock loading.

2. Never shorten a chain by tying a knot in it. A chain has it’s maximum strength with the load running in a straight line.

3. Always use softeners on the corners of rectangular loads.

4. Lift from the center of hooks. Avoid lifting from the point of the hook.

5. Distribute the load evenly on all legs.

6. Inspect chains regularly. Look for elongated links.

7. Never exceed the estimated rating capacity of the chain.

8. Don’t drop loads onto the chain.

Rigging Use of Chain Rigging

Page 15: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches
Page 16: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

• Synthetic web slings, because of their flexibility and elasticity, are a very popular rigging tool. The material with which these synthetic slings are made allows them to be very flexible, but it also makes them susceptible to heat and sharp edges. Synthetic web slings must be well taken care of, and the user must always be aware of sharp corners, welding sparks, and metal chips.

• Slings used in environments where they are subject to continuous exposure to ultra-violet light should be proof tested to two times the rated capacity annually, or more frequently depending on the severity of exposure.

Rigging Use of Synthetic Slings

Page 17: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

Types of Hitches

Most common types of hitches

Page 18: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

Never overload a sling! 

Remember, the wider the sling legs are spread apart, the less the sling can lift!

1000 lbs Lift Capacity1000 lbs Lift Capacity 707 lbs Lift Capacity707 lbs Lift Capacity 500 lbs Lift Capacity500 lbs Lift Capacity

Page 19: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

Wire Rope Capacities

Page 20: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

Wire Rope Sling Choker Adjustments

Page 21: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

Associates in the direction of travel should be warned to move and remain clear of a lifted load at all times.

Loads should not be suspended over personnel below.

Overhead Crane Operation

Page 22: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

Under no circumstances may anyone ride the hook or load.

Directional movement should be made smoothly and deliberately. Avoid rapid movements in any direction.

Overhead Crane Operation

Page 23: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

Do not exceed the rated load capacity of the crane, hoist, chain, cable, slings, or other component.

Slings, load chains and other lifting devices must be fully and securely seated in the hook before moving a load. Remove slack from the sling, chain, or cable before lifting a load.

Overhead Crane Operation

Page 24: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

Use the following practices to avoid swinging loads:

Locate the hoist directly above the lifting point of the load before lifting.

Lower loads directly below the hoist.

Keep hoisting ropes vertical. Do not pull or push the load.

Maintain two full wraps of cable on the hoisting drum.

Overhead Crane Operation

Page 25: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

When lifting loads at or near capacity, test the hoist brakes by returning the master switch or push button to the “OFF” position after raising the load a few inches off the floor. If the brakes do not hold, lower the load to the floor slowly and do not operate the crane. Report the situation immediately and DO NOT USE until repaired.

Overhead Crane Operation

Page 26: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

Ensure that all loads are lifted high enough to clear obstructions before moving the bridge or trolley. Whenever possible, maintain a minimum clearance of one foot above loads and to the sides. Raise the load only to the height necessary to clear lower objects.

Never pull a hoist by the pendant cable.

Overhead Crane Operation

Page 27: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

Never leave the controls unattended while a load is suspended. If it becomes necessary to leave the controls, lower the load to the floor.

Familiarize yourself with the location of the disconnect switch.

If loss of electrical power occurs, place controls in the “OFF” position to prevent unexpected startup upon restoration of power.

Overhead Crane Operation

Page 28: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

Disconnect power to a hoist that is unsafe or in need of repair. Arrange to have the disconnect switch locked and the control panel tagged with and “Out of Order” or “Do Not Operate” tag. Never operate a hoist that has been tagged with an “Out of Order” or “Do Not Operate” tag, or is your opinion, UNSAFE TO OPERATE…

Overhead Crane Operation

Page 29: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

Field Service Boom Trucks

The basic rules of crane safety and proper rigging also apply to boom trucks. However, there are some differences: Before picking up any lift, the outrigger must be

extended. If the ground is soft, either relocate the lift point or use outrigger pads to spread out the weight of the load over a greater surface area.

During the lift use the boom angle indicator to ensure the capacity is never exceeded. The capacity is also affected by the distance the boom is extended, the farther the reach, the lower the capacity.

Page 30: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

Field Service Vehicles

Page 31: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

WARNING

Photo on the next slide are graphic in nature.

Page 32: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches

Removing Jewelry and Wearing Gloves!

Cause?

Not wearing gloves and not taking off the ring.

Page 33: CRANE OPERATIONS Cummins Southern Plains, Ltd.. Crane Operations Inspection Rigging Wire Rope Construction Chain Rigging Synthetic Slings Types of Hitches