CRACKS IN CRACKS IN BUILDINGS:BUILDINGS:
Some Remedial Some Remedial MeasuresMeasures
Dr. J. N.JhaDr. J. N.JhaProfessor and Dean (Consultancy)Professor and Dean (Consultancy)Department of Civil EngineeringDepartment of Civil Engineering
Guru Nanak Dev Engineering College,Guru Nanak Dev Engineering College,Ludhiana Ludhiana
![Page 2: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/2.jpg)
IS THAT CRACK IS THAT CRACK SERIOUS?SERIOUS?
• Simplest questions to ask.Simplest questions to ask.• One of the most difficult to answer.One of the most difficult to answer.• Prof. Mealcom Hollis-”Surveying Prof. Mealcom Hollis-”Surveying
buildings is an art, verifying the buildings is an art, verifying the cause of failure is a science”cause of failure is a science”
![Page 3: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/3.jpg)
Classification of Cracks Classification of Cracks Structural crack Structural crack Non structural crack Non structural crack
Incorrect designIncorrect design
Faulty constructionFaulty construction
OverloadingOverloading
Internal induced Internal induced stress in building stress in building materialmaterial
![Page 4: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/4.jpg)
Continue…Continue…
• Non Structural Crack Non Structural Crack Penetration of moisture through Penetration of moisture through
crackcrackWeathering actionWeathering actionResult in corrosion of reinforcementResult in corrosion of reinforcementStructure become unsafe (structural Structure become unsafe (structural
crack)crack)
![Page 5: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/5.jpg)
Classification of cracks Classification of cracks (Based on width)(Based on width)
TypeType WidthWidth
ThinThin
MediumMedium
WideWide
< 1 mm< 1 mm
1-2 mm1-2 mm
> 2 mm> 2 mm
![Page 6: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/6.jpg)
Common sight of crackCommon sight of crack
VerticalVertical
HorizontalHorizontal
DiagonalDiagonal
StraightStraight
ToothedToothed
SteppedStepped
Map patternMap pattern
RandomRandom
Uniform Uniform throughoutthroughout
Narrow at Narrow at one end and one end and gradually gradually widening at widening at the other the other
![Page 7: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/7.jpg)
Internal stress in Building Internal stress in Building component component
• Compressive Compressive • TensileTensile• ShearShear• Building materialBuilding material• 1. Masonry, Concrete, 1. Masonry, Concrete,
Mortar Mortar
2. Weak in tension/shear 2. Weak in tension/shear 3. 3. Causing tension/shear Causing tension/shear crack crack
![Page 8: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/8.jpg)
Present trend in Present trend in constructionconstruction
• Modern StructureModern Structure- Tall, slender, thin wallTall, slender, thin wall- Designed for higher stressDesigned for higher stress- Constructed at fast paceConstructed at fast pace• More crack proneMore crack prone
![Page 9: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/9.jpg)
Continue…Continue…
![Page 10: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/10.jpg)
Continue…Continue…
![Page 11: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/11.jpg)
Continue…Continue…
![Page 12: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/12.jpg)
Continue…Continue…
![Page 13: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/13.jpg)
Cause of cracks in Cause of cracks in buildingsbuildings
• Moisture changeMoisture change• Thermal variationThermal variation• Elastic deformationElastic deformation• CreepCreep• Chemical reactionChemical reaction• Foundation movement and Foundation movement and
settlement of soilsettlement of soil• Vegetation Vegetation
![Page 14: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/14.jpg)
Moisture Movement Moisture Movement
• Reversible Movement Reversible Movement - Material expands on absorbing Material expands on absorbing
moisture content moisture content - Shrinks on drying Shrinks on drying • Irreversible movement Irreversible movement
-- Material undergo some irreversible Material undergo some irreversible movement due to initial moisture movement due to initial moisture change change
![Page 15: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/15.jpg)
Types and causes of cracks Types and causes of cracks in Concretein Concrete
• Before hardeningBefore hardeningDrying Drying - Plastic shrinkagePlastic shrinkage- Settlement shrinkageSettlement shrinkage- BleedingBleeding- Delayed curingDelayed curing
![Page 16: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/16.jpg)
Continue…Continue…
ConstructionalConstructional- Formwork movementFormwork movement- Excess vibrationExcess vibration- Subgrade settlementSubgrade settlement- FinishingFinishingEarly frost damage Early frost damage
![Page 17: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/17.jpg)
Continue…Continue…
• After hardeningAfter hardening Unsound materialUnsound material Long term drying shrinkageLong term drying shrinkage ThermalThermal Moisture movementMoisture movement BiologicalBiological Structural design deficienciesStructural design deficiencies ChemicalChemical Corrosion of reinforcement Corrosion of reinforcement
![Page 18: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/18.jpg)
Plastic shrinkage cracksPlastic shrinkage cracks
• Concrete surface loses water faster Concrete surface loses water faster than the bleeding action brings it to than the bleeding action brings it to toptop
• Quick drying of concrete at the surface Quick drying of concrete at the surface results in shrinkageresults in shrinkage
• Concrete at the plastic state can not Concrete at the plastic state can not resist tension resist tension
• Crack Depth 5 to 10 cm, width 3 mmCrack Depth 5 to 10 cm, width 3 mm• Once developed difficult to rectifyOnce developed difficult to rectify
![Page 19: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/19.jpg)
Measure to reduce Measure to reduce plastic crack plastic crack
• Moisture the sub grade and form Moisture the sub grade and form workwork
• Erect the temporary wind breakerErect the temporary wind breaker• Erect the temporary roof to protect Erect the temporary roof to protect
green concrete from hot sungreen concrete from hot sun• Reduce the time between placing & Reduce the time between placing &
finishingfinishing• In case of delay in finishing cover the In case of delay in finishing cover the
concrete with polytheneconcrete with polythene
![Page 20: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/20.jpg)
Settlement shrinkage Settlement shrinkage
• If concrete is free to settle If concrete is free to settle uniformly, no crack occursuniformly, no crack occurs
• Obstruction to uniform settlement Obstruction to uniform settlement creates voids/cracks creates voids/cracks (Reinforcement/Aggregate)(Reinforcement/Aggregate)
• Settlement crack (common in deep Settlement crack (common in deep beam) beam)
![Page 21: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/21.jpg)
MeasureMeasure
• Pouring of concrete in layers with Pouring of concrete in layers with proper compactionproper compaction
• Revibration, if possibleRevibration, if possible
![Page 22: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/22.jpg)
BleedingBleeding
• Upward movement of water when concrete Upward movement of water when concrete settle downssettle downs
• Internal bleedingInternal bleeding- Bleeding water trapped below reinforcement Bleeding water trapped below reinforcement
& aggregate& aggregate- Affects bonds between reinforcement and Affects bonds between reinforcement and
concrete concrete - Interface, prone to micro crackingInterface, prone to micro cracking- Weak link in concreteWeak link in concrete- Further loading propagate cracking Further loading propagate cracking
![Page 23: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/23.jpg)
Continue…Continue…
• External BleedingExternal Bleeding- Upward movement of water Upward movement of water
emerged at top surfaceemerged at top surface- After evaporation : surface – Porous After evaporation : surface – Porous
and abrasion resistance very little.and abrasion resistance very little.
![Page 24: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/24.jpg)
General Observations General Observations
• Mason floats concrete when bleeding water still Mason floats concrete when bleeding water still standing.standing.
• Results Results
-- Downward movement of coarse aggregateDownward movement of coarse aggregate- Upward movement of fine particles (cement and Upward movement of fine particles (cement and
water)water)• Top surface Top surface - Presence of fine materials develops crack and Presence of fine materials develops crack and
craziness craziness
(Craziness: occurrence of closely spaced crack at (Craziness: occurrence of closely spaced crack at surface) surface)
![Page 25: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/25.jpg)
Delayed CuringDelayed Curing
• Common practice Common practice - Delayed curingDelayed curing- Interruption in continuous curingInterruption in continuous curing- Curing not done for required period Curing not done for required period • Major cause for shrinkageMajor cause for shrinkage• Minimum 7 to 10 days curing Minimum 7 to 10 days curing
required required
![Page 26: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/26.jpg)
Constructional Effects Constructional Effects
• Crack/Deformation of plastic concrete (After Crack/Deformation of plastic concrete (After Compaction)Compaction)
-Lack of rigidity of formwork (Remains -Lack of rigidity of formwork (Remains unnoticed) unnoticed)
-Use of high consistency concrete (present -Use of high consistency concrete (present trend)trend)
: Pumping requirement, Use of superplasticizer: Pumping requirement, Use of superplasticizer
-Avoid segregation by proper vibration-Avoid segregation by proper vibration• Segregated Concrete Mix- Exhibits high Segregated Concrete Mix- Exhibits high
shrinkage crackshrinkage crack
![Page 27: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/27.jpg)
Unsound MaterialUnsound Material
• Use of crushed sand very common nowUse of crushed sand very common now• Amount of dust (<75 micron): Very highAmount of dust (<75 micron): Very high• Presence of excess dust :Presence of excess dust :
- Causes crack formation- Causes crack formation- Interfere with setting time, - Interfere with setting time,
Shrinkage andShrinkage and Bond Bond
• Maximum %age of fine = 3% (Coarse Maximum %age of fine = 3% (Coarse aggregate) aggregate)
![Page 28: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/28.jpg)
Some measures to avoid Some measures to avoid crackscracks
![Page 29: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/29.jpg)
Continue…Continue…
![Page 30: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/30.jpg)
Continue…Continue…
![Page 31: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/31.jpg)
Continue…Continue…
![Page 32: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/32.jpg)
Continue…Continue…
![Page 33: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/33.jpg)
Continue…Continue…
![Page 34: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/34.jpg)
Continue…Continue…
![Page 35: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/35.jpg)
Continue…Continue…
![Page 36: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/36.jpg)
Continue…Continue…
![Page 37: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/37.jpg)
Continue…Continue…
![Page 38: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/38.jpg)
Continue…Continue…
![Page 39: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/39.jpg)
Continue…Continue…
![Page 40: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/40.jpg)
Thermal expansion and Thermal expansion and shrinkageshrinkage
• Assume characteristics compressive Assume characteristics compressive strength of concrete -25 MPastrength of concrete -25 MPa
• Modulus of elasticity – 5000x √fck N/mmModulus of elasticity – 5000x √fck N/mm22
- 5000 x √25 = 25 x 10- 5000 x √25 = 25 x 1044 N/mm N/mm22
• Flexural strength = 0.7 x √fck = 3.5 Flexural strength = 0.7 x √fck = 3.5 N/mmN/mm22
• Coefficient of thermal expansion of Coefficient of thermal expansion of concrete = 10 x 10-concrete = 10 x 10-66/◦c/◦c
• Diurnal Variation in temperature = 20 ◦cDiurnal Variation in temperature = 20 ◦c
![Page 41: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/41.jpg)
Continue…Continue…
• Thermal shrinkage strain = 20 x 10 x Thermal shrinkage strain = 20 x 10 x 1010-6-6
• Modulus of elasticity = Stress/StrainModulus of elasticity = Stress/Strain• 2.5 x 10 2.5 x 10 44 = Stress/200x10 = Stress/200x10-6-6
• Tensile Stress = 5.0 N/mmTensile Stress = 5.0 N/mm22
• Tensile Strength of concrete = 3.5 Tensile Strength of concrete = 3.5 N/mmN/mm22
• Sure to cause crack Sure to cause crack
![Page 42: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/42.jpg)
Continue…Continue…
![Page 43: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/43.jpg)
Continue…Continue…
![Page 44: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/44.jpg)
Continue…Continue…
![Page 45: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/45.jpg)
Continue…Continue…
![Page 46: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/46.jpg)
Continue…Continue…
![Page 47: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/47.jpg)
Foundation settlement…Foundation settlement…
![Page 48: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/48.jpg)
Continue…Continue…
![Page 49: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/49.jpg)
Crack due to Crack due to vegetation…vegetation…
![Page 50: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/50.jpg)
Continue…Continue…
![Page 51: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/51.jpg)
Continue…Continue…
![Page 52: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/52.jpg)
Continue…Continue…
![Page 53: Cracks in Buildings](https://reader035.vdocuments.mx/reader035/viewer/2022081414/54c16b674a7959c5568b457d/html5/thumbnails/53.jpg)
Thanks…..Thanks…..