cr 236 resurfacing from us 441 to i-75 30% plans alachua county board of county commissioners...

Download CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010

If you can't read please download the document

Upload: dorian-tree

Post on 14-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

  • Slide 1

CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010 Slide 2 Recommendation Approve the 30% plans as proposed and direct staff to proceed with the design phase and return to the Board of County Commissioners at 90%. Slide 3 Project Background Purpose: to rehabilitate the pavement and provide for minor safety and drainage modifications Approved by the Board of County Commissioners in 2007 Design funded by 2007 Sales Tax Bond Construction to be funded by second sales tax bond or other source Slide 4 High Springs Elementary Project Location CR 236 High Springs High Springs Elementary Project Length = 5 miles NW 201 st Lane US 441 I-75 Slide 5 Existing Cross Section US 441 to NW 201 st Lane Slide 6 Existing Cross Section NW 201 st Lane to I-75 Slide 7 Traffic Data Count Station Station LocationAADT Heavy Truck % Speed Posted85th 10 MPH Pace 1NE 8th Avenue (City Limits)40873.835 mph40 mph31-40mph 2NW 214th Terrace21526.255 mph63 mph51-60 mph 3South of I-75 Ramp22176.255 mph63 mph51-60 mph Slide 8 Crash Data No.DateTypeContributing Cause 16/8/2006AnimalDeer 26/23/2006SideswipeDrove Left of Center 312/21/2006Off RoadCareless Driving 48/3/2007DitchExceed Safe Speed 512/11/2007Off RoadImproper Lane Change 61/17/2008Left TurnImproper Turn 72/25/2008AnimalDeer 83/2/2008SideswipeImproper Passing 910/3/2009AnimalDeer 1010/10/2009SideswipeCareless Driving 1110/25/2009AnimalDeer 1212/29/2009SideswipeDriver Distraction Slide 9 Crash Rate Comparison Crashes per million vehicle miles traveled Slide 10 Pavement Condition Alligator cracking Edge of pavement drop-offs Potholes Base failures Slide 11 Pavement Condition Results of geotechnical evaluation Cracking to the base Poorly constructed base Clay pockets Complete pavement removal required for most of the project Slide 12 Stormwater Issues Erosion and sedimentation control Flooding Water quality Slide 13 Stormwater Issues Depressional Areas Slide 14 Proposed Cross Section US 441 to NW 201 st Lane Slide 15 Proposed Cross Section NW 201 st Lane to I-75 Slide 16 Proposed Safety Modifications Reconstruct damaged portions of the sidewalk Address drop-off hazards at the edge of the sidewalk Provide ADA ramps at intersections Remove large roadside hazards Remove edge-of pavement drop-offs Slide 17 Proposed Stormwater Modifications Provide swales through the City of High Springs Construct ditch blocks and weirs near the depressional areas Remove sediment from pipes and drainage ditches Chip seal and add erosion control at the intersection of Old Bellamy Road Slide 18 Proposed Multimodal Modifications Provide marked bike lanes up to NW 201 st Lane Provide paved shoulders from NW 201 st Lane to I-75 Fill in gaps in sidewalks and extend up to NW 201 st Lane on both sides Widen sidewalk on west side up to 8 wherever possible Slide 19 Proposed Landscaping Add shade trees where possible around new and existing sidewalk Preserve scenic views in agricultural areas Slide 20 Recommendation Approve the 30% plans as proposed and direct staff to proceed with the design phase and return to the Board of County Commissioners at 90%. Slide 21 Questions?