Today’s MeetingToday’s Meeting

• Program Update• Point Place• River Road• Bay View Wastewater Treatment Plant

• Long Term Control Plan

• Next Meeting

Page 3: CPAC Meeting 6-12-06

Point PlacePoint Place

• Working in area since 2003

• Ottawa River Pump Station

• Edgewater Pump Station

• Force main, gravity sewer installation

Page 4: CPAC Meeting 6-12-06

Point PlacePoint Place

• Final phase of project completed in May

• Restoration now underway

• Overflows will no longer occur in this area

Page 5: CPAC Meeting 6-12-06

Point Place – Point Place – Edgewater Pump StationEdgewater Pump Station

Page 6: CPAC Meeting 6-12-06

Point Place – Point Place – Edgewater DriveEdgewater Drive

Page 7: CPAC Meeting 6-12-06

Point Place –Point Place –Pump Station DemolitionPump Station Demolition

Page 8: CPAC Meeting 6-12-06

Point Place –Point Place –290290thth Street Pump Station Street Pump Station

Page 9: CPAC Meeting 6-12-06

River RoadRiver Road

• Underground Equalization Basin – River Road Park

• Underground Pump Station – River Road Park

• New Force Main Sewer – Brookford Drive

• New Relief Sewer– Beverly and River Road

• Beverly Pump Station – West of Trail

Page 10: CPAC Meeting 6-12-06

River Road Area –River Road Area –River Road ParkRiver Road Park

Page 11: CPAC Meeting 6-12-06

River Road Area –River Road Area –River Road ParkRiver Road Park

Page 12: CPAC Meeting 6-12-06

River Road Area –River Road Area –River Road ParkRiver Road Park

Page 13: CPAC Meeting 6-12-06

River Road Area –River Road Area –Beverly DriveBeverly Drive

Page 14: CPAC Meeting 6-12-06

BVWWTPBVWWTP

• EQ Basin• Will be completed in February 2007

• Ballasted flocculation• Will be completed this fall

• Grit facility• Will be completed this fall

• Chlorination• Will be completed this fall

Page 15: CPAC Meeting 6-12-06

BVWWTPBVWWTP

• Water tower• Construction completed to base of bowl• Will most likely be off-white, with ‘Toledo’ in red

or black script• About 193 feet tall

Page 16: CPAC Meeting 6-12-06

Bay View Wastewater Bay View Wastewater Treatment PlantTreatment Plant

Page 17: CPAC Meeting 6-12-06

Bay View Wastewater Bay View Wastewater Treatment PlantTreatment Plant

Page 18: CPAC Meeting 6-12-06

Bay View Wastewater Bay View Wastewater Treatment PlantTreatment Plant

Page 19: CPAC Meeting 6-12-06

Bay View Wastewater Bay View Wastewater Treatment PlantTreatment Plant

Page 20: CPAC Meeting 6-12-06

LTCPLTCP

• EPA will be in Toledo June 29th