cover ltd. - brochure zbiorniki

Upload: wonnykot

Post on 06-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/3/2019 COVER Ltd. - Brochure Zbiorniki

    1/19

    COVER EUROENGINEERING Ltd. is a Services Company performingcorrosion protection works. The companys expertise includes steel andconcrete constructions of large-size industrial objects.

    COVER EUROENGINEERING Ltd. is currently a leader on the Polishcorrosion protection market. The Company's success results from longexperience, professional knowledge of the engineering staff, the bestavailable equipment as well as state of the art coating systems.

    Projects are performed according to individual needs, on time,professionally and basing on the newest technological solutions with no

    compromise to quality.

    COVER EUROENGINEERING Ltd. stands for a lifelong guarantee.

    www.cover-euroengineering.eu 1

  • 8/3/2019 COVER Ltd. - Brochure Zbiorniki

    2/19

    - Contents -

    Profile 3Storage 3Chemical units and plants 4Bridges and plates 4Ships 5Stacks and cooling towers 5Power pylons 6Sewage treatment plant 6Structure protection with fire-resistant substances 7

    Exemplary projects 8Project I 8Project II 9Quality policy 10Mission 11Technical equipment 12List of references 14Company structure 16Contact 17Notes 18

    - Profile -

    www.cover-euroengineering.eu 2

  • 8/3/2019 COVER Ltd. - Brochure Zbiorniki

    3/19

    We specialize in performing corrosion protections of large-sizeindustrial objects which are exposed to various corrosion hazards,for example:

    1. Load-bearing structures of bridges and viaducts2. Steel and concrete orthotropic plates of bridges and

    viaducts - insulations under asphalt pavements3. Underground storage tanks and reservoirs as well as

    ground-based tanks for liquid fuels and crude oil4. Tanks and reservoirs for aggressive chemicals5. Monitoring systems of the tightness of storage tanks and

    reservoirs6. Funnels and chimney stacks7. Exhaust gas channels with desulphurization systems8. Cooling water pipelines9. Overhead transmission line supports (power pylons)10.Public facilities and edifices - covering with fireproof

    materials11. Construction of halls of industrial facilities12. Sewage treatment plants13. Steel and concrete structures of chemical and

    petrochemical units and plants14.Hulls, holds, decks and superstructures of ships15. Railway and road rolling stock

    The technological supervision over all corrosion protection worksis carried out by inspectors leased by materials manufacturers. The internal supervision over executed works is done by anauthorized COVER EUROENGINEERING's employee holding highprofessional qualifications. All works are executed according torequirements of the Building Law as well as EnvironmentalProtection Law.

    1 - Storage

    Within the complex repair and overhaul of storage tanks forpetroleum, fuel, chemicals, water and others, we carry out:

    1. technical expertise2. construction works3. electrical works4. steel works5. anticorrosion works including inner and outer surface

    protection.

    We also conduct lamination of tanks and install leak-tightnessmonitoring systems. Tanks equipped with our GP monitoringsystem meet all current requirements set (among others) by theEuropean Parliament and Council Directive 94/63/EC of 20December 1994 on the control of volatile organic compound(VOC) emissions resulting from the storage of petrol and itsdistribution from terminals to service stations.

    www.cover-euroengineering.eu 3

  • 8/3/2019 COVER Ltd. - Brochure Zbiorniki

    4/19

    2 - Chemical units and plants

    We protect steel and concrete constructions based on cleaning the

    surface by sand-blasting or manual cleaning and painting themwith color sets individually applied to the chemical environmentthe plant operates in. We also dispose of a wet sand-blastingsystem that allows safe conducting of works during theinstallations movement.

    3 Bridges: load-bearing structures and orthotropicplates

    1. corrosion protection of steel and concrete structures ofbridges

    2. insulation of orthotropic steel plates under the asphaltlayers

    3. insulation of reinforced concrete slabs under the asphaltlayers

    All materials and products used by COVER EUROENGINEERINGLtd. have appropriate technical and quality certificates issued bythe Institute of Roads and Bridges.

    We execute all works regardless of the weather conditions using

    a tent coverage and, should it be necessary, high efficiency airheaters and air conditioners.

    www.cover-euroengineering.eu 4

  • 8/3/2019 COVER Ltd. - Brochure Zbiorniki

    5/19

    4 - Ships

    Corrosion protection works on ships require full speed of workand the highest quality performance. Only companies with

    highly-efficient equipment for preparing the surface andapplying the paint can meet these criteria. COVEREUROENGINEERING Ltd. is one of the best in this branch. We areproud of our active cooperation with local and foreign shipsoperators and shipyards.

    5 - Stacks and cooling towers

    1. technical assessment of stacks/tower blankets, including: non-destructive thickness measurement sclerometrical assessment infrared mapping photographs

    2. filling of cracks and cavities in the surface of concreteblankets

    3. completion and sealing of ceramic furnace lining4. assembly and repairs of electrical fixtures and fittings5. reinforcement of the construction of stacks and cooling

    towers6. maintenance and repair works of stacks guy-ropes7. disassembly and demolition of steel and concrete stacks8. cleaning the industrial deposits of stacks inner and outer

    surfaces9. inner insulation of stacks operating in the system of flue

    gas desulphurization10. thermal insulation of stacks

    www.cover-euroengineering.eu 5

  • 8/3/2019 COVER Ltd. - Brochure Zbiorniki

    6/19

    6 - Power pylons

    1. construction works repairs and filling of the concrete foundations corrosion protection of the concrete foundations

    2. anticorrosion works cleaning the steel structure of pylons painting painting with warning colours

    7 - Sewage treatment plant

    The chemical environment of the systems of bioreactors requirestaking additional safety measures and a great deal of specialist

    knowledge while performing corrosion protection works. Onlynon-solvent HS (hot sprayed) substances are resistant to thekind of corrosion that can be found in sewage treatment plantsand guarantee very long periods of their proper operation.COVER EUROENGINEERING Ltd. has got considerable experiencein this matter.

    www.cover-euroengineering.eu 6

  • 8/3/2019 COVER Ltd. - Brochure Zbiorniki

    7/19

    8 - Structure protection with fireproofing materials

    Protection with fire resistant substances:

    1. steel structures2. wooden structures3. electrical cables

    Steel structure of an air-shed protected with fire resistantsubstances.

    The steel structure of the arrival hall of the International Airportin Kuala Lumpur protected with fire resistant substances.

    www.cover-euroengineering.eu 7

  • 8/3/2019 COVER Ltd. - Brochure Zbiorniki

    8/19

    - Exemplary projects -

    I. Insulation of an orthotropic plate and a load-bearing structure of the bridge "Legionw Marszalka J.Pilsudskiego" over the Vistula river in Plock

    www.cover-euroengineering.eu 8

  • 8/3/2019 COVER Ltd. - Brochure Zbiorniki

    9/19

    II. Assembly of storage tanks in Rejowiec Poznaski

    www.cover-euroengineering.eu 9

  • 8/3/2019 COVER Ltd. - Brochure Zbiorniki

    10/19

    www.cover-euroengineering.eu 10

  • 8/3/2019 COVER Ltd. - Brochure Zbiorniki

    11/19

    - Quality policy -

    www.cover-euroengineering.eu 11

  • 8/3/2019 COVER Ltd. - Brochure Zbiorniki

    12/19

    Our policy in terms of quality reflects the companys main goals andcorresponds to established quality rules, which are focused onmeeting our customers' expectations.Knowing the quality policy is obligatory for every member of our staff.

    We have been striving to reach quality and economic objectives byimplementing innovations while taking the following actions:

    1. constant increase of quality awareness by introducing propermanagement policies in all areas of activity

    2. introducing optimized staff training and motivation systems3. cost reduction4. work efficiency in all areas of our activity5. ensuring good cooperation standards with our business

    partners6. systematic control and overview of quality tasks and objectives

    - Mission -

    www.cover-euroengineering.eu 12

  • 8/3/2019 COVER Ltd. - Brochure Zbiorniki

    13/19

    "We have been working hard to be where we are as the leader in the Polishcorrosion protection market serving industry with the highest quality and

    latest technologies thus ensuring safety for newly erected as well as existingplants and machinery. By extending the lifespan of steel and concretestructures we have been helping to protect the original work from beingwasted".

    "We have been eager to provide services to any business entities subject tosteel and concrete corrosion hazards, working for the sake of specificindustry and society as a whole".

    "We have been doing our best to stay renowned for quality, promptperformance and strict fulfillment of contractual obligation. We have beencoming up with solution when facing problems".

    - Technical equipment -

    1 High efficiency devices for closed-circuit shot-blasting of steel and concrete surfaces - by BLASTRAC 2 pieces

    www.cover-euroengineering.eu 13

  • 8/3/2019 COVER Ltd. - Brochure Zbiorniki

    14/19

    2 High-pressure water devices up to 1800 bars - made by WOMA 1 piece

    3 Compressor stations made by INGERSOLL - RAND XP900 25m/min. of air at 10 bar pressure 10 pieces

    4Each compressor station, to get sandblasting air of the highest quality, is equipped with an additional equipment in theform of an air radiator of 25m/min. plus an equalizing tank of 2.5 m with accessories 10 pieces

    5 Water-hydraulic slurry blaster - made by AQUABLAST 8 pieces

    6 Power generators PETBOW 100 kW 2 pieces

    7 Large sandblasting multiple-station sets of 3 to 8 tonnes of capacity 8 pieces

    8 Silos for storing bulk abrasive material of 20 to 40 tonnes 6 pieces

    9Thousands of meters of air hoses as well as high quality hoses for sandblasting together with fixtures with the possibility tohook up abrasive material to sandblasting nozzles without considerable losses. This enables to obtain a very good profile ofthe sandblasted surface from 50 to 8Oum.

    10 Pneumatic and mechanical equipment for unloading and loading the abrasive material

    11Full protective equipment for 30 sandblasters (helmets, overalls, air-filters, air conditioners for breathing) - made byCLEMCO

    12

    Equipment for air-conditioning of facilities from inside or under a tent made by MUNTERS; efficiency: 10.000 m3/h of dry air.

    This equipment enables to execute anticorrosion works of the highest standard regardless of the year season orweather/climatic conditions 3 pieces

    13Air heaters of large efficiency, used in the autumnwinter period, including two heaters of 80.000 m hot air of 90 Celsiusdegrees

    5 pieces

    14 Production and construction site back-up containers 20 pieces

    15Scaffolding:- 30.000 m of module scaffolding (RUX type)- 20.000 m of exterior scaffolding (RUX type)

    16 Big industrial hoovers by VIBRAMAT VACUM AB and SOLAR & POLAN 6 pieces

    17 Painter's hydrokinetic pumps made by WIWA WAGNER for hot-spraying of heavy paints 10 pieces

    18

    Full electric equipment of the construction site:- high voltage cables- electrical switch-boards of various size- petty electrical equipment

    19 Devices for metal spraying made by METALLISATION 4 pieces

    20 Painter's devices for spraying two-component hot paints with gelation time up to 10 seconds 1 piece

    21 Petty technical equipment - pumps, ventilators, conveyor belts, etc.

    www.cover-euroengineering.eu 14

  • 8/3/2019 COVER Ltd. - Brochure Zbiorniki

    15/19

    22 Heavy transportation vehicles, vans and passenger cars 8 pieces

    23 WIWA DUOMIX 333 PFP - a high efficiency application unit for intumescent fireproofing CHARTEK material 1 piece

    - List of references -

    1. PERN PRZYJA POCK (Crude Oil Operations Pipeline Company) - Storage tanks V 12500-50000 m3, 37 pieces (area 525000 m2)

    2. NAFTOBAZY WARSZAWA (oil wholesale bases) - Storage tanks V 50-32000 m3, 60 pieces (area 152000 m2)

    3. OKRGOWA DYREKCJA CPN GDASK (District Oil Products Distribution Company) - Storage tanks V 1000-20000 m3, 16 pieces (area 81000 m2)

    4. OKRGOWA DYREKCJA CPN BYDGOSZCZ (District Oil Products Distribution Company) - Storage tanks V 500-20000 m3, 15 pieces (area 43700 m2)

    www.cover-euroengineering.eu 15

  • 8/3/2019 COVER Ltd. - Brochure Zbiorniki

    16/19

    5. OKRGOWA DYREKCJA CPN D (District Oil Products Distribution Company) - Storage tanks V 100-5000 m3, 20 pieces (area 35000 m2)

    6. OKRGOWA DYREKCJA CPN WROCAW (District Oil Products Distribution Company) - Storage tanks V 100-5000 m3, 15 pieces (area 27000 m2)

    7. OKRGOWA DYREKCJA CPN SZCZECIN (District Oil Products Distribution Company) - Storage tanks V 1000-2000 m3, 25 pieces (area 14300 m2)

    8. OKRGOWA DYREKCJA CPN KIELCE (District Oil Products Distribution Company) - Storage tanks V 100-5000 m3, 5 pieces (area 10300 m2)

    9. OKRGOWA DYREKCJA CPN POZNA (District Oil Products Distribution Company) - Storage tanks V 100-20000 m3, 9 pieces {area 5400 m2)

    10.DYREKCJA EKSPLOATACJI CYSTERN WARSZAWA (Rail Cars Operations Company) - Oil products rail cars, 340 pieces {area 20000 m2)

    11.The Polish Army - Storage tanks V 250-2000 m3, 19 pieces (area 15600 m2)

    12.BAZA PALIW 'SOLO' SZCZECIN (Fuels Wholesale Base "Solo") - Storage tanks V 1000-2000 m3, 8 pieces (area 9000 m2)

    13.PKN ORLEN POCK (Polish Oil Company "ORLEN") - Storage tanks V 1000-2000 m3, 3 pieces (area 6500 m2)

    14.OLPP LTD - Storage tank V 1000m3, Fuel Base in Koluszki

    15.ZAKADY AZOTOWE TARNW (Nitrogen Production Works) - Rail cars, 30 pieces (area 1500 m2)

    16.ROBOKOP GDASK - Holds, decks, above and under water body of sea ships (area 180000 m2)

    17.OKRGOWE DYREKCJE CPN (District Oil Products Distribution Head Offices) - Tanks at filling stations V 32-100 m3, 60 pieces (area 4000 m2)

    18.SEWAGE TREATMENT PLANT in WARSAW - Settling tank (area 2000 m2)

    19.CHEMICAL WORKS in ABUKAMASH, Libya - Construction of a chemical plant (area 15000 m2)

    20.FABRYKA LEVIS POCK ("LEVIS" Clothing Company) - Elevation of the production facility (area 5000 m2)

    21.POWER PLANT in BECHATW - Flue gas channels (area 1800 m2)

    22.POWER PLANT in KOZIENICE - Concrete surfaces of the cooling tower + cooling water pipelines for 500 MW power units (area 8800 m2)

    23.POLSKIE SIECI ENERGETYCZNE KATOWICE (Polish Power Grids) - Constructions of power pylons (area 150000 m2)

    24.WDDiM POCK - Orthotropic plate in the bridge over the Vistula river in Plock (area 5500 m3)

    25.HANNOVER, GERMANY - A bridge (area 8000 m2)

    26.ZACHODNIA DOKP (Western Area Railway Head Office) - A railway bridge (area 6000 m2)

    27.THE POLISH ARMY - A steel bridge (area 6000 m2)

    28.GDDiM ODDZIA in LUBLIN - A steel structure of a bridge over the Wieprz river (area 10500 m2)

    29.WDDiM POCK - Technical assessment of the bridge over the Vistula river in Plock

    30. INTERBUD-CHEM BYDGOSZCZ - Orthotropic plate in the new bridge over the Vistula river in Plock (area 3000 m2)

    31.MOSTOSTAL PUAWY S.A. - steel bridge construction over the Vistula river in Plock (area 25000 m2)

    32.MOSTOSTAL PUAWY S.A. - steel bridge construction over the Vistula river in Pulawy (area 25000 m2)

    33.MOSTOSTAL WARSZAWA S.A. - steel bridge construction over the Vistula river in Warsaw (area 44000 m2)

    34.PKP ENERGETYKA - steel bridge construction over the Vistula river in Tczew

    www.cover-euroengineering.eu 16

  • 8/3/2019 COVER Ltd. - Brochure Zbiorniki

    17/19

    35.BYDGOSZCZ BREWERY - Fermentating vats (area 2600 m2)

    36.BIAYSTOK BREWERY - Fermentating vats (area 2200 m2)

    37.ABB KIRISHI LUMMUS GLOBAL B.V. Air heaters KIRISHI Hydrocracker Complex (area 6 500 m2)

    38.NAFTOBAZY WARSZAWA Storage tanks V 10 000 m, 3 pieces (area 30 000 m2)

    39.GRUPA OFFSHOROWA SINGLE BUOY MOORNINGS Corrosion protection of clamps for underwater pipelines (1120 pieces)

    - Company structure -

    Major company:

    www.cover-euroengineering.eu 17

  • 8/3/2019 COVER Ltd. - Brochure Zbiorniki

    18/19

    Chairman Bogdan GRABOWIEC

    Subsidiary companies:

    - Contact -

    www.cover-euroengineering.eu 18

    Chairman Mateusz SZYMASKI Chairman Wojciech MELENTOWICZChairman Wiesaw KONIECZNY

  • 8/3/2019 COVER Ltd. - Brochure Zbiorniki

    19/19

    COVER EUROENGINEERING Ltd.

    Armii Krajowej 20/8, 09-410 Plock, Polandtel: +48 24 268 50 05, fax: +48 24 264 20 54

    office @covereuro.eu www.cover-euroengineering.eu

    - Notes -

    www.cover-euroengineering.eu 19