29
Special Topics 2017 February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction with Power Utility Systems

Upload: others

Post on 26-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Special Topics

2017

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1

Period 2

CP Interaction with Power Utility Systems

Page 2: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Agenda

• Utility and CP system orientation

• Utility neutral interaction

• Examples of unintended interactions (interference?) between the two

February 21-23, 2017

2017 Underground Corrosion Short Course Special Topics – Period 3

Jay Warner Dairyland Electrical Industries, Inc. 2

Page 3: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

System Orientation

• Power utility and customer grounding systems are bonded together by default.

• Your facility and all other power co customers are connected together.

• CP systems and utility systems exist in the same environment.

• Let the fun begin…

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

3

Page 4: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Power/CP Proximity Case

House

Impressed anode bed

Rectifier and phone pedestal

Power feeds

Pipeline

Distribution power line

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

4

Page 5: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Power/CP Proximity Case

What CP current distribution would you expect?

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

5

Page 6: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Current Distribution Effects

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

What CP current distribution would you expect?

6

Page 7: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Current Distribution Effects

Resulting current flow

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

7

Page 8: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Current Distribution Effects

Pickup

Discharge

Image Credit: Keith Boswell, National Pipeline Service

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

8

Page 9: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Result on Phone Pedestal

Image Credit: Keith Boswell, National Pipeline Service

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

9

Page 10: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Result on Guy Wire Anchor

Image Credit: Keith Boswell, National Pipeline Service

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

10

Page 11: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Power Utility Systems

HV Phase

Utility Neutral

Neutral ground

Ground rod

Utility neutral is grounded once every several poles and at services.

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

11

Page 12: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Currents on Power Utility Systems

HV Phase

Utility Neutral

Grounding system and utility neutral interaction.

VOLTAGE GRADIENT

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

12

Page 13: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Currents on Power Utility Systems

HV Phase

Utility Neutral

Grounding system and utility neutral interaction, plus customer neutral.

Phone Co Bond

VOLTAGE GRADIENT

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

13

Page 14: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

f

Current on all Systems

Utility and customer neutral pickup.

Utility neutral pickup/discharge

Customer neutral pickup /discharge

Customer 1

Customer 2

Bond discharge

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

14

Page 15: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Current at Discharge Points

Phone bond

Customer neutralRectifierN

G

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

15

Page 16: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Utility Transformer Connections

Utility neutral

Neutral grounding lug

X0X1 X2

Customer neutral

X0 = Customer neutral bushing

Neutral ground strap

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

16

Page 17: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Utility Transformer Connection Currents

Utility neutral

Neutral grounding lug

X0X1 X2

Customer 1 neutralCustomer 2 neutral

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

17

Page 18: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Decoupling at Transformer

Neutral ground strap removed

Decoupler

Decoupler connected between isolated X0 (customer neutral) bushing and tank ground (utility neutral). Negative to customer side and positive to utility side.

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

18

Page 19: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Decoupling at Transformer

What effect does decoupler have when two customers are served by one transformer?

Customer Neutral 1

Customer Neutral 2

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

19

Page 20: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Decoupling at Transformer

Both customers’ neutrals, and therefore grounding systems, remain common. The decoupler separates both from the utility neutral but not from each other.

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

20

Page 21: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

f

Current Split with DecouplingEven with decoupler at transformer, current flow separates into two paths, but not eliminated.

Utility neutral pickup/discharge

Customer neutral pickup /discharge

Customer 1

Customer 2

Bond discharge

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

21

Page 22: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Example: Utility Proximity

House with water well

Discharge from guy anchors, power line grounds, water well. Neutrals tied at transformer, allows CP flow

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

22

Page 23: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Example: City Water Well

Well with pump

Equipment grounding conductor

N

G

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

23

Page 24: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Distribution AC Return

N

G

To AC Source

All currents shown are AC

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

24

Page 25: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Distribution AC Return

AC neutral current (actually bi-directional) flows on neutral wire and all parallel grounded paths. Why? The neutral is grounded at many points.

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

25

Page 26: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Distribution AC Return

N

GTo AC Source

All currents shown are AC

Corrosion?

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

26

Page 27: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Special Blocking Device Required

N

GTo AC Source

DC and AC blocking device

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

27

Page 28: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Special Blocking Device Required

• Normal decouplers block DC, pass AC to accomplish induction mitigation and continuity.

• Corrosion related to AC return current requires AC (and DC) blocking device. Standard decoupler would have no effect.

• Structure may have CP and need DC isolation (or prevent galvanic cell creation).

• AC discharge may prevent proper polarization film on well pump surface, allowing active corrosion and shortened life of only months to several years.

February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc.

2017 Underground Corrosion Short Course Special Topics – Period 3

28

Page 29: CP Interaction with Power Utility Systemscorrosionshortcourse.com/2017 slides/2017 UCSC...February 21-23, 2017 Jay Warner Dairyland Electrical Industries, Inc. 1 Period 2 CP Interaction

Summary

• Utility structures and CP systems live in the same space.

• There will always be interaction between the two.

• Non-obvious connections between utility systems and other systems.

• Consider if orientation, bonding, current magnitudes/concentration are a concern.

Questions? Contact [email protected]