crane operation signals
TRANSCRIPT
-
7/28/2019 Crane Operation Signals
1/6
Raise the load.
Cable up.
Index finger points up, hand & forearm makea small circular motion.
Swing the boom.
Outstretched arm with index finger pointing in
the desired direction.
Raise the load slowly.
Cable up, slowly.
One hand is held flat, palm down, over theother hand which has a pointed index finger
making a circular motion under the palm
area
Raise the boom - Hold the load.
Outstretched arm, thumb pointing up, handopening & closing.
-
7/28/2019 Crane Operation Signals
2/6
Lower the load slowly.
Cable down.
One hand is held flat, palm up, with the otherhand having a downward pointed index
finger making a circular motion over the palmarea
Lower the boom.
Outstretched arm, fingers clenched withthumb pointing down.
-
7/28/2019 Crane Operation Signals
3/6
Boom Up
Raise the boom.
Outstretched arm, fingers clenched withthumb pointing up.
Trolley Out
Extend the boom.
Both arms outstretched, fingers clenchedwith both thumbs pointing outward.
Retract the boom.
Both arms outstretched, fingers clenchedwith both thumbs pointing inward.
.
Walk the crane forward.
Forearms circling forward, away from thebody.
Reverse the motion to walk the cranebackward.
-
7/28/2019 Crane Operation Signals
4/6
Everything slow.
Palms together, slowly rubbing.
Emergency Stop
Arms Crossed Waving
Routine stop.
Arm extended, palm down.
-
7/28/2019 Crane Operation Signals
5/6
-
7/28/2019 Crane Operation Signals
6/6