3.3 (A) (I) (2) (3) Company. Detail Scope ofWO-WUR 3.3 Perform calibration: protection relay or (A) recJoser control unit (Job Code: WUR-l, WUR-2) Relay protection encompasses (I) electromechanical relays and electronic relays (solid state), with protection element not more than 3 and recloser control unit is microprocessor type without looking the the numbers of protection element are available. Calibration can be performed at the (2) substation location or at the company's workshop (PGT shop), depending on the Company's request. If the calibration is performing at the workshop, Company provides relay unit for the replacement, the the replacement unit installed by Contractor in Substation to replace the old relay. Journey to the substation (and vice versa) as well as the relay replacement works are included in the unity of this work, and are not count separately. The work also includes cleaning of the unit and cleaning the relay contacts using sandpaper or a miser, if the contacts are accessible. Rate per unit (unit rate) calculated from the (3) relay unit, or recloser control unit, instead of how much protection elements contained in one unit of the equipment. Elements that will be calibrated includes all the elements that are activated (by Company) on the equipment dalam SPK untuk pekerjaan dengan Harga Satuan Personil Per Pekerjaan, Kontraktor tidak dapat menambah jumlah jam kerja kecuali disetujui oleh Perusahaan. Rincian Ruang Lingkup SPK untuk pekerjaan dengan Harga Satuan per Pekerjaan Melakukan tera ulang (kalibrasi): relay proteksi atau unit kontrol recJoser (Kode Pekerjaan: WUR-l, WUR-2) Relay proteksi yang dimaksud mencakup relay elektromekanik dan relay elektronik (solid state), dengan elemen proteksi tidak lebih dari 3 dan unit kontrol recloser yang dimaksud dad tipe mikroprosesor tanpa melihat banyaknya elemen proteksi yang tersedia. Peneraan dapat dilakukan di tempat Ilokasi gardu induk atau di bengkel kerja Perusahaan (PGT shop), bergantung permintaan Perusahaan. Apabila peneraan dilakukan di bengkel kerja, Perusahaan menyediakan relay pengganti untuk dilakukan peneraan, kemudian relay tersebut dipasang oleh Kontraktor menggantikan relay lama di lokasi gardu induk. Perjalanan ke gardu induk (dan sebaliknya) serta pekeljaan penggantian relay terse but termasuk ke dalam satu kesatuan pekerjaan ini, dan tidak dihitung terpisah. Pekerjaan mencakup juga pembersihan unit dan pembersihan kontak- kontak relay dengan menggunakan kertas amp las atau kikir halus, apabila kontak- kontak dapat diakses. Tarif per satuan (unit rate) dihitung dad satu unit relay, atau unit kontrol recloser, bukan dad berapa elemen proteksi yang terdapat dalam satu unit peralatan tersebut. Elemen yang di teraulang mencakup semua elemen yang diaktifkan (oleh Perusahaan) pada unit peralatan tersebut. [T&D High & Medium Voltage Equipment Maintenance Contract No. CWl329093 IU40lDL Indonesia Lac-Inti (Rev9 February 2015) (Insert for Drafts "Counsel's Initials Draft DD Month YYYY" and for Finals "Execution Version"] 130 /

Upload: mario

Post on 17-Dec-2015

50 views

Category:

Documents


3 download

TRANSCRIPT

  • 3.3

    (A)

    (I)

    (2)

    (3)

    Company.

    Detail Scope ofWO-WUR 3.3

    Perform calibration: protection relay or (A) recJoser control unit (Job Code: WUR-l, WUR-2)

    Relay protection encompasses (I) electromechanical relays and electronic relays (solid state), with protection element not more than 3 and recloser control unit is microprocessor type without looking the the numbers of protection element are available.

    Calibration can be performed at the (2) substation location or at the company's workshop (PGT shop), depending on the Company's request. If the calibration is performing at the workshop, Company provides relay unit for the replacement, the the replacement unit installed by Contractor in Substation to replace the old relay. Journey to the substation (and vice versa) as well as the relay replacement works are included in the unity of this work, and are not count separately. The work also includes cleaning of the unit and cleaning the relay contacts using sandpaper or a miser, if the contacts are accessible.

    Rate per unit (unit rate) calculated from the (3) relay unit, or recloser control unit, instead of how much protection elements contained in one unit of the equipment. Elements that will be calibrated includes all the elements that are activated (by Company) on the equipment

    dalam SPK untuk pekerjaan dengan Harga Satuan Personil Per Pekerjaan, Kontraktor tidak dapat menambah jumlah jam kerja kecuali disetujui oleh Perusahaan.

    Rincian Ruang Lingkup SPK untuk pekerjaan dengan Harga Satuan per Pekerjaan

    Melakukan tera ulang (kalibrasi): relay proteksi atau unit kontrol recJoser (Kode Pekerjaan: WUR-l, WUR-2)

    Relay proteksi yang dimaksud mencakup relay elektromekanik dan relay elektronik (solid state), dengan elemen proteksi tidak lebih dari 3 dan unit kontrol recloser yang dimaksud dad tipe mikroprosesor tanpa melihat banyaknya elemen proteksi yang tersedia.

    Peneraan dapat dilakukan di tempat Ilokasi gardu induk atau di bengkel kerja Perusahaan (PGT shop), bergantung permintaan Perusahaan. Apabila peneraan dilakukan di bengkel kerja, Perusahaan menyediakan relay pengganti untuk dilakukan peneraan, kemudian relay tersebut dipasang oleh Kontraktor menggantikan relay lama di lokasi gardu induk. Perjalanan ke gardu induk (dan sebaliknya) serta pekeljaan penggantian relay terse but termasuk ke dalam satu kesatuan pekerjaan ini, dan tidak dihitung terpisah. Pekerjaan mencakup juga pembersihan unit dan pembersihan kontak-kontak relay dengan menggunakan kertas amp las atau kikir halus, apabila kontak-kontak dapat diakses.

    Tarif per satuan (unit rate) dihitung dad satu unit relay, atau unit kontrol recloser, bukan dad berapa elemen proteksi yang terdapat dalam satu unit peralatan tersebut. Elemen yang di teraulang mencakup semua elemen yang diaktifkan (oleh Perusahaan) pada unit peralatan tersebut.

    [T &D High & Medium Voltage Equipment Maintenance Contract No. CWl329093 IU40lDL Indonesia Lac-Inti (Rev9 February 2015) (Insert for Drafts "Counsel's Initials ~ Draft DD Month YYYY" and for Finals "Execution Version"] 130

    /

    MWiryaTypewritten TextWUR-1

    MWiryaTypewritten TextWUR-2

  • (B) Replace the intact relay nnit or replace (B) one / some kind of relay modnle unit in one relay using microcontroller, microprocessor or DSP (one brand, one type, the same form, can be different firmware). (Job Code: WUR-2, WUR-3)

    (1) Included in this work is upload program (1) and logic from the PC to the relay, re-setting the address of the input / output (digital and analog) when there is a change in the configuration of the module input / output, re-calibration, update firmware if needed, test elements of protection that requested by the Company and communication test for line differential relays.

    (2) Rates per unit is calculate from the relay (2) unit, instead of how many elements are contained neither in a single protective relay unit, nor of how the module is replaced in the relay unit. Element that will be calibrate includes all elements that are enabled on the relay unit. Calibration is perform at substation location or in the Company workshop, depends on Company request. Journey to the substation (and vice versa) are included in a single unit of work, are not count separately.

    (C) Perform the initial inspection of VCB (C) 4,16 kV or 13,8kV either outdoor or indoor types, The work performed at the substation. (Job Code: WUR-5)

    (1) Perform cleaning on external component of (1) circuit breaker

    ------(-2)--Perfsrm-insulation-test-and--polarization --f2) index with DC test equipment, and analyze the root cause of low values of insulation or polarization index does not meet the passing criteria, refer to Table 1 and Table 2

    Mengganti unit relay utuh atau mengganti satu/beberapa unit modul relay sejenis dalam satu relay berbasis mikrokontroler, mikroprosesor, atau DSP (satu merk, satu tipe, form yang sama, bisa berbeda firmware) (Kode Pekerjaan: WUR-2, WUR-3) Termasuk dalam pekerjaan ini adalah unduh naik (upload) program dan logika (logic) dari PC ke relay, re-setting alamat input/output (digital dan analog) bila ada perubahan pada konfigurasi modul input/output, tera ulang, pemutakhiran (update) firmware apabila diperlukan, pengujian elemen-elemen proteksi yang diminta oleh Perusahaan dan tes komunikasi khusus untuk relay line differential.

    Tarif per unit dihitung dari per unit relay, bukan dari berapa elemen proteksi yang terdapat dalam satu unit relay, bukan pula dari berapa modul yang diganti dalam satu unit relay. Elemen yang diteraulang mencakup semua elemen yang diaktifkan pada unit relay tersebut. Kalibrasi dilakukan di masing-masing lokasi substation atau di bengkel kelja Perusahaan, bergantung pennintaan Perusahaan. Peljalanan ke gardu induk (dan sebaliknya) termasuk dalam satu kesatuan pekerjaan, tidak dihitung terpisah

    Melakukan pemeriksaan awal VCB 4,16 kV atau 13,8kV baik tipe outdoor maupun indoor. Pekerjaan dilakukan di gardu induk. (Kode Pekerjaan: WUR-5) Melakukan pembersihan komponen-komponen eksternal circuit breaker

    Melakukan-ujiisolasi-dan-indeks-pelarisasi -dengan alat uji DC, dan mencari penyebab rendahnya isolasi bila ditemukan isolasi yang rendah atau indeks polarisasi tidak memenuhi kriteria kelulusan, mengacu pada tabel 1 dan tabel 2

    [T&D High & Medium Voltage Equipment Maintenance Connact No. CWI329093 !U40 IDL Indonesia Lac-IntI (Rev9 February 2015) [Insert for Drafts "Counsel's Initials - Draft DD Month YYYY" and for Finals "Execution Version"]

    MWiryaTypewritten TextWUR-3

    MWiryaTypewritten TextWUR-4

    MWiryaTypewritten TextwUR-5

  • (3)

    (4)

    (5)

    (a)

    (b)

    (6)

    (7)

    (8)

    (9)

    (10)

    (D)

    Perform mechanical check (3)

    Perform contact resistance test. Criteria for (4) passing the test results refer to the data provided by the manufacturer. When data are not available, use the data in Table 3

    Perform time travel test, including: (5)

    Measurement the duration of closing and (a) opening time, criteria for passmg the opening test maxllnum 5 cycles at frequency of 60 Hz

    Measurement the time difference between (b) closing and opening phases, among the fastest to late. Criteria for passing the test: maximum 8ms

    Perform insulation test for power supply (6) cable. Criteria for passing the test: minimum 2 megohm with test voltage 500V DC

    Perform examination of erosion condition (7) of contact with overtravel examination. When overtravel exceeds the manufacturer's specifications, if the indicator is available.

    Perform Current Transformer (CT) test, (8) includes turns ratio and saturation curve

    Perform power factor test for all bushing (9) with a maximum value of passing criteria 1 %. If the test telminal is not available using hot collar test method with a maximum loss are 100 milli watts

    Make documention for initial inspection (10) ana---Officiiil- report-OW the Company, including data from the test result (pass or not pass)

    Perform initial inspection of 4_16 kV or (D) 13,8kV ACB either outdoor or indoor types (Job Code: WUR-6)

    Melakukan pemeriksaan mekanikal

    Melakukan uji tahanan kontak. Kriteria kelulusan hasil uji mengacu kepada data yang disediakan oleh pabrikan. Bila data tidak tersedia, digunakan data pada tabel 3

    Melakukan uji time-travel, mencakup :

    Pengukuran durasi waktu penutupan dan pembukaan, Kriteria kelulusan untuk pembukaan maksimum 5 cycle pada frekuensi 60 Hz

    Pengukuran selisih waktu penutupan dan pembukaan antar fasa, antara yang tercepat dengan terlambat. Kriteria kelulusan: maksimum 8ms

    Melakukan uj i isolasi terhadap kabel suplai daya. Kriteria kelulusan uji : minimum 2 megaohm, pada tegangan uji DC 500V

    Melakukan pemeriksaan terhadap kondisi erosi pada kontak dengan pemeriksaan overtravel. Bila overtravel telah melebihi spesifikasi pabrik, apabila indikator keausan tersedia.

    Melakukan uji Current Transformer (CT), mencakup rasio belitan (tum ratio) dan kurva saturasi

    Melakukan uji power factor pada semua bushing dengan kriteria kelulusan maksimum 1%. Bila terminal uji tidak tersedia maka dilakukan metode hot collar test dengan watt loss maksimum 100 mili watt

    Membuat dokumentasi hasil pemeriksaan awal dan laporan resmi untuk Perusahaan, mencakup data hasil uji yang lulus kriteria dan tidak lulus

    Melakukan pemeriksaan awal ACB 4,16kV atau 13,SkV baik tipe outdoor maupun indoor (Kode Pekerjaan

    [T&D High & Medium Voltage Equipment Maintenance Contract No. CWI329093 IU40lDL Indonesia Loc-Intl (Rev9 February 2015) [Inseli for Drafts "Counsel's Initials ~ Draft DD Month YYYY" and for Finals "Execution Version"] 132

    /

  • (I)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    (8)

    (E)

    (I)

    Perform cleaning on component of circuit (1) breaker is accessible

    Perform insulation test and polarization (2) index with DC test equipment, and analyze the root cause of low values of insulation or polarization index does not meet the passing criteria, refer to Table 1 and Table 2.

    Perform mechanical inspection especially (3) for contact fingers.

    Perform contact resistance test. Criteria for (4) passing the test results refer to the data provided by the manufacturer. When data are not available, use the data in Table 3

    Perform insulation test for power supply (5) cable. Criteria for passing the test: mInImum 2 megohm with test voltage 500VDC

    Perform Current Transfonner (CT) test (if (6) CT is available and accessible) , includes turns ratio and saturation curve

    Perform power factor test for all bushing (7) with a maximum value of passing criteria 1 %. If the test terminal is not available using hot collar test method with a maximum loss are 100 milli watts

    Make documention for initial inspection (8) and official report to the Company, including data from the test result (pass or not pass)

    Perform the initial inspection of 44kV (E) GCB, 115 kV GCB or circuit switcher, 230kV GCB. (Job Code: WUR-7, WUR-8, WUR-9, WUR-IO)

    Perform cleaning on component of circuit (I)

    WUR-6)

    Melakukan pembersihan komponen-komponen circuit breaker yang dapat diakses

    Melakukan uji isolasi dan indeks polarisasi dengan alat uji DC, dan mencari penyebab rendahnya isolasi bila ditemukan isolasi yang rendah atau indeks polarisasi tidak memenuhi kriteria kelulusan, mengacu pada tabel 1 dan tabel 2.

    Melakukan pemeriksaan mekanikal terutamajari-jari kontak.

    Melakukan uji tahanan kontak. Kriteria kelulusan hasil uji mengacu kepada data yang disediakan oleh pabrikan. Bila data tidak tersedia, digunakan data pada tabel 3

    Melakukan uji isolasi terhadap kabel suplai daya. Kriteria kelulusan uji : minimum 2 megaohm, pada tegangan uji DC 500V

    Melakukan uji Current Transformer (CT), (bila CT tersedia dan dapat diakses) mencakup rasio belitan (turn ratio) dan kurva saturasi.

    Melakukan uji power factor pada semua bushing dengan kriteria kelulusan maksimum 1 %. Bila terminal uji tidak tersedia maka dilakukan metode hot collar test dengan watt loss maksimum 100 mili watt

    Membuat dokumentasi hasil pemeriksaan awal dan laporan resmi untuk Perusahaan, mencakup data hasil uji yang lulus kriteria dan tidak lulus

    Melakukan pemeriksaau awal GCB 44kV, GCB atau circuit switcher 115kV, GCB 230kV. (Kode Pekerjaan: WUR-7, WUR-8, WUR-9, WUR-IO)

    Melakukan pembersihan komponen-komponen circuit breaker yang dapat

    [T&D High & Medium Voltage Equipment Maintenance Contract No. CWl329093 IU40IDL Indonesia Loc-Intl (Rev9 February 2015) [Insert for Drafts "Counsel's Initials - Draft DD Month YYYY" and for Finals "Execution Version"] 133

    /

  • (2)

    (3)

    (4)

    (5)

    (a)

    (b)

    (6)

    (7)

    (8)

    breaker on accessible component

    Perform insulation test and polarization (2) index with DC test equipment, and analyze the root cause of low values of insulation or polarization index does not meet the passing criteria, refer to Table I and Table 2.

    Perform mechanical inspection of gas (3) pressure and visual conditions (leakage on external gaskets etc.)

    Perform contact resistance test. Criteria for (4) passing the test results refer to the data provided by the manufacturer. When data are not available, use the data in Table 3

    Perform time travel test, including: (5)

    Measurement the duration of closing and (a) opening time, criteria for passing the opening test maximum 3 cycles at frequency of 60 Hz

    Measurement the time difference between (b) closing and opening phases, among the fastest to late. Criteria for passing the test: maximum 8ms

    Perform insulation test for power supply (6) cable. Criteria for passing the test: minimum 2 megohm with test voltage 500VDC

    Perform CUlTent Transfonner (CT) test, (7) includes turns ratio and saturation curve

    Perform power factor test for all bushing (8) with a maximum value of passing criteria 1%. If the test tenninal is not available ---~ usi~liot colla:r-tesrmethod with a

    (9)

    maximum loss are 100 milli watts

    Make documention for initial inspection (9) and official repOli to the Company, including data from the test result (pass or

    diakses

    Melakukan uji isolasi dan indeks polarisasi dengan alat uji DC, dan mencari penyebab rendahnya isolasi bila ditemukan isolasi yang rendah atau indeks polarisasi tidak memenuhi kriteria kelulusan, mengacu pada tabel I dan tabel2.

    Melakukan pemeriksaan mekanikal mencakup tekanan gas dan kondisi visual (kebocoran pada gasket eksternal dll)

    Melakukan uji tahanan kontak. Kriteria kelulusan hasil uji mengacu kepada data yang disediakan oleh pabrikan. Bila data tidak tersedia, digunakan data pada tabel3

    Melakukan uji time-travel, mencakup :

    Pengukuran durasi waktu penutnpan dan pembukaan, Kriteria kelulusan untnk pembukaan maksimum 3 cycle pada frekuensi 60 Hz

    Pengukuran selisih waktu penutupan dan pembukaan antar fasa, antara yang tercepat dengan terlambat. Kriteria kelulusan maksimum 8ms

    Melakukan uji isolasi terhadap kabel suplai daya. Kriteria kelulusan uji : minimum 2 megaohm, pada tegangan uji DC 500V

    Melakukan uji Current Transformer (CT), mencakup rasio belitan (turn ratio) dan kurva saturasi

    Melakukan uji power factor pada semua bushing dengan kriteria kelulusan maksimum 1%. Bila tenninal uji tidak tersedia maka dilakukan metode-hotcoilar test dengan watt loss maksimum 100 mili watt

    Membuat dokumentasi hasil pemeriksaan awal dan laporan resmi untuk Perusahaan, mencakup data hasil uji yang lulus kriteria

    [T &D High & Medium Voltage Equipment Maintenance Contract No. CWI329093 IU40IDL Indonesia Lac-Inti (Rev9 February 2015) [Inseli for Drafts "Counsel's Initials - Draft DD Month YYYY" and for Finals "Execution Version"] 134

    /

  • (F)

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    not pass)

    Perform maintenance of 4.16 kV or 13.S (F) kV of VCB either indoor or outdoor type. The work will performed at substation. (Job Code: WUR-ll)

    Perform cleaning, repair or replacement of (1) components (eg partitions, insulation rod and bushing) that do not meet the passing criteria for insulation and power factor test until meets the passing criteria

    Perform mechanical maintenance (2) (including lubrication) and electrical and minor repairs when necessary (replacement fuse, terminal connection, cable holes, naming cables, replacement heater, contactor and MCB, wiring, and gaskets). Contractor to provide consumables, includes sandpaper, grease, lube oil, nuts, bolts, cables and connectors

    Perform the replacement bottle interuptor if (3) the components do not meet the criteria of interuptor vacuum integrity test with test voltage is AC (AC hipot test). Interuptor replacement bottles provided by Company

    Perform examination the erosion condition (4) of contact with overtravel examination. When the overtravel exceeds the manufacturer's specifications, the Contractor shall replace interuptor bottle. Company provide a replacement bottle of interuptor

    If the deviation and pumping I bounce still (5) occurs, then Contractor shall repmi to Gompany

    Perform the replacement of cable for (6) power supply if the components do not meet the passing criteria for insulation test. Contractor provides Cable replacement.

    dan tidak lulus

    Melakukan pemeliharaan VCB 4,16 kV atau 13,SkV baik tipe outdoor maupuu indoor. Pekerjaan dilakukan di gardu induk. (Kode Pekerjaan: WUR-ll) Melakukan pembersihan, perbaikan atau penggantian komponen (misal : partisi, rod insulasi dan bushing) yang tidak memenuhi kriteria kelulusan uji isolasi dan power factor sehingga memenuhi kriteria kelulusan

    Melakukan pemeliharaan mekanikal (antara lain pelumasan) dan elektrikal dan bila diperlukan perbaikan minor (penggantian sikring, telminal koneksi, lubang kabel, penamaan kabel, penggantian heater, kontaktor dan MCB, perkabelan, dan gasket). Kontraktor menyediakan bahan habis pakai, mencakup amp las, gemuk, lube oil, mur, baut, kabel dan konektor

    Melakukan penggantian botol interuptor bila komponen tersebut tidak memenuhi kriteria uji integritas interuptor vakum dengan uji tegangan lebih AC (AC hipot test). Botol interuptor pengganti disediakan oleh Perusahaan

    Melakukan pemeriksaan terhadap kondisi erosi pada kontak dengan pemeriksaan overtravel. Bila overtravel telah melebihi spesifikasi pabrik, Kontraktor wajib mengganti botol interuptor. Botol interuptor pengganti disediakan Perusahaan

    Bila penYlmpangan dan pumping Ibonncing masih terjadi, maka Kontraktor

    - wajib-melaporkan---kepada--pihak Perusahaan

    Melakukan penggantian kabel suplai daya apabila komponen terse but tidak memenuhi kriteria kelulusan uji isolasi. Kabel pengganti disediakan oleh

    [T&D High & Medium Voltage Equipment Maintenance Contract No. CWI329093 IU40lDL Indonesia Lac-Inti (Rev9 February 2015) [Insert for Drafts "Counsel's Initials ~ Draft DD Month YYYY" and for Finals "Execution Version"] 7

    MWiryaTypewritten TextWUR-11

  • (7)

    (8)

    (9)

    (10)

    (G)

    (I)

    (2)

    (3)

    (4)

    Perform re-testing for repair and / or (7) replacement of components, for the relevant test items

    Perform AC hipot test with contacts in (8) open and closed condition. Test voltages refer to table 4.

    Perform function test of unit circuit breaker (9) (open and closed)

    Make documentation of maintenance result (10) and official repOlts to Company

    Perform maintenance of 4.16 kV or (G) 13,8kV ACB (Job Code: WUR-12)

    Perform cleaning of bushing that do not (I) meet the passing criteria for insulation and power factor test until meets the passing criteria

    Perform mechanical maintenance (such as (2) lubrication and adjustments to the drive mechanism, spring repair, the jammed mechanism, cleaning dust and carbon from contacts and arcing room ) and electrical and minor repairs when necessary (replacement fuse, terminal connections, cable hole, cables naming, heater replacement, contactor and MCB, wiring, and gaskets). Contractor to provide consumables, includes sandpaper, grease, lube oil, nuts, bolts, cables and connectors

    Contractor shall report to Company if (3) interuptor can not meilhe passing criteria for high voltage AC test.

    If it has found that, the time travel is not (4) simultaneously or show pumping / bounces phenomena. When deviations and pumping / bollnce still occurs, Contractor shall

    Kontraktor.

    Melakukan pengujian ulangan atas hasil perbaikan dan/atau penggantian komponen, terhadap item uji yang relevan

    Melakukan uji tegangan tinggi AC (AC hipot test) dalam kondisi kontak-kontak terbuka dan tertutup. Tegangan uji mengacu pada tabel 4.

    Melakukan uj i fungsi unit circuit breaker (buka dan tutup)

    Membuat dokumentasi hasil pemeliharaan dan laporan resmi untuk Perusahaan

    Melakukan pemeliharaan ACB 4,16kV atau 13,8kV (Kode Pekerjaan : WUR-12)

    Melakukan pembersihan bushing, yang tidak memenuhi kriteria kelulusan uji isolasi dan power factor sehingga memenuhi kriteria kelulusan

    Melakukan pemeliharaan mekanikal (antara lain pelumasan dan adjustment pada mekanisme penggerak, perbaikan pegas, mekanisme yang macet, pembersihan debu dan karbon dari kontak-kontak dan ruangan busur api) dan elektrikal dan bila diperlukan perbaikan minor (penggantian sikring, telminal koneksi, lubang kabel, penamaan kabel, penggantian heater, kontaktor dan MCB, perkabelan, dan gasket). Kontraktor menyediakan bahan habis pakai, mencakup amp las, gemuk, lube oil, mur, baut, kabel dan konektor

    Kontraktor waj ib melaporkan kepada pihak Perusahaan bila interuptor tidakdapat memenuhi kriteria kelulusan uji tegangan tinggi AC.

    B ila ditemukan time travel tidak serempak atau menunjukkan fenomena pumping /bouncing. Bila penyimpangan dan pumping /bouncing masih terjadi,

    [T&D High & Medium Voltage Equipment Maintenance Contract No. CWl329093 IU40IDL Indonesia Lac-Inti (Rev9 February 2015) [Insert for Drafts "Counsel's Initials - Draft DD Month YYYY" and for Finals "Execution Version"} 136

    /

    MWiryaTypewritten TextWUR-12

  • (5)

    (6)

    (7)

    (8)

    (9)

    (II)

    (I)

    (2)

    (3)

    report to Company.

    Perform the replacement of cable for (5) power supply if the components do not meet the passing criteria for insulation test. Contractor provides Cable replacement

    Perform re-testing for repaIr and / or (6) replacement of components, for the relevant test items

    Perform AC hipot test with contacts in (7) open and closed condition. Test voltages refer to table 4.

    Perform function test of unit circuit breaker (8) (open and closed)

    Make documentation of maintenance result (9) and official reports to Company

    Perform maintenance of 44kV GCB, 115 (II) kV GCB or circuit switcher, 230kV GCB. (Job Code: WUR-13, WUR-14, WUR-15, WUR-16)

    Perform cleaning, repair or replacement of (I) components (eg bushing) that do not meet the passing criteria for insulation and power factor test until meets the passing criteria

    Perform mechanical maintenance (2) (including lubrication) and electrical and minor repairs when necessary (replacement fuse, terminal connection, cable holes, naming cables, replacement heater, contactor and MCB, wiring, and gaskets). Contractor to provide consumables, inGludes-sandpaper.,grease,lube-oil,.nuts,. bolts, cables and connectors

    Perform filling SF6 gas when pressure SF6 (3) gas shows below the mllllmum recommendations or based on company

    Kontraktor wajib melaporkan kepada pihak Perusahaan.

    Melakukan penggantian kabel suplai daya apabila komponen tersebut tidak memenuhi kriteria kelulusan UJI isolasi. Kabel pengganti disediakan oleh Kontraktor.

    Melakukan pengujian ulangan atas hasil perbaikan dan/atau penggantian komponen, terhadap item uji yang relevan

    Melakukan uji tegangan tinggi AC (AC hipot test) dalam kondisi kontak-kontak terbuka dan teltutup. Tegangan uji mengacu pada tabel 4.

    Melakukan uji fungsi unit circuit breaker (buka dan tutup)

    Membuat dokumentasi hasil pemeliharaan dan laporan resmi untuk Perusahaan

    Melakukan pemeliharaan GCB 44kV, GCB atau circuit switcher 115kV, GCB 230kV.(Kode Pekerjaan: WUR-13, WUR-14, WUR-15, WUR-16)

    Melakukan pembersihan, perbaikan atau penggantian komponen (misal: bushing) yang tidak memenuhi kriteria kelulusan uji isolasi dan power factor sehingga memenuhi kriteria kelulusan

    Melakukan pemeliharaan mekanikal (antara lain pelumasan mekanisme penggerak) dan perbaikan mlllor bila diperlukan (penggantian sikring, tenninal koneksi, lubang kabel, penamaan kabel, penggantian heater, kontaktor dan MCB, perkabelan, dan gasket). Kontraktor

    .. menyediakan-bahanhabis-pakai,-mencakup ... amp las, gemuk, lube oil, mur, baut, kabel dan konektor

    Melakukan pengisian gas SF6 bila tekanan gas SF6 menunjukkan dibawah rekomendasi minimum atau atas

    [T&D High & Medium Voltage Equipment Maintenance Contract No. CWI329093 IU40lDL Indonesia Loc-Intl (Rev9 FebrualY 2015) [Insert for Drafts "Counsel's Initials - Draft DD Month YYYY" and for Finals "Execution Version"]

    MWiryaTypewritten TextWUR 13,14,15

  • (4)

    (5)

    (6)

    (7)

    (1)

    (I)

    (2)

    (3)

    (4)

    (a)

    (b)

    (5)

    request

    Perform the replacement of cable for (4) power supply if the components do not meet the passing criteria for insulation test. Contractor provides Cable replacement

    Perform AC hipot test with contacts in (5) open and closed condition. Test voltages refer to table 4.

    Perform function test of unit circuit breaker (6) (open and closed)

    Make documentation of maintenance result (7) and official reports to Company

    Perform the initial inspection OCB 13.8 (1) kV (Job Code: WUR-17)

    Perform cleaning on external component of (I) circuit breaker

    Perform insulation test and polarization (2) index with DC test equipment, and analyze the root cause of low values of insulation or polarization index does not meet the passing criteria, refer to Table 1 and Table 2.

    Perform contact resistance test. Criteria for (3) passing the test results refer to the data provided by the manufacturer. When data are not available, use the data in Table 3

    Perform time travel test, including: (4)

    Measurement the duration of closing and (a) opening time, criteria for passing the opening test: maxImum 5 cycles at frequency of 60 Hz

    Measurement the time difference between (b) closing and opening phases, among the fastest to late. Criteria for passing the test: maximum 8ms

    Perform insulation test for power supply (5)

    permintaan perusahaan

    Melakukan penggantian kabel suplai daya apabila komponen tersebnt tidak memenuhi kriteria kelulusan uji isolasi. Kabel pengganti disediakan oleh Kontraktor.

    Melakukan uji tegangan tinggi AC (AC hipot test) dalam kondisi kontak-kontak terbuka dan tertutup. Tegangan UJI mengacu pada tabel 4.

    Melakukan uji fungsi unit circuit breaker (buka dan tutup)

    Membuat dokumentasi hasil pemeliharaan dan laporan resmi untuk Perusahaan

    Melakukau pemeriksaan awal OCB 13,8 kV (Kode Pekerjaan: WUR-17)

    Melakukan pembersihan komponen-komponen eksternal circuit breaker

    Melakukan uji isolasi dan indeks polarisasi dengan alat uji DC, dan mencari penyebab rendahnya isolasi bila ditemukan isolasi yang rendah atau indeks polarisasi tidak memenuhi kriteria kelulusan, mengacu pada tabel 1 dan tabel2.

    Melakukan uji tahanan kontak. Kriteria kelulusan hasil uji mengacu kepada data yang disediakan oleh pabrikan. Bila data tidak tersedia, digunakan data pada tabel 3

    Melakukan uji time-travel, mencakup :

    Pengukuran durasi waktu penutupan dan pembukaan, Kriteria kelulusan: maksimum 5 cycle pada frekuensi 60 Hz

    Pengukuran selisih waktu penutupan dan pembukaan antar fasa, antara yang tercepat dengan terlambat. Kriteria kelulusan maksimum 8ms

    Melakukan uji isolasi terhadap kabel suplai

    [T&D High & Medium Voltage Equipment Maintenance Contract No. CW1329093 IU40 1 DL Indonesia Loc-Intl (Rev9 February 2015) [Insert for Drafts "Counsel's Initials - Draft DD Month YYYY" and for Finals "Execution Version"] 138

    I

    MWiryaTypewritten TextWUR-17

  • (6)

    (7)

    (8)

    (9)

    (J)

    (I)

    (2)

    (3)

    cable. Criteria for passing the test: minimum 2 megohm with test voltage 500VDC

    Perform Current Transfonner (CT) test, (6) includes turns ratio and saturation curve

    Perform power factor test for all bushing (7) with a maximum value of passing criteria 1 %. If the test terminal is not available using hot collar test method with a maximum loss are 100 milli watts

    Perform dismantling of unit for checking (8) the internal components of OCB

    Make documention for initial inspection (9) and official report to the Company, including data from the test result (pass or not pass)

    Perform maintenance of OCB 13.S kV (J) (Job Code: WUR-lS)

    Perform cleaning, repair or replacement of (I) components (eg bushing) that do not meet the passing criteria for insulation and power factor test until meets the passing criteria

    Perform mechanical maintenance (2) (including lubrication) and electrical and minor repairs when necessalY (replacement fuse, terminal connection, cable holes, naming cables, replacement heater, contactor and MCB, wiring, and gaskets). Contractor to provide consumables, inclndes sandpaper, grease, lube oil, nuts, bolts, cables and connectors

    Perform the adjustment of driving (3) mechanism, spring repair, jammed mechanism, inspection and tightening of the legs as well as the support from interuptor unit

    daya. Kriteria kelulusan uji : minimum 2 megaohm, pada tegangan uji DC 500V

    Melakukan uji Current Transformer (CT), mencakup rasio belitan (tum ratio) dan kurva saturasi

    Melakukan uji power factor pada semua bushing dengan kriteria kelulusan maksimum 1 %. Bila tenninal uji tidak tersedia maka dilakukan metode hot collar test dengan watt loss maksimum 100 mili watt

    Melakukan pembongkaran unit untuk pengecekan komponen-komponen internal OCB

    Membuat dokumentasi hasil pemeriksaan awal dan laporan resmi untuk Perusahaan, mencakup data hasil uji yang lulus kriteria dan tidak lulus

    Melakukau pemeliharaan OCB 13,S kV (Kode Pekerjaau : WUR-lS)

    Melakukan pembersihan, perbaikan atau penggantian komponen (misal : bushing) yang tidak memenuhi kriteria kelulusan uji isolasi dan power factor sehingga memenuhi kriteria kelulusan

    Melakukan pemeliharaan mekanikal (antara lain pelumasan mekanisme penggerak) dan perbaikan minor bila diperlukan (penggantian sikring, terminal koneksi, lubang kabel, penamaan kabel, penggantian heater, kontaktor dan MCB, perkabelan, dan gasket). Kontraktor menyediakan bahan habis pakai, mencakup amp las, gemuk, lube oil, mur, baut, kabel dankonektGf--------------- -----

    Melakukan adjustment pada mekanisme penggerak, perbaikan pegas, mekanisme yang macet, pemeriksaan dan pengencangan kaki-kaki serta suppOll dari unit interuptor

    [T&D High & Medium Voltage Equipment Maintenance Contract No. CWI329093 IU40IDL Indonesia Lac-Inti (Rev9 FeblUary 2015) [Insert for Drafts "Counsel's Initials ~ Draft DD Month YYYY" and for Finals "Execution Version"] 139

    /

    MWiryaTypewritten TextWUR-18

  • (4)

    (5)

    (6)

    (7)

    (8)

    (9)

    (10)

    (11)

    (K)

    (I)

    Perform maintenance of moving and static (4) contact on circuit breaker

    Perfonn oil purification in workshop and (5) filling the OCB tank and perform the oil dielectric test according to ASTM D877 with the minimum passing criteria 30 k V

    Perform the replacement of cable for (6) power supply if the components do not meet the passing criteria for insulation test. Contractor provides Cable replacement

    Perform assembly of OCB unit after (7) maintenance is completed

    Perform AC hipot test with contacts in (8) open and closed condition. Test voltages refer to table 4.

    Perform function test of unit circuit breaker (9) (open and closed)

    Perform re-testing for repair and / or (10) replacement of components, for the relevant test items

    Make documentation of maintenance result (11) and official reports to Company

    Perform initial inspection and (K) maintenance of recloser 13.8 kV or 4.16 kV (Job Code: WUR-19)

    Perform insulation test and polarization (I) index with DC test equipment, and analyze the root cause of low values of insulation or polarization index does not meet the

    ----p-a-ssing criterIa, iefeito Table 1 and Table

    (2)

    (3)

    2.

    PerfOllli inspection on external component (2) of recloser

    Perfonn contact resistance test. Criteria for (3) passing the test results refer to the data

    Melakukan pemeliharaan pada kontak bergerak dan kontak diam/statis pada circuit breaker

    Melakukan purifikasi minyak di bengkel kerja dan mengisi kembali ke tangki OCB dan melakukan uji dielektrik minyak berdasarkan ASTM D877 dengan kriteria kelulusan minimum 30 kV.

    Melakukan penggantian kabel suplai daya apabila komponen tersebut tidak memenuhi kriteria kelulusan uji isolasi. Kabel pengganti disediakan oleh Kontraktor.

    Melakukan perakitan unit OCB setelah pemeliharaan selesai dilakukan

    Melakukan uji tegangan tinggi AC (AC hipot test) dalam kondisi kontak-kontak terbuka dan teltutup. Tegangan uji mengacu pada tabel4.

    Melakukan uji fungsi unit circuit breaker (buka dan tutup)

    Melakukan pengujian ulangan atas hasil perbaikan dan/atau penggantian komponen, terhadap item uji yang relevan

    Membuat dokumentasi hasil pemeliharaan dan laporan resmi untuk Perusahaan

    Melakukau Pemeriksaan Awal dan pemeliharaan recloser 13,8 kV atau 4,16 kV (Kode Pekerjaan : WUR-19)

    Melakukan uji isolasi dan indeks polarisasi dengan alat uji DC, dan mencari penyebab rendahnya isolasi bila ditemukan isolasi yang rendah atau indeks polarisasi tidak memenuhi kriteria kelulusan, mengacu pada tabel 1 dan tabel 2.

    Melakukan pemeriksaan external komponen recloser

    Melakukan uji tahanan kontak. Kriteria kelulusan hasil uji mengacu kepada data

    [T &D High & Medium Voltage Equipment Maintenance Contract No. CWI329093 IU40 IDL Indonesia Loc-Int! (Rev9 February 2015) [Insert for Drafts "Counsel's Initials - Draft DD Month YYYY" and for Finals "Execution Version"] 140

    /

    MWiryaTypewritten TextWUR-19

  • (4)

    (a)

    (b)

    (5)

    (6)

    (7)

    (8)

    (9)

    (10)

    (11)

    provided by the manufacturer. When data are not available, use the data in Table 3

    Perform time travel test, including: (4)

    Measurement the duration of closing and (a) opening time, criteria for passing the opening test maximum 5 cycles at frequency of 60 Hz

    Measurement the time difference between (b) closing and opening phases, among the fastest to late. Criteria for passing the test: maximum Sms

    Perform insulation test for power supply (5) cable. Criteria for passmg the test: mmllllum 2 megohm with test voltage 500VDC

    Perform examination of erosion condition (6) of contact with overtravel examination. When overtravel exceeds the manufacturer's specifications, if the indicator is available.

    Perform Current Transformer (CT) test, (7) includes turns ratio and saturation curve

    Perform power factor test for all bushing (8) with a maximum value of passing criteria 1 %. If the test terminal is not available using hot collar test method with a maximum loss are 100 milli watts

    Perform dismantling of unit for checking (9) the internal components of recloser

    Make documention for initial inspection (10) and-official-report-to-the-Company, ___ ._ including data from the test result (pass or not pass)

    Perform cleaning, repair or replacement of (II) components (eg pal1itions, insulation rod and bushing) that do not meet the passing criteria for insulation and power factor test

    yang disediakan oleh pabrikan. Bila data tidak tersedia, digunakan data pada tabel 3

    Melakukan uji time-travel, mencakup:

    Pengukuran durasi waktu penutupan dan pembukaan, Kriteria kelulusan maksimum 5 cycle pada frekuensi 60 Hz

    Pengukuran selisih waktu penutupan dan pembukaan antar fasa, antara yang tercepat dengan terlamba!. Kriteria kelulusan : maksimum 8ms

    Melakukan uji isolasi terhadap kabel suplai daya. Kriteria kelulusan uji : minimum 2 megaohm, pada tegangan uji DC 500V

    Melakukan pemeriksaan terhadap kondisi erosi pada kontak dengan pemeriksaan overtravel. Bila oVeI1ravei telah melebihi spesifikasi pabrik, apabila indikator keausan tersedia.

    Melakukan uji Current Transformer (CT), mencakup rasio belitan (turn ratio) dan kurva saturasi

    Melakukan uji power factor pada semua bushing dengan kriteria kelulusan maksimum 1 %. Bila telminal uji tidak tersedia maka dilakukan metode hot collar test dengan watt loss maksimum 100 mili watt

    Melakukan pembongkaran unit untuk pengecekan komponen-komponen internal recloser

    Membuat dokumentasi hasil pemeriksaan awal .danJaporanxesmLuntuk_l'emsahaan, mencakup data hasil uji yang lulus kriteria dan tidak lulus

    Melakukan pembersihan, perbaikan atau penggantian komponen (misal : partisi, rod insulasi dan bushing) yang tidak memenuhi hiteria kelulusan uji isolasi dan power

    [T &D High & Medium Voltage Equipment Maintenance Contract No. CW1329093 IU40 lDL Indonesia Lac-Inti (Rev9 February 2015) [Insert for Drafts "Counsel's Initials - Draft DD Month YYYY" and for Finals "Execution Version"] 141

    /

  • (12)

    (13)

    (14)

    (15)

    (16)

    (17)

    (18)

    (19)

    until meets the passing criteria

    Perform mechanical maintenance (12) (including lubrication) and electrical and minor repairs when necessary (replacement fuse, terminal connection, cable holes, naming cables, contactor and MCB, wiring, and gaskets). Contractor to provide consumables, includes sandpaper, grease, lube oil, nuts, bolts, cables and connectors.

    Perform the replacement bottle interuptor if (13) the components do not meet the criteria of interuptor vacuum integrity test with test voltage is AC (AC hipot test). Interuptor replacement bottles provided by Company.

    Perform examination the erosion condition (14) of contact with overtravel examination. When the overtravel exceeds the manufacturer's. specifications, the Contractor shall replace interuptor bottle. Company provide a replacement bottle of interuptor

    If the deviation and pumping I bounce still (15) occurs, then Contractor shall report to Company

    Perform the replacement of cable for (16) power supply if the components do not meet the passing criteria for insulation test. Contractor provides Cable replacement

    Perform assembly of recloser unit after (17) maintenance is completed

    Perform the oil dielectric test according to (18) ASTM D877 with the minimum passing criteria 30 kV

    Perform AC hipot test with contacts in (19) open and closed condition. Test voltages refer to table 4.

    factor sehingga memenuhi kriteria kelulusan

    Melakukan pemeliharaan mekanikal (antara lain pelumasan) dan elektrikal dan bila diperlukan perbaikan minor (penggantian sikring, terminal koneksi, lubang kabel, penamaan kabel, kontaktor dan MCB, perkabelan, dan gasket). Kontraktor menyediakan bahan habis pakai, mencakup amplas, mur, baut, kabel dan konektor.

    Melakukan penggantian botol interuptor bila komponen terse but tidak memenuhi kriteria uji integritas interuptor vakum dengan uji tegangan lebih AC (AC hipot test). Botol interuptor pengganti disediakan oleh Perusahaan.

    Melakukan pemeriksaan terhadap kondisi erosi pada kontak dengan pemeriksaan overtravel. Bila overtravel telah melebihi spesifikasi pabrik, Kontraktor wajib mengganti botol interuptor. Botol interuptor pengganti disediakan Perusahaan

    Bila penyimpangan dan pumping Ibouncing masih terjadi, maka Kontraktor wajib melaporkan kepada pihak Perusahaan

    Melakukan penggantian kabel suplai daya apabila komponen tersebut tidak memenuhi kriteria kelulusan uji isolasi. Kabel pengganti disediakan oleh Kontraktor.

    Melakukan perakitan unit recloser setelah pemeliharaan selesai dilakukan

    Melakukan uji dielektrik minyak berdasarkan ASTM D877 dengan kriteria kelulusan minimum 30 kV

    Melakukan uji tegangan tinggi AC (AC hipot test) dalam kondisi kontak-kontak terbuka dan tertutup. Tegangan uji

    [T &D High & Medium Voltage Equipment Maintenance Contract No. CWI329093 IU40lDL Indonesia Loc-Intl (Rev9 February 2015) [Insert for Drafts "Counsel's Initials - Draft DD Month YYYY" and for Finals l'Execution Version"] , 142

    /

  • (20) Perfonn re-testing for repair and I or (20) replacement of components, for the relevant test items

    (21) Perform function test of unit recloser (open (21) and closed)

    (22) Make documentation of maintenance result (22) and official reports to Company.

    (L)

    (I)

    (2)

    (3)

    (4)

    (5)

    Monthly WO for 1 Relay Specialist (Job (L) Code: WUR-20)

    In this work item, Contractor provides I (I) Relay Specialist with working hours following normal Company working hours.

    This work item is counted in lump sum (2) basis with montly payment.

    If Contractor could not fulfill the personel (3) of this work item for I month full, then payment from Company to Contractor will be pro rate based on number of days.

    If Company requests this personel to work (4) out of Company's normal working hour, then Company will pay using manhours rate only for additional working out of normal working hours.

    On this WO, cost paid by Company is (5) including items to be provided by Contractor, so the Company may ask Contractor to perform the work using Contractor's eguiRment as 10nK~ ____ _ mentioned on Items to be provided by Contractor as listed on Article 8 in this Exhibit.

    mengacu pada tabel4.

    Melakukan pengujian ulangan atas hasil perbaikan dan/atau penggantian komponen, terhadap item uji yang relevan

    Melakukan uji fungsi unit recloser (buka dan tutup)

    Membuat dokumentasi hasil pemeliharaan dan laporan resmi untuk Perusahaan.

    SPK Bulanan untuk 1 orang Relay Specialist (Kode Pekerjaan : WUR-20)

    Pada item pekerjaan ini, Kontraktor . menyediakan I orang Relay Specialist untuk Perusahaan dengan jam kelja mengikutijam kerja nonnal Perusahaan.

    Item pekerjaan ini dihitung secara lump sum dengan pembayaran bulanan.

    Jika Kontraktor tidak dapat memenuhi personil pekerjaan ini full dalam sebulan, maka pembayaran Perusahaan kepada Kontraktor akan di pro rate berdasarkan jumlah hari.

    Jika Perusahaan meminta personil ini untuk bekerja di luar jam kelja normal Perusahaan, maka Perusahaan akan membayar dengan manhours rate untuk tambahan jam kerja di luar jam kerja normal.

    Dalam SPK ini, biaya yang dibayarkan oleh Perusahaan termasuk hal-hal yang perlu disediakan oleh Kontraktor, sehingga Perusahaan dapat meminta Kontraktor mengeri.ak,'n_pekeljaan_ dengan J,eralatan Kontraktor selama tennasukdalam Hal-hal yang perlu disediakan oleh Kontraktor sebagaimana tercantum dalam Pasal 8 pada Lampiran ini.

    [T &D High & Medium Voltage Equipment Maintenance Contract No. CW1329093 IU40lDL Indonesia Loc-Intl (Rev9 February 2015) [Insert for Drafts "Counsel's Initials - Draft DD Month YYYY" and for Finals "Execution Version"] 143

    /